CN107524090B - 钢管拱桥拱肋顶升拼装施工方法 - Google Patents
钢管拱桥拱肋顶升拼装施工方法 Download PDFInfo
- Publication number
- CN107524090B CN107524090B CN201710794088.2A CN201710794088A CN107524090B CN 107524090 B CN107524090 B CN 107524090B CN 201710794088 A CN201710794088 A CN 201710794088A CN 107524090 B CN107524090 B CN 107524090B
- Authority
- CN
- China
- Prior art keywords
- arch rib
- arch
- rib section
- pressure oil
- hydraulic pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种钢管拱桥拱肋顶升拼装施工方法,属于桥梁的建筑术领域。该施工方法包括以下步骤:1)在钢管拱桥的主纵梁完成安装后,安装第一、第二拱肋段以及第一、第二液压油顶;2)将第三拱肋段的一端铰接在第一或第二拱肋段的另一端上,在第三拱肋段和与其铰接的第一或第二拱肋段之间铰接有设于锁定状态的第三液压油顶;3)将第一、第二拱肋段旋转顶起至设计位置;4)将第一、第二和第三拱肋段合拢;5)焊接第一、第二、第三拱肋段和拱脚,拆除第一、第二和第三液压油顶。该施工方法充分利用绞轴与液压油顶完成拱肋的顶升、拼装,在满足拱肋拼装精度的前提下,简化了施工流程、减少了临时设施投入、降低了安全风险。
Description
技术领域
本发明涉及一种钢管拱桥拱肋顶升拼装施工方法,属于桥梁的建筑技术领域。
背景技术
随着中国城镇化的步伐越来越快,大型桥梁工程层出不穷,拱桥作为跨越既有公路、铁路、山谷、河流的桥梁形式,得到了大量应用。
传统的钢管拱桥拱肋施工一般采用悬臂拼装、支架、斜拉扣挂法等,大型临时工程及辅助设施投入大、成本高;机械化程度低、施工质量不易控制;高空作业多,安全风险高。
发明内容
本发明要解决的技术问题是,针对现有技术不足,提出一种在满足拱肋拼装精度的前提下可以简化施工流程、减少临时设施投入、降低安全风险的钢管拱桥拱肋顶升拼装施工方法。
本发明为解决上述技术问题提出的技术方案是:一种钢管拱桥拱肋顶升拼装施工方法,该钢管拱桥包括主纵梁和拱肋,所述拱肋包括设于主纵梁前端的第一拱肋段、设于主纵梁后端的第二拱肋段、设于第一拱肋段和第二拱肋段之间的第三拱肋段,包括以下步骤:
1)在钢管拱桥的主纵梁完成安装后,通过吊装设备分别将第一、第二拱肋段的一端铰接在主纵梁的前、后端上,然后在主纵梁和第一拱肋段之间铰接有设于锁定状态的第一液压油顶,在主纵梁和第二拱肋段之间铰接有设于锁定状态的第二液压油顶,接着将吊装设备移除;
2)通过吊装设备将第三拱肋段的一端铰接在第一或第二拱肋段的另一端上,在第三拱肋段和与其铰接的第一或第二拱肋段之间铰接有设于锁定状态的第三液压油顶,接着将吊装设备移除;
3)解锁第一、第二液压油顶并缓慢伸出,将第一、第二拱肋段旋转顶起并移动至设计位置,锁定第一、第二液压油顶;
4)解锁第三液压油顶并缓慢伸出,将第三拱肋段旋转顶起,直至第一、第二和第三拱肋段合拢,锁定第三液压油顶;
5)将第一、第二和第三拱肋段彼此焊接固定,将拱肋的拱脚焊接固定在主纵梁上,解锁第一、第二和第三液压油顶并进行拆除。
本发明采用上述技术方案的有益效果是:本发明直接将第一、第二拱肋段的一端铰接在主纵梁的前、后端上,将第三拱肋段的一端铰接在第一或第二拱肋段的另一端上,在主纵梁和第一、第二拱肋段之间分别铰接有设于锁定状态的第一、第二液压油顶,在第三拱肋段和与其铰接的第一或第二拱肋段之间铰接有设于锁定状态的第三液压油顶,只要利用绞轴与第一、第二和第三液压油顶就可以完成拱肋的顶升、拼装。这样,本发明取消了支架法的支架搭设,将高空作业转换为地面拼装、焊接;且解决了斜拉扣挂法因拉索支撑位大悬臂结构,刚度小、变形不易控制的难题;在满足拱肋拼装精度的前提下,简化了施工流程、减少了临时设施投入、降低了安全风险。
上述技术方案的改进是:所述吊装设备是起吊机。
上述技术方案的改进是:所述拱肋是由第一、第二和第三拱肋段形成的半圆形拱肋。
附图说明
下面结合附图对本发明作进一步说明:
图1 为本发明实施例钢管拱桥拱肋顶升拼装施工方法的施工示意图一。
图2为本发明实施例钢管拱桥拱肋顶升拼装施工方法的施工示意图二。
图3 为本发明实施例钢管拱桥拱肋顶升拼装施工方法的施工示意图三。
图4 为本发明实施例钢管拱桥拱肋顶升拼装施工方法的施工示意图四。
图5为本发明实施例钢管拱桥拱肋顶升拼装施工方法的施工示意图五。
图中示出构件和对应的标记:主纵梁1、拱肋2、第一拱肋段2-1、第二拱肋段2-2、第三拱肋段2-3、拱脚2-4、第一液压油顶3、第二液压油顶4、第三液压油顶5
具体实施方式
本实施例的一种钢管拱桥拱肋顶升拼装施工方法,该钢管拱桥包括主纵梁1和拱肋2。拱肋2包括设于主纵梁1前端的第一拱肋段2-1、设于主纵梁1后端的第二拱肋段2-2、设于第一拱肋段2-1和第二拱肋段2-2之间的第三拱肋段2-3。拱肋2是由第一拱肋段2-1、第二拱肋段2-2和第三拱肋段2-3形成的半圆形拱肋,等等。
该钢管拱桥拱肋顶升拼装施工方法包括以下步骤:
如图1所示,1)在钢管拱桥的主纵梁1完成安装后,通过吊装设备分别将第一拱肋段2-1、第二拱肋段2-2的一端铰接在主纵梁1的前、后端上,吊装设备是起吊机。然后在主纵梁1和第一拱肋段2-1之间铰接有设于锁定状态的第一液压油顶3,在主纵梁1和第二拱肋段2-2之间铰接有设于锁定状态的第二液压油顶4,接着将吊装设备移除;
如图2所示,2)通过吊装设备将第三拱肋段2-3的一端铰接在第一拱肋段2-1或第二拱肋段2-2的另一端上,在第三拱肋段2-3和与其铰接的第一拱肋段2-1或第二拱肋段2-2之间铰接有设于锁定状态的第三液压油顶5,接着将吊装设备移除;
如图3所示,3)解锁第一液压油顶3、第二液压油顶4并缓慢伸出,将第一拱肋段2-1、第二拱肋段2-2旋转顶起并移动至设计位置,锁定第一液压油顶3、第二液压油顶4;
如图4所示,4)解锁第三液压油顶5并缓慢伸出,将第三拱肋段2-3旋转顶起,直至第一拱肋段2-1、第二拱肋段2-2和第三拱肋段2-3合拢,锁定第三液压油顶5;
如图5所示,5)将第一拱肋段2-1、第二拱肋段2-2和第三拱肋段2-3彼此焊接固定,将拱肋2的拱脚2-4焊接固定在主纵梁1上,解锁第一液压油顶3、第二液压油顶4和第三液压油顶5并进行拆除。
本发明不局限于上述实施例。凡采用等同替换形成的技术方案,均落在本发明要求的保护范围。
Claims (3)
1.一种钢管拱桥拱肋顶升拼装施工方法,其特征在于,该钢管拱桥包括主纵梁和拱肋,所述拱肋包括设于主纵梁前端的第一拱肋段、设于主纵梁后端的第二拱肋段、设于第一拱肋段和第二拱肋段之间的第三拱肋段,包括以下步骤:
1)在钢管拱桥的主纵梁完成安装后,通过吊装设备分别将第一、第二拱肋段的一端铰接在主纵梁的前、后端上,然后在主纵梁和第一拱肋段之间铰接有设于锁定状态的第一液压油顶,在主纵梁和第二拱肋段之间铰接有设于锁定状态的第二液压油顶,接着将吊装设备移除;
2)通过吊装设备将第三拱肋段的一端铰接在第一或第二拱肋段的另一端上,在第三拱肋段和与其铰接的第一或第二拱肋段之间铰接有设于锁定状态的第三液压油顶,接着将吊装设备移除;
3)解锁第一、第二液压油顶并缓慢伸出,将第一、第二拱肋段旋转顶起并移动至设计位置,锁定第一、第二液压油顶;
4)解锁第三液压油顶并缓慢伸出,将第三拱肋段旋转顶起,直至第一、第二和第三拱肋段合拢,锁定第三液压油顶;
5)将第一、第二和第三拱肋段彼此焊接固定,将拱肋的拱脚焊接固定在主纵梁上,解锁第一、第二和第三液压油顶并进行拆除。
2.如权利要求1所述钢管拱桥拱肋顶升拼装施工方法,其特征在于:所述吊装设备是起吊机。
3.如权利要求1所述钢管拱桥拱肋顶升拼装施工方法,其特征在于:所述拱肋是由第一、第二和第三拱肋段形成的半圆形拱肋。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710794088.2A CN107524090B (zh) | 2017-09-06 | 2017-09-06 | 钢管拱桥拱肋顶升拼装施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710794088.2A CN107524090B (zh) | 2017-09-06 | 2017-09-06 | 钢管拱桥拱肋顶升拼装施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107524090A CN107524090A (zh) | 2017-12-29 |
CN107524090B true CN107524090B (zh) | 2018-11-30 |
Family
ID=60683575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710794088.2A Active CN107524090B (zh) | 2017-09-06 | 2017-09-06 | 钢管拱桥拱肋顶升拼装施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107524090B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797354B (zh) * | 2018-06-20 | 2019-12-10 | 安徽省新路建设工程集团有限责任公司 | 一种建筑桥梁自动修建设备及其修建施工工艺 |
CN109577165B (zh) * | 2019-01-25 | 2024-06-14 | 中煤第三建设集团机电安装工程有限责任公司 | 一种桥梁钢拱肋体系及其吊装方法 |
CN112144402B (zh) * | 2020-09-03 | 2022-04-15 | 浙江精工钢结构集团有限公司 | 一种旋转顶升方法 |
CN112030713B (zh) * | 2020-09-03 | 2022-04-15 | 浙江精工钢结构集团有限公司 | 大跨度单斜拱斜拉景观桥及自平衡高空竖向旋转施工方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3520420A1 (de) * | 1985-06-07 | 1986-12-11 | Hein, Lehmann AG, 4000 Düsseldorf | Verfahren zum bau eines brueckenbogens |
CN101519864B (zh) * | 2009-03-30 | 2011-06-22 | 中铁二十三局集团第三工程有限公司 | 一种箱型拱桥安装方法 |
CN101672011B (zh) * | 2009-10-13 | 2011-02-16 | 中铁二局股份有限公司 | 钢管拱肋竖向提升方法 |
CN103437296B (zh) * | 2013-08-28 | 2015-06-24 | 山东中宏路桥建设有限公司 | 钢管拱桥无塔扣挂三段式双肋合拢吊装施工方法 |
-
2017
- 2017-09-06 CN CN201710794088.2A patent/CN107524090B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN107524090A (zh) | 2017-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107524090B (zh) | 钢管拱桥拱肋顶升拼装施工方法 | |
CN106065577B (zh) | 一种新的桩基托换的结构与方法 | |
CN207919363U (zh) | 一种钢管混凝土拱桥拱肋低位拼装提升系统 | |
CN110205938B (zh) | 下承式梁拱组合桥的钢管拱安装方法 | |
CN209585612U (zh) | 一种建筑变形缝模板的内支撑结构 | |
LU501962B1 (en) | Long Platform Guy-Wire Hanging Basket and Construction Method For Main Girder Section | |
CN205172590U (zh) | 一种组合多用隧道衬砌台车 | |
CN111017698A (zh) | 超大断面矩形管节吊装翻转方法及其适用的装置 | |
CN102691269A (zh) | 主拱外包混凝土移动挂篮 | |
CN104314013B (zh) | 一种极不对称组合梁的双悬臂施工方法 | |
CN106592446B (zh) | 一种带边跨湿接缝的预制节段平衡悬臂拼装施工方法 | |
CN109653102B (zh) | 一种中高钢拱桥转体施工装置及施工方法 | |
CN110184945A (zh) | 用于架桥机的四前支腿系统以及架设方法 | |
CN202626841U (zh) | 吊挂法外包主拱混凝土装置 | |
CN106284097B (zh) | 一种钢管拱桥拱上墩k撑的安装方法 | |
CN117345300A (zh) | 一种隧道工程加固装置及其使用方法 | |
CN111691317A (zh) | 可控式防倾覆转体球铰 | |
CN105463999B (zh) | 一种节段拼装架桥机及曲线架桥方法 | |
CN207193754U (zh) | 一种城市道路及高速公路桥梁维修用挂篮 | |
CN203393619U (zh) | 一种用于双幅桥梁间横系梁现浇施工的多功能施工平台 | |
CN103266572B (zh) | 一种用于双幅桥梁间横系梁现浇施工的多功能施工平台 | |
CN108677752A (zh) | 一种桥梁转体施工装配化梁体顶升系统 | |
CN205857004U (zh) | 一种施工便梁 | |
CN208701517U (zh) | 铁路桥梁转体施工梁体抬升系统 | |
CN205400755U (zh) | 分离式台车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |