CN107883551A - New blower fan fresh air quantity control method, apparatus and computer-readable recording medium - Google Patents
New blower fan fresh air quantity control method, apparatus and computer-readable recording medium Download PDFInfo
- Publication number
- CN107883551A CN107883551A CN201710977732.XA CN201710977732A CN107883551A CN 107883551 A CN107883551 A CN 107883551A CN 201710977732 A CN201710977732 A CN 201710977732A CN 107883551 A CN107883551 A CN 107883551A
- Authority
- CN
- China
- Prior art keywords
- blower fan
- new blower
- target
- windscreen
- fresh air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
Landscapes
- Control Of Positive-Displacement Air Blowers (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The invention discloses a kind of new blower fan fresh air quantity control method, it includes:Obtain the total number of persons that new blower fan in the measurement period period corresponds to air-supply region;The target windscreen of the new blower fan is determined based on the total number of persons;Front windshield is worked as according to the target windscreen adjustment new blower fan.The invention also discloses a kind of new blower fan fresh air quantity control device and computer-readable recording medium.The present invention realizes the accurate acquisition for corresponding to air-supply region total number of persons to new blower fan within the measurement period period, so as to can more accurately determine actually required resh air requirement and target windscreen according to the total number of persons, the accuracy to new blower fan fresh air quantity control is further increasing, is realized simultaneously also by measurement period and new blower fan resh air requirement is real-time dynamicly controlled.
Description
Technical field
The present invention relates to field of heating ventilation air conditioning, more particularly to a kind of new blower fan fresh air quantity control method, apparatus and computer
Readable storage medium storing program for executing.
Background technology
The demand of new blower fan resh air requirement is generally all by indoor occupant and building generation, partial building resh air requirement demand
It is main relevant with air conditioning area area, calculate relatively simple.The resh air requirement in industry for indoor occupant demand designs at present, leads to
It is often using the maximum personnel amount of sensor estimation, the control to new blower fan resh air requirement is realized according to the maximum personnel amount
System.
And because the personnel amount of interior is change, and the difference and gathered data of related sensor position postpone
Resh air requirement detection error caused by meeting so that can not be obtained exactly to the resh air requirement of actual demand, so as to cause nothing
The resh air requirement of method exactly according to the actual requirements, the problem of control exactly the resh air requirement of new blower fan.
The above is only used for auxiliary and understands technical scheme, does not represent and recognizes that the above is existing skill
Art.
The content of the invention
It is a primary object of the present invention to provide a kind of new blower fan fresh air quantity control method, apparatus and computer-readable storage
Medium, it is intended to solve the technical problem that can not be controlled exactly new blower fan resh air requirement.
To achieve the above object, the present invention provides a kind of new blower fan fresh air quantity control method, the new blower fan resh air requirement control
Method processed comprises the following steps:
Obtain the total number of persons that new blower fan in the measurement period period corresponds to air-supply region;
The target windscreen of the new blower fan is determined based on the total number of persons;
Front windshield is worked as according to the target windscreen adjustment new blower fan.
In one embodiment, the step for obtaining new blower fan in the measurement period period and corresponding to the total number of persons of air-supply region
Suddenly include:
When receiving the starting-up signal of new blower fan, measurement period is obtained;
Based on the measurement period, total people that the new blower fan in the measurement period period corresponds to air-supply region is counted
Number.
In one embodiment, the new blower fan corresponds to the total of air-supply region in the statistics measurement period period
The step of number, includes:
Obtain the net number in the measurement period period;
According to the net number, the total number of persons that new blower fan in the measurement period period corresponds to air-supply region is calculated.
In one embodiment, it is described obtain the measurement period period in net number the step of include:
Obtain in the measurement period period, based on the infrared discrepancy number and source number released electric transducer and detected;
According to the discrepancy number and the source number, the net number in the measurement period period is calculated.
In one embodiment, it is described the new blower fan is determined based on the total number of persons target windscreen the step of include:
Obtain demand resh air requirement per capita;
Based on the resh air requirement of demand per capita and the total number of persons, the target windscreen of the new blower fan is determined.
In one embodiment, it is described based on demand resh air requirement and the total number of persons per capita, determine the new blower fan
Target windscreen the step of include:
Based on the resh air requirement of demand per capita and the total number of persons, target resh air requirement corresponding to the measurement period is calculated;
According to the target resh air requirement, the target windscreen of the new blower fan is determined.
In one embodiment, it is described that being wrapped the step of working as front windshield for the new blower fan is adjusted according to the target windscreen
Include:
Obtain the new blower fan works as front windshield;
It is determined that it is described when the ratio relation of front windshield and the target windscreen, the fresh air is adjusted according to the ratio relation
Machine works as front windshield.
In one embodiment, it is described that being wrapped the step of working as front windshield for the new blower fan is adjusted according to the ratio relation
Include:
Obtain the standard gear scope of the new blower fan;
Based on the standard gear scope and the ratio relation, adjust the new blower fan works as front windshield.
In addition, to achieve the above object, the present invention also provides a kind of new blower fan fresh air quantity control device, and the new blower fan is new
Air quantity controller includes:Memory, processor and it is stored on the memory and can runs on the processor new
Blower fan fresh air quantity control program, any of the above-described institute is realized when the new blower fan fresh air quantity control program is by the computing device
The step of new blower fan fresh air quantity control method stated.
In addition, to achieve the above object, the present invention also provides a kind of computer-readable recording medium, described computer-readable
New blower fan fresh air quantity control program is stored with storage medium, it is real when the new blower fan fresh air quantity control program is executed by processor
The step of showing the new blower fan fresh air quantity control method described in any of the above-described.
New blower fan fresh air quantity control method proposed by the present invention, correspondingly sent by obtaining new blower fan in the measurement period period
The total number of persons in wind region, the target windscreen that the total number of persons determines the new blower fan is next based on, then according to the target wind
The gear adjustment new blower fan works as front windshield, realizes and corresponds to air-supply region total number of persons to new blower fan within the measurement period period
Accurate acquisition, so as to according to the total number of persons can more accurately determine actually required resh air requirement and target windscreen, further
Ground improves the accuracy to new blower fan fresh air quantity control, is realized simultaneously also by measurement period real-time to new blower fan resh air requirement
Dynamically control.
Brief description of the drawings
Belonging to new blower fan fresh air quantity control device in the hardware running environment that Fig. 1 is related to for scheme of the embodiment of the present invention eventually
The structural representation at end;
Fig. 2 is the schematic flow sheet of the new blower fan fresh air quantity control method first embodiment of the present invention;
Fig. 3 is new blower fan control system architecture schematic diagram provided in an embodiment of the present invention;
Fig. 4 is new blower fan in the acquisition measurement period period in the new blower fan fresh air quantity control method first embodiment of the present invention
The refinement schematic flow sheet of the step of total number of persons of corresponding air-supply region;
Fig. 5 is counts institute in the measurement period period in blower fan fresh air quantity control method second embodiment of the invention new
State the refinement schematic flow sheet for the step of new blower fan corresponds to the total number of persons of air-supply region;
Fig. 6 is that the net people in the measurement period period is obtained in the new blower fan fresh air quantity control method 3rd embodiment of the present invention
The refinement schematic flow sheet of several steps;
Fig. 7 is to determine the fresh air based on the total number of persons in the new blower fan fresh air quantity control method first embodiment of the present invention
The refinement schematic flow sheet of the step of target windscreen of machine;
Fig. 8 in the embodiment of blower fan fresh air quantity control method the 5th of the invention new based on demand resh air requirement and the institute per capita
Total number of persons is stated, the refinement schematic flow sheet for the step of determining the target windscreen of the new blower fan;
Fig. 9 is described new according to target windscreen adjustment in the new blower fan fresh air quantity control method first embodiment of the present invention
Refinement schematic flow sheet the step of working as front windshield of blower fan;
Figure 10 in the new embodiment of blower fan fresh air quantity control method the 7th of the present invention according to ratio relation adjustment
Refinement schematic flow sheet the step of working as front windshield of new blower fan.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
As shown in figure 1, Fig. 1 is the new blower fan fresh air quantity control in the hardware running environment that scheme of the embodiment of the present invention is related to
The structural representation of the affiliated terminal of device.
Terminal of the embodiment of the present invention can be PC or smart mobile phone, tablet personal computer, E-book reader, MP3
(Moving Picture Experts Group Audio Layer III, dynamic image expert's compression standard audio aspect 3)
Player, MP4 (Moving Picture Experts Group Audio Layer IV, dynamic image expert's compression standard sound
Frequency aspect 4) player, pocket computer etc. have the packaged type terminal device of display function.
As shown in figure 1, the terminal can include:Processor 1001, such as CPU, network interface 1004, user interface
1003, memory 1005, communication bus 1002.Wherein, communication bus 1002 is used to realize the connection communication between these components.
User interface 1003 can include display screen (Display), input block such as keyboard (Keyboard), optional user interface
1003 can also include wireline interface, the wave point of standard.Network interface 1004 can optionally connect including the wired of standard
Mouth, wave point (such as WI-FI interfaces).Memory 1005 can be high-speed RAM memory or stable memory
(non-volatile memory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned processor
1001 storage device.
Alternatively, terminal can also include camera, RF (Radio Frequency, radio frequency) circuit, sensor, audio
Circuit, WiFi module etc..Wherein, sensor ratio such as optical sensor, motion sensor and other sensors.Specifically, light
Sensor may include ambient light sensor and proximity transducer, wherein, ambient light sensor can according to the light and shade of ambient light come
The brightness of display screen is adjusted, proximity transducer can close display screen and/or backlight when mobile terminal is moved in one's ear.As
One kind of motion sensor, gravity accelerometer can detect in all directions the size of (generally three axles) acceleration, quiet
Size and the direction of gravity are can detect that when only, the application available for identification mobile terminal posture is (such as horizontal/vertical screen switching, related
Game, magnetometer pose calibrating), Vibration identification correlation function (such as pedometer, tap) etc.;Certainly, mobile terminal can also match somebody with somebody
The other sensors such as gyroscope, barometer, hygrometer, thermometer, infrared ray sensor are put, will not be repeated here.
It will be understood by those skilled in the art that the restriction of the terminal structure shown in Fig. 1 not structure paired terminal, can be wrapped
Include than illustrating more or less parts, either combine some parts or different parts arrangement.
As shown in figure 1, it can lead to as in a kind of memory 1005 of computer-readable storage medium including operating system, network
Believe module, Subscriber Interface Module SIM and new blower fan fresh air quantity control program.
In the terminal shown in Fig. 1, network interface 1004 is mainly used in connecting background server, is carried out with background server
Data communicate;User interface 1003 is mainly used in connecting client (user terminal), enters row data communication with client;And processor
1001 can be used for calling the new blower fan fresh air quantity control program stored in memory 1005.
Based on above-mentioned terminal hardware structure, each embodiment of the invention is proposed.
The present invention provides a kind of new blower fan fresh air quantity control method, reference picture 2, and Fig. 2 is new blower fan resh air requirement control of the invention
The schematic flow sheet of method first embodiment processed.
In the present embodiment, the new blower fan fresh air quantity control method includes:
Step S1000, obtain the total number of persons that new blower fan in the measurement period period corresponds to air-supply region;
In the present embodiment, new blower fan is corresponding with certain air-supply region scope, by obtaining in the measurement period period
New blower fan correspond to the total number of persons of air-supply region, the resh air requirement of demand according to corresponding to the total number of persons determines the measurement period;Its
In, measurement period is counts the time interval cycle that new blower fan corresponds to number in the range of air-supply region, every the measurement period then
Once new blower fan corresponds to number in the range of air-supply region to statistics;Specifically, when receiving the starting-up signal of new blower fan, then obtain
Measurement period is taken, according to the measurement period, the new blower fan counted within the measurement period period corresponds to the total of air-supply region
Number;Air-supply region corresponding to new blower fan can be divided into some sub- air-supply regions, therefore, by counting different sub- air-supply regions
Net number can then obtain the total number of persons that the new blower fan corresponds to air-supply region, wherein, the net number be then expressed as statistics week
Number corresponding to every sub- air-supply region of last moment of phase, the net number can be by every sub- air-supply regions in measurement period
Interior discrepancy number is calculated with source number, and the discrepancy number can then detect to obtain with the source number by sensor, such as
Infrared sensor;Read group total is carried out to accessed net number, the number for calculating gained is the new blower fan in the statistics
Cycle corresponds to the total number of persons of air-supply region;
As shown in figure 3, division has some sub- air-supply regions in air-supply region corresponding to new blower fan in the figure, per height
Air-supply region is separated by door, then configures an infrared sensor in every sub- air-supply region, i.e., infrared sensor 1 is to answering the door
1 regional extent, infrared sensor 2 to answer the door 2 regional extent ... infrared sensor n to the regional extent for the n that answers the door, pass through
Each infrared sensor is detected, discrepancy number and people from source of sub- air-supply region corresponding to the infrared sensor can be obtained
Number;The controller of new blower fan is when receiving the discrepancy number and source number that different sensors detect, according to the discrepancy number
The corresponding net number of each infrared sensor can be then obtained with the source number, all net demographics are obtained into the new blower fan
The total number of persons of corresponding air-supply region.
Step S2000, the target windscreen of the new blower fan is determined based on the total number of persons;
In the present embodiment, target windscreen is the target adjustment value of new blower fan windscreen, when being adjusted to new blower fan, i.e.,
The windscreen of new blower fan is adjusted, original windscreen is adjusted to target windscreen;Specifically, correspondingly send getting new blower fan
During the total number of persons in wind region, demand resh air requirement per capita is obtained, according to demand resh air requirement and the total number of persons per capita, by calculating then
Target resh air requirement corresponding to measurement period can be obtained;And each target resh air requirement is corresponding with identical or different target air volume model
Enclose, and different target air volume scopes then corresponds to different target windscreens;Therefore, when target resh air requirement is calculated, it is determined that
Target air volume scope corresponding to the target resh air requirement, according to the target air volume scope so that it is determined that mesh corresponding to the target resh air requirement
Mark windscreen;Wherein, target air volume scope and the corresponding relation of target windscreen can then be preset by self-defined, or be acquiescence
Corresponding relation.
Step S3000, front windshield is worked as according to the target windscreen adjustment new blower fan.
In the present embodiment, when the windscreen that front windshield is new blower fan corresponding to the current statistic cycle;Specifically, calculating
During to target windscreen, the ratio relation worked as front windshield and deserve front windshield and target windscreen of new blower fan is obtained, wherein, the ratio
Relation then then corresponds to the tune of different new blower fan windscreens for target windscreen and the magnitude relationship when front windshield, different ratio relations
Perfect square case;Get new blower fan when the ratio relation of front windshield and the ratio relation for deserving front windshield and target windscreen when,
The standard gear bands of the new blower fan are obtained, wherein, the standard gear bands are the new blower fan lower limit windscreen to upper limit windscreen
Scope;Work as front windshield according to what the standard gear bands and the ratio relation adjusted new blower fan;It is more than current wind in target windscreen
During gear, judge whether deserve front windshield is equal to the upper limit windscreen of the standard gear bands, if deserving front windshield is equal to the upper limit wind
Front windshield is worked as in gear, then new blower fan holding;If deserving front windshield is not equal to the upper limit windscreen, adjust the new blower fan works as front windshield
To target windscreen;When target windscreen is less than when front windshield, judge to deserve whether front windshield is equal under the standard gear bands
Windscreen is limited, if deserving front windshield is equal to the lower limit windscreen, new blower fan keeps working as front windshield;If deserve front windshield to be not equal under this
Windscreen is limited, then adjustment is when front windshield to target windscreen;When target windscreen is equal to when front windshield, then new blower fan keeps current wind
Gear.
The new blower fan fresh air quantity control method that the present embodiment proposes, it is corresponding by obtaining new blower fan in the measurement period period
The total number of persons of air-supply region, the target windscreen that the total number of persons determines the new blower fan is next based on, then according to the target
The windscreen adjustment new blower fan works as front windshield, realizes and corresponds to the total people of air-supply region to new blower fan within the measurement period period
Several accurate acquisitions, so as to can more accurately determine actually required resh air requirement and target windscreen according to the total number of persons, enter one
The accuracy to new blower fan fresh air quantity control is improved to step, is realized simultaneously also by measurement period real to new blower fan resh air requirement
When dynamically control.
Based on first embodiment, the second embodiment of the new blower fan fresh air quantity control method of the proposition present invention, reference picture 4,
In the present embodiment, step S1000 includes:
Step S1100, when receiving the starting-up signal of new blower fan, obtain measurement period;
In the present embodiment, measurement period is expressed as counting the time interval that new blower fan corresponds to number in the range of air-supply region
In the cycle, then count once new blower fan every the measurement period and correspond to number in the range of air-supply region;Specifically, receiving newly
During the starting-up signal of blower fan, i.e., the start of new blower fan when, then obtain corresponding to measurement period, wherein, the measurement period can pass through
Self-defined setting.
Step S1200, based on the measurement period, count the corresponding air-supply of new blower fan in the measurement period period
The total number of persons in region.
In the present embodiment, in air-supply region corresponding to new blower fan, one is then placed every a fixed zoning
Individual number detection sensor, the number passed in and out by number detection sensor detection in the zoning of the fixation, this stroke
Subregion is sub- air-supply region corresponding to the new blower fan;Then the number in the sub- air-supply region of each fixation is counted
Record, then can get the total number of persons that new blower fan corresponds to air-supply region, and the total number of persons is in measurement period last moment fresh air
Machine corresponds to the total number of persons of air-supply region;Specifically, when getting measurement period, then statistics is every within the measurement period period
The net number of individual sub- air-supply region, wherein, the net number is the people in the last moment of the measurement period air-supply region
Number;The net number of each sub- air-supply region is counted, then it is corresponding can to get new blower fan in the measurement period period
The total number of persons of air-supply region.
The new blower fan fresh air quantity control method that the present embodiment proposes, by when receiving the starting-up signal of new blower fan, obtaining
Measurement period is taken, is next based on the measurement period, the new blower fan in the measurement period period is counted and corresponds to blow zones
The total number of persons in domain, the real-time dynamic statistical for corresponding to air-supply region number to new blower fan by measurement period is realized, and according to this
Demographics result, the actually required resh air requirement asked is more accurately determined, also so that control to new blower fan resh air requirement
It is more accurate.
Based on second embodiment, the 3rd embodiment of the new blower fan fresh air quantity control method of the proposition present invention, reference picture 5,
In the present embodiment, step S1200 includes:
Step S1210, obtain the net number in the measurement period period;
In the present embodiment, net number is number of the last moment in each zoning in measurement period;In fresh air
In air-supply region corresponding to machine, by setting number detection sensor device, to detect area corresponding to the number detection sensor
Number in domain;Because number detection range is limited corresponding to number detection sensor, therefore, by blow zones corresponding to new blower fan
If domain is divided into equal portions, and places the detection of number detection sensor (in i.e. sub- air-supply region) in the region of each division, with
Detect the number detection sensor and correspond to number in sub- air-supply region, the number is net number;Therefore, statistics is being got
During the cycle, then it can obtain each number detection sensor by number detection sensor and examined within the measurement period period
The number measured, the number are the net number of every sub- air-supply region in the measurement period period.
Step S1220, according to the net number, calculate new blower fan in the measurement period period and correspond to air-supply region
Total number of persons.
In the present embodiment, net number is the number in the sub- air-supply region for correspond to air-supply region division according to new blower fan,
Therefore, the net number in every sub- air-supply region within the measurement period period is counted, can then be calculated according to the net number
Arrive, new blower fan corresponds to the total number of persons of air-supply region in the measurement period period;Specifically, obtained according to number detection sensor
When getting net number, the net number of every sub- air-supply region to getting carries out read group total, then can obtain statistics week
New blower fan corresponds to the total number of persons of air-supply region in period phase;
The total number of persons is represented by:Pa=P1+P2+P3+......+Pn, wherein, P1、P2、P3…..PnIt is expressed as not
With net number, P corresponding to sub- air-supply regionaRepresent total number of persons.
The new blower fan fresh air quantity control method that the present embodiment proposes, by obtaining the net people in the measurement period period
Number, then according to the net number, calculates the total number of persons that new blower fan in the measurement period period corresponds to air-supply region, realizes
The accurate acquisition of air-supply region total number of persons is corresponded to new blower fan, is accurately defined according to the total number of persons and actually required asks new
Air quantity, further realize accurate control to new blower fan resh air requirement.
Based on 3rd embodiment, the fourth embodiment of the new blower fan fresh air quantity control method of the proposition present invention, reference picture 6,
In the present embodiment, step S1210 includes:
Step S1211, obtain in the measurement period period, based on the infrared discrepancy number released electric transducer and detected
With source number;
In the present embodiment, electric transducer is released by infrared in number detection sensor, can detected in statistics week
Infrared electric transducer of releasing corresponds to net number in detection range, i.e., net number corresponding to the sub- air-supply region in period phase;Its
In, it is infrared release electric transducer and detected when, the number that can detect away and the number entered, the number gone out with should
The absolute value of the difference of the number of entrance is discrepancy number;Source number is the net number of a upper measurement period, i.e., is united at this
When the meter cycle starts, infrared electric transducer of releasing carries out demographics, and the infrared electric transducer of releasing corresponds to detection zone presence originally
Number;Specifically, when getting measurement period, then obtain infrared electric transducer of releasing in the measurement period period and correspond to area
The infrared discrepancy number for releasing electric transducer corresponding region in the source number in domain, and the measurement period period, according to the source number
With the discrepancy number, the infrared net people for releasing electric transducer corresponding region in the measurement period period can be then obtained by calculating
Number.
Step S1212, according to the discrepancy number and the source number, calculate the net people in the measurement period period
Number.
In the present embodiment, the net number then for the discrepancy number and the source number and value;Specifically, system is being got
When counting the cycle, while obtain the infrared electric transducer of releasing and correspond to source number in detection range (i.e. corresponding to the sub- air-supply region
Source number), and the infrared electric transducer of releasing corresponds to discrepancy number in detection range within the measurement period period, wherein,
For the measurement period, the infrared electric transducer of releasing corresponds in detection range the discrepancy number, and the number gone out and the number entered are poor
The absolute value of value;When getting the source number and the discrepancy number, read group total is carried out to the source number and the discrepancy number,
What is be calculated is net number;
The new blower fan fresh air quantity control method that the present embodiment proposes, by obtaining in the measurement period period, is based on
The infrared discrepancy number and source number released electric transducer and detected, then according to the discrepancy number and the source number, is calculated
Net number in the measurement period period, realize and net number is detected by infrared electric transducer of releasing, obtained more accurate
True demographics numerical value, so as to more accurately define the resh air requirement of the actually required new blower fan asked.
Based on first embodiment, the 5th embodiment of the new blower fan fresh air quantity control method of the proposition present invention, reference picture 7,
In the present embodiment, step S2000 includes:
Step S2100, obtain demand resh air requirement per capita;
In the present embodiment, demand resh air requirement is the resh air requirement of required new blower fan per capita per capita, and demand is new per capita for this
Air quantity is preset value, can be also calculated according to pre-set programs;Specifically, when getting total number of persons, storage is obtained per capita
Demand resh air requirement;According to the amount of fresh air per person and total number of persons, then the total number of persons within the measurement period period can be calculated
The resh air requirement of corresponding demand, i.e. target resh air requirement, so as to can then determine that new blower fan needs what is adjusted according to the target air volume
Target windscreen.
Step S2200, based on the resh air requirement of demand per capita and the total number of persons, determine the target wind of the new blower fan
Gear.
In the present embodiment, target windscreen is the target adjustment value of new blower fan windscreen, when being adjusted to new blower fan, i.e.,
When being adjusted to the windscreen of new blower fan, original windscreen is adjusted to target windscreen, it is new that measurement period is also indicated as this simultaneously
The adjustment cycle of blower fan;Specifically, when getting total number of persons, then when obtaining demand resh air requirement per capita, by the total number of persons with being somebody's turn to do
Demand resh air requirement is multiplied per capita, can then obtain demand resh air requirement total corresponding to the measurement period by calculating, i.e. target is new
Air quantity;When target resh air requirement is calculated, target air volume scope corresponding to the target resh air requirement is determined, according to default target
Air quantity scope and the corresponding relation of target windscreen, it may be determined that target windscreen corresponding to the target air volume.
The new blower fan fresh air quantity control method that the present embodiment proposes, by obtaining demand resh air requirement per capita, it is next based on institute
Demand resh air requirement per capita and the total number of persons are stated, determines the target windscreen of the new blower fan, is realized by new to demand per capita
The calculating of air quantity and total number of persons, the actually required total resh air requirement asked is accurately obtained, has further been realized to new blower fan
The accurate control of resh air requirement.
Based on the 5th embodiment, the sixth embodiment of the new blower fan fresh air quantity control method of the proposition present invention, reference picture 8,
In the present embodiment, step S2200 includes:
Step S2210, based on the resh air requirement of demand per capita and the total number of persons, calculate mesh corresponding to the measurement period
Mark resh air requirement;
In the present embodiment, target resh air requirement is the target air volume value of new blower fan adjustment;According to the demand per capita got
Resh air requirement and total number of persons, target resh air requirement corresponding to measurement period can be calculated;Specifically, the measurement period is being got
During corresponding total number of persons, demand resh air requirement per capita is obtained;To the total number of persons and the demand resh air requirement progress multiplying per capita, institute
The product obtained is target resh air requirement;Corresponding target windscreen can determine that according to the target resh air requirement;
The target air volume is represented by:Vp=Pa*V0, wherein, V0Represent demand resh air requirement per capita, PaRepresent total number of persons, Vp
Represent target air volume.
Step S2220, according to the target resh air requirement, determine the target windscreen of the new blower fan.
In the present embodiment, each target resh air requirement is corresponding with identical or different air quantity scope, different air quantity scopes
Then correspond to different windscreens;Therefore, when by the way that target resh air requirement is calculated, target wind corresponding to the target resh air requirement is determined
Amount scope, the target windscreen according to corresponding to the target air volume scope can then determine the target resh air requirement, wherein, each target wind
The corresponding relation of the corresponding windscreen of scope is measured, can be determined by self-defined setting or acquiescence corresponding relation;For example, acquiescence
Three groups of target air volume scope division, respectively 500 to 1000 groups, 1000 to 1500 groups, 1500 to 2000 groups, three groups of target wind
Amount scope then corresponds to the low windscreen, middle windscreen and high windscreen of target windscreen respectively;The target resh air requirement is being calculated as 1800
When, then it is 1500 to 2000 groups that can determine target air volume scope corresponding to the target resh air requirement, and the group 1500 to 2000
Target windscreen scope then corresponds to the high windscreen of target windscreen, so, it may be determined that target corresponding to the obtained target resh air requirement
Windscreen is high windscreen.
The new blower fan fresh air quantity control method that the present embodiment proposes, by based on the resh air requirement of demand per capita and described total
Number, target resh air requirement corresponding to the measurement period is calculated, then according to the target resh air requirement, determine the new blower fan
Target windscreen, the acquisition to target windscreen is realized, and by calculating target resh air requirement so that determined according to target resh air requirement
Target windscreen is more accurate, further realizes the accurate control to new blower fan resh air requirement.
Based on first embodiment, the 7th embodiment of the new blower fan fresh air quantity control method of the proposition present invention, reference picture 9,
In the present embodiment, step S3000 includes:
Step S3100, obtain the new blower fan works as front windshield;
In the present embodiment, when the windscreen that front windshield is new blower fan corresponding to the current statistic cycle, it is determined that target windscreen
When, obtain currently the newly windscreen of blower fan, i.e. target windscreen;Specifically, when front windshield can by reading the windscreen signal of new blower fan,
Different windscreens correspond to different windscreen signals, obtain current windscreen signal, and the fresh air can be got according to the windscreen signal
Machine works as front windshield.
Step S3200, it is determined that it is described when the ratio relation of front windshield and the target windscreen, adjusted according to the ratio relation
The whole new blower fan works as front windshield.
In the present embodiment, ratio relation is the magnitude relationship with target windscreen, different ratio relations pair when front windshield
Answer the Adjusted Option of different new blower fan windscreens;Get new blower fan when front windshield when, judge the current wind of the new blower fan
The ratio relation for the target windscreen for keeping off and being calculated, it is determined that the target windscreen and the ratio relation for deserving front windshield are 1 to 1
When, i.e., when the target windscreen is equal to front windshield is deserved, then new blower fan keeps working as front windshield;It is determined that the target windscreen is current with this
When the ratio relation of windscreen is not 1 to 1, i.e., when the target windscreen is not equal to front windshield is deserved, then need to obtain the new blower fan
Standard gear bands, the standard gear bands are scope of the new blower fan lower limit windscreen to upper limit windscreen;Wherein, in the target wind
When gear is more than front windshield is deserved, then judge to deserve the upper limit windscreen whether front windshield is equal to the standard gear bands, if this is current
Windscreen is equal to the upper limit windscreen, then new blower fan keeps working as front windshield;If deserving front windshield is not equal to the upper limit windscreen, adjustment should
New blower fan works as front windshield to target windscreen;When target windscreen is less than when front windshield, then judge to deserve whether front windshield is equal to
The lower limit windscreen of the standard gear bands, if deserving front windshield is equal to the lower limit windscreen, new blower fan keeps working as front windshield.
The new blower fan fresh air quantity control method that the present embodiment proposes, work as front windshield by obtain the new blower fan, then
It is determined that it is described when the ratio relation of front windshield and the target windscreen, the current of the new blower fan is adjusted according to the ratio relation
Windscreen, realize to when the determination of front windshield and target windscreen ratio relation, so as to adjust new blower fan according to the ratio relation
Work as front windshield so that the control to new blower fan resh air requirement is more accurate.
Based on the 7th embodiment, the 8th embodiment of the new blower fan fresh air quantity control method of the proposition present invention, reference picture 10,
In the present embodiment, step S3200 includes:
Step S3210, obtain the standard gear scope of the new blower fan;
In the present embodiment, standard gear scope is the adjustable gear bands of new blower fan, the i.e. new blower fan lower limit windscreen
To the scope of upper limit windscreen;Different new blower fans correspond to similar and different standard gear bands, specifically, are getting new blower fan
When the ratio relation of front windshield and target windscreen, then standard gear bands corresponding to the new blower fan are obtained, if the standard gear
Scope [Fmin,Fmax] represent, then wherein FminRepresent the lower limit windscreen of the new blower fan windscreen, FmaxRepresent the new blower fan windscreen
Upper limit windscreen;, can according to the standard gear bands of the new blower fan and the ratio relation of the new current windscreen of blower fan and target windscreen
With to the new blower fan when front windshield is adjusted.
Step S3220, based on the standard gear scope and the ratio relation, the current wind of the adjustment new blower fan
Gear.
In the present embodiment, get new blower fan when front windshield and target windscreen ratio relation and standard gear bands
When, work as front windshield according to what the ratio relation and the standard gear bands adjusted the new blower fan, front windshield will be deserved and be adjusted to
Target windscreen;Specifically, when target windscreen is more than when front windshield, judge to deserve whether front windshield is equal to the standard gear bands
Upper limit windscreen, if deserving front windshield is equal to the upper limit windscreen, front windshield is worked as in new blower fan holding;If deserve front windshield to be not equal to
The upper limit windscreen, then adjust the new blower fan works as front windshield to target windscreen;When target windscreen is less than when front windshield, judging should
When front windshield whether be equal to the standard gear bands lower limit windscreen, if deserve front windshield be equal to the lower limit windscreen, new blower fan
Front windshield is worked as in holding;If deserving front windshield is not equal to the lower limit windscreen, adjustment is when front windshield to target windscreen in target windscreen
Equal to when front windshield, then new blower fan keeps working as front windshield.
If target windscreen FbRepresent, as front windshield FaRepresent, in Fa=FbWhen, new blower fan is kept when front windshield is Fa;
In Fb>FaWhen, and Fa≠Fmax, then adjust the new blower fan works as front windshield FaTo target windscreen Fb;In Fb<FaWhen, and Fa≠Fmin,
Then equally adjust the new blower fan works as front windshield FaTo target windscreen Fb。
The new blower fan fresh air quantity control method that the present embodiment proposes, by obtaining the standard gear scope of the new blower fan,
The standard gear scope and the ratio relation are next based on, adjust the new blower fan works as front windshield, realizes to fresh air
The control of machine resh air requirement, according to standard gear bands and when front windshield and the ratio relation of target windscreen so that new to new blower fan
The control of air quantity is more accurate, and the windscreen of new blower fan can be adjusted according to real demand resh air requirement.
In addition, to achieve the above object, the present invention also provides a kind of new blower fan fresh air quantity control device, and the new blower fan is new
Air quantity controller includes:Memory, processor and it is stored on the memory and can runs on the processor new
Blower fan fresh air quantity control program, following steps are realized when the new blower fan fresh air quantity control program is by the computing device:
Obtain the total number of persons that new blower fan in the measurement period period corresponds to air-supply region;
The target windscreen of the new blower fan is determined based on the total number of persons;
Front windshield is worked as according to the target windscreen adjustment new blower fan.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
When receiving the starting-up signal of new blower fan, measurement period is obtained;
Based on the measurement period, total people that the new blower fan in the measurement period period corresponds to air-supply region is counted
Number.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain the net number in the measurement period period;
According to the net number, the total number of persons that new blower fan in the measurement period period corresponds to air-supply region is calculated.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain in the measurement period period, based on the infrared discrepancy number and source number released electric transducer and detected;
According to the discrepancy number and the source number, the net number in the measurement period period is calculated.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain demand resh air requirement per capita;
Based on the resh air requirement of demand per capita and the total number of persons, the target windscreen of the new blower fan is determined.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Based on the resh air requirement of demand per capita and the total number of persons, target resh air requirement corresponding to the measurement period is calculated;
According to the target resh air requirement, the target windscreen of the new blower fan is determined.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain the new blower fan works as front windshield;
It is determined that it is described when the ratio relation of front windshield and the target windscreen, the fresh air is adjusted according to the ratio relation
Machine works as front windshield.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain the standard gear scope of the new blower fan;
Based on the standard gear scope and the ratio relation, adjust the new blower fan works as front windshield.
In addition, to achieve the above object, the present invention also provides a kind of computer-readable recording medium, described computer-readable
New blower fan fresh air quantity control program is stored with storage medium, it is real when the new blower fan fresh air quantity control program is executed by processor
Existing following steps:
Obtain the total number of persons that new blower fan in the measurement period period corresponds to air-supply region;
The target windscreen of the new blower fan is determined based on the total number of persons;
Front windshield is worked as according to the target windscreen adjustment new blower fan.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
When receiving the starting-up signal of new blower fan, measurement period is obtained;
Based on the measurement period, total people that the new blower fan in the measurement period period corresponds to air-supply region is counted
Number.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain the net number in the measurement period period;
According to the net number, the total number of persons that new blower fan in the measurement period period corresponds to air-supply region is calculated.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain in the measurement period period, based on the infrared discrepancy number and source number released electric transducer and detected;
According to the discrepancy number and the source number, the net number in the measurement period period is calculated.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain demand resh air requirement per capita;
Based on the resh air requirement of demand per capita and the total number of persons, the target windscreen of the new blower fan is determined.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Based on the resh air requirement of demand per capita and the total number of persons, target resh air requirement corresponding to the measurement period is calculated;
According to the target resh air requirement, the target windscreen of the new blower fan is determined.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain the new blower fan works as front windshield;
It is determined that it is described when the ratio relation of front windshield and the target windscreen, the fresh air is adjusted according to the ratio relation
Machine works as front windshield.
Further, the new blower fan fresh air quantity control program is also realized following operation during the computing device:
Obtain the standard gear scope of the new blower fan;
Based on the standard gear scope and the ratio relation, adjust the new blower fan works as front windshield.
It should be noted that herein, term " comprising ", "comprising" or its any other variant are intended to non-row
His property includes, so that process, method, article or system including a series of elements not only include those key elements, and
And also include the other element being not expressly set out, or also include for this process, method, article or system institute inherently
Key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including this
Other identical element also be present in the process of key element, method, article or system.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on such understanding, technical scheme is substantially done to prior art in other words
Going out the part of contribution can be embodied in the form of software product, and the computer software product is stored in one as described above
In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions to cause a station terminal equipment (can be mobile phone,
Computer, server, air conditioner, or network equipment etc.) perform method described in each embodiment of the present invention.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every to utilize this hair
The equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills
Art field, is included within the scope of the present invention.
Claims (10)
- A kind of 1. new blower fan fresh air quantity control method, it is characterised in that the new blower fan fresh air quantity control method includes:Obtain the total number of persons that new blower fan in the measurement period period corresponds to air-supply region;The target windscreen of the new blower fan is determined based on the total number of persons;Front windshield is worked as according to the target windscreen adjustment new blower fan.
- 2. new blower fan fresh air quantity control method as claimed in claim 1, it is characterised in that in the acquisition measurement period period The step of new blower fan corresponds to the total number of persons of air-supply region includes:When receiving the starting-up signal of new blower fan, measurement period is obtained;Based on the measurement period, the total number of persons that the new blower fan in the measurement period period corresponds to air-supply region is counted.
- 3. new blower fan fresh air quantity control method as claimed in claim 2, it is characterised in that during the statistics measurement period Between the step of new blower fan corresponds to the total number of persons of air-supply region in section include:Obtain the net number in the measurement period period;According to the net number, the total number of persons that new blower fan in the measurement period period corresponds to air-supply region is calculated.
- 4. new blower fan fresh air quantity control method as claimed in claim 3, it is characterised in that the acquisition measurement period period The step of interior net number, includes:Obtain in the measurement period period, based on the infrared discrepancy number and source number released electric transducer and detected;According to the discrepancy number and the source number, the net number in the measurement period period is calculated.
- 5. new blower fan fresh air quantity control method as claimed in claim 1, it is characterised in that described to be determined based on the total number of persons The step of target windscreen of the new blower fan, includes:Obtain demand resh air requirement per capita;Based on the resh air requirement of demand per capita and the total number of persons, the target windscreen of the new blower fan is determined.
- 6. new blower fan fresh air quantity control method as claimed in claim 5, it is characterised in that described new based on the demand per capita Air quantity and the total number of persons, include the step of the target windscreen for determining the new blower fan:Based on the resh air requirement of demand per capita and the total number of persons, target resh air requirement corresponding to the measurement period is calculated;According to the target resh air requirement, the target windscreen of the new blower fan is determined.
- 7. new blower fan fresh air quantity control method as claimed in claim 1, it is characterised in that described to be adjusted according to the target windscreen The new blower fan includes the step of working as front windshield:Obtain the new blower fan works as front windshield;It is determined that it is described when the ratio relation of front windshield and the target windscreen, the new blower fan is adjusted according to the ratio relation Work as front windshield.
- 8. new blower fan fresh air quantity control method as claimed in claim 7, it is characterised in that described to be adjusted according to the ratio relation The new blower fan includes the step of working as front windshield:Obtain the standard gear scope of the new blower fan;Based on the standard gear scope and the ratio relation, adjust the new blower fan works as front windshield.
- 9. a kind of new blower fan fresh air quantity control device, it is characterised in that the new blower fan fresh air quantity control device includes:Storage Device, processor and the new blower fan fresh air quantity control program that is stored on the memory and can run on the processor, institute New blower fan fresh air quantity control program is stated by fresh air of the realization as any one of claim 1 to 8 during the computing device The step of machine fresh air quantity control method.
- 10. a kind of computer-readable recording medium, it is characterised in that new blower fan is stored with the computer-readable recording medium Fresh air quantity control program, realized when the new blower fan fresh air quantity control program is executed by processor as any in claim 1 to 8 Described in new blower fan fresh air quantity control method the step of.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710977732.XA CN107883551A (en) | 2017-10-18 | 2017-10-18 | New blower fan fresh air quantity control method, apparatus and computer-readable recording medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710977732.XA CN107883551A (en) | 2017-10-18 | 2017-10-18 | New blower fan fresh air quantity control method, apparatus and computer-readable recording medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107883551A true CN107883551A (en) | 2018-04-06 |
Family
ID=61781906
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710977732.XA Pending CN107883551A (en) | 2017-10-18 | 2017-10-18 | New blower fan fresh air quantity control method, apparatus and computer-readable recording medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107883551A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108592304A (en) * | 2018-04-27 | 2018-09-28 | 广东美的制冷设备有限公司 | Inletting fresh air control method, air conditioner and the readable storage medium storing program for executing of air conditioner |
CN112181032A (en) * | 2020-10-21 | 2021-01-05 | 成都小巨人畜牧设备有限公司 | Intelligent pasture environment control system |
CN112628982A (en) * | 2020-12-23 | 2021-04-09 | 青岛海信电子产业控股股份有限公司 | Control equipment and ventilation control method thereof |
CN112880135A (en) * | 2021-01-12 | 2021-06-01 | 许磊 | Fresh air system control method and device, storage medium and data processing terminal |
CN112902414A (en) * | 2019-12-03 | 2021-06-04 | 佛山市云米电器科技有限公司 | Control method of fresh air system, fresh air system and computer readable storage medium |
CN114791142A (en) * | 2021-01-25 | 2022-07-26 | 浙江盾安人工环境股份有限公司 | Control method and device of fresh air system, electronic device and computer equipment |
CN114963437A (en) * | 2022-04-26 | 2022-08-30 | 青岛海尔空调器有限总公司 | Control method of fresh air fan in air conditioner indoor unit and air conditioner indoor unit |
CN116085986A (en) * | 2022-12-27 | 2023-05-09 | 小米科技(武汉)有限公司 | Fresh air curtain adjusting method, device, equipment, storage medium and program product |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11351633A (en) * | 1999-06-01 | 1999-12-24 | Misawa Homes Co Ltd | Central ventilating apparatus |
JP2002349937A (en) * | 2001-05-24 | 2002-12-04 | Asahi Kasei Corp | Ventilation amount of building, and temperature predicting system |
CN201155836Y (en) * | 2007-09-13 | 2008-11-26 | 尹晓东 | Fresh air machine intelligent control frequency conversion energy-saving device |
CN102444958A (en) * | 2010-10-11 | 2012-05-09 | 上海建坤信息技术有限责任公司 | Fresh air system based on video people flow statistics and energy-saving control method thereof |
CN102878641A (en) * | 2012-10-11 | 2013-01-16 | 重庆大学 | Energy-saving control method for fresh air |
CN202947258U (en) * | 2012-10-09 | 2013-05-22 | 四川澄观节能环保科技有限公司 | Machine room fresh air machine intelligent frequency-conversion and energy-conservation control device with self-adaptive functions |
CN105485840A (en) * | 2015-12-16 | 2016-04-13 | 深圳达实智能股份有限公司 | Control method and system for air supply of air conditioner |
CN106123229A (en) * | 2016-06-29 | 2016-11-16 | 广东美的暖通设备有限公司 | New blower fan and the air quantity control method of new blower fan |
CN106545956A (en) * | 2016-10-08 | 2017-03-29 | 珠海格力电器股份有限公司 | Control method and device of fresh air machine |
CN206073370U (en) * | 2016-09-30 | 2017-04-05 | 长安大学 | Public Areas Associated with Metro Station air conditioner fresh air control system |
-
2017
- 2017-10-18 CN CN201710977732.XA patent/CN107883551A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11351633A (en) * | 1999-06-01 | 1999-12-24 | Misawa Homes Co Ltd | Central ventilating apparatus |
JP2002349937A (en) * | 2001-05-24 | 2002-12-04 | Asahi Kasei Corp | Ventilation amount of building, and temperature predicting system |
CN201155836Y (en) * | 2007-09-13 | 2008-11-26 | 尹晓东 | Fresh air machine intelligent control frequency conversion energy-saving device |
CN102444958A (en) * | 2010-10-11 | 2012-05-09 | 上海建坤信息技术有限责任公司 | Fresh air system based on video people flow statistics and energy-saving control method thereof |
CN202947258U (en) * | 2012-10-09 | 2013-05-22 | 四川澄观节能环保科技有限公司 | Machine room fresh air machine intelligent frequency-conversion and energy-conservation control device with self-adaptive functions |
CN102878641A (en) * | 2012-10-11 | 2013-01-16 | 重庆大学 | Energy-saving control method for fresh air |
CN105485840A (en) * | 2015-12-16 | 2016-04-13 | 深圳达实智能股份有限公司 | Control method and system for air supply of air conditioner |
CN106123229A (en) * | 2016-06-29 | 2016-11-16 | 广东美的暖通设备有限公司 | New blower fan and the air quantity control method of new blower fan |
CN206073370U (en) * | 2016-09-30 | 2017-04-05 | 长安大学 | Public Areas Associated with Metro Station air conditioner fresh air control system |
CN106545956A (en) * | 2016-10-08 | 2017-03-29 | 珠海格力电器股份有限公司 | Control method and device of fresh air machine |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108592304A (en) * | 2018-04-27 | 2018-09-28 | 广东美的制冷设备有限公司 | Inletting fresh air control method, air conditioner and the readable storage medium storing program for executing of air conditioner |
CN112902414A (en) * | 2019-12-03 | 2021-06-04 | 佛山市云米电器科技有限公司 | Control method of fresh air system, fresh air system and computer readable storage medium |
CN112902414B (en) * | 2019-12-03 | 2022-08-19 | 佛山市云米电器科技有限公司 | Control method of fresh air system, fresh air system and computer readable storage medium |
CN112181032A (en) * | 2020-10-21 | 2021-01-05 | 成都小巨人畜牧设备有限公司 | Intelligent pasture environment control system |
CN112628982A (en) * | 2020-12-23 | 2021-04-09 | 青岛海信电子产业控股股份有限公司 | Control equipment and ventilation control method thereof |
CN112880135A (en) * | 2021-01-12 | 2021-06-01 | 许磊 | Fresh air system control method and device, storage medium and data processing terminal |
CN114791142A (en) * | 2021-01-25 | 2022-07-26 | 浙江盾安人工环境股份有限公司 | Control method and device of fresh air system, electronic device and computer equipment |
CN114791142B (en) * | 2021-01-25 | 2023-12-05 | 浙江盾安人工环境股份有限公司 | Control method and device of fresh air system, electronic device and computer equipment |
CN114963437A (en) * | 2022-04-26 | 2022-08-30 | 青岛海尔空调器有限总公司 | Control method of fresh air fan in air conditioner indoor unit and air conditioner indoor unit |
WO2023207533A1 (en) * | 2022-04-26 | 2023-11-02 | 青岛海尔空调器有限总公司 | Control method for fresh air fan in air conditioner indoor unit, and air conditioner indoor unit |
CN116085986A (en) * | 2022-12-27 | 2023-05-09 | 小米科技(武汉)有限公司 | Fresh air curtain adjusting method, device, equipment, storage medium and program product |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107883551A (en) | New blower fan fresh air quantity control method, apparatus and computer-readable recording medium | |
CN107781957A (en) | Constant air capacity control, air conditioner and the computer-readable recording medium of air conditioner | |
CN109361865B (en) | Shooting method and terminal | |
CN108006914A (en) | Air conditioning control method, device and computer-readable recording medium | |
CN110910503B (en) | Simulation method and device for air conditioning environment | |
CN108489040B (en) | Floor air conditioner, method of controlling the same, and computer-readable storage medium | |
CN107120813A (en) | Air conditioner air blowing control method, electronic equipment and computer-readable recording medium | |
CN104215264A (en) | Portable electronic device with integrated temperature sensor being compensated by other sensing data | |
US20010041647A1 (en) | Health maintenance system | |
CN107426423A (en) | Reminding method, terminal and the computer-readable storage medium of posture are used based on terminal | |
CN110970003A (en) | Screen brightness adjusting method and device, electronic equipment and storage medium | |
CN107449111A (en) | Air-conditioner control method, electronic equipment and computer-readable recording medium | |
CN107623818B (en) | Image exposure method and mobile terminal | |
CN107770454A (en) | A kind of image processing method, terminal and computer-readable recording medium | |
US20180059079A1 (en) | Method and apparatus for calibrating particulate matter measurement value | |
CN107906698A (en) | Floor air conditioner and control method, device, computer-readable recording medium | |
CN110533651B (en) | Image processing method and device | |
CN107576026A (en) | Fresh air quantity control method, new blower fan and the computer-readable recording medium of new blower fan | |
CN108224713B (en) | Calm sensing control method, apparatus and computer readable storage medium | |
CN105241594A (en) | Method and device for determining value of consumed energy | |
CN108180608A (en) | Air conditioning control method, device and computer readable storage medium | |
CN108536367A (en) | A kind of processing method, terminal and the readable storage medium storing program for executing of interaction page interim card | |
CN107678934A (en) | Interim card index selection method and device | |
CN107575993B (en) | Multi-connected fresh air machine control method and device and computer readable storage medium | |
CN110363036A (en) | Code scanning method and device based on wire controller and code scanning system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180406 |