CN206736662U - A kind of job site pin-connected panel precast concrete temporary road - Google Patents
A kind of job site pin-connected panel precast concrete temporary road Download PDFInfo
- Publication number
- CN206736662U CN206736662U CN201720506809.0U CN201720506809U CN206736662U CN 206736662 U CN206736662 U CN 206736662U CN 201720506809 U CN201720506809 U CN 201720506809U CN 206736662 U CN206736662 U CN 206736662U
- Authority
- CN
- China
- Prior art keywords
- prefabricated section
- bar
- precast concrete
- job site
- connected panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
A kind of job site pin-connected panel precast concrete temporary road; including prefabricated section; double-deck bar-mat reinforcement is provided with inside prefabricated section, bottom layer of the reinforcing steel supports top bars by the stirrup muscle into quincuncial arrangement, and marble protective layer cushion block is placed in bottom layer of the reinforcing steel colligation handing-over position plum blossom-shaped;Described prefabricated section is diagonally opposed to be provided with preformed hole, and preformed hole sets suspension hook inside;Described four, prefabricated section top corner arrangement angle bar, angle bar are welded and fixed by round steel and bar-mat reinforcement, the combination of prefabricated section on-site consolidation, simple and quick construction, realization is repeatedly used in turn, and is reduced building waste yield, has been implemented the management philosophy of green construction.Meanwhile effectively shorten to face to build the road construction duration and face and build the time that road comes into operation, substantially increase operating efficiency.
Description
Technical field
It the utility model is related to a kind of temporary road, and in particular to a kind of job site pin-connected panel precast concrete temporary road
Road.
Background technology
In recent years, job site office and life originally realized standardization with foundations, can repeatedly be used in turn, and temporary road
Road is also using cast-in-place concrete road surface, thus causes the great wasting of resources, also generates substantial amounts of rubbish, and " builds
Building refuse discharge capacity " is the important controlling unit of " green construction " again, according to having been carried out " green construction demonstration project " project
Measuring and calculating, faces and builds refuse production averagely accounts for building waste total amount 26%, and temporary road refuse production proportion reaches
9.3%.
Technical scheme
The shortcomings that in order to overcome above-mentioned prior art, the purpose of this utility model are to provide a kind of job site pin-connected panel
It precast concrete temporary road, can repeatedly be used in turn, be effectively controlled building waste yield, while reduce cost,
Accelerate to face and build construction speed.
In order to achieve the above object, the technical scheme that the utility model is taken is:
A kind of job site pin-connected panel precast concrete temporary road, including prefabricated section, prefabricated section inside are provided with double-deck
Bar-mat reinforcement 1, the stirrup muscle 2 into quincuncial arrangement on bottom layer of the reinforcing steel support top bars, join position in bottom layer of the reinforcing steel colligation
Plum blossom-shaped is placed on marble protective layer cushion block 5.
Described prefabricated section is diagonally opposed to be provided with preformed hole 3, and preformed hole 3 sets suspension hook 4 inside.
Described four, prefabricated section top corner arrangement angle bar 6, angle bar 6 by round steel 7 and bar-mat reinforcement 1 weld admittedly
It is fixed.
Described prefabricated section is prepared by formwork, and formwork includes template 8, and template 8 adds flitch 9 to carry on the back using minute surface bamboo slab rubber
Stupefied, direction sets to pull bar 10 and fixed by mountain type card template 8 in length and breadth, and 8 four jiaos of template uses the oblique pull of batten 11, and formwork finishes
Afterwards prefabricated section is poured out with concrete 12.
The advantages of the utility model:Prefabricated section on-site consolidation is combined, simple and quick construction, and realization is repeatedly used in turn, and is subtracted
Lack building waste yield, implement the management philosophy of green construction.Meanwhile effectively shorten to face and build the road construction duration
And face and build the time that road comes into operation, substantially increase operating efficiency.
Brief description of the drawings
Fig. 1 is structural plan schematic diagram of the present utility model.
Fig. 2 is the utility model structural profile illustration.
Fig. 3 is the utility model formwork schematic diagram.
Embodiment
The utility model is described in further details below in conjunction with the accompanying drawings.
Referring to Figures 1 and 2, a kind of job site pin-connected panel precast concrete temporary road, including prefabricated section, in prefabricated section
Portion is provided with double-deck bar-mat reinforcement 1, and bottom layer of the reinforcing steel supports top bars by the stirrup muscle 2 into quincuncial arrangement, in prefabricated section pair
Preformed hole 3 is reserved in angular direction, and preformed hole 3 sets suspension hook 4 inside, and marble is placed in bottom layer of the reinforcing steel colligation handing-over position plum blossom-shaped
Material protective layer cushion block 5, avoid Lou muscle reduction service life;In four, prefabricated section top corner arrangement angle bar 6, angle bar 6 passes through circle
Steel 7 is welded and fixed with bar-mat reinforcement 1.
Reference picture 3, described prefabricated section are prepared by formwork, and formwork includes template 8, and template 8 is added using minute surface bamboo slab rubber
The back cord of flitch 9, direction sets to pull bar 10 and fixed by mountain type card template 8 in length and breadth, and 8 four jiaos of template uses the oblique pull of batten 11,
Ensure the sectional dimension and squareness of prefabricated components, prefabricated section is poured out with concrete 12 after formwork.
Operation principle of the present utility model is:
Prefabricated section on-site consolidation combines, in use, place using dirt tamp it is smooth after, including preformed hole 3
If suspension hook 4 carries out the lifting of prefabricated section, constructed by the way of advance is paved, road surface is all assembled to complete, and carries out filling out filling
Joint filling sand, extruding is avoided to cause the damage of prefabricated section.
Claims (4)
1. a kind of job site pin-connected panel precast concrete temporary road, including prefabricated section, it is characterised in that:Set inside prefabricated section
There is the bar-mat reinforcement (1) of bilayer, bottom layer of the reinforcing steel supports top bars by the stirrup muscle (2) into quincuncial arrangement, in bottom layer of the reinforcing steel
Colligation handing-over position plum blossom-shaped places marble protective layer cushion block (5).
A kind of 2. job site pin-connected panel precast concrete temporary road according to claim 1, it is characterised in that:It is described
Prefabricated section it is diagonally opposed be provided with preformed hole (3), preformed hole (3) sets suspension hook (4) inside.
A kind of 3. job site pin-connected panel precast concrete temporary road according to claim 1, it is characterised in that:It is described
Four corners in prefabricated section top arrangement angle bar (6), angle bar (6) is welded and fixed by round steel (7) and bar-mat reinforcement (1).
A kind of 4. job site pin-connected panel precast concrete temporary road according to claim 1, it is characterised in that:It is described
Prefabricated section prepared by formwork, formwork includes template (8), and template (8) adds flitch (9) back cord, template using minute surface bamboo slab rubber
(8) direction sets to pull bar (10) and by mountain type card and fixed in length and breadth, and template (8) corner uses batten (11) oblique pull, and formwork is complete
After finishing prefabricated section is poured out with concrete (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720506809.0U CN206736662U (en) | 2017-05-08 | 2017-05-08 | A kind of job site pin-connected panel precast concrete temporary road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720506809.0U CN206736662U (en) | 2017-05-08 | 2017-05-08 | A kind of job site pin-connected panel precast concrete temporary road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206736662U true CN206736662U (en) | 2017-12-12 |
Family
ID=60564808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720506809.0U Expired - Fee Related CN206736662U (en) | 2017-05-08 | 2017-05-08 | A kind of job site pin-connected panel precast concrete temporary road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206736662U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252711A (en) * | 2018-11-12 | 2019-01-22 | 上海宝冶集团有限公司 | Precast splice type steel bar meter field and its manufacturing method |
CN109518556A (en) * | 2018-12-20 | 2019-03-26 | 中国雄安集团基础建设有限公司 | The Prefabricated road plate and its manufacturing method and Joining Technology of a kind of bolt with one end bent back connection |
-
2017
- 2017-05-08 CN CN201720506809.0U patent/CN206736662U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252711A (en) * | 2018-11-12 | 2019-01-22 | 上海宝冶集团有限公司 | Precast splice type steel bar meter field and its manufacturing method |
CN109518556A (en) * | 2018-12-20 | 2019-03-26 | 中国雄安集团基础建设有限公司 | The Prefabricated road plate and its manufacturing method and Joining Technology of a kind of bolt with one end bent back connection |
CN109518556B (en) * | 2018-12-20 | 2024-04-05 | 中国雄安集团基础建设有限公司 | Prefabricated road plate connected by elbow bolts, manufacturing method thereof and connecting process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105839850A (en) | Basement reverse-construction scape post-casting pre-stressed construction method | |
CN102839601A (en) | Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure | |
CN104060760B (en) | High Rise Building Transfer Floor Structure concrete super large beam construction in layer method | |
CN108005387A (en) | A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers | |
CN106437034A (en) | Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof | |
CN106702914A (en) | Reinforcing system capable of improving load bearing capacity of concrete structures and construction method of reinforcing system | |
CN206736662U (en) | A kind of job site pin-connected panel precast concrete temporary road | |
CN107460985A (en) | A kind of straw concrete exempts from the close rib laminated floor slab construction technology of form removal | |
CN105484403A (en) | Assembly type concrete bidirectional ribbed floor and construction method therefor | |
CN201770942U (en) | Support for soft soil foundation cast-in-place concrete continuous beam bridge | |
CN210946329U (en) | High embankment structure of filling up in subway top | |
CN202899481U (en) | Fast-assembled concrete stair | |
CN101929245A (en) | Thin webbed girder vertical construction method | |
CN109811613B (en) | Temporary ground facility and integrated construction method thereof | |
CN203755171U (en) | Bridge back-pulling bearing construction support | |
CN109881699A (en) | The concrete moulding bed fabrication and installation method of the general raft foundation of assembled tongue and groove Miller type | |
CN102953336A (en) | Modular construction method of cast-in-situ continuous box beam on deep soft foundation road segment | |
CN206529881U (en) | The constructing device of cushion cap and ground girder construction | |
CN104929012A (en) | Construction method for basalt brick road and tile road of skid pad | |
CN210946354U (en) | Temporary road with in-situ prefabricated reinforced concrete prefabricated slab | |
CN212926589U (en) | Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body | |
CN108018972A (en) | Full precast floor slab and laminated floor slab combining structure, making and assembly method | |
CN102877485A (en) | Ground beam bearing platform moulding bed | |
CN108532985B (en) | Construction method of foundation beam plate | |
CN203034790U (en) | Basic prefabricated concrete formwork for basement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171212 Termination date: 20200508 |
|
CF01 | Termination of patent right due to non-payment of annual fee |