CN107576026A CN201710729148.2A CN201710729148A CN107576026A CN 107576026 A CN107576026 A CN 107576026A CN 201710729148 A CN201710729148 A CN 201710729148A CN 107576026 A CN107576026 A CN 107576026A
Authority
CN
China
Prior art keywords
air requirement
resh air
blower fan
resh
new blower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710729148.2A
Other languages
Chinese (zh)
Inventor
李波
许永锋
熊美兵
万永强
舒文涛
钱小龙
陈汝锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea HVAC Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710729148.2A priority Critical patent/CN107576026A/en
Publication of CN107576026A publication Critical patent/CN107576026A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a kind of fresh air quantity control method of new blower fan, this method includes:When receiving start-up command, the initial resh air requirement of user's setting is obtained, and indoor moving terminal signaling quantity information is obtained at interval of preset time;Target resh air requirement is determined according to the mobile terminal signal quantity information;The target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, obtain comparison result, and the output resh air requirement of new blower fan is controlled according to the comparison result, wherein, the default resh air requirement threshold value includes preset upper limit resh air requirement and pre-determined lower limit resh air requirement.The invention also discloses a kind of new blower fan and computer-readable recording medium.The optimal resh air requirement for being according to demand the invention enables the resh air requirement of new blower fan and exporting, so as to lift Consumer's Experience, can also reach the purpose of reasonable energy utilization.

Description

Fresh air quantity control method, new blower fan and the computer-readable recording medium of new blower fan
Technical field
The present invention relates to new blower fan technical field, more particularly to a kind of fresh air quantity control method of new blower fan, new blower fan and Computer-readable recording medium.
Background technology
New blower fan is the equipment in air-conditioning on-line system, the air of outdoor can be carried out filtration treatment and be transported to room It is interior, so as to give indoor offer fresh air.But the new blower fan of majority at present in industry can not be adjusted according to the demand of interior Rational resh air requirement is exported, thus comfortableness is bad.
The above is only used for auxiliary and understands technical scheme, does not represent and recognizes that the above is existing skill Art.
The content of the invention
It is a primary object of the present invention to provide a kind of fresh air quantity control method of new blower fan, new blower fan and computer-readable Storage medium, it is intended to which rational fresh air can not be exported according to the demand regulation of interior by solving the new blower fan of the majority in current industry Amount, thus the technical problem that comfortableness is bad.
To achieve the above object, the present invention provides a kind of fresh air quantity control method of new blower fan, and methods described includes:
When receiving start-up command, the initial resh air requirement of user's setting is obtained, and interior is obtained at interval of preset time Mobile terminal signal quantity information;
Target resh air requirement is determined according to the mobile terminal signal quantity information;
The target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, obtains comparing knot Fruit, and according to the output resh air requirement of the new blower fan of comparison result control, wherein, the default resh air requirement threshold value is included on default Limit resh air requirement and pre-determined lower limit resh air requirement.
Alternatively, described the step of obtaining indoor moving terminal signaling quantity information at interval of preset time, includes:
The indoor moving terminal signaling quantity information of outdoor machine of air-conditioner transmission is obtained at interval of preset time, wherein, the sky Outer machine is adjusted to be used for the indoor moving terminal signaling for receiving air-conditioning internal machine and the collection of new blower fan, and it is whole according to the indoor moving received Mobile terminal signal quantity information is calculated in end signal.
Alternatively, described the step of determining target resh air requirement according to the mobile terminal signal quantity information, includes:
Occupancy information is determined according to the mobile terminal signal quantity information;
Target resh air requirement is calculated according to the occupancy information.
It is alternatively, described that the target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, The step of obtaining comparison result, and controlling the output resh air requirement of new blower fan according to the comparison result includes:
If the target resh air requirement is more than initial resh air requirement, the initial resh air requirement is carried out with preset upper limit resh air requirement Compare;
If the initial resh air requirement is equal to preset upper limit resh air requirement, new blower fan is controlled to keep initial resh air requirement as output Resh air requirement.
Alternatively, if the target resh air requirement is more than initial resh air requirement, by the initial resh air requirement with presetting Also include after the step of limit resh air requirement is compared:
If the initial resh air requirement is not equal to preset upper limit resh air requirement, by the target resh air requirement and preset upper limit fresh air Amount is compared;
If target resh air requirement is less than preset upper limit resh air requirement, new blower fan is controlled to be adjusted resh air requirement is exported to target fresh air Amount;
If target resh air requirement is more than or equal to preset upper limit resh air requirement, new blower fan is controlled to be adjusted resh air requirement is exported to pre- If upper limit resh air requirement.
It is alternatively, described that the target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, The step of obtaining comparison result, and controlling the output resh air requirement of new blower fan according to the comparison result also includes:
If the target resh air requirement is less than initial resh air requirement, the initial resh air requirement is carried out with pre-determined lower limit resh air requirement Compare;
If the initial resh air requirement is equal to pre-determined lower limit resh air requirement, new blower fan is controlled to keep initial resh air requirement as output Resh air requirement.
Alternatively, if the target resh air requirement is less than initial resh air requirement, by the initial resh air requirement with setting in advance Also include after the step of limit resh air requirement is compared:
If the initial resh air requirement is not equal to pre-determined lower limit resh air requirement, by the target resh air requirement and pre-determined lower limit fresh air Amount is compared;
If target resh air requirement is more than pre-determined lower limit resh air requirement, new blower fan is controlled to be adjusted resh air requirement is exported to target fresh air Amount;
If target resh air requirement is less than or equal to pre-determined lower limit resh air requirement, control new blower fan will export resh air requirement adjust to Pre-determined lower limit resh air requirement.
It is alternatively, described that the target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, The step of obtaining comparison result, and controlling the output resh air requirement of new blower fan according to the comparison result also includes:
If the target resh air requirement is equal to initial resh air requirement, new blower fan is controlled to keep initial resh air requirement as output fresh air Amount.
In addition, to achieve the above object, the present invention also provides a kind of new blower fan, and the new blower fan includes:Memory, processing Device and the fresh air quantity control program for being stored in the new blower fan that can be run on the memory and on the processor, the fresh air The fresh air quantity control program of machine is realized the step of the fresh air quantity control method of new blower fan as described above during the computing device Suddenly.
In addition, to achieve the above object, the present invention also provides a kind of computer-readable recording medium, described computer-readable The fresh air quantity control program of new blower fan is stored with storage medium, the fresh air quantity control program of the new blower fan is executed by processor Shi Shixian as described above the fresh air quantity control method of new blower fan the step of.
A kind of fresh air quantity control method for new blower fan that the embodiment of the present invention proposes, this method include:Receiving start During instruction, the initial resh air requirement of user's setting is obtained, and indoor moving terminal signaling quantity information is obtained at interval of preset time; Target resh air requirement is determined according to the mobile terminal signal quantity information;By the target resh air requirement and the initial resh air requirement and Default resh air requirement threshold value is compared, and obtains comparison result, and the output resh air requirement of new blower fan is controlled according to the comparison result, Wherein, the default resh air requirement threshold value includes preset upper limit resh air requirement and pre-determined lower limit resh air requirement.It is by the above-mentioned means, of the invention Controller in new blower fan obtains the initial resh air requirement of user's setting, and every first when receiving the start-up command of user Indoor moving terminal signaling quantity information is obtained every preset time, further, is believed according to obtained mobile terminal signal quantity Breath determines target resh air requirement, and mobile terminal signal quantity information represents occupancy information, therefore according to mobile terminal signal The target resh air requirement that quantity information determines is exactly the real-time net demand resh air requirement of indoor current period, further, by the mesh Mark resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, and adjusts the defeated of new blower fan according to comparison result Go out resh air requirement so that the optimal resh air requirement that the resh air requirement of new blower fan is according to demand and exported, not only can make indoor environment more Add comfortable, lifting Consumer's Experience, can also reach the purpose of reasonable energy utilization.
Brief description of the drawings
Fig. 1 is the system architecture schematic diagram that scheme of the embodiment of the present invention is related to;
Fig. 2 is the terminal structure schematic diagram for the hardware running environment that scheme of the embodiment of the present invention is related to;
Fig. 3 is the schematic flow sheet of the fresh air quantity control method first embodiment of the new blower fan of the present invention;
Fig. 4 is the refinement schematic flow sheet of step S20 in Fig. 3;
Fig. 5 is the refinement schematic flow sheet of step S30 in Fig. 3;
Fig. 6 is the schematic flow sheet of the fresh air quantity control method second embodiment of the new blower fan of the present invention.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:When receiving start-up command, the initial new of user's setting is obtained Air quantity, and obtain indoor moving terminal signaling quantity information at interval of preset time;Believed according to the mobile terminal signal quantity Breath determines target resh air requirement;The target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, obtained To comparison result, and according to the output resh air requirement of the new blower fan of comparison result control, wherein, the default resh air requirement threshold value bag Include preset upper limit resh air requirement and pre-determined lower limit resh air requirement.
As shown in figure 1, the Organization Chart for the air conditioning multi-couple machine system that Fig. 1, which is scheme of the embodiment of the present invention, to be related to.It is of the invention empty Adjust multiple on-line system include outer machine (outdoor host computer 1 and outdoor slave 2), interior machine 3 (more than one, herein " more than " include this number) With new blower fan 4.Wherein, the development based on bus control technology, outer machine can be with each interior machine and fresh airs by internal-external machine signal wire 6 Machine realizes both-way communication;Each interior machine configures mobile terminal IR signal reception element 7 and Wi-Fi module 8, available for gathering room The signal of interior mobile terminal 5, and each interior machine can realize mutual communication by interior machine signal wire 9, can also pass through interior machine signal Line 9 is realized with new blower fan and communicated;New blower fan configuration mobile terminal IR signal reception element 7 and Wi-Fi module 8, new blower fan bag Include controller 10.
As shown in Fig. 2 Fig. 2 is the terminal structure schematic diagram for the hardware running environment that scheme of the embodiment of the present invention is related to.
Terminal of the embodiment of the present invention is the controller in new blower fan.
As shown in figure 1, the terminal can include:Processor 1001, such as CPU, communication bus 1002, user interface 1003, network interface 1004, memory 1005.Wherein, communication bus 1002 is used to realize the connection communication between these components. User interface 1003 can include display screen (Display), input block such as keyboard (Keyboard), optional user interface 1003 can also include wireline interface, the wave point of standard.Network interface 1004 can optionally connect including the wired of standard Mouth, wave point (such as WI-FI interfaces).Memory 1005 can be high-speed RAM memory or stable memory (non-volatile memory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned processor 1001 storage device.
Alternatively, terminal can also include camera, RF (Radio Frequency, radio frequency) circuit, sensor, audio Circuit, Wi-Fi module etc..Wherein, sensor ratio such as optical sensor, motion sensor and other sensors.Specifically, light Sensor may include ambient light sensor and proximity transducer, wherein, ambient light sensor can according to the light and shade of ambient light come The brightness of display screen is adjusted, proximity transducer can close display screen and/or backlight when mobile terminal is moved in one's ear.As One kind of motion sensor, gravity accelerometer can detect in all directions the size of (generally three axles) acceleration, quiet Size and the direction of gravity are can detect that when only, the application available for identification mobile terminal posture is (such as horizontal/vertical screen switching, related Game, magnetometer pose calibrating), Vibration identification correlation function (such as pedometer, tap) etc.;Certainly, mobile terminal can also match somebody with somebody The other sensors such as gyroscope, barometer, hygrometer, thermometer, infrared ray sensor are put, will not be repeated here.
It will be understood by those skilled in the art that the restriction of the terminal structure shown in Fig. 1 not structure paired terminal, can be wrapped Include than illustrating more or less parts, either combine some parts or different parts arrangement.
As shown in figure 1, it can lead to as in a kind of memory 1005 of computer-readable storage medium including operating system, network Believe the fresh air quantity control program of module, Subscriber Interface Module SIM and new blower fan.
In the terminal shown in Fig. 1, network interface 1004 is mainly used in connecting background server, is carried out with background server Data communicate;User interface 1003 is mainly used in connecting client (user terminal), enters row data communication with client;And processor 1001 can be used for calling the fresh air quantity control program of new blower fan stored in memory 1005, and perform following operate:
When receiving start-up command, the initial resh air requirement of user's setting is obtained, and interior is obtained at interval of preset time Mobile terminal signal quantity information;
Target resh air requirement is determined according to the mobile terminal signal quantity information;
The target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, obtains comparing knot Fruit, and according to the output resh air requirement of the new blower fan of comparison result control, wherein, the default resh air requirement threshold value is included on default Limit resh air requirement and pre-determined lower limit resh air requirement.
Further, processor 1001 can call the fresh air quantity control program of the new blower fan stored in memory 1005, Also perform following operate:
The indoor moving terminal signaling quantity information of outdoor machine of air-conditioner transmission is obtained at interval of preset time, wherein, the sky Outer machine is adjusted to be used for the indoor moving terminal signaling for receiving air-conditioning internal machine and the collection of new blower fan, and it is whole according to the indoor moving received Mobile terminal signal quantity information is calculated in end signal.
Further, processor 1001 can call the fresh air quantity control program of the new blower fan stored in memory 1005, Also perform following operate:
Occupancy information is determined according to the mobile terminal signal quantity information;
Target resh air requirement is calculated according to the occupancy information.
Further, processor 1001 can call the fresh air quantity control program of the new blower fan stored in memory 1005, Also perform following operate:
If the target resh air requirement is more than initial resh air requirement, the initial resh air requirement is carried out with preset upper limit resh air requirement Compare;
If the initial resh air requirement is equal to preset upper limit resh air requirement, new blower fan is controlled to keep initial resh air requirement as output Resh air requirement.
Further, processor 1001 can call the fresh air quantity control program of the new blower fan stored in memory 1005, Also perform following operate:
If the initial resh air requirement is not equal to preset upper limit resh air requirement, by the target resh air requirement and preset upper limit fresh air Amount is compared;
If target resh air requirement is less than preset upper limit resh air requirement, new blower fan is controlled to be adjusted resh air requirement is exported to target fresh air Amount;
If target resh air requirement is more than or equal to preset upper limit resh air requirement, new blower fan is controlled to be adjusted resh air requirement is exported to pre- If upper limit resh air requirement.
Further, processor 1001 can call the fresh air quantity control program of the new blower fan stored in memory 1005, Also perform following operate:
If the target resh air requirement is less than initial resh air requirement, the initial resh air requirement is carried out with pre-determined lower limit resh air requirement Compare;
If the initial resh air requirement is equal to pre-determined lower limit resh air requirement, new blower fan is controlled to keep initial resh air requirement as output Resh air requirement.
Further, processor 1001 can call the fresh air quantity control program of the new blower fan stored in memory 1005, Also perform following operate:
If the initial resh air requirement is not equal to pre-determined lower limit resh air requirement, by the target resh air requirement and pre-determined lower limit fresh air Amount is compared;
If target resh air requirement is more than pre-determined lower limit resh air requirement, new blower fan is controlled to be adjusted resh air requirement is exported to target fresh air Amount;
If target resh air requirement is less than or equal to pre-determined lower limit resh air requirement, control new blower fan will export resh air requirement adjust to Pre-determined lower limit resh air requirement.
Further, processor 1001 can call the fresh air quantity control program of the new blower fan stored in memory 1005, Also perform following operate:
If the target resh air requirement is equal to initial resh air requirement, new blower fan is controlled to keep initial resh air requirement as output fresh air Amount.
Based on above-mentioned hardware configuration and system architecture, the fresh air quantity control embodiment of the method for the new blower fan of the proposition present invention.
Reference picture 3, the fresh air quantity control method first embodiment of the new blower fan of the present invention provide a kind of resh air requirement of new blower fan Control method, methods described include:
Step S10, when receiving start-up command, the initial resh air requirement of user's setting is obtained, and at interval of preset time Obtain indoor moving terminal signaling quantity information;
Step S20, target resh air requirement is determined according to the mobile terminal signal quantity information;
Step S30, the target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, obtained Comparison result, and according to the output resh air requirement of the new blower fan of comparison result control, wherein, the default resh air requirement threshold value includes Preset upper limit resh air requirement and pre-determined lower limit resh air requirement.
The air of outdoor can be carried out filtration treatment and be transported to interior by fresh air machine of the present invention, so as to new to indoor offer Fresh air.The application scenarios of the present embodiment can be:When user opens new blower fan, to make new blower fan adjust according to the actual requirements Optimal output resh air requirement, so that indoor environment is more comfortable, and reach the purpose of reasonable energy utilization, the embodiment of the present invention A kind of fresh air quantity control method of new blower fan is provided.
In the present embodiment, when receiving start-up command, the initial resh air requirement of user's setting is obtained first, and at interval of pre- If the time obtains indoor moving terminal signaling quantity information.
Specifically, when the controller in new blower fan receives the start-up command of user, it is first determined user sets first Beginning wind shelves FPTo obtain the initial resh air requirement V of user's setting1, and obtain indoor moving terminal signaling quantity at interval of preset time T Information.Mobile terminal includes the mobile devices such as smart mobile phone or tablet personal computer herein.It is it should be noted that new in the present embodiment Blower fan is preset with resh air requirement threshold value, and the default resh air requirement threshold value includes preset upper limit resh air requirement Vmax(the new exportable maximum of blower fan Resh air requirement, corresponding wind shelves Fmax) and pre-determined lower limit resh air requirement Vmin(the new exportable minimum fresh air requirmente of blower fan, corresponding wind shelves Fmin), Therefore, the initial resh air requirement V of user's setting1One is scheduled on preset upper limit resh air requirement VmaxWith pre-determined lower limit resh air requirement VminBetween.
Wherein, the step of obtaining indoor moving terminal signaling quantity information at interval of preset time includes:
Step S11, the indoor moving terminal signaling quantity information of outdoor machine of air-conditioner transmission is obtained at interval of preset time, its In, the outdoor machine of air-conditioner is used for the indoor moving terminal signaling number for receiving air-conditioning internal machine and the collection of new blower fan, and according to reception To indoor moving terminal signaling number mobile terminal signal quantity information is calculated.
Specifically, the indoor mobile terminal signal of the Wi-Fi module search of interior machine and the interior configuration of new blower fan, and at interval of pre- If time T sends the mobile terminal signal each collected to outer machine by internal-external machine signal wire, that is to say, that in current week In phase T, the mobile terminal signal that interior machine and new blower fan collect just sends corresponding situation to outer per one more or less Machine.Outer machine is in current period T, and the mobile terminal signal sent to interior machine and new blower fan is collected and calculated, to therein Repeating signal only counts once (repeating signal only represents a mobile terminal), finally gives mobile terminal quantity information, i.e., indoor The total quantity of all mobile terminals.Further, the controller in new blower fan passes through internal-external machine signal wire at interval of preset time T Receive the mobile terminal quantity information that outer machine is sent.
Controller in new blower fan is after mobile terminal signal quantity information is obtained, according to the mobile terminal signal quantity Information determines target resh air requirement.Specifically, reference picture 4, step S20 include:
Step S21, occupancy information is determined according to the mobile terminal signal quantity information;
Step S22, target resh air requirement is calculated according to the occupancy information.
In the present embodiment, everyone demand resh air requirement v can be pre-set in the controller in new blower fan0.In new blower fan Controller after mobile terminal signal quantity information is obtained, the preset rules of a people are represented with a mobile terminal, it is determined that Occupancy information (i.e. indoor total number of persons M).Then current period T is calculated according to default net demand resh air requirement calculation formula Interior net demand resh air requirement, i.e. target resh air requirement V2(corresponding wind shelves Fa).Calculation formula is as follows:
V2=v0*M
Controller in new blower fan is calculating target resh air requirement V2Afterwards, by target resh air requirement V2Set with user initial Resh air requirement V1, and above-mentioned default resh air requirement threshold value (preset upper limit resh air requirement VmaxWith pre-determined lower limit resh air requirement Vmin) compared It is right, and according to the final output resh air requirement of the new blower fan of comparison result control.
Specifically, reference picture 5, step S30 include:
Step S31 is new by the initial resh air requirement and preset upper limit if the target resh air requirement is more than initial resh air requirement Air quantity is compared;
Step S310, if the initial resh air requirement is equal to preset upper limit resh air requirement, new blower fan is controlled to keep initial fresh air Amount is as output resh air requirement.
In the present embodiment, by target resh air requirement V2(the net demand resh air requirement in current period T) is first with user's setting Beginning resh air requirement V1After being compared, if target resh air requirement V2More than initial resh air requirement V1, now, due to not can determine that user sets Initial resh air requirement V1The exportable maximum resh air requirement of new blower fan whether is reached, has also needed initial resh air requirement V further1With Preset upper limit resh air requirement VmaxIt is compared.
If comparison result is, initial resh air requirement V1With preset upper limit resh air requirement VmaxInitial fresh air equal, i.e., that user sets Measure V1The exportable maximum resh air requirement of new blower fan is reached, that is to say, that target resh air requirement V2It is exportable beyond new blower fan Maximum resh air requirement, then the controller in new blower fan can only control the initial wind shelves F that new blower fan keeps user to setP, with initial Resh air requirement (now corresponding to the exportable maximum resh air requirement of new blower fan) is as output resh air requirement.
Further, reference picture 5, step S31 also include afterwards:
Step S311, if the initial resh air requirement is not equal to preset upper limit resh air requirement, by the target resh air requirement and in advance If upper limit resh air requirement is compared;
Step S3110, if target resh air requirement is less than preset upper limit resh air requirement, new blower fan is controlled to export resh air requirement adjustment To target resh air requirement;
Step S3111, if target resh air requirement is more than or equal to preset upper limit resh air requirement, new blower fan is controlled to export fresh air Amount is adjusted to preset upper limit resh air requirement.
By target resh air requirement V2(the net demand resh air requirement in current period T) and the initial resh air requirement V of user's setting1Enter After row compares, if target resh air requirement V2More than initial resh air requirement V1, and by initial resh air requirement V1With preset upper limit resh air requirement VmaxEnter After row compares, if initial resh air requirement V1Not equal to preset upper limit resh air requirement Vmax(the initial resh air requirement V of user's setting1One be scheduled on it is pre- If upper limit resh air requirement VmaxWith pre-determined lower limit resh air requirement VminBetween), now, by target resh air requirement V2With upper limit resh air requirement VmaxEnter Row compares, to judge whether the net demand resh air requirement calculated has reached the exportable maximum resh air requirement of new blower fan.
If target resh air requirement V2Less than upper limit resh air requirement Vmax, i.e. V1< V2< Vmax, now the controller in new blower fan is by wind Shelves are adjusted to target wind shelves Fa, to export target resh air requirement.
If target resh air requirement V2More than or equal to upper limit resh air requirement Vmax, that is, work as V2> V1(and V2≥Vmax, Vmin< V1< Vmax) when, because the net demand resh air requirement now calculated is equal to or over the exportable maximum resh air requirement of new blower fan, then Controller in new blower fan can only adjust the wind shelves of new blower fan to most strong wind shelves Fmax, with the exportable maximum resh air requirement of new blower fan As output resh air requirement, i.e., with upper limit resh air requirement VmaxAs output resh air requirement.
In the present embodiment, after new fan operation a cycle T, repeat the above steps and adjust the new of new blower fan in real time to realize The purpose of air quantity.
Controller in the new blower fan of the present embodiment obtains the first of user's setting first when receiving the start-up command of user Beginning resh air requirement, and indoor moving terminal signaling quantity information is obtained at interval of preset time, further, according to obtained movement Terminal signaling quantity information determines target resh air requirement, and mobile terminal signal quantity information represents occupancy information, therefore root The target resh air requirement determined according to mobile terminal signal quantity information is exactly the real-time net demand resh air requirement of indoor current period, enters one Step ground, the target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, and according to comparison result Adjust the output resh air requirement of new blower fan so that the reasonable resh air requirement that the resh air requirement of new blower fan is according to demand and exported, not only may be used So that indoor environment is more comfortable, Consumer's Experience is lifted, can also reach the purpose of reasonable energy utilization.
Further, reference picture 6, the fresh air quantity control method second embodiment of the new blower fan of the present invention provide a kind of new blower fan Fresh air quantity control method, based on above-mentioned shown embodiment, step S30 also includes:
Step S32 is new by the initial resh air requirement and pre-determined lower limit if the target resh air requirement is less than initial resh air requirement Air quantity is compared;
Step S320, if the initial resh air requirement is equal to pre-determined lower limit resh air requirement, new blower fan is controlled to keep initial fresh air Amount is as output resh air requirement.
In the present embodiment, the controller in new blower fan is calculating target resh air requirement V2Afterwards, by target resh air requirement V2With user The initial resh air requirement V of setting1After being compared, if target resh air requirement V2Less than initial resh air requirement V1, due to not can determine that user sets Fixed initial resh air requirement V1Whether it has been the exportable minimum fresh air requirmente of new blower fan, has also needed initial resh air requirement V further1With Pre-determined lower limit resh air requirement VminIt is compared.
If comparison result is, initial resh air requirement V1With pre-determined lower limit resh air requirement VminInitial fresh air equal, i.e., that user sets Measure V1It has been the exportable minimum fresh air requirmente of new blower fan, that is to say, that target resh air requirement V2It is more exportable than new blower fan minimum new Air quantity is also small, and now, the controller in new blower fan can only control the initial wind shelves F that new blower fan keeps user to setP, with initial Resh air requirement (now corresponding to the exportable minimum fresh air requirmente of new blower fan) is as output resh air requirement.
Further, reference picture 6, step S32 also include afterwards:
Step S321, if the initial resh air requirement is not equal to pre-determined lower limit resh air requirement, by the target resh air requirement and in advance Limit resh air requirement is set to be compared;
Step S3210, if target resh air requirement is more than pre-determined lower limit resh air requirement, new blower fan is controlled to export resh air requirement adjustment To target resh air requirement;
Step S3211, if target resh air requirement is less than or equal to pre-determined lower limit resh air requirement, new blower fan is controlled to export new Air quantity is adjusted to pre-determined lower limit resh air requirement.
In the present embodiment, by target resh air requirement V2(the net demand resh air requirement in current period T) is first with user's setting Beginning resh air requirement V1After being compared, if target resh air requirement V2Less than initial resh air requirement V1, and by initial resh air requirement V1With pre-determined lower limit Resh air requirement VminAfter being compared, if initial resh air requirement V1Not equal to default pre-determined lower limit resh air requirement Vmin(i.e. Vmin< V1< Vmax), Now, by target resh air requirement V2With pre-determined lower limit resh air requirement VminIt is compared, to judge target resh air requirement V2Whether fresh air is less than The exportable minimum fresh air requirmente of machine.
If target resh air requirement V2More than pre-determined lower limit resh air requirement Vmin, i.e. Vmin< V2< V1, the now controller in new blower fan Wind shelves are adjusted to target wind shelves Fa, i.e., output fresh air is used as using user's net demand resh air requirement in the current period T calculated Amount, to reduce energy waste.
If target resh air requirement V2Less than or equal to pre-determined lower limit resh air requirement Vmin, that is, work as V2≤Vmin(and V2< V1, Vmin< V1 < Vmax) when, now, because the net demand resh air requirement calculated is equal to or less than the exportable minimum fresh air requirmente of new blower fan, that Controller in new blower fan can only adjust the wind shelves of new blower fan to minimum wind shelves Fmin, with the exportable minimum fresh air of new blower fan Amount is as output resh air requirement, i.e., with lower limit resh air requirement VminAs output resh air requirement.
Further, step S30 also includes:
Step S33, if the target resh air requirement is equal to initial resh air requirement, new blower fan is controlled to keep initial resh air requirement conduct Export resh air requirement.
In the present embodiment, by target resh air requirement V2(the net demand resh air requirement in current period T) is first with user's setting Beginning resh air requirement V1After being compared, if V2=V1, then the initial wind of the new blower fan holding user's setting of controller control in new blower fan Shelves FP, output resh air requirement is used as using initial resh air requirement.
The present embodiment is adjusted according to target resh air requirement and the initial resh air requirement and the comparison result of default resh air requirement threshold value The output resh air requirement of new blower fan, not only lifts comfort level, can also reduce the waste of the energy.
In addition, the embodiment of the present invention also proposes a kind of new blower fan, the new blower fan includes:Memory, processor and storage On the memory and the fresh air quantity control program of new blower fan that can run on the processor, the software governing equation Sequence is realized the step of fresh air quantity control method of new blower fan as described above during the computing device.
Wherein, the specific implementation that the fresh air quantity control program of the new blower fan stored in the new blower fan of the present invention is executed by processor Example is essentially identical with each embodiment of fresh air quantity control method of above-mentioned new blower fan, and therefore not to repeat here.
In addition, the embodiment of the present invention also proposes a kind of computer-readable recording medium.
The fresh air quantity control method program of new blower fan, the new blower fan are stored with computer-readable recording medium of the present invention The fresh air quantity control program the step of fresh air quantity control method of new blower fan as described above is realized when being executed by processor.
Wherein, the fresh air quantity control program of the new blower fan stored in computer-readable recording medium of the present invention is held by processor Each embodiment of fresh air quantity control method of capable specific embodiment and above-mentioned new blower fan is essentially identical, and therefore not to repeat here.
It should be noted that herein, term " comprising ", "comprising" or its any other variant are intended to non-row His property includes, so that process, method, article or system including a series of elements not only include those key elements, and And also include the other element being not expressly set out, or also include for this process, method, article or system institute inherently Key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including this Other identical element also be present in the process of key element, method, article or system.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on such understanding, technical scheme is substantially done to prior art in other words Going out the part of contribution can be embodied in the form of software product, and the computer software product is stored in one as described above In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions to cause a station terminal equipment (can be mobile phone, Computer, server, air conditioner, or network equipment etc.) perform method described in each embodiment of the present invention.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills Art field, is included within the scope of the present invention.

Claims (10)

  1. A kind of 1. fresh air quantity control method of new blower fan, it is characterised in that methods described includes:
    When receiving start-up command, the initial resh air requirement of user's setting is obtained, and indoor moving is obtained at interval of preset time Terminal signaling quantity information;
    Target resh air requirement is determined according to the mobile terminal signal quantity information;
    The target resh air requirement is compared with the initial resh air requirement and default resh air requirement threshold value, obtains comparison result, and The output resh air requirement of new blower fan is controlled according to the comparison result, wherein, it is new that the default resh air requirement threshold value includes preset upper limit Air quantity and pre-determined lower limit resh air requirement.
  2. 2. the fresh air quantity control method of new blower fan as claimed in claim 1, it is characterised in that described to be obtained at interval of preset time The step of taking indoor moving terminal signaling quantity information includes:
    The indoor moving terminal signaling quantity information of outdoor machine of air-conditioner transmission is obtained at interval of preset time, wherein, outside the air-conditioning Machine is used for the indoor moving terminal signaling for receiving air-conditioning internal machine and the collection of new blower fan, and is believed according to the indoor moving terminal received Number mobile terminal signal quantity information is calculated.
  3. 3. the fresh air quantity control method of new blower fan as claimed in claim 1, it is characterised in that described according to the mobile terminal Number of signals information determines that the step of target resh air requirement includes:
    Occupancy information is determined according to the mobile terminal signal quantity information;
    Target resh air requirement is calculated according to the occupancy information.
  4. 4. the fresh air quantity control method of new blower fan as claimed in claim 1, it is characterised in that described by the target resh air requirement It is compared with the initial resh air requirement and default resh air requirement threshold value, obtains comparison result, and control according to the comparison result The step of output resh air requirement of new blower fan, includes:
    If the target resh air requirement is more than initial resh air requirement, the initial resh air requirement is compared with preset upper limit resh air requirement It is right;
    If the initial resh air requirement is equal to preset upper limit resh air requirement, new blower fan is controlled to keep initial resh air requirement as output fresh air Amount.
  5. 5. the fresh air quantity control method of new blower fan as claimed in claim 4, it is characterised in that if the target resh air requirement More than initial resh air requirement, then will also include after described the step of initially resh air requirement is compared with preset upper limit resh air requirement:
    If the initial resh air requirement is not equal to preset upper limit resh air requirement, the target resh air requirement is entered with preset upper limit resh air requirement Row compares;
    If target resh air requirement is less than preset upper limit resh air requirement, new blower fan is controlled to be adjusted resh air requirement is exported to target resh air requirement;
    If target resh air requirement is more than or equal to preset upper limit resh air requirement, controls new blower fan to export resh air requirement and adjust on presetting Limit resh air requirement.
  6. 6. the fresh air quantity control method of new blower fan as claimed in claim 1, it is characterised in that described by the target resh air requirement It is compared with the initial resh air requirement and default resh air requirement threshold value, obtains comparison result, and control according to the comparison result The step of output resh air requirement of new blower fan, also includes:
    If the target resh air requirement is less than initial resh air requirement, the initial resh air requirement is compared with pre-determined lower limit resh air requirement It is right;
    If the initial resh air requirement is equal to pre-determined lower limit resh air requirement, new blower fan is controlled to keep initial resh air requirement as output fresh air Amount.
  7. 7. the fresh air quantity control method of new blower fan as claimed in claim 6, it is characterised in that if the target resh air requirement Less than initial resh air requirement, then will also include after described the step of initially resh air requirement is compared with pre-determined lower limit resh air requirement:
    If the initial resh air requirement is not equal to pre-determined lower limit resh air requirement, the target resh air requirement is entered with pre-determined lower limit resh air requirement Row compares;
    If target resh air requirement is more than pre-determined lower limit resh air requirement, new blower fan is controlled to be adjusted resh air requirement is exported to target resh air requirement;
    If target resh air requirement is less than or equal to pre-determined lower limit resh air requirement, controls new blower fan to export resh air requirement and adjust to default Lower limit resh air requirement.
  8. 8. the fresh air quantity control method of new blower fan as claimed in claim 1, it is characterised in that described by the target resh air requirement It is compared with the initial resh air requirement and default resh air requirement threshold value, obtains comparison result, and control according to the comparison result The step of output resh air requirement of new blower fan, also includes:
    If the target resh air requirement is equal to initial resh air requirement, new blower fan is controlled to keep initial resh air requirement as output resh air requirement.
  9. 9. a kind of new blower fan, it is characterised in that the new blower fan includes:Memory, processor and it is stored on the memory And the fresh air quantity control program for the new blower fan that can be run on the processor, the fresh air quantity control program of the new blower fan is by institute The step of fresh air quantity control method of the new blower fan as any one of claim 1 to 8 is realized when stating computing device.
  10. 10. a kind of computer-readable recording medium, it is characterised in that new blower fan is stored with the computer-readable recording medium Fresh air quantity control program, realized when the fresh air quantity control program of the new blower fan is executed by processor as in claim 1 to 8 The step of fresh air quantity control method of new blower fan described in any one.
CN201710729148.2A 2017-08-22 2017-08-22 Fresh air quantity control method, new blower fan and the computer-readable recording medium of new blower fan Pending CN107576026A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710729148.2A CN107576026A (en) 2017-08-22 2017-08-22 Fresh air quantity control method, new blower fan and the computer-readable recording medium of new blower fan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710729148.2A CN107576026A (en) 2017-08-22 2017-08-22 Fresh air quantity control method, new blower fan and the computer-readable recording medium of new blower fan

Publications (1)

Publication Number Publication Date
CN107576026A true CN107576026A (en) 2018-01-12

Family

ID=61034195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710729148.2A Pending CN107576026A (en) 2017-08-22 2017-08-22 Fresh air quantity control method, new blower fan and the computer-readable recording medium of new blower fan

Country Status (1)

Country Link
CN (1) CN107576026A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110160246A (en) * 2019-05-30 2019-08-23 广东美的暖通设备有限公司 Operation method, fresh air conditioner and the computer readable storage medium of compressor
CN110260480A (en) * 2019-05-10 2019-09-20 珠海格力电器股份有限公司 Indoor fresh air control method, control device and the equipment with fresh air function
CN112902414A (en) * 2019-12-03 2021-06-04 佛山市云米电器科技有限公司 Control method of fresh air system, fresh air system and computer readable storage medium
CN113623834A (en) * 2021-07-27 2021-11-09 重庆美的制冷设备有限公司 Control method and control device of air conditioner, air conditioner and readable storage medium
CN114110918A (en) * 2021-11-29 2022-03-01 宁波奥克斯电气股份有限公司 Fresh air control method and device, fresh air conditioner and computer storage medium
CN115876508A (en) * 2022-11-21 2023-03-31 广州旭杰电子有限公司 Improved generation computer lab new trend system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201155836Y (en) * 2007-09-13 2008-11-26 尹晓东 Fresh air machine intelligent control frequency conversion energy-saving device
CN205090565U (en) * 2015-11-10 2016-03-16 珠海迈科智能科技股份有限公司 Intelligence temperature regulation apparatus
CN105892427A (en) * 2016-04-15 2016-08-24 谷振宇 Internet of Things intelligent control method and Internet of Things intelligent control system based on user perception
CN106545956A (en) * 2016-10-08 2017-03-29 珠海格力电器股份有限公司 The control method and device of new blower fan

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201155836Y (en) * 2007-09-13 2008-11-26 尹晓东 Fresh air machine intelligent control frequency conversion energy-saving device
CN205090565U (en) * 2015-11-10 2016-03-16 珠海迈科智能科技股份有限公司 Intelligence temperature regulation apparatus
CN105892427A (en) * 2016-04-15 2016-08-24 谷振宇 Internet of Things intelligent control method and Internet of Things intelligent control system based on user perception
CN106545956A (en) * 2016-10-08 2017-03-29 珠海格力电器股份有限公司 The control method and device of new blower fan

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260480A (en) * 2019-05-10 2019-09-20 珠海格力电器股份有限公司 Indoor fresh air control method, control device and the equipment with fresh air function
CN110160246A (en) * 2019-05-30 2019-08-23 广东美的暖通设备有限公司 Operation method, fresh air conditioner and the computer readable storage medium of compressor
CN112902414A (en) * 2019-12-03 2021-06-04 佛山市云米电器科技有限公司 Control method of fresh air system, fresh air system and computer readable storage medium
CN112902414B (en) * 2019-12-03 2022-08-19 佛山市云米电器科技有限公司 Control method of fresh air system, fresh air system and computer readable storage medium
CN113623834A (en) * 2021-07-27 2021-11-09 重庆美的制冷设备有限公司 Control method and control device of air conditioner, air conditioner and readable storage medium
CN114110918A (en) * 2021-11-29 2022-03-01 宁波奥克斯电气股份有限公司 Fresh air control method and device, fresh air conditioner and computer storage medium
CN115876508A (en) * 2022-11-21 2023-03-31 广州旭杰电子有限公司 Improved generation computer lab new trend system
CN115876508B (en) * 2022-11-21 2023-06-30 广州旭杰电子有限公司 Improved generation computer lab new trend system

Similar Documents

Publication Publication Date Title
CN107576026A (en) Fresh air quantity control method, new blower fan and the computer-readable recording medium of new blower fan
CN109059179B (en) Control method of air conditioner, control method of electric curtain and related equipment
CN107763812A (en) Air-conditioner control method, air conditioner and computer-readable recording medium
CN108489020A (en) Air-conditioner control method, terminal, air conditioner and computer readable storage medium
CN107479401A (en) Home appliance and its control method, device, system and readable storage medium storing program for executing
CN107606705A (en) Floor air conditioner control method, device and computer-readable recording medium
CN107454342A (en) A kind of control method, mobile terminal and computer-readable recording medium
CN108180605A (en) Automatic calm sensing control method, apparatus and computer readable storage medium
CN109028480B (en) Constant temperature and humidity control system and method thereof
CN107631419A (en) Air conditioner operating parameter method of adjustment, air conditioner and computer-readable recording medium
CN108572558A (en) Intelligent home furnishing control method, device and computer readable storage medium
WO2019134703A1 (en) Control method and system, and air conditioner and server
CN107906698A (en) Floor air conditioner and control method, device, computer-readable recording medium
CN107404721A (en) Internet of things equipment matches somebody with somebody network method, image-pickup method and equipment
CN107883551A (en) New blower fan fresh air quantity control method, apparatus and computer-readable recording medium
CN107655169A (en) Air-treatment method, device and computer-readable recording medium
CN107514751A (en) Control method, device and the air conditioner of air conditioner
CN107906699A (en) Floor air conditioner control method, device and computer-readable recording medium
CN107676938A (en) Air-conditioner control method, device, electronic equipment and computer-readable recording medium
CN108227513A (en) Intelligent window control method, device and computer readable storage medium
CN109163422A (en) Air conditioner and its control method, device and computer readable storage medium
CN108224713B (en) Calm sensing control method, apparatus and computer readable storage medium
CN107580103A (en) The control method and device of lighting device
CN108180608A (en) Air conditioning control method, device and computer readable storage medium
CN107975915A (en) Control method, device and the computer-readable recording medium of air conditioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180112