CN1075183A - Cement built-up shuttering and using method thereof - Google Patents

Cement built-up shuttering and using method thereof Download PDF

Info

Publication number
CN1075183A
CN1075183A CN 92100777 CN92100777A CN1075183A CN 1075183 A CN1075183 A CN 1075183A CN 92100777 CN92100777 CN 92100777 CN 92100777 A CN92100777 A CN 92100777A CN 1075183 A CN1075183 A CN 1075183A
Authority
CN
China
Prior art keywords
template
shuttering
ribbet
panel
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 92100777
Other languages
Chinese (zh)
Inventor
梁显许
陈庆庆
刘义趾
梁显煌
梁必棠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SPECIAL CONSTRUCTIONAL ENGINEERING TEAM JI'AN
Original Assignee
SPECIAL CONSTRUCTIONAL ENGINEERING TEAM JI'AN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SPECIAL CONSTRUCTIONAL ENGINEERING TEAM JI'AN filed Critical SPECIAL CONSTRUCTIONAL ENGINEERING TEAM JI'AN
Priority to CN 92100777 priority Critical patent/CN1075183A/en
Publication of CN1075183A publication Critical patent/CN1075183A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a kind of cement built-up shuttering capable of being combined and using method thereof that the monolithic reinforced concrete structure architecture construction is used that be used for, have a pair of on the panel or two pairs of long pin rings, be ribbet all around, elder generation is according to building shape during construction, size, calculate and determine template size and required number, in case remainder, prefabricated template, the grab that becomes 90 ° of iron with two ends are enclosed within the formwork erection that carries out inner and outer template in the long pin ring of panel, fixing, can carry out concrete and water the work of smashing, template links with the concrete body, improved the concrete compactness, need not form removal, shortened the engineering phase, need not timber, unit's nail, materials such as release agent have reduced cost.

Description

Cement built-up shuttering and using method thereof
The present invention relates to a kind of construction work cement built-up shuttering and using method thereof, especially a kind of cement formwork capable of being combined that is applicable to that the monolithic reinforced concrete structure architecture construction is used.
When general construction of buildings body of wall concrete, adopt the manual template formwork that is assembled in usually, or adopt steel, wooden form, or big punching block is made up in advanced typing.With give formulation type wooden model, waste of material is excessive; With the holding capacity deficiency of wooden model, unbalance stress, the yielding and tripe that rises of template; After the form removal, the existence of common quality defects such as revealing muscle, honeycomb is often arranged, the construction works phase is long simultaneously, the cost height, and the wooden model life cycle is short, consumes big, the demoulding has very big difficulty again, is the backward construction technology of a kind of time-consuming, effort, high cost, with steel form or typing combined large steel model formworks such as (China Patent No. 90201809.4), template weight is big, volume is big, price is expensive, the transition of construction point is dumb, after concrete is made, and also must be through operations such as demolition templates, workload is big, the cost height.
The object of the present invention is to provide a kind of prefabricated cement built-up shuttering, use this cement built-up shuttering, strengthened the holding capacity (the crowded power when smashing concrete, the drag of the power of vibrating) of template, improved the quality of concrete watering, a large amount of timber and unit's nail have been saved, simultaneously template directly is applied on the building, need not form removal, and also the template volume is little, in light weight, easy and simple to handle, laborsaving, save time, reduced engineering cost significantly, shortened the construction period greatly.
Above-mentioned purpose of the present invention is achieved in that cement built-up shuttering comprises cast-in-place cement built-up shuttering panel, reinforcing bar, long pin ring and ribbet, cement built-up shuttering is aggregate with the microlith, the reinforcing bar that diameter is about 4 millimeter intersects anyhow to be imbedded in the cement built-up shuttering, according to the maximum load capacity design sandstone ratio and the radical that buries reinforcing bar that gives, in the high 1/3h of the panel position about 10 centimeters from the edge, the right and left is respectively settled a long pin ring symmetrically, collar extension in the same way, the panel bottom of the cement built-up shuttering of using as bottom and the long pin ring on top are set up group leader's pin ring on the symmetrical position, edge, template surrounding is a ribbet, protruding inboard, the ribbet outside, every template top is recessed, and ribbet inboard, bottom is protruding, outer concave, the outside, the ribbet left side, the left and right sides is protruding, and is then recessed in the outside, the right.Every panel area generally is no more than 0.25m 2, weight is not more than 12 kilograms, and high h is no more than 40cm, and long L is no more than 60cm, about about 2.5 centimeters of thick a.
During construction, at first according to building shape, size, size and required number of calculating and definite cement built-up shuttering, in case remainder, and by maximum load capacity design sandstone proportioning and the reinforcing bar number of going into to bury, cement built-up shuttering given make, then as building wall, carry out formwork erection, elder generation is first template in corner fixedly, the bottom is firm with cement mortar filling seat, the band one side inwardly, and two template formation inner and outer templates staggered relatively, by the concrete breadth of section iron wire two ends that diameter is about 8 millimeter are curved 90 ° grab, respectively grab is inserted in four group leader's pin rings of inner and outer template, upright good template center of gravity can not be departed from, template is strained, fixing, the ribbet of template will align, coincide, the outside of seam mortar raking treats that the combination of first floor cement built-up shuttering finishes, and can carry out concrete and water the work of smashing, cement is poured between the inner and outer template, and the limit is watered the concrete limit and is vibrated.Suffered crowded power on the template, the shear stress of the power of vibrating and ribbet is all less than the permission power through calculating and designing, so can not produce the tripe that rises, phenomenons such as fission, template and concrete body strike up partnership, after treating that concrete has certain intensity, then carry out the assembling of upper former, arrangement and concrete water the work of smashing, because the protruding inboard, the ribbet outside, upper edge of lower template is recessed and the lower edge outer concave of upper former, inboard protuberance part matches, therefore the center of gravity of upper former can not depart from, and the combinated seam of levels template coincide firmly, and the long pin ring of upper former only needs top to get final product for one group.
The present invention compares with existing wooden form, steel form, combined large steel model, and its advantage has the following aspects.
1. can carry out concrete once and water the work of smashing, need not the form removal operation, save a large amount of manpowers, financial resources, material resources, shorten the duration.
2. the lateral pressure of suffered cement mortar on the panel of cement built-up shuttering, the power of vibrating of vibrator and the shear stress of ribbet are filled Xu Li during all less than design, thus the concrete compactness height of pouring, thus guaranteed the quality of building.
3. save a large amount of timber and unit's nail, reduced construction costs.
4. the cement built-up shuttering volume is little in light weight, and constructing operation is convenient, flexible.
Below in conjunction with drawings and Examples the present invention is described in further detail.
Fig. 1 is the elevation of cement built-up shuttering of the present invention;
Fig. 2 is the B-B ' sectional view of cement built-up shuttering of the present invention;
Fig. 3 is the A-A ' sectional view of cement built-up shuttering of the present invention;
Fig. 4 is the schematic perspective view of cement built-up shuttering of the present invention;
Fig. 5 is the combination formwork erection working condition sectional drawing of cement built-up shuttering of the present invention;
Fig. 6 is the working condition schematic perspective view of cement built-up shuttering of the present invention.
By Fig. 1-Fig. 6 as can be known, be ribbet 4 around the cement built-up shuttering, be convenient to combination, the formwork erection, identical of template.And seam crossing is non-leakage.During prefabricated cement built-up shuttering, at first according to shape, the size of building, the size of size, moulding budget and definite template, in case remainder, the long L of template is 50-60m 2, high h is 30-40cm, thick about 2.5cm, and area is no more than 0.25cm 2Weight is not more than 12 kilograms, make aggregate with microlith when every template is prefabricated, with 2 of horizontal strokes, perpendicular 3 left and right sides diameters are about 4 millimeters reinforcing bar 2 and imbed in the panel 1, high 1/3h on panel 1, in about 10 centimeters of two edges, on the position some long pin rings 3 are set, template as bottom, establish the symmetrical position, position of long pin ring on panel 1 bottom and top and set up some long pin rings 3, during construction, by the concrete breadth of section iron wire two ends of 8 millimeter are bent into 90 ° of grabs 5 with iron wire, the two ends crotch is inserted in respectively in the long pin ring 3 of cement built-up shuttering staggered relatively, template is strained, upright jail forms inner and outer template, ribbet will align, the seam of inner and outer template outside tape edge water silt particle slurry raking, clog with cement mortar the bottom, the inner and outer template imprisonment is finished after, can carry out concrete and water the work of smashing, treat that template and the cement that waters down strike up partnership, and after certain intensity was arranged, arrangement and the concrete that can go up face die plate watered the work of smashing.
As run into garden shape, the building of modeling structures such as arc, prefabricated cement built-up shuttering panel is curved, presses the garden radian number of building when calculating in advance, and size calculated radian number and the required number and the size of arc formwork, carries out prefabricated arc cement built-up shuttering.

Claims (3)

1, a kind ofly be used for the cement built-up shuttering that the monolithic reinforced concrete structure architecture construction uses and comprise panel, reinforcing bar, long pin ring and ribbet, it is characterized in that cement built-up shuttering is aggregate with the microlith, 1 li reinforcing bar 2 that is embedded with perpendicular traversed by fork of panel, about 10 centimeters position is provided with some collar extensions long pin ring 3 in the same way to both sides, high 1/3h place far from the edge on the panel 1, set up some long pin rings 3 as the bottom of the cement built-up shuttering of bottom and the position of last minister's pin ring 3 symmetries, the edge, surrounding of template is a ribbet 4, protruding inboard, the ribbet outside, every template top is recessed, the inboard protruding outer concave of bottom ribbet, the outside, the left side, the left and right sides is protruding, the right outer concave.
2, cement built-up shuttering area according to claim 1 is no more than 0.25m usually 2, weight is not more than 12kg, and high h is no more than 40cm, and long L is no more than 60cm, about 2.5 centimeters of thick A.
3, a kind of using method of cement built-up shuttering, it is characterized in that: by the concrete breadth of section grab 5 curve 90 ° is twisted at two ends and be inserted in respectively in the long pin ring on the panel, bottom template grab is inserted in respectively up and down in a few group leader's pin rings, aim at ribbet, upper and lower layer template when combination with the upper former lower edge outer recessed in the upper edge evagination of protuberance position and lower template recess part match, the formation convex-concave is identical.
CN 92100777 1992-02-01 1992-02-01 Cement built-up shuttering and using method thereof Pending CN1075183A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92100777 CN1075183A (en) 1992-02-01 1992-02-01 Cement built-up shuttering and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92100777 CN1075183A (en) 1992-02-01 1992-02-01 Cement built-up shuttering and using method thereof

Publications (1)

Publication Number Publication Date
CN1075183A true CN1075183A (en) 1993-08-11

Family

ID=4938793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92100777 Pending CN1075183A (en) 1992-02-01 1992-02-01 Cement built-up shuttering and using method thereof

Country Status (1)

Country Link
CN (1) CN1075183A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1995578B (en) * 2005-12-31 2011-02-02 中国建筑材料科学研究院 Assembled architecture outer wall and its construction method
CN102235045A (en) * 2010-04-30 2011-11-09 广州市壁圣专利技术开发有限公司 Wall building method for casting non-bearing wall on site
CN102345378A (en) * 2010-08-02 2012-02-08 王亚运 Plastic building template
CN113338611A (en) * 2021-06-22 2021-09-03 中国建筑第七工程局有限公司 Supporting structure is pour to prefabricated shear force wall of ring muscle lock

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1995578B (en) * 2005-12-31 2011-02-02 中国建筑材料科学研究院 Assembled architecture outer wall and its construction method
CN102235045A (en) * 2010-04-30 2011-11-09 广州市壁圣专利技术开发有限公司 Wall building method for casting non-bearing wall on site
CN102345378A (en) * 2010-08-02 2012-02-08 王亚运 Plastic building template
CN102345378B (en) * 2010-08-02 2014-06-11 王亚运 Plastic building template
CN113338611A (en) * 2021-06-22 2021-09-03 中国建筑第七工程局有限公司 Supporting structure is pour to prefabricated shear force wall of ring muscle lock
CN113338611B (en) * 2021-06-22 2023-09-12 中国建筑第七工程局有限公司 Casting supporting structure of ring rib buckling precast shear wall

Similar Documents

Publication Publication Date Title
CN109403458A (en) Novel pre-fabricated one
CN106592426B (en) The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN103615053B (en) Monolithic reinforced concrete structure post empiricism engineering method
CN204343459U (en) The parapet node structure of overlaid plate type concrete shear wall system
CN209227836U (en) Prefabricated concrete structure wall-column all steel is keyed structure
CN1075183A (en) Cement built-up shuttering and using method thereof
CN210737909U (en) Cavity frame column
CN206736662U (en) A kind of job site pin-connected panel precast concrete temporary road
CN105332386A (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN209293197U (en) Wall and floor connection structure and assembled arthitecutral structure system
CN208152311U (en) A kind of two-sided folded type steel shear wall
CN212926589U (en) Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body
CN108301510A (en) A kind of bean column node and its construction method
CN210216123U (en) Rigid hollow plate girder without longitudinal wet joint
CN209397710U (en) Novel pre-fabricated one
CN211736420U (en) Concrete windowsill coping combination formula construction structures
CN112227580A (en) Steel pipe truss prestressed hollow superimposed sheet
CN113403936A (en) Bracket-free rapid construction method for hollow pier partition plate of bridge
CN209686711U (en) Prefabricated laminated superposed column, reinforced column and assembled architecture body
CN206477251U (en) Transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN218374656U (en) Windowsill coping prefabricated part
CN110080461A (en) A kind of prestressing force regeneration concrete empty stomach composite beam
CN101240569A (en) In-situ integrated placing construction method for aerated concrete wall
CN210887292U (en) Prefabricated assembled retaining wall
CN212715331U (en) Green solid waste regeneration large-volume concrete structure

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication