CN206736662U - A kind of job site pin-connected panel precast concrete temporary road - Google Patents

A kind of job site pin-connected panel precast concrete temporary road Download PDF

Info

Publication number
CN206736662U
CN206736662U CN201720506809.0U CN201720506809U CN206736662U CN 206736662 U CN206736662 U CN 206736662U CN 201720506809 U CN201720506809 U CN 201720506809U CN 206736662 U CN206736662 U CN 206736662U
Authority
CN
China
Prior art keywords
prefabricated section
bar
precast concrete
job site
connected panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720506809.0U
Other languages
Chinese (zh)
Inventor
王琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xijing University
Original Assignee
Xijing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xijing University filed Critical Xijing University
Priority to CN201720506809.0U priority Critical patent/CN206736662U/en
Application granted granted Critical
Publication of CN206736662U publication Critical patent/CN206736662U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

A kind of job site pin-connected panel precast concrete temporary road; including prefabricated section; double-deck bar-mat reinforcement is provided with inside prefabricated section, bottom layer of the reinforcing steel supports top bars by the stirrup muscle into quincuncial arrangement, and marble protective layer cushion block is placed in bottom layer of the reinforcing steel colligation handing-over position plum blossom-shaped;Described prefabricated section is diagonally opposed to be provided with preformed hole, and preformed hole sets suspension hook inside;Described four, prefabricated section top corner arrangement angle bar, angle bar are welded and fixed by round steel and bar-mat reinforcement, the combination of prefabricated section on-site consolidation, simple and quick construction, realization is repeatedly used in turn, and is reduced building waste yield, has been implemented the management philosophy of green construction.Meanwhile effectively shorten to face to build the road construction duration and face and build the time that road comes into operation, substantially increase operating efficiency.

Description

A kind of job site pin-connected panel precast concrete temporary road
Technical field
It the utility model is related to a kind of temporary road, and in particular to a kind of job site pin-connected panel precast concrete temporary road Road.
Background technology
In recent years, job site office and life originally realized standardization with foundations, can repeatedly be used in turn, and temporary road Road is also using cast-in-place concrete road surface, thus causes the great wasting of resources, also generates substantial amounts of rubbish, and " builds Building refuse discharge capacity " is the important controlling unit of " green construction " again, according to having been carried out " green construction demonstration project " project Measuring and calculating, faces and builds refuse production averagely accounts for building waste total amount 26%, and temporary road refuse production proportion reaches 9.3%.
Technical scheme
The shortcomings that in order to overcome above-mentioned prior art, the purpose of this utility model are to provide a kind of job site pin-connected panel It precast concrete temporary road, can repeatedly be used in turn, be effectively controlled building waste yield, while reduce cost, Accelerate to face and build construction speed.
In order to achieve the above object, the technical scheme that the utility model is taken is:
A kind of job site pin-connected panel precast concrete temporary road, including prefabricated section, prefabricated section inside are provided with double-deck Bar-mat reinforcement 1, the stirrup muscle 2 into quincuncial arrangement on bottom layer of the reinforcing steel support top bars, join position in bottom layer of the reinforcing steel colligation Plum blossom-shaped is placed on marble protective layer cushion block 5.
Described prefabricated section is diagonally opposed to be provided with preformed hole 3, and preformed hole 3 sets suspension hook 4 inside.
Described four, prefabricated section top corner arrangement angle bar 6, angle bar 6 by round steel 7 and bar-mat reinforcement 1 weld admittedly It is fixed.
Described prefabricated section is prepared by formwork, and formwork includes template 8, and template 8 adds flitch 9 to carry on the back using minute surface bamboo slab rubber Stupefied, direction sets to pull bar 10 and fixed by mountain type card template 8 in length and breadth, and 8 four jiaos of template uses the oblique pull of batten 11, and formwork finishes Afterwards prefabricated section is poured out with concrete 12.
The advantages of the utility model:Prefabricated section on-site consolidation is combined, simple and quick construction, and realization is repeatedly used in turn, and is subtracted Lack building waste yield, implement the management philosophy of green construction.Meanwhile effectively shorten to face and build the road construction duration And face and build the time that road comes into operation, substantially increase operating efficiency.
Brief description of the drawings
Fig. 1 is structural plan schematic diagram of the present utility model.
Fig. 2 is the utility model structural profile illustration.
Fig. 3 is the utility model formwork schematic diagram.
Embodiment
The utility model is described in further details below in conjunction with the accompanying drawings.
Referring to Figures 1 and 2, a kind of job site pin-connected panel precast concrete temporary road, including prefabricated section, in prefabricated section Portion is provided with double-deck bar-mat reinforcement 1, and bottom layer of the reinforcing steel supports top bars by the stirrup muscle 2 into quincuncial arrangement, in prefabricated section pair Preformed hole 3 is reserved in angular direction, and preformed hole 3 sets suspension hook 4 inside, and marble is placed in bottom layer of the reinforcing steel colligation handing-over position plum blossom-shaped Material protective layer cushion block 5, avoid Lou muscle reduction service life;In four, prefabricated section top corner arrangement angle bar 6, angle bar 6 passes through circle Steel 7 is welded and fixed with bar-mat reinforcement 1.
Reference picture 3, described prefabricated section are prepared by formwork, and formwork includes template 8, and template 8 is added using minute surface bamboo slab rubber The back cord of flitch 9, direction sets to pull bar 10 and fixed by mountain type card template 8 in length and breadth, and 8 four jiaos of template uses the oblique pull of batten 11, Ensure the sectional dimension and squareness of prefabricated components, prefabricated section is poured out with concrete 12 after formwork.
Operation principle of the present utility model is:
Prefabricated section on-site consolidation combines, in use, place using dirt tamp it is smooth after, including preformed hole 3 If suspension hook 4 carries out the lifting of prefabricated section, constructed by the way of advance is paved, road surface is all assembled to complete, and carries out filling out filling Joint filling sand, extruding is avoided to cause the damage of prefabricated section.

Claims (4)

1. a kind of job site pin-connected panel precast concrete temporary road, including prefabricated section, it is characterised in that:Set inside prefabricated section There is the bar-mat reinforcement (1) of bilayer, bottom layer of the reinforcing steel supports top bars by the stirrup muscle (2) into quincuncial arrangement, in bottom layer of the reinforcing steel Colligation handing-over position plum blossom-shaped places marble protective layer cushion block (5).
A kind of 2. job site pin-connected panel precast concrete temporary road according to claim 1, it is characterised in that:It is described Prefabricated section it is diagonally opposed be provided with preformed hole (3), preformed hole (3) sets suspension hook (4) inside.
A kind of 3. job site pin-connected panel precast concrete temporary road according to claim 1, it is characterised in that:It is described Four corners in prefabricated section top arrangement angle bar (6), angle bar (6) is welded and fixed by round steel (7) and bar-mat reinforcement (1).
A kind of 4. job site pin-connected panel precast concrete temporary road according to claim 1, it is characterised in that:It is described Prefabricated section prepared by formwork, formwork includes template (8), and template (8) adds flitch (9) back cord, template using minute surface bamboo slab rubber (8) direction sets to pull bar (10) and by mountain type card and fixed in length and breadth, and template (8) corner uses batten (11) oblique pull, and formwork is complete After finishing prefabricated section is poured out with concrete (12).
CN201720506809.0U 2017-05-08 2017-05-08 A kind of job site pin-connected panel precast concrete temporary road Expired - Fee Related CN206736662U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720506809.0U CN206736662U (en) 2017-05-08 2017-05-08 A kind of job site pin-connected panel precast concrete temporary road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720506809.0U CN206736662U (en) 2017-05-08 2017-05-08 A kind of job site pin-connected panel precast concrete temporary road

Publications (1)

Publication Number Publication Date
CN206736662U true CN206736662U (en) 2017-12-12

Family

ID=60564808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720506809.0U Expired - Fee Related CN206736662U (en) 2017-05-08 2017-05-08 A kind of job site pin-connected panel precast concrete temporary road

Country Status (1)

Country Link
CN (1) CN206736662U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252711A (en) * 2018-11-12 2019-01-22 上海宝冶集团有限公司 Precast splice type steel bar meter field and its manufacturing method
CN109518556A (en) * 2018-12-20 2019-03-26 中国雄安集团基础建设有限公司 The Prefabricated road plate and its manufacturing method and Joining Technology of a kind of bolt with one end bent back connection

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252711A (en) * 2018-11-12 2019-01-22 上海宝冶集团有限公司 Precast splice type steel bar meter field and its manufacturing method
CN109518556A (en) * 2018-12-20 2019-03-26 中国雄安集团基础建设有限公司 The Prefabricated road plate and its manufacturing method and Joining Technology of a kind of bolt with one end bent back connection
CN109518556B (en) * 2018-12-20 2024-04-05 中国雄安集团基础建设有限公司 Prefabricated road plate connected by elbow bolts, manufacturing method thereof and connecting process

Similar Documents

Publication Publication Date Title
CN105839850A (en) Basement reverse-construction scape post-casting pre-stressed construction method
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN104060760B (en) High Rise Building Transfer Floor Structure concrete super large beam construction in layer method
CN108005387A (en) A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN106702914A (en) Reinforcing system capable of improving load bearing capacity of concrete structures and construction method of reinforcing system
CN206736662U (en) A kind of job site pin-connected panel precast concrete temporary road
CN107460985A (en) A kind of straw concrete exempts from the close rib laminated floor slab construction technology of form removal
CN105484403A (en) Assembly type concrete bidirectional ribbed floor and construction method therefor
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN210946329U (en) High embankment structure of filling up in subway top
CN202899481U (en) Fast-assembled concrete stair
CN101929245A (en) Thin webbed girder vertical construction method
CN109811613B (en) Temporary ground facility and integrated construction method thereof
CN203755171U (en) Bridge back-pulling bearing construction support
CN109881699A (en) The concrete moulding bed fabrication and installation method of the general raft foundation of assembled tongue and groove Miller type
CN102953336A (en) Modular construction method of cast-in-situ continuous box beam on deep soft foundation road segment
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN104929012A (en) Construction method for basalt brick road and tile road of skid pad
CN210946354U (en) Temporary road with in-situ prefabricated reinforced concrete prefabricated slab
CN212926589U (en) Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body
CN108018972A (en) Full precast floor slab and laminated floor slab combining structure, making and assembly method
CN102877485A (en) Ground beam bearing platform moulding bed
CN108532985B (en) Construction method of foundation beam plate
CN203034790U (en) Basic prefabricated concrete formwork for basement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171212

Termination date: 20200508

CF01 Termination of patent right due to non-payment of annual fee