CN110512772A - The connecting node of out-hung panel and beam - Google Patents
The connecting node of out-hung panel and beam Download PDFInfo
- Publication number
- CN110512772A CN110512772A CN201910918548.7A CN201910918548A CN110512772A CN 110512772 A CN110512772 A CN 110512772A CN 201910918548 A CN201910918548 A CN 201910918548A CN 110512772 A CN110512772 A CN 110512772A
- Authority
- CN
- China
- Prior art keywords
- hung panel
- built
- fitting
- ear
- upper layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003466 welding Methods 0.000 claims description 13
- 239000000565 sealant Substances 0.000 claims description 9
- 230000002787 reinforcement Effects 0.000 claims description 8
- 210000001503 joint Anatomy 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 5
- 230000009545 invasion Effects 0.000 abstract description 5
- 238000005253 cladding Methods 0.000 abstract description 4
- 239000004567 concrete Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000009738 saturating Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4114—Elements with sockets
- E04B1/4121—Elements with sockets with internal threads or non-adjustable captive nuts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6806—Waterstops
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The present invention relates to the connecting nodes of a kind of out-hung panel and beam.The connecting node of out-hung panel and beam includes: beam, is convexly equipped on the outside of the beam and chooses ear;Upper layer out-hung panel supports and chooses the upside of ear described in being set to, and is fixedly connected with the beam;Lower layer's out-hung panel supports and chooses the downside of ear described in being set to, and is fixedly connected with the beam.The connecting node of above-mentioned out-hung panel and beam chooses ear by the outside projection in beam, and upper layer out-hung panel and lower layer's out-hung panel are respectively arranged at the two sides up and down for choosing ear, provide installation position for out-hung panel.And, due to choosing ear between upper layer exterior wall cladding and lower layer's out-hung panel, therefore the connecting support of the curtain wall on the outside of out-hung panel can be installed on and is chosen on ear, to realize the purpose for installing curtain wall on the alien invasion (i.e. the outside of out-hung panel) of building.
Description
Technical field
The present invention relates to assembled architecture fields, more particularly to the connecting node of a kind of out-hung panel and beam.
Background technique
Assembly concrete building refers to based on the precast member for reinforcing bar concrete with the factorial production, passes through assembled in situ
Mode design-build concrete structure class building construction.It is fast with speed of application, be conducive to winter construction, high production efficiency,
Good product quality, the advantages that reducing material loss.
Generally, in order to improve prefabricated rate, using precast concrete out-hung panel.However, due to concrete
Do not stress component when native out-hung panel, therefore curtain wall support cannot be mounted on out-hung panel, also can not around exterior wall cladding with
The main structure of building is effectively connected, and leads to not install curtain wall on the alien invasion of building.
Summary of the invention
Based on this, it is necessary to, can not be in building for the building for using precast concrete out-hung panel in the prior art
The problem of curtain wall is installed on alien invasion provides the connecting node of a kind of out-hung panel for improving drawbacks described above and beam.
A kind of connecting node of out-hung panel and beam, comprising:
Beam is convexly equipped on the outside of the beam and chooses ear;
Upper layer out-hung panel supports and chooses the upside of ear described in being set to, and is fixedly connected with the beam;And lower layer is plug-in
Wallboard supports and chooses the downside of ear described in being set to, and is fixedly connected with the beam.
The connecting node of above-mentioned out-hung panel and beam chooses ear by the outside projection in beam, by upper layer out-hung panel under
Layer out-hung panel is respectively arranged at the two sides up and down for choosing ear, provides installation position for out-hung panel.Also, due to choosing ear positioned at upper
Between layer exterior wall cladding and lower layer's out-hung panel, therefore the connecting support of the curtain wall on the outside of out-hung panel can be installed on and be chosen
On ear, to realize the purpose for installing curtain wall on the alien invasion (i.e. the outside of out-hung panel) of building.
In one embodiment, the connecting node further includes the first built-in fitting, connector and the second built-in fitting;
First built-in fitting is embedded in the upper layer out-hung panel in advance, and second built-in fitting is embedded in the beam in advance, described
Connector is fixedly connected on first built-in fitting and second built-in fitting.
In one embodiment, first built-in fitting has threaded hole, and the connector passes through threaded fastener and institute
The threaded connection for stating threaded hole is anchored on first built-in fitting.
In one embodiment, second built-in fitting has the welding surface being exposed on the upside of the beam, the connector
It is welded to connect in the welding surface.
In one embodiment, first built-in fitting is exposed to the inside of the upper layer out-hung panel, and described second is pre-
Embedded part is exposed to the upside of the beam;
The connector includes that first connecting portion and be fixedly connected second perpendicular with the first connecting portion connect
It fits on the inside of portion, the first connecting portion and the upper layer out-hung panel, and is fixedly connected with first built-in fitting;Institute
It states and fits on the upside of second connecting portion and the beam, and be fixedly connected with second built-in fitting.
In one embodiment, lower layer's out-hung panel is embedded with third built-in fitting, one end of the third built-in fitting
It extends in the beam.
In one embodiment, arrangement of reinforcement is laid in the beam, and the arrangement of reinforcement extends to described choose in ear;
The part that the third built-in fitting extends to the beam is fixedly connected with the arrangement of reinforcement.
In one embodiment, the upper layer out-hung panel and the butt joint interface for choosing ear are equipped with waterproof tongue and groove.
In one embodiment, the upper layer out-hung panel, lower layer's out-hung panel and the outer surface for choosing ear
Concordantly.
In one embodiment, the upper layer out-hung panel and lower layer's out-hung panel and described choose are provided between ear
Sealant.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the connecting node of out-hung panel and beam in one embodiment of the invention;
Fig. 2 is equipped with the structural schematic diagram of curtain wall for the connecting node of out-hung panel shown in FIG. 1 and beam.
Specific embodiment
To facilitate the understanding of the present invention, a more comprehensive description of the invention is given in the following sections with reference to the relevant attached drawings.In attached drawing
Give preferred embodiment of the invention.But the invention can be realized in many different forms, however it is not limited to herein
Described embodiment.On the contrary, purpose of providing these embodiments is keeps the understanding to the disclosure more saturating
It is thorough comprehensive.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element
Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention
The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more phases
Any and all combinations of the listed item of pass.
As shown in Figures 1 and 2, the connecting node of the out-hung panel and beam that are provided in one embodiment of the invention, including beam
10, upper layer out-hung panel 20 and lower layer's out-hung panel 30.The outside of the beam 10, which is convexly equipped with, chooses ear 12.Upper layer out-hung panel 20 supports
It is set to the upside for choosing ear 12, and is fixedly connected with beam 10.Lower layer's out-hung panel 30, which supports, is set to the downside for choosing ear 12, and with
Beam 10 is fixedly connected.
The connecting node of above-mentioned out-hung panel and beam chooses ear 12 by the outside projection in beam 10, by upper layer out-hung panel
20 and lower layer's out-hung panel 30 be respectively arranged at the two sides up and down for choosing ear 12, be out-hung panel (for simplicity, Xia Shuji
The out-hung panel of load refer both to include upper layer out-hung panel 20 and lower layer's out-hung panel 30 integral wall structure) provide installation position.
Also, due to choosing ear 12 between upper layer exterior wall cladding and lower layer's out-hung panel 30, can will be located on the outside of out-hung panel
The connecting support 1001 of curtain wall 100 be installed on and choose on ear 12, so that (i.e. out-hung panel is outer for the alien invasion for realizing in building
Side) on install curtain wall 100 purpose.
Extend specific to longitudinally lengthwise of the ear 12 along beam 10 in embodiment, is chosen.In this way, being conducive to preferably carry outer
Wallboard, so that connecting node is more firm.In the embodiment shown in fig. 1, ear 12 is chosen along the direction perpendicular with paper
Lengthwise extends.
In the embodiment of the present invention, the connecting node of out-hung panel and beam further include the first built-in fitting 22, connector 24 and
Second built-in fitting 14.First built-in fitting 22 is embedded in upper layer out-hung panel 20 in advance, and the second built-in fitting 14 is embedded in advance in beam 10.Connector
24 are fixedly connected on the first built-in fitting 22 and the second built-in fitting 14.In this way, by connector 24 with to be embedded in upper layer in advance respectively plug-in
The first built-in fitting 22 and the second built-in fitting 14 of wallboard 20 and beam 10, to realize the fixation of upper layer out-hung panel 20 Yu beam 10
Connection.
It should be noted that the first built-in fitting of multiple groups 22 and second that the settable longitudinally interval along beam 10 is laid are pre-
Embedded part 14, every group includes first built-in fitting 22 and second built-in fitting 14, the first built-in fitting 22 and second in every group
Built-in fitting 14 is fixedly connected in connector 24.It should also be noted that, connector 24 may also comprise multiple, multiple connectors 24
It is laid along the longitudinally interval of beam 10.Every a connection piece 24 is fixedly connected on corresponding one group of first built-in fitting 22 and second in advance
Embedded part 14.
Specific in embodiment, the first built-in fitting 22 has threaded hole.Connector 24 is pre- by threaded fastener and first
The threaded connection of the threaded hole of embedded part 22 and be anchored on the first built-in fitting 22.In this way, the mode being connected through a screw thread realizes first
Built-in fitting 22 is fixedly connected with connector 24, convenient for constructing, and stable connection.Optionally, the first built-in fitting 22 can be sleeve.
Threaded fastener can be bolt.
Specific in embodiment, the second built-in fitting 14 has the welding surface for being exposed to 10 upside of beam.The welding of connector 24 connects
It is connected to the welding surface.In this way, realizing being fixedly connected for the second built-in fitting 14 and connector 24 by way of welded connecting, connect
Firm, welding procedure is easy to operate.
Further, the second built-in fitting 14 includes welded plate 142 and at least one embedded division 144, and each embedded division 144 is solid
Surely it is connected to the same side of welded plate 142.Above-mentioned welding surface is the side that welded plate 142 deviates from embedded division 144.Embedded division 144
It is embedded in beam 10 in advance with welded plate 142, and the welding surface of welded plate 142 is exposed to the upside of beam 10.In this way, by the second built-in fitting
14 are designed as the form of welded plate 142 and embedded division 144, and one side welded plate 142 advantageously ensures that welding quality;On the other hand
Embedded division 144 ensure that the bonding strength of the second built-in fitting 14 and beam 10, be beneficial to prevent the loosening of the second built-in fitting 14.
Further, to be welded to connect convenient for connector 24 and the second built-in fitting 14, positioning can be first passed through before welding
Connector 24 is positioned on the welding surface of the second built-in fitting 14 by part.That is, on connector 24 and the second built-in fitting 14
Corresponding location hole is offered, locating piece realizes positioning through two location holes.Optionally, the locating piece can for bolt,
Screw or positioning pin etc..Specific in one embodiment, location hole is opened in following second connecting portions 244 and of connector 24
On the welded plate 142 of two built-in fittings 14.
Specific in embodiment, the first built-in fitting 22 is exposed to the inside of upper layer out-hung panel 20, and the second built-in fitting 14 is sudden and violent
It is exposed to the upside of beam 10.Connector 24 includes first connecting portion 242 and be fixedly connected the perpendicular with first connecting portion 242
Two interconnecting pieces 244.First connecting portion 242 and the inside of upper layer out-hung panel 20 fit, and fix and connect with the first built-in fitting 22
It connects.Second connecting portion 244 and the upside of beam 10 fit, and are fixedly connected with the second built-in fitting 14.In this way, connector 24 is set
It is calculated as the form of first connecting portion 242 and second connecting portion 244, is conducive to improve upper layer out-hung panel 20 and the connection of beam 10 is strong
Degree.Optionally, connector 24 can be angle steel.
In the embodiment of the present invention, lower layer's out-hung panel 30 is embedded with third built-in fitting 40.One end of third built-in fitting 40
It extends in beam 10, so that lower layer's out-hung panel 30 is fixedly connected with beam 10.In this way, pre-buried in prefabricated lower layer's out-hung panel 30
One end of the third built-in fitting 40, third built-in fitting 40 is pierced by by the top of lower layer's out-hung panel 30.Then, under will be prefabricated
Layer out-hung panel 30 lifts in place, so that third built-in fitting 40 penetrates the casting space for pouring molding beam 10.Subsequently pour
Type beam 10 is built up, to realize being fixedly connected for lower layer's out-hung panel 30 and beam 10.Optionally, third connector 24 can be steel
Muscle.
Specific in embodiment, being laid with arrangement of reinforcement in beam 10, and arrangement of reinforcement is extended to and is chosen in ear 12.In order to further strengthen down
The arrangement of reinforcement laid in third built-in fitting 40 and beam 10, can be fixedly connected by the bonding strength of layer out-hung panel 30 and beam 10, such as
The fixed forms such as binding and fixing can be used or be welded and fixed.
In the embodiment of the present invention, the inside of lower layer's out-hung panel 30 and the outside of beam 10 fit, and are conducive to lower layer
Out-hung panel 30 is positioned, and installation accuracy is promoted.
In the embodiment of the present invention, upper layer out-hung panel 20 and lower layer's out-hung panel 30 are provided between ear 12 with choosing respectively
Sealant, with seal upper layer out-hung panel 20 and lower layer's out-hung panel 30 respectively with choose the gap between ear 12, play waterproof
Effect.Optionally, building weather proofing sealant can be used in sealant.Further, it upper layer out-hung panel 20 and chooses between ear 12
The flexible anticracking grout of gap filling positioned at 20 inside of upper layer out-hung panel.
Specific in embodiment, before filling with sealant, in upper layer out-hung panel 20 and choose in gap between ear 12
It is provided with foam rods.In filling with sealant, foam rods stop sealant, improve the sealing effect of sealant.
It should be noted that curtain wall 100 has certain water-proof function, upper layer out-hung panel 20 and lower layer's out-hung panel 30
Also there is water-proof function, that is to say, that form twice waterproof construction, substantially increase the waterproof effect of facade.
In the embodiment of the present invention, upper layer out-hung panel 20 is equipped with waterproof tongue and groove h with the butt joint interface for choosing ear 12, further
Improve waterproof effect.
In the embodiment of the present invention, upper layer out-hung panel 20, lower layer's out-hung panel 30 and choose ear 12 outer surface it is concordant,
To further be conducive to the installation of curtain wall 100.
It should also be noted that, beam 10 can be Cast-in-situ Beam 10.In construction, first lower layer's out-hung panel 30 can be lifted in place
And it is installed on the beam 10 of its lower layer.Then pouring molding is located at the beam 10 at 30 top of lower layer's out-hung panel, so that lower layer is plug-in
The top of wallboard 30 is fixedly connected by third built-in fitting 40 with beam 10.It subsequently lifts upper layer out-hung panel 20 and chooses on ear 12
Side, and upper layer out-hung panel 20 is fixedly connected on beam 10 by connector 24.
In the embodiment of the present invention, the connecting support 1001 of curtain wall 100 is fixedly attached to be set to the fixation for choosing ear 12
Part 16 (see Fig. 2), to realize being fixedly connected for the connecting support 1001 of curtain wall 100.In one embodiment, fixing piece 16 can
It is embedded in and is chosen in ear 12 in advance, and one end is pierced by the outside for choosing ear 12, in order to install the connecting support 1001 of curtain wall 100.It can manage
Solution, fixing piece 16, which can also be used other modes and be fixedly connected on, chooses ear 12, such as can be used and choosing embedded sleeve barrel in ear 12,
Fixing piece 16 such as is connected through a screw thread at the mode etc. that modes are fixedly connected on the sleeve, is not limited thereto.
Specific in embodiment, fixing piece 16 can be screw rod, which is pierced by the one end for choosing 12 outside of ear through connection branch
Seat 1001, and connecting support is locked in choosing ear 12 by threaded fastener.That is, threaded fastener is threadedly coupled
In screw rod, and it is connected to connecting support 1001 and deviates from the side for choosing ear 12.Optionally, which can be nut.It needs
Illustrate, belongs to the more mature technology in this field as the structure of curtain wall 100, details are not described herein.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. the connecting node of a kind of out-hung panel and beam characterized by comprising
Beam, outside, which is convexly equipped with, chooses ear;
Upper layer out-hung panel supports and chooses the upside of ear described in being set to, and is fixedly connected with the beam;And
Lower layer's out-hung panel supports and chooses the downside of ear described in being set to, and is fixedly connected with the beam.
2. the connecting node of out-hung panel according to claim 1 and beam, which is characterized in that the connecting node further includes
First built-in fitting, connector and the second built-in fitting;
First built-in fitting is embedded in the upper layer out-hung panel in advance, and second built-in fitting is embedded in the beam, the connection in advance
Part is fixedly connected on first built-in fitting and second built-in fitting.
3. the connecting node of out-hung panel according to claim 2 and beam, which is characterized in that first built-in fitting has
Threaded hole, the connector are anchored on first built-in fitting by the threaded connection of threaded fastener and the threaded hole.
4. the connecting node of out-hung panel according to claim 2 and beam, which is characterized in that second built-in fitting has
The welding surface being exposed on the upside of the beam, the connector are welded to connect in the welding surface.
5. the connecting node of out-hung panel according to claim 2 and beam, which is characterized in that the first built-in fitting exposure
In the inside of the upper layer out-hung panel, second built-in fitting is exposed to the upside of the beam;
The connector includes first connecting portion and the second connecting portion that is fixedly connected perpendicular with the first connecting portion, institute
It states and fits on the inside of first connecting portion and the upper layer out-hung panel, and be fixedly connected with first built-in fitting;Described
It fits on the upside of two interconnecting pieces and the beam, and is fixedly connected with second built-in fitting.
6. the connecting node of out-hung panel according to claim 1 and beam, which is characterized in that lower layer's out-hung panel is pre-
It is embedded with third built-in fitting, one end of the third built-in fitting extends in the beam.
7. the connecting node of out-hung panel according to claim 6 and beam, which is characterized in that be laid with and match in the beam
Muscle, and the arrangement of reinforcement extends to described choose in ear;
The part that the third built-in fitting extends to the beam is fixedly connected with the arrangement of reinforcement.
8. the connecting node of out-hung panel according to claim 1 and beam, which is characterized in that the upper layer out-hung panel with
The butt joint interface for choosing ear is equipped with waterproof tongue and groove.
9. the connecting node of out-hung panel according to claim 1 and beam, which is characterized in that the upper layer out-hung panel,
Lower layer's out-hung panel and the outer surface for choosing ear are concordant.
10. the connecting node of out-hung panel according to claim 1 and beam, which is characterized in that the upper layer out-hung panel
And lower layer's out-hung panel and described choose are provided with sealant between ear.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910918548.7A CN110512772B (en) | 2019-09-26 | 2019-09-26 | Connecting node of externally hung wallboard and beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910918548.7A CN110512772B (en) | 2019-09-26 | 2019-09-26 | Connecting node of externally hung wallboard and beam |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110512772A true CN110512772A (en) | 2019-11-29 |
CN110512772B CN110512772B (en) | 2024-07-23 |
Family
ID=68632400
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910918548.7A Active CN110512772B (en) | 2019-09-26 | 2019-09-26 | Connecting node of externally hung wallboard and beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110512772B (en) |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU897983A1 (en) * | 1980-05-12 | 1982-01-15 | Тбилисский зональный научно-исследовательский и проектный институт типового и экспериментального проектирования жилых и общественных зданий | Connection assembly between building floor and wall panels |
CN103821265A (en) * | 2014-02-28 | 2014-05-28 | 北京建筑大学 | Self-resetting energy dissipation node for externally hung aerated concrete wallboard and construction method thereof |
CN104074274A (en) * | 2014-07-17 | 2014-10-01 | 长沙远大住宅工业集团有限公司 | Connection joint of prefabricated sandwich side fascia |
CN104328849A (en) * | 2014-11-19 | 2015-02-04 | 沈阳建筑大学 | U-shaped rebar inserting connection method of mixed externally hung wallboard and girder |
CN204551801U (en) * | 2015-03-24 | 2015-08-12 | 中国十七冶集团有限公司 | A kind of assembling out-hung panel |
WO2017031627A1 (en) * | 2015-08-21 | 2017-03-02 | 陈敬全 | Assembled building structure, wallboard installation hanger, and assembled building construction method |
CN206707020U (en) * | 2017-04-14 | 2017-12-05 | 王亚楠 | A kind of assembling type outer wall beam dry type connecting node |
CN206859423U (en) * | 2017-03-28 | 2018-01-09 | 海南珠江建筑设计院有限公司 | A kind of fabricated shear wall mid-side node |
CN107564399A (en) * | 2016-10-24 | 2018-01-09 | 张波 | Fabricated construction system demonstration lesson platform |
CN107762079A (en) * | 2017-11-06 | 2018-03-06 | 常德远大建筑工业有限公司 | A kind of anchoring type precast stair attachment structure |
CN208039655U (en) * | 2018-03-09 | 2018-11-02 | 中国建筑第二工程局有限公司 | Waterproof head-folding structure of ear-picking structure |
CN208650277U (en) * | 2018-07-25 | 2019-03-26 | 无锡市亨利富建设发展有限公司 | It is constructed at a kind of prefabricated fair-faced out-hung panel and cast-in-place overhanging beam connecting node |
CN109653423A (en) * | 2019-01-31 | 2019-04-19 | 长沙远大住宅工业集团股份有限公司 | A kind of connecting node of prefabricated superstructure and out-hung panel, vertical supporting member |
CN109930759A (en) * | 2019-03-28 | 2019-06-25 | 中建四局第一建筑工程有限公司 | A kind of structure using prefabricated components assembling stair |
CN110005072A (en) * | 2019-04-22 | 2019-07-12 | 河北省建筑科学研究院有限公司 | The installation method of PC out-hung panel connection structure and PC out-hung panel |
CN209114658U (en) * | 2018-11-12 | 2019-07-16 | 广东博意建筑设计院有限公司 | A kind of precast concrete partition plate structure for staircase |
CN110258815A (en) * | 2019-05-31 | 2019-09-20 | 南京长江都市建筑设计股份有限公司 | Rotary precast concrete out-hung panel connecting joint structure and construction method in steel construction |
CN211341295U (en) * | 2019-09-26 | 2020-08-25 | 远大住宅工业(天津)有限公司 | Connecting joint of external wall board and beam |
-
2019
- 2019-09-26 CN CN201910918548.7A patent/CN110512772B/en active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU897983A1 (en) * | 1980-05-12 | 1982-01-15 | Тбилисский зональный научно-исследовательский и проектный институт типового и экспериментального проектирования жилых и общественных зданий | Connection assembly between building floor and wall panels |
CN103821265A (en) * | 2014-02-28 | 2014-05-28 | 北京建筑大学 | Self-resetting energy dissipation node for externally hung aerated concrete wallboard and construction method thereof |
CN104074274A (en) * | 2014-07-17 | 2014-10-01 | 长沙远大住宅工业集团有限公司 | Connection joint of prefabricated sandwich side fascia |
CN104328849A (en) * | 2014-11-19 | 2015-02-04 | 沈阳建筑大学 | U-shaped rebar inserting connection method of mixed externally hung wallboard and girder |
CN204551801U (en) * | 2015-03-24 | 2015-08-12 | 中国十七冶集团有限公司 | A kind of assembling out-hung panel |
WO2017031627A1 (en) * | 2015-08-21 | 2017-03-02 | 陈敬全 | Assembled building structure, wallboard installation hanger, and assembled building construction method |
CN107564399A (en) * | 2016-10-24 | 2018-01-09 | 张波 | Fabricated construction system demonstration lesson platform |
CN206859423U (en) * | 2017-03-28 | 2018-01-09 | 海南珠江建筑设计院有限公司 | A kind of fabricated shear wall mid-side node |
CN206707020U (en) * | 2017-04-14 | 2017-12-05 | 王亚楠 | A kind of assembling type outer wall beam dry type connecting node |
CN107762079A (en) * | 2017-11-06 | 2018-03-06 | 常德远大建筑工业有限公司 | A kind of anchoring type precast stair attachment structure |
CN208039655U (en) * | 2018-03-09 | 2018-11-02 | 中国建筑第二工程局有限公司 | Waterproof head-folding structure of ear-picking structure |
CN208650277U (en) * | 2018-07-25 | 2019-03-26 | 无锡市亨利富建设发展有限公司 | It is constructed at a kind of prefabricated fair-faced out-hung panel and cast-in-place overhanging beam connecting node |
CN209114658U (en) * | 2018-11-12 | 2019-07-16 | 广东博意建筑设计院有限公司 | A kind of precast concrete partition plate structure for staircase |
CN109653423A (en) * | 2019-01-31 | 2019-04-19 | 长沙远大住宅工业集团股份有限公司 | A kind of connecting node of prefabricated superstructure and out-hung panel, vertical supporting member |
CN109930759A (en) * | 2019-03-28 | 2019-06-25 | 中建四局第一建筑工程有限公司 | A kind of structure using prefabricated components assembling stair |
CN110005072A (en) * | 2019-04-22 | 2019-07-12 | 河北省建筑科学研究院有限公司 | The installation method of PC out-hung panel connection structure and PC out-hung panel |
CN110258815A (en) * | 2019-05-31 | 2019-09-20 | 南京长江都市建筑设计股份有限公司 | Rotary precast concrete out-hung panel connecting joint structure and construction method in steel construction |
CN211341295U (en) * | 2019-09-26 | 2020-08-25 | 远大住宅工业(天津)有限公司 | Connecting joint of external wall board and beam |
Also Published As
Publication number | Publication date |
---|---|
CN110512772B (en) | 2024-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA3106047C (en) | Prefabricated wall and assembly structure for prefabricated building, and construction method therefor | |
CN106401036B (en) | A kind of assembled steel frame prefabricated concrete floor structure | |
CN103104040B (en) | A kind of assembling frame bean column node and construction method adopting vertical connection | |
CN104563299B (en) | Reinforced concrete prefabricated component and mounting method | |
CN102230315A (en) | Prefabricated part and semi-prefabricated construction method for multistory building | |
CN209293238U (en) | Section overlap joint connection is poured after overlapped shear wall | |
CN106400952A (en) | Assembly type prefabricated structure wallboard unit and connecting joints thereof | |
CN108756021A (en) | Envelope storehouse method for assembled architecture conversion layer sleeve grouting exterior wall | |
CN107938856A (en) | Walling system | |
CN109914589B (en) | Vertical connecting structure of prestressed reinforced concrete precast column and construction method thereof | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
CN110805144A (en) | Full-assembly type high-rise/super high-rise concrete frame support structure system and construction method thereof | |
CN207003673U (en) | A kind of connecting node of beam and wallboard | |
CN107313516B (en) | Autoclaved aerated concrete wallboard and steel girder connecting node structure and construction method thereof | |
CN116397779B (en) | Connecting device for assembled connecting column and construction method | |
CN111255059A (en) | Assembly type concrete house structure and node connection method thereof | |
CN110512772A (en) | The connecting node of out-hung panel and beam | |
CN106193540A (en) | A kind of GRC assembly | |
CN211341295U (en) | Connecting joint of external wall board and beam | |
CN205990663U (en) | A kind of prefabricated structural wall board unit and its connecting node | |
CN209817215U (en) | Connection assembly for laminated floor slab and wall | |
CN209817222U (en) | Connection node of coincide floor and wall body | |
CN209082792U (en) | A kind of connection structure on straight building floor | |
CN203393729U (en) | Road slope protection structure | |
CN110939216A (en) | Plaster-free wall based on gypsum hollow building blocks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |