CN107564399B - Assembled structure system teaching demonstration platform - Google Patents

Assembled structure system teaching demonstration platform Download PDF

Info

Publication number
CN107564399B
CN107564399B CN201710999130.4A CN201710999130A CN107564399B CN 107564399 B CN107564399 B CN 107564399B CN 201710999130 A CN201710999130 A CN 201710999130A CN 107564399 B CN107564399 B CN 107564399B
Authority
CN
China
Prior art keywords
assembled
foundation beam
platform
prefabricated
display room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710999130.4A
Other languages
Chinese (zh)
Other versions
CN107564399A (en
Inventor
张波
张树辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Wanda Technology Co ltd
Original Assignee
Shandong Wanda Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Wanda Technology Co ltd filed Critical Shandong Wanda Technology Co ltd
Publication of CN107564399A publication Critical patent/CN107564399A/en
Application granted granted Critical
Publication of CN107564399B publication Critical patent/CN107564399B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The assembled structure system teaching demonstration platform comprises a platform, wherein a tower crane, an assembled steel structure display room, an assembled concrete frame structure display room, a multi-layer plate type fast-assembling structure display room and an assembled shear wall structure display room are arranged on the platform, and the assembled steel structure display room, the assembled concrete frame structure display room, the multi-layer plate type fast-assembling structure display room and the assembled shear wall structure display room are all arranged around the tower crane within the lifting range of the tower crane. The invention has the advantages that: the foundation components of various construction methods in the assembled building are integrated in a special teaching platform, and the foundation components share one tower crane for hoisting operation, so that various operation methods and working procedures in the assembled building construction are demonstrated for students, the students can conveniently and intensively learn to watch and learn, the learning period is greatly shortened, the students are not required to enter and exit a building construction site, the safety is effectively ensured, the building construction progress is not influenced, and the like.

Description

Assembled structure system teaching demonstration platform
Technical Field
The invention relates to a teaching demonstration tool in the building industry, in particular to an assembled structural system teaching demonstration platform.
Background
Fabricated building refers to a building assembled from prefabricated components at a worksite. The building has the advantages of high building speed, less limitation of weather conditions, labor saving and building quality improvement. The connection mode from the structural system to the members such as beams, plates, walls, columns and the like and the members of the assembled structure is different from that of the traditional integral cast-in-situ structure, and the assembled structure is different from that of the traditional building in terms of structural stress, calculation, manufacturing and installation. At present, in courses of universities, the adopted teaching materials and teaching contents mainly adopt the design and construction of traditional buildings, and only a small part of the courses related to the assembled structure are set in the schools, but the teaching materials in the aspects of design, manufacture, installation and the like of the assembled structure are relatively absent. At present, when students of each building specialty learn to learn, the students need to learn knowledge such as construction operation methods and working procedures on site in a field, but the students learn on site in the construction site to have certain potential safety hazards and influence the construction progress, and because the construction modes and the progress of each construction site are different, the students can only learn part of working procedures and construction methods in one-time observation arrangement, the students need to know that various assembled building construction knowledge often needs to repeatedly enter and exit a plurality of construction sites to conduct observation, and because the construction period is long, and moreover, each construction site often is more scattered, the period of the student site observation learning is generally long for several months.
Disclosure of Invention
The invention aims to provide an assembled structural system teaching demonstration platform, which integrates basic components of various construction methods in an assembled building into a special teaching platform, and shares a tower crane for hoisting operation, so that various operation methods and working procedures in the assembled building construction are demonstrated for students, the students can conveniently and intensively learn to observe and learn, the learning period is greatly shortened, the students are not required to enter and exit building construction sites, the safety is effectively ensured, and the construction progress of the building is not influenced.
In order to achieve the above purpose, the following technical scheme is adopted: including the platform, set up tower crane, assembled steel construction show house, assembled concrete frame structure show house, multi-layer board-like fast-assembling structure show house and assembled shear wall structure show house on the platform, assembled steel construction show house, assembled concrete frame structure show house, multi-layer board-like fast-assembling structure show house and assembled shear wall structure show house all surround the tower crane setting in the handling scope of tower crane, assembled steel construction show house is including setting up the first foundation beam at the platform top surface, and first foundation beam top surface sets up a plurality of steel stand, installs steel crossbeam between the steel stand, and the first outer wall link is installed in the steel crossbeam outside, and first outer wall link upper portion is connected with the steel crossbeam through detachable upper connecting piece, and first outer wall link lower part is connected with first foundation beam through detachable lower connecting piece, and the first precast floor of steel crossbeam top installation, assembled concrete frame structure show house is including setting up the second foundation beam at the platform top surface, and the second foundation beam top surface sets up a plurality of concrete stand, installs the first external wall link between the concrete stand, and second external wall link upper connecting piece is connected with the first foundation beam through the first outer wall link, and the second outer wall link upper connecting piece is connected with the first foundation beam, and the second outer wall link upper connecting piece is fixed, and the second wall link upper roof is connected with the first precast floor top surface is fixed, the first prefabricated movable wallboard bottom surface sets up first jack with the position that each first dowel bar corresponds, and first dowel bar and first jack cooperation are pegged graft, all is connected through detachable transverse connection spare between first prefabricated movable wallboard and the adjacent first fixed wall or another first prefabricated movable wallboard, and the third prefabricated floor is installed at first fixed wall top, assembled shear wall structure show room is including setting up the fourth foundation beam at the platform top surface, and fourth foundation beam top surface sets up a plurality of second fixed wall and a plurality of second prefabricated movable wallboard, and second fixed wall and fourth foundation beam fixed connection, and second prefabricated movable wallboard bottom surface sets up a plurality of second jacks, and fourth foundation beam top surface sets up the second dowel bar with the position that each second jack corresponds, and second dowel bar and second jack peg graft the cooperation are equipped with cast-in-place clearance between the adjacent second prefabricated movable wallboard, and cast-in-place clearance both sides set up cast-in-place template, second fixed wall top installation fourth prefabricated floor. And the first external wall hanging plate, the second external wall hanging plate, the first prefabricated movable wall plate and the second prefabricated movable wall plate are all provided with embedded hanging rings. The detachable transverse connecting piece comprises a first lantern ring connected with the first prefabricated movable wallboard and a second lantern ring installed on the first fixed wall adjacent to the first prefabricated movable wallboard or another first prefabricated movable wallboard, the first lantern ring and the second lantern ring can be mutually overlapped in the vertical direction, and after the first lantern ring and the second lantern ring are mutually overlapped in the vertical direction, the longitudinal reinforcing ribs penetrate into the first lantern ring and the second lantern ring. And cushion layers are arranged among the first foundation beam, the second foundation beam, the third foundation beam, the fourth foundation beam and the platform. The second fixed walls or the inner sides of the second prefabricated movable wallboards at the two ends of the cast-in-situ gap are provided with embedded screw sleeves, the two ends of the cast-in-situ template at the inner side of the cast-in-situ gap are respectively provided with a pressing plate, each pressing plate is connected with the embedded screw sleeve through a bolt, and the cast-in-situ templates at the inner side and the outer side of the cast-in-situ gap are connected through split bolts. The prefabricated stairway is arranged in the fabricated steel structure display room or the fabricated concrete frame structure display room or the multi-layer plate type fast-assembling structure display room or the fabricated shear wall structure display room.
The invention has the advantages that: the foundation components of various construction methods in the assembled building are integrated in a special teaching platform, and the foundation components share one tower crane for hoisting operation, so that various operation methods and working procedures in the assembled building construction are demonstrated for students, the students can conveniently and intensively learn to watch and learn, the learning period is greatly shortened, the students are not required to enter and exit a building construction site, the safety is effectively ensured, the building construction progress is not influenced, and the like.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is an enlarged schematic view of the cross-section A-A of FIG. 1;
FIG. 3 is an enlarged schematic view of the cross-section B-B of FIG. 1;
FIG. 4 is an enlarged schematic view of the cross-section C-C of FIG. 1;
FIG. 5 is an enlarged schematic view of the section D-D of FIG. 1;
FIG. 6 is an enlarged schematic view of the structure of the portion I in FIG. 1;
fig. 7 is an enlarged schematic view of the portion II in fig. 1.
Description of the embodiments
The invention relates to an assembled structure system teaching demonstration platform, which comprises a platform 1, wherein a tower crane 2, an assembled steel structure display room 3, an assembled concrete frame structure display room 4, a multi-layer plate type fast-assembling structure display room 5 and an assembled shear wall structure display room 6 are arranged on the platform 1, the assembled steel structure display room 3, the assembled concrete frame structure display room 4, the multi-layer plate type fast-assembling structure display room 5 and the assembled shear wall structure display room 6 are all arranged around the tower crane 2 within the lifting range of the tower crane 2, the assembled steel structure display room 3 comprises a first foundation beam 11 arranged on the top surface of the platform 1, a plurality of steel upright posts 12 are arranged on the top surface of the first foundation beam 11, steel cross beams 13 are arranged between the steel upright posts 12, a first outer wall hanging plate 14 is arranged outside the steel cross beams 13, the upper part of the first outer wall hanging plate 14 is connected with the steel cross beams 13 through detachable upper connecting pieces, the lower part of the first exterior wall cladding 14 is connected with the first foundation beam 11 through a detachable lower connecting piece, the top of the steel beam 13 is provided with a first precast floor slab 15, the assembled concrete frame structure display house 4 comprises a second foundation beam 21 arranged on the top surface of the platform 1, a plurality of concrete upright posts 22 are arranged on the top surface of the second foundation beam 21, a concrete beam 23 is arranged between the concrete upright posts 22, a second exterior wall cladding 24 is arranged outside the concrete beam 23, the upper part of the second exterior wall cladding 24 is connected with the concrete beam 23 through a detachable upper connecting piece, the lower part of the second exterior wall cladding 24 is connected with the second foundation beam 21 through a detachable lower connecting piece, the top of the concrete beam 23 is provided with a second precast floor slab 25, the multi-layer plate type fast-assembling structure display house 5 comprises a third foundation beam 31 arranged on the top surface of the platform 1, the top of the third foundation beam 31 is provided with a plurality of first fixed walls 32 and a plurality of first prefabricated movable wallboards 33, the first fixed walls 32 are fixedly connected with the third foundation beam 31, the top of the third foundation beam 31 is provided with a plurality of first inserting ribs 34, the bottom of the first prefabricated movable wallboards 33 is provided with first inserting holes 35 at positions corresponding to the first inserting ribs 34, the first inserting ribs 34 are matched and inserted with the first inserting holes 35, the first prefabricated movable wallboards 33 are connected with the adjacent first fixed walls 32 or the other first prefabricated movable wallboards 33 through detachable transverse connectors, the top of each first fixed wall 32 is provided with a third prefabricated floor slab 36, the fabricated shear wall structure display room 6 comprises a fourth foundation beam 41 arranged on the top of the platform 1, the top of the fourth foundation beam 41 is provided with a plurality of second fixed walls 42 and a plurality of second prefabricated movable wallboards 43, the bottom of the second fixed walls 42 are fixedly connected with the fourth foundation beam 41, the bottom of the fourth prefabricated movable wallboards 43 is provided with a plurality of second inserting holes 45, the fourth foundation beam 41 is cast-in-place and-place corresponding to the second inserting holes 45 is provided with second inserting ribs 44, the second inserting ribs 44 are arranged between the second prefabricated movable wallboards 46 and the two sides of the second prefabricated floor slabs 46, and the two sides of the second prefabricated floor slabs 46 are arranged between the second inserting ribs 46 are arranged on the two sides of the second prefabricated floor slabs 46 in a cast-in-place mode, and the prefabricated floor slab 46 is arranged between the second inserting ribs 45. When a learner observes and rubs, the tower crane 2 can be used for lifting the first outer wall hanging plate 14, the second outer wall hanging plate 24, the first prefabricated movable wall plate 33 and the second prefabricated movable wall plate 43 to the assembly position, the construction method and the working procedure of the foundation component in the assembled building system are demonstrated on site, so that the learner can conveniently concentrate on observing and rubs and study, the teaching demonstration of the complete working procedure of the four-large-structure system in the assembled building can be completed within four days in general, the study period can be greatly shortened, the learner does not need to enter and exit the building construction site, the safety environment is good, the uncontrollable factors are few, the safety risk is low, the teaching and learning process is safer and more reliable, and the construction progress of the building construction site cannot be influenced. The detachable upper connecting piece and the detachable lower connecting piece can adopt various connecting structures such as hooks, hanging rings and the like which are used on the prior assembled building exterior wall hanging plate, wherein the disclosure number is preferably as follows: 205604545U's exterior wall cladding antidetonation goes up connecting piece and publication number: 205604464U's exterior wall cladding antidetonation connecting piece down, this kind of structure adopts bolt and nut cooperation location, and the reliability of dismouting is strong repeatedly, and is not fragile, the accident that the unexpected of difficult emergence exterior wall cladding emptys is favorable to promoting teaching platform's security.
The first exterior wall cladding 14, the second exterior wall cladding 24, the first prefabricated movable wall panel 33 and the second prefabricated movable wall panel 43 can be lifted by adopting a plurality of modes such as rope bundling, and for improving the lifting efficiency, pre-buried lifting rings can be arranged on the first exterior wall cladding 14, the second exterior wall cladding 24, the first prefabricated movable wall panel 33 and the second prefabricated movable wall panel 43. The structure can greatly improve the connection speed of the lifting hook when the building foundation component is repeatedly lifted.
The detachable transverse connecting piece of the invention can adopt various structures, for example, lateral planting bars can be arranged on the first prefabricated movable wallboard 33 of the first fixed wall 32, and after the two planting bars are close, steel wire bundling and the like are used, wherein the preferable structure is as follows: the detachable transverse connector comprises a first collar 52 connected with the first prefabricated movable wallboard 33 and a second collar 53 installed on the first fixed wall 32 adjacent to the first prefabricated movable wallboard 33 or another first prefabricated movable wallboard 33, the first collar 52 and the second collar 53 can be mutually overlapped in the vertical direction, and after the first collar 52 and the second collar 53 are mutually overlapped in the vertical direction, the longitudinal reinforcing ribs 54 penetrate from the first collar 52 and the second collar 53. The structure is convenient to operate in the connection and disassembly processes, can be repeatedly used, and is more suitable for demonstration.
In order to facilitate the same leveling of the foundation beams, the invention ensures that the tower crane 2 uniformly lifts and falls to reduce the operation difficulty and the operation error rate when lifting the components in each display room, and even creates conditions for the automatic operation of the tower crane 2 controlled by a computer program, and cushion layers 55 can be arranged among the first foundation beam 11, the second foundation beam 21, the third foundation beam 31 and the fourth foundation beam 41 and the platform 1.
The cast-in-situ template 47 is used for demonstrating the cast-in-situ construction method of the cast-in-situ gap 46, but actual casting is not needed, so that the cast-in-situ template 47 is preferably installed by adopting the following structure in order to demonstrate the template installation position more clearly and intuitively and reduce the disassembly difficulty at the same time: the second fixed walls 42 at two ends of the cast-in-situ gap 46 or the inner side of the second prefabricated movable wallboard 43 are provided with embedded screw sleeves 48, two ends of the cast-in-situ template 47 at the inner side of the cast-in-situ gap 46 are respectively provided with pressing plates 49, each pressing plate 49 is connected with the embedded screw sleeve 48 through bolts, and the cast-in-situ templates 47 at the inner side and the outer side of the cast-in-situ gap 46 are connected through counter bolts 50. The structure is convenient to disassemble and assemble, clear and visual in structure and convenient for students to observe. Of course, the cast-in-situ mold plate 47 can be installed by other structures such as diagonal braces, but the disassembly and assembly steps of the structures are complicated and are not convenient for students to observe.
The invention can also be used for installing the prefabricated stairway 61 in the assembled steel structure display room 3 or the assembled concrete frame structure display room 4 or the multi-layer plate type fast-assembling structure display room 5 or the assembled shear wall structure display room 6 to demonstrate the assembly mode of the prefabricated stairway between floors, and the prefabricated stairway can also be installed in a mode of matching the dowel bars and the jacks.

Claims (6)

1. Assembled structural system teaching demonstration platform, including platform (1), its characterized in that: set up tower crane (2), assembled steel construction show house (3), assembled concrete frame structure show house (4), multi-layer board-like fast-assembling structure show house (5) and assembled shear wall structure show house (6) on platform (1), assembled steel construction show house (3), assembled concrete frame structure show house (4), multi-layer board-like fast-assembling structure show house (5) and assembled shear wall structure show house (6) all set up around tower crane (2) in the handling scope of tower crane (2), assembled steel construction show house (3) including set up first foundation beam (11) at platform (1) top surface, first foundation beam (11) top surface sets up a plurality of steel stand columns (12), install steel crossbeam (13) between steel stand column (12), install first outer wall link (14) in steel crossbeam (13) outside, first outer wall link (14) upper portion is connected with steel crossbeam (13) through detachable upper connecting piece, first outer wall link (14) lower part is through detachable lower connecting piece and first foundation beam (11) top surface setting up, first foundation beam (21) top surface setting up at platform (4), the top surface of the second foundation beam (21) is provided with a plurality of concrete columns (22), a concrete beam (23) is arranged between the concrete columns (22), a second outer wall hanging plate (24) is arranged outside the concrete beam (23), the upper part of the second outer wall hanging plate (24) is connected with the concrete beam (23) through a detachable upper connecting piece, the lower part of the second outer wall hanging plate (24) is connected with the second foundation beam (21) through a detachable lower connecting piece, the top of the concrete beam (23) is provided with a second prefabricated floor (25), the multi-layer plate type quick-assembly structure display room (5) comprises a third foundation beam (31) arranged on the top surface of the platform (1), a plurality of first fixed walls (32) and a plurality of first prefabricated movable wallboards (33) are arranged at the top of the third foundation beam (31), the first fixed walls (32) are fixedly connected with the third foundation beam (31), a plurality of first inserted ribs (34) are arranged at the top surface of the third foundation beam (31), a plurality of first prefabricated movable wallboards (33) are correspondingly arranged at the positions of the bottom surfaces of the first inserted ribs (34), the first inserted ribs (35) are matched with the first inserted ribs (33) or the first prefabricated wallboards (33) which are connected with the first movable wallboards (33) in a detachable mode, the third precast floor slab (36) is installed at first fixed wall (32) top, assembled shear wall structure show room (6) is including setting up fourth foundation beam (41) at platform (1) top surface, fourth foundation beam (41) top surface sets up a plurality of second fixed walls (42) and a plurality of prefabricated movable wallboard of second (43), second fixed wall (42) and fourth foundation beam (41) fixed connection, a plurality of second jack (45) are set up to second prefabricated movable wallboard (43) bottom surface, second dowel (44) are set up with the position that each second jack (45) corresponds to fourth foundation beam (41) top surface, second dowel (44) are pegged graft the cooperation with second jack (45), be equipped with cast-in-place clearance (46) between adjacent second prefabricated movable wallboard (43), cast-in-place clearance (46) both sides set up cast-in-place template (47), fourth precast floor slab (40) are installed at second fixed wall (42) top.
2. The fabricated structural architecture teaching demonstration platform of claim 1, wherein: the first outer wall hanging plate (14), the second outer wall hanging plate (24), the first prefabricated movable wallboard (33) and the second prefabricated movable wallboard (43) are respectively provided with an embedded hanging ring.
3. The fabricated structural architecture teaching demonstration platform of claim 1, wherein: the detachable transverse connecting piece comprises a first lantern ring (52) connected with the first prefabricated movable wallboard (33) and a second lantern ring (53) installed on the first fixed wall (32) adjacent to the first prefabricated movable wallboard (33) or another first prefabricated movable wallboard (33), the first lantern ring (52) and the second lantern ring (53) can be mutually overlapped in the vertical direction, and after the first lantern ring (52) and the second lantern ring (53) are mutually overlapped in the vertical direction, the longitudinal reinforcing ribs (54) penetrate into the first lantern ring (52) and the second lantern ring (53).
4. The fabricated structural architecture teaching demonstration platform of claim 1, wherein: cushion layers (55) are arranged between the first foundation beam (11), the second foundation beam (21), the third foundation beam (31) and the fourth foundation beam (41) and the platform (1).
5. The fabricated structural architecture teaching demonstration platform of claim 1, wherein: the second fixed walls (42) at two ends of the cast-in-situ gap (46) or the inner sides of the second prefabricated movable wallboards (43) are provided with embedded screw sleeves (48), two ends of the cast-in-situ templates (47) at the inner sides of the cast-in-situ gap (46) are respectively provided with pressing plates (49), each pressing plate (49) is connected with the embedded screw sleeve (48) through a bolt, and the cast-in-situ templates (47) at the inner side and the outer side of the cast-in-situ gap (46) are connected through opposite-pull bolts (50).
6. The fabricated structural architecture teaching demonstration platform of claim 1, wherein: prefabricated stairway (61) is arranged in the assembled steel structure display room (3) or the assembled concrete frame structure display room (4) or the multi-layer plate type fast-assembling structure display room (5) or the assembled shear wall structure display room (6).
CN201710999130.4A 2016-10-24 2017-10-24 Assembled structure system teaching demonstration platform Active CN107564399B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201621150398 2016-10-24
CN2016211503988 2016-10-24

Publications (2)

Publication Number Publication Date
CN107564399A CN107564399A (en) 2018-01-09
CN107564399B true CN107564399B (en) 2023-07-25

Family

ID=60986016

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201721375023.6U Withdrawn - After Issue CN207966282U (en) 2016-10-24 2017-10-24 Fabricated construction system demonstration lesson platform
CN201710999130.4A Active CN107564399B (en) 2016-10-24 2017-10-24 Assembled structure system teaching demonstration platform

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201721375023.6U Withdrawn - After Issue CN207966282U (en) 2016-10-24 2017-10-24 Fabricated construction system demonstration lesson platform

Country Status (1)

Country Link
CN (2) CN207966282U (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207966282U (en) * 2016-10-24 2018-10-12 张波 Fabricated construction system demonstration lesson platform
CN108010433A (en) * 2018-01-21 2018-05-08 黄昆 A kind of assembled architecture comprehensive practical traning model
CN110556048A (en) * 2019-08-30 2019-12-10 中国一冶集团有限公司 Assembled house PC component hoist and mount experience device
CN110512772A (en) * 2019-09-26 2019-11-29 远大住宅工业(天津)有限公司 The connecting node of out-hung panel and beam
CN111009178B (en) * 2019-12-20 2022-11-18 重庆房地产职业学院 Assembled building teaching model

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1113072A (en) * 1997-06-20 1999-01-19 Koshii Mokuzai Kogyo Kk Basement structural body, and construction method thereof
JP3119923U (en) * 2005-12-22 2006-03-16 英三 庄司 Architectural model assembly set
CN101139849A (en) * 2006-09-07 2008-03-12 张兴汉 Modular building component and on-site hoisting building method
KR20110011444A (en) * 2009-07-28 2011-02-08 이병화 A prefabricated house construction method and the construction device
CN103422672A (en) * 2013-08-29 2013-12-04 杜新智 Construction method for reinforced concrete prefabricated house
CN204496836U (en) * 2015-03-18 2015-07-22 陈凌辉 A kind of building structure and material Training Room sand table system model
CN104992613A (en) * 2015-07-28 2015-10-21 上海建工二建集团有限公司 Visual prefabricated shear wall construction indoor simulation teaching tool and mounting method
CN105089178A (en) * 2015-07-21 2015-11-25 重庆欧冠钢结构有限公司 Fabricated building of pre-assembling structure of prefabricated section steel concrete shear wall
CN105332417A (en) * 2015-12-04 2016-02-17 武汉理工大学 Method for constructing prefabricated steel frame composite structure with concrete wrapped outside
CN105484354A (en) * 2015-12-15 2016-04-13 宝钢建筑系统集成有限公司 Assembled steel structure building system and construction method thereof
CN105649360A (en) * 2015-12-29 2016-06-08 山东远博建筑科技有限公司 Integral assembling type building system and installing method
CN205444446U (en) * 2015-12-31 2016-08-10 中国三冶集团有限公司 Assembled industrialization steel construction house
CN207966282U (en) * 2016-10-24 2018-10-12 张波 Fabricated construction system demonstration lesson platform

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1113072A (en) * 1997-06-20 1999-01-19 Koshii Mokuzai Kogyo Kk Basement structural body, and construction method thereof
JP3119923U (en) * 2005-12-22 2006-03-16 英三 庄司 Architectural model assembly set
CN101139849A (en) * 2006-09-07 2008-03-12 张兴汉 Modular building component and on-site hoisting building method
KR20110011444A (en) * 2009-07-28 2011-02-08 이병화 A prefabricated house construction method and the construction device
CN103422672A (en) * 2013-08-29 2013-12-04 杜新智 Construction method for reinforced concrete prefabricated house
CN204496836U (en) * 2015-03-18 2015-07-22 陈凌辉 A kind of building structure and material Training Room sand table system model
CN105089178A (en) * 2015-07-21 2015-11-25 重庆欧冠钢结构有限公司 Fabricated building of pre-assembling structure of prefabricated section steel concrete shear wall
CN104992613A (en) * 2015-07-28 2015-10-21 上海建工二建集团有限公司 Visual prefabricated shear wall construction indoor simulation teaching tool and mounting method
CN105332417A (en) * 2015-12-04 2016-02-17 武汉理工大学 Method for constructing prefabricated steel frame composite structure with concrete wrapped outside
CN105484354A (en) * 2015-12-15 2016-04-13 宝钢建筑系统集成有限公司 Assembled steel structure building system and construction method thereof
CN105649360A (en) * 2015-12-29 2016-06-08 山东远博建筑科技有限公司 Integral assembling type building system and installing method
CN205444446U (en) * 2015-12-31 2016-08-10 中国三冶集团有限公司 Assembled industrialization steel construction house
CN207966282U (en) * 2016-10-24 2018-10-12 张波 Fabricated construction system demonstration lesson platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
预制装配式剪力墙结构住宅建筑的设计;徐晔桢;;建筑施工(第10期);第928-930页 *

Also Published As

Publication number Publication date
CN107564399A (en) 2018-01-09
CN207966282U (en) 2018-10-12

Similar Documents

Publication Publication Date Title
CN107564399B (en) Assembled structure system teaching demonstration platform
US10753080B1 (en) Method of constructing a building, and a building construction system therefor
CN112900692B (en) Large-span special-shaped steel structure building, supporting device thereof and construction method
EP2852724B1 (en) High rise building elevation concept
CN108560895B (en) Adjustable elevator shaft operation platform and erection method thereof
US10829927B2 (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
JP6474151B2 (en) Dismantling system and dismantling method
JP2012132145A (en) Lifting device for building
JP5192251B2 (en) Tower crane support structure and construction method thereof
CN102561689B (en) Construction method for cantilever lifting scaffold
JP2013238095A (en) Construction method of reinforced concrete skeleton and reinforced concrete structural skeleton
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN110230414A (en) A kind of assembled platform canopy and its installation method
CN213597442U (en) Elevator shaft template operation platform that encorbelments
CN104499565A (en) Assembled balcony
CN115030046A (en) Hydraulic creeping formwork for hollow thin-wall pier and construction method thereof
JP2010255374A (en) Demolition method for skyscraper building
CN212743356U (en) Reverse construction method hangs mould system
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
CN107993557B (en) Fire test device for anti-cutting performance of reinforced concrete slab and column structure
CN110805256A (en) Construction process of flower basket pull rod tool type overhanging scaffold
JP2016145497A (en) Demolition system and demolition method
CN219418297U (en) Real operating method and equipment for assembling building components
KR101296814B1 (en) Upper pressing type support building method
CN217439509U (en) Operating platform for high-rise hollow structure internal mold construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230421

Address after: 250000 north of No. 5 road and west of Panwang Road, Longshan Industrial Park, Longshan street, Zhangqiu District, Jinan City, Shandong Province

Applicant after: Shandong Wanda Technology Co.,Ltd.

Address before: 250014 No. 102, unit 1, building 5, No. 81, Qianfo Shandong Road, Lixia District, Jinan City, Shandong Province

Applicant before: Zhang Bo

GR01 Patent grant
GR01 Patent grant