CN108005387A CN201711260059.4A CN201711260059A CN108005387A CN 108005387 A CN108005387 A CN 108005387A CN 201711260059 A CN201711260059 A CN 201711260059A CN 108005387 A CN108005387 A CN 108005387A
Authority
CN
China
Prior art keywords
assembled wallboard
wall
cast
wallboard
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711260059.4A
Other languages
Chinese (zh)
Other versions
CN108005387B (en
Inventor
钱卫东
王硕干
姜磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Dongxin New Mstar Technology Ltd
Original Assignee
Tianjin Dongxin New Mstar Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Dongxin New Mstar Technology Ltd filed Critical Tianjin Dongxin New Mstar Technology Ltd
Priority to CN201711260059.4A priority Critical patent/CN108005387B/en
Publication of CN108005387A publication Critical patent/CN108005387A/en
Application granted granted Critical
Publication of CN108005387B publication Critical patent/CN108005387B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers.The present invention comprises the following steps:(1) the reinforcing bar binding of agent structure;(2) assembled wallboard is lifted in place, and assembled wallboard is attached and supported fixation;(3) cast-in-situ template is installed, and building template is supported fixation;(4) concreting enters mould, and assembled wallboard is molded with agent structure one-time-concreting.Short-shear wall structure and secondary structure are carried out synchronous construction by the present invention, one-pass molding, and the common quality defect such as hollowing, cracking, greatly enhances structural integrity, lifting construction quality and effect in no traditional secondary structure construction;On-site construction processes and material category model significantly reduce, and the big improvement of construction environment, the factor for polluting environment greatly reduces;The advantages that being provided simultaneously with the environmentally friendly, energy saving, high-quality, efficient of fabricated construction, safe construction.

Description

A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers
Technical field
The invention belongs to technical field of building construction, more particularly to a kind of assembled wallboard and the cast-in-place main body of shear wall with short piers Method for synchronously constructing.
Background technology
Before the eighties, building is substantially less than seven layers of brick mix structure, using brick wall, constructional column, collar tie beam, Successively synchronous construction builds completion to floorboard, and the intensity of brick is in more than 10MPa;The nineties due to the needs of Aseismic Design, Start based on framework design, first constructing structure beam, column and floor, then secondary filling enclosure wall and partition wall, it is ensured that earthquake When brick wall destroys, main body building will not collapse;After 2 years, start largely to use high-layer shear force wall slab-type apartment building, shear force of frame Wall and short-shear wall structure, enclosure wall and the secondary construction of internal partition wall, the at present secondary knot of frame-shear wall and shear wall with short piers Structure uses the construction method of the secondary filling of frame.
Current designs and job specfication requirement:Constructional column, waistband, the door and window of the secondary construction of frame structure embrace frame, filling wall When design strength requirement need to be reached in agent structure concrete strength, can start to fill secondary structure and partition wall etc.;It is mainly anti- Only during synchronous construction, constructional column forms fulcrum force, changes the force part and position of frame, makes matching somebody with somebody during crossbeam Force Calculation Muscle portion position and live actual loading position are inconsistent, the Beam fracture for causing partial reinforcement and occurring, or even the risk of fracture;Together When prevent wall from shifting to an earlier date stress after, floor load directly passes down along wall, cause lower floor's wall because intensity deficiency there is wall Destroy, also have crossbeam to shift to an earlier date stress, the uncertain influence that the deformation of concrete and reinforcing bar is produced on structure (mixes the overhanging of structure in multilayer In beam construction, upper wall is synchronous construction, and after removing bottom bracing, overhanging beam stress is substantially without influence;Gu this can be not required to examine Consider).
Being found in Construction practices for many years, when secondary construction, process is relative complex, time-consuming for frame, shear wall, The many artificial and material costs of increase a, if synchronous construction can be used to save many construction costs;And structure is safely The pressure control condition of all codes and standards, must not arbitrarily be altered or modified;But if above detrimental effect factor can be solved, Synchronous construction should be feasible;Particularly in structure stress than in more uniform short-shear wall structure, Vierendeel girder is less, beam Span is little, after above-mentioned adverse effect is handled well, can realize synchronous construction completely.
On this basis we we have proposed a kind of assembled wallboard and the cast-in-place main body synchronous construction side of shear wall with short piers Method, realizes integral construction increased quality, and creates conditions for environmental protection and energy saving construction.
The content of the invention
It is an object of the invention to provide a kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers, with Solve the above-mentioned problems in the prior art.
To achieve the above object, the present invention provides following technical solution:A kind of assembled wallboard and shear wall with short piers are cast-in-place Main body method for synchronously constructing, comprises the following steps:(1) the reinforcing bar binding of agent structure;(2) by assembled wallboard lifting just Position, and assembled wallboard is attached and supported fixation;(3) cast-in-situ template is installed, and building template is supported admittedly It is fixed;(4) concreting enters mould, and assembled wallboard is molded with agent structure one-time-concreting.
Preferably, the step (2) include it is following step by step:(1) constructional column, door and window embrace frame portion position up and down with swollen Bolt fixes longitudinal reinforcement, starts to lift first piece of assembled wallboard after the completion of stirrup binding, first block of wallboard should be from main body wall end Start;(2) multiple card slots are reserved at the plate bottom of assembled wallboard, plate underlayment set with card slot relative to positioning card, assembled Wallboard, which blocks card slot with corresponding positioning when lifting and falling, is directed at positioning;(3) the pre-buried built-in fitting in plate side of assembled wallboard Or embedded bar gets rid of muscle, during the side plate of mounting structure wall column, built-in fitting or reinforcing bar get rid of muscle and main body reinforcement welding or droop, at the same time Wall is fixed;(4) then second piece of assembled wallboard of lifting, the positioning of aligned with lower basic unit block in place, assembled wallboard Plate stitch control in 5~8mm, the top edges of boards of assembled wallboard are prefabricated to box out, and enters in the top U-shaped card insertion of adjacent two plate pre- In system is boxed out, it is ensured that the upper end of adjacent two plate is fixed concordant;Temporary support is added in the side of assembled wallboard at the same time, is prevented Riser topples to opposite;(5) lifting, installation and support for being sequentially completed assembled wallboard according to the method described above are fixed;(6) when one The assembled wallboard of face wall is after installation is complete, installation constitution column and embraces frame template, the mould of the Cast-in-place concrete part of all supporting modules Plate is pressed into contiguous prefabricated wall 100mm or so, it is ensured that the level requirements and globality effect of metope, are also beneficial to wall face supporting Stability;Adjacent cast-in-situ template is after installation is complete, and carrying out once adjustment to the plate face of assembled wallboard reinforces, it is ensured that metope Wall-panels supports are carried out a stabilization and reinforcement by overall vertical level requirements;(7) standard widths of a room in an old-style house or one layer of metope be after installation is complete, Whole face wall is checked, is corrected, squeegeeed or welded in time, then the connection of plate top is once fastened.
Preferably, the step (3) comprises the following steps, and assembled wallboard installs wallboard top beam steel after installation is complete The side form of coupling beam on muscle, then installing plate top, beam side can penetrate steel bar end in lifting, as the preliminary support of side form, use Through-wall bolt fixes side template.
Preferably, the step (4) comprises the following steps, one layer or a flowing water section assembled wallboard and cast-in-situ template Installing engineering complete and check and accept after pour concrete, the profit pipe mortar slump before pour concrete suitably increases, and profit pipe mortar is whole The seam crossing being marked between wallboard, then carry out the cast of normal concrete.
Preferably, in (2) step by step, the positioning card is prefabricated ironware or cement part, and the middle part for positioning card is pre- Box out eye, be fixed by nailing.
Preferably, in (4) step by step, the temporary support includes L-type support frame leg, the top of L-type support frame leg End is horizontally disposed supporting back cord, is fixedly connected between supporting back cord and L-type support frame leg;The side of the supporting back cord opens up There are multiple horizontal connecting holes, the top of supporting back cord offers multiple vertical connecting holes;The supporting back cord passes through horizontal connection Hole is fixedly connected with assembled wallboard;The connector of screw thread is provided with the vertical connecting hole, it is solid for being connected with wallboard It is fixed.
Compared with prior art, the beneficial effects of the invention are as follows:This method for synchronously constructing subtracts compared with traditional secondary is constructed Lack the substantial amounts of horizontal connection reinforcing bar of wall in secondary construction and the reinforcing steel implant process and material that are connected with main body, reduce two The processes such as secondary template installation and concrete cast and maintenance in secondary construction;The secondary support fixation and adjustment for reducing metope are checked and accepted Time, reduces the plastering process and workload of secondary metope, can effectively solve showing for the difficulty of the transport of materials in secondary construction Real problem etc.;Reduce preparation of construction time and the time of working procedure at the same time, effectively can accelerate construction progress and be lifted work Efficiency;The engineering construction cycle can be rationally effectively compressed, reduces management of enterprise operation cost and Corporate finance cost etc.;Building is overall One-pass molding, good integrity, appearance are highly improved, and have prevented many common quality defects of secondary construction;In addition significantly Reduce the use of bulk material and the construction of wet construction, the construction environment condition of operating personnel is greatly improved, and pollutes ring The factor in border greatly reduces;It can be seen that the application of this technology can bring larger economic benefit and healthy environmentally friendly social benefit; Under the current overall background for carrying forward vigorously fabricated construction, since mechanization, standardization, industry rate are constantly lifted, built to overall Building upgrading of industries has very positive history and realistic meaning.
Brief description of the drawings
Fig. 1 is the assembled wallboard supporting structure schematic diagram of one embodiment of the present invention;
Fig. 2 is the structure diagram of temporary support in Fig. 1.
In figure:1st, assembled wallboard;2nd, U-shaped card;3rd, temporary support;31st, supporting rack leg;32nd, supporting back cord;33rd, erect Straight connecting hole;34th, horizontal connecting hole;4th, embedded bar head.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes.
First, working procedure
The working procedure of the present invention comprises the following steps:
(1) the reinforcing bar binding of agent structure;
(2) assembled wallboard is lifted in place, and assembled wallboard is attached and supported fixation;
(3) cast-in-situ template is installed, and building template is supported fixation;
(4) concreting enters mould, and assembled wallboard is molded with agent structure one-time-concreting.
And traditional working procedure includes main body construction and secondary structure is constructed:
Main body construction process is mainly:Reinforcing bar -- template -- concrete;
Secondary structure construction technology is mainly:Constructional column reinforcing bar, template -- masonry is built by laying bricks or stones -- jamb, waist rail reinforcing bar, Template -- -- tiltedly build stuff up a crack -- to manage -- mesh plaster -- outside metope basic unit suitably to conserve, particularly after a week by reinforced bar engineering pour concrete Pre-buried and welding of reinforcing bar etc. is extremely taken a lot of work, and overall process is more, material category is more, and construction is complicated, long in time limit;And produce more Building waste, construction cost is higher, and construction quality is difficult to ensure, it is secondary construction wall quality common fault be difficult to effect a radical cure.
And the present invention uses synchronous construction, technique is simple, mainly includes:Reinforcing bar is bound -- wallboard lifting support --, and template is pacified Dress and support are fixed -- concrete placings, one-pass molding, good integrity, the common quality defect of no secondary structure construction;Site operation material Significantly reduce, the big improvement of construction environment, the factor for polluting environment greatly reduces;Uniquely unfortunately in synchronous construction, reinforcing bar Engineering and wallboard installation needs synchronously complete, and cause when reinforcing bar is bound, and working face has reduced, and need reasonable arrangement scene interspersed Operation, reasonable arrangement.
2nd, concrete construction method
Fig. 1 is referred to, the specific installation method of assembled wallboard of the present invention comprises the following steps:
(1) longitudinal reinforcement is fixed with swollen bolt, start to hang after the completion of stirrup binding up and down what constructional column, door and window embraced frame portion position First piece of assembled wallboard is filled, first block of wallboard should be since main body wall end;
If precast wall body have it is wide go out edges of boards get rid of muscle, the sleeper stirrup at main body wall end and should treat side plate installation just with drag hook Installed again position;Remaining template can the installation before main body template molds;
(2) multiple card slots are reserved at the plate bottom of assembled wallboard 1, plate underlayment set with card slot relative to positioning card, dress Card slot is blocked with corresponding positioning when lifting and falling with formula wallboard 1 and is directed at positioning;The positioning card is prefabricated ironware or water Eyelet is reserved at mud part, the middle part for positioning card, by being fixed with basic nailing.
(3) the pre-buried built-in fitting in plate side of assembled wallboard 1 or embedded bar get rid of muscle, during the side plate of mounting structure wall column, Built-in fitting or reinforcing bar get rid of muscle and main body reinforcement welding or droop, while wallboard is fixed;
(4) then second piece of assembled wallboard of lifting, the positioning of aligned with lower basic unit block in place, the plate stitch control of assembled wallboard System is in 5~8mm, the top edges of boards prefabricated preset hole of assembled wallboard, in the top of the adjacent two plate insertion preformed hole of U-shaped card 2 It is interior, it is ensured that the upper end of adjacent two plate is fixed concordant;Temporary support 3 is added in the side of assembled wallboard at the same time, prevents riser Topple to opposite, in stress supporting point of the appropriate embedded bar of flooring first 4 as temporary support.
Refer to Fig. 2, in the present embodiment, the temporary support includes L-type support frame leg 31, L-type support frame leg 31 Top has been horizontally disposed with supporting back cord 32, is fixedly connected between supporting back cord 32 and L-type support frame leg 31;The supporting back cord 32 Side offer multiple horizontal connecting holes 34, the top of supporting back cord 32 offers multiple vertical connecting holes 33;The support Back cord 32 is fixedly connected by horizontal connecting hole 34 with assembled wallboard 1;Screw thread is provided with the vertical connecting hole 33 Connector, for being fixedly connected with wallboard.
Back cord 32 on temporary support also can be selected the flitch or square tube for lengthening the identical material of leg, then with L screw thread cards The opposite of flitch or square tube and plate is blocked, plays the role of fixed support.
(5) lifting, installation and support for being sequentially completed assembled wallboard according to the method described above are fixed;
In lifting, after reply side plate, sealing adjustment plate, wire box Board position confirm one by one, it can start to lift, be referred to by special messenger Wave and arrange platform sling order and position;The size of last deficiency sealing adjustment plate is without exception in plate stitch or in constructional column, armful frame section Adjustment;Only when plate gap is larger, when adjustment occurs that distributing bar need to be increased because section is excessive in constructional column, armful frame, side The size of plate stitch can suitably be adjusted;Under normal circumstances, the adjustment of plate stitch size is not made as far as possible;
In constructional column position, setting is secondary is fixedly connected, and reinforcing bar is disconnected in beam lower part 200mm or so, is poured when concrete synchronously pours Disconnect in beam bottom 200mm upper-lower positions, disconnection position flitch, styrofoam and do girder bearing plate, other beam bottom styrofoam arch cambers It is supported on wallboard;
Wire box plate need to be identified separately, specially carry out mark at the scene, be prevented wrong;Last block seals Board position, foundation The principle of convenient construction, can suitably adjust;There is the reinforcing plate of fixed suspension hook intensity requirement in toilet, while also need separately to mark Note, must not adjust;During plate ejection now out-of-flatness, leveled up at plate bottom with crowbar and dry mortar;
(6) after installation is complete for the assembled wallboard of a face wall, installation constitution column and armful frame template, all supporting modules The template of Cast-in-place concrete part is pressed into contiguous prefabricated wall 100mm or so, it is ensured that the level requirements and globality effect of metope, Be conducive to the stability of wall face supporting;Adjacent cast-in-situ template once adjusts the plate face of assembled wallboard after installation is complete Reinforce, it is ensured that wall-panels supports are carried out a stabilization and reinforcement by the vertical level requirements of entirety of metope;Set on supporting leg between square tube Put adjusting bolt and be adjusted fastening;When lifting hole(eyelet) differs larger with supporting square tube vertical height, it can be installed in square tube horizontal position Put the support connecting hole of special anti-flare;
(7) standard widths of a room in an old-style house or one layer of metope are checked, are corrected, squeegeeed or welded to whole face wall in time after installation is complete, The connection of plate top is once fastened again;
(8) assembled wallboard is after installation is complete, installs wallboard top beam reinforcing bar, then on installing plate top coupling beam side form, beam side Mould can penetrate steel bar end in lifting, as the preliminary support of side form, with through-wall bolt fixed beam side plate;
Pour concrete after the installing engineering of (9) one layers or a flowing water section assembled wallboard and cast-in-situ template is completed and checked and accepted, The profit pipe mortar slump before pour concrete suitably increases, and profit pipe mortar is all marked with the seam crossing of wallboard, then carry out normal concrete Cast.
After wall form is removed, plug-hole and plate stitch basic unit are carried out in time to whole metope, the exposed prefabricated ironware that buries is used Cement plastering, and handled with screen cloth and cement plaster reinforcement;Concrete curing is the same as normal condition requirement.
3rd, the fixing means of assembled wallboard
Specific fixed connection method between assembled wallboard and agent structure and between plate includes:
1st, the connection of plate and structure wall column:Muscle and main body reinforcement welding are got rid of in plate side built-in fitting or reinforcing bar or is drooped, together When pour concrete connect to form entirety.
2nd, plate bottom riser positioning is fixed:Two grooves are done in plate bottom, and two convexs are fixed in the foundation structure of plate bottom and are fixed Part, plate is in the process of whereabouts, the convex groove positioning of alignment and fixation part, using supporting rack support after adjustment.
3rd, the connection between plate:First tie up constructional column and door window side and embrace frame reinforcing bar, wallboard side get rid of muscle or embedded iron parts and constructional column, Frame reinforcement welding is embraced, is formed after pour concrete overall;Connect between two plates using convex-concave interface screening cloth with cement mortar slurry or seam mouth is noted Slurry connection, top is fixed with U-shaped card.
4th, the connection of plate top and cast-in-situ beam slab:Small sircle hole is reserved in two side of plate top between plate and plate, is connected with U-shaped reinforcing bar clamp ring Connect, if assembled wallboard is the light-weight aggregate sandwiched concrete of light material filling, can directly be pounded with U-shaped card and be fixed into two edges of boards.
5th, the support of plate is fixed:Before wallboard installation, supported in the appropriate embedded bar head of flooring as the stress of wall-panels supports, Method is pre-buried with shuttering supporting;Coordinate at the same time or utilize shuttering supporting point, reduce pre-buried quantity to the greatest extent.
6th, the fixation of wallboard:After wallboard presses above method for positioning and fixing entry evaluation core position, using shaped steel or wooden support Lower end thereof, is fixed on earth anchor reinforcing bar, and by fixing a square tube or flitch at wallboard, wallboard leans against square tube or wood on support top Fang Shang, to prevent from toppling over to opposite, reinforcing bar card of the L-type with screw thread, the one end of vertical bar with screw thread are installed in the outer side edges of plate Penetrated in square tube or flitch hole and fixed with hole for hoist, one end of other end tool extractor blocks wallboard face, prevents wallboard flare;Work as lifting hole(eyelet) When differing larger with supporting square tube vertical height, the support connecting hole of special anti-flare can be set in square tube horizontal level.
7th, the constructional column under Vierendeel girder, concrete separate cast, beam heelpiece 30~50mm thickness styrofoams, and constructional column reinforcing bar disconnects Overlap or weld afterwards, thin reality concrete tamps;Steel bar end is inserted into the preformed hole on plate top at the same time and stretches into beam bottom 200mm or so, it is ensured that The overall effect that plate is connected with beam.
4th, the factor and counter-measure of shear wall with short piers secondary structure synchronous construction are influenced
1st, to prevent the counter support active force of constructional column from causing the change of crossbeam forced position, can be set in constructional column position Secondary to be fixedly connected, reinforcing bar is disconnected in beam lower part 200mm or so, is poured in beam bottom 200mm upper-lower positions, is stayed when concrete synchronously pours Go out to get rid of muscle to overlap with lower rebar, disconnect position and support girder bearing plate, other beam bottoms styrofoam arch camber branch with styrofoam/flitch Support on wallboard;It can prevent the influence of the reaction of bearing of constructional column;Ensure that crossbeam forced position does not change.
2nd, the live load of the design load value of wall underbeam comprising structure dead load and during use, design value load is each Half, i.e., when concrete reaches the half of design strength, crossbeam can undertake the whole load of structure (containing wall) safely;7 day age of concrete Phase intensity is the 60% of design strength, and 14 days age strengths are 80%;Construction period is close to one layer of week age;Work as first layer After crossbeam construction is completed seven days, crossbeam is in addition to it can undertake this layer of load safely, moreover it is possible to undertake the fractional load of last layer;At this time Two-layer structure and wall have been constructed completion;Passing to next layer of load also partly needs wall to undertake;This requires that wall Compression strength increase, could meet the security needs of synchronous construction;The strength of materials requirement of routine load bearing wall exists at present MU7.5~MU10;Lightweight outer wall material is 5KPa, and light internal wall material is 3.5MPa;Gu this infer exterior wall 5`7.5MPa it Between, interior wall is needed between 3.5~5.0MPa.
5th, prepare before construction
The technique preparation that does and working condition requirement is needed to include before construction:
1st, according to current construction requirement and custom, before stuffing wall construction, by filled wall requirement determine jamb, Constructional column position, and carry out arrangement of reinforcement and section design by code requirement;The arrangement of wallboard is carried out again, and Board position is carried out per axis number Numbering, after the authorization of inside, plant produced is submitted after owner and design confirm one month earlier.
2nd, during Deepen Design, when having cavity to door and window top and structure, negotiation should be submitted to change, takes the side of lower drop in beam plate Method, ensures that door and window top is consistent with structure bottom elevation, to ensure the globality of wall and appearance as far as possible.
3rd, every safe practice before being constructed is told somebody what one's real intentions are, while prepares corresponding fitment material or instrument.
4th, the order of reinforcing bar binding and wallboard installation, while reinforcing bar is bound, the arm scope of hanging device at the scene Interior, the installation site number order according to plate is stacked orderly.
5th, the template of wallboard and design and installation drawing is answered with the position of the supporting connection of main body etc., connecting node method is reliable, Plate face is smooth consistent with cast-in-place face;It is main including door side plate, window side plate, with the connecting plate of agent structure, have the reinforcement of toilet Plate, wire box plate etc..
When the 6th, being bound due to reinforcing bar, live reinforcing bar stacking is more, should be substantially complete in a face wall or a standard width of a room in an old-style house reinforcing bar binding Cheng Qian, cleans out the debris such as remaining reinforcing bar, and necessary operating space is provided to wallboard installation.
7th, there is the position of non-whole plate, special joint plate is set, should be in plate stitch and construction when joint plate is less than 300mm Adjusted on column, armful width of frame, increase plate stitch or constructional column, the length for embracing frame;When more than 300mm, less than 500mm, 300mm is set Or the adjustable plate of 450mm, deficiency or equally adjust beyond size, when between the empty lower 500mm~600mm of plate, use at the same time The adjustable plate of 450mm, unnecessary size are adjusted using increase constructional column or an armful frame section;Adjustable plate only occur 300mm and Bis- kinds of specifications of 450mm, easy to produce and installation.
8th, wallboard installation is outer after answering in elder generation, first door and window wallboard, rear common wallboard;Carry out model wall, then large area wall;Together When factory process it is various needed for plate shape when should strengthen conserving, by domain number mark dispatch from the factory.
9th, the actual size of plate is smaller 6~10mm than design size, and independent gate stack should all be linked to be with adjacent constructional column or an armful frame One;
10th, constructional column can prefabricated installation at the same time, in suspension column both sides, installation top angle is welded with the swollen bolt in basis.
This method for synchronously constructing reduces the substantial amounts of horizontal connection steel of wall in secondary construction compared with traditional secondary is constructed Muscle and the reinforcing steel implant process and material being connected with main body, reduce the secondary template installation in secondary construction and concrete cast and support The processes such as shield;Reduce secondary support fixation and the adjustment reception time of metope, reduce the plastering process and work of secondary metope Measure, can effectively solve realistic problem of transport of materials difficulty in secondary construction etc.;At the same time reduce the preparation of construction time and The time of working procedure, effectively can accelerate construction progress and be lifted work efficiency;The engineering construction cycle can be rationally effectively compressed, is subtracted Few management of enterprise operation cost and Corporate finance cost etc.;Integral one-step molding is built, good integrity, appearance obtains larger Lifting, has prevented many common quality defects of secondary construction;In addition the use of bulk material and the construction of wet construction are greatly reduced, The construction environment condition of operating personnel is greatly improved, and the factor for polluting environment greatly reduces;It can be seen that this technology applies energy Bring larger economic benefit and healthy environmentally friendly social benefit;In the case where currently carrying forward vigorously the overall background of fabricated construction, by Constantly lifted in mechanization, standardization, industry rate, to monolithic architecture upgrading of industries with very positive history and now Sincere justice.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on, should all be included in the protection scope of the present invention god.

Claims (6)

1. a kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers, it is characterised in that:Comprise the following steps,
(1) the reinforcing bar binding of agent structure;
(2) assembled wallboard is lifted in place, and assembled wallboard is attached and supported fixation;
(3) cast-in-situ template is installed, and building template is supported fixation;
(4) concreting enters mould, and assembled wallboard is molded with agent structure one-time-concreting.
2. a kind of assembled wallboard according to claim 1 and the cast-in-place main body method for synchronously constructing of shear wall with short piers, it is special Sign is:The step (2) include it is following step by step,
(1) longitudinal reinforcement is fixed with swollen bolt, start lifting the after the completion of stirrup binding up and down what constructional column, door and window embraced frame portion position One piece of assembled wallboard, first block of wallboard should be since main body wall end;
(2) multiple card slots are reserved at the plate bottom of assembled wallboard, plate underlayment set with card slot relative to positioning card, assembled wall Plate, which blocks card slot with corresponding positioning when lifting and falling, is directed at positioning;
(3) the pre-buried built-in fitting in plate side of assembled wallboard or embedded bar get rid of muscle, during the side plate of mounting structure wall column, built-in fitting Or reinforcing bar gets rid of muscle and main body reinforcement welding or droops, while wall is fixed;
(4) then second piece of assembled wallboard of lifting, the positioning of aligned with lower basic unit block in place, and the plate stitch control of assembled wallboard exists 5~8mm, the top edges of boards of assembled wallboard are prefabricated to box out, and enters in the top U-shaped card insertion of adjacent two plate in prefabricated box out, really The upper end for protecting adjacent two plate is fixed concordantly;Temporary support is added in the side of assembled wallboard at the same time, prevents riser to opposite Topple;
(5) lifting, installation and support for being sequentially completed assembled wallboard according to the method described above are fixed;
(6) after installation is complete for the assembled wallboard of a face wall, installation constitution column and embrace frame template, all supporting modules it is cast-in-place The template of concrete part is pressed into contiguous prefabricated wall 100mm or so, it is ensured that the level requirements and globality effect of metope, also favorably In the stability of wall face supporting;Adjacent cast-in-situ template is after installation is complete, and carrying out once adjustment to the plate face of assembled wallboard reinforces, Ensure the vertical level requirements of entirety of metope, a stabilization and reinforcement is carried out to wall-panels supports;
(7) standard widths of a room in an old-style house or one layer of metope are checked, are corrected, squeegeeed or welded to whole face wall in time after installation is complete, then right The connection of plate top is once fastened.
3. a kind of assembled wallboard according to claim 2 and the cast-in-place main body method for synchronously constructing of shear wall with short piers, it is special Sign is:The step (3) comprises the following steps, and assembled wallboard installs wallboard top beam reinforcing bar, then install after installation is complete The side form of coupling beam on plate top, beam side can penetrate steel bar end in hole for hoist, as the preliminary support of side form, use through-wall bolt Fixed side template.
4. a kind of assembled wallboard according to claim 3 and the cast-in-place main body method for synchronously constructing of shear wall with short piers, it is special Sign is:The step (4) comprises the following steps, one layer or the erector of a flowing water section assembled wallboard and cast-in-situ template Pour concrete after journey is completed and checked and accepted, the profit pipe mortar slump before pour concrete suitably increase, and profit pipe mortar is all marked with wallboard Between seam crossing, then carry out the cast of normal concrete.
5. a kind of assembled wallboard according to claim 2 and the cast-in-place main body method for synchronously constructing of shear wall with short piers, it is special Sign is:In (2) step by step, the positioning card is prefabricated ironware or cement part, and eyelet is reserved at the middle part for positioning card, is led to Nailing is crossed to be fixed.
6. a kind of assembled wallboard according to claim 2 and the cast-in-place main body method for synchronously constructing of shear wall with short piers, it is special Sign is:In (4) step by step, the temporary support includes L-type support frame leg (31), the top of L-type support frame leg (31) End is horizontally disposed supporting back cord (32), is fixedly connected between supporting back cord (32) and L-type support frame leg (31);The support back of the body The side of stupefied (32) offers multiple horizontal connecting holes (34), and the top of supporting back cord (32) offers multiple vertical connecting holes (33);The supporting back cord (32) is fixedly connected by horizontal connecting hole (34) with assembled wallboard;The vertical connecting hole (33) connector of screw thread is provided with, for being connected fixation with wallboard.
CN201711260059.4A 2017-12-04 2017-12-04 Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall Active CN108005387B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711260059.4A CN108005387B (en) 2017-12-04 2017-12-04 Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711260059.4A CN108005387B (en) 2017-12-04 2017-12-04 Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall

Publications (2)

Publication Number Publication Date
CN108005387A true CN108005387A (en) 2018-05-08
CN108005387B CN108005387B (en) 2021-02-02

Family

ID=62056442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711260059.4A Active CN108005387B (en) 2017-12-04 2017-12-04 Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall

Country Status (1)

Country Link
CN (1) CN108005387B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505352A (en) * 2018-11-29 2019-03-22 仇国辉 Integrated hollow wall assembly construction technology synchronous with concrete frame structure
CN109914823A (en) * 2019-04-15 2019-06-21 谷尚坤 A kind of assembled architecture prefabricated panel installation method
CN110451890A (en) * 2019-08-27 2019-11-15 广东粤腾建设有限公司 The impervious leakage-proof construction method of secondary structure
CN110792202A (en) * 2019-11-01 2020-02-14 江苏省华建建设股份有限公司 Surface crack prevention and control process for assembly type partition plate joint
CN111005444A (en) * 2019-12-26 2020-04-14 滨州市宏基建材有限公司 Synchronous construction method for wall body and main body frame in steel structure building
CN112878665A (en) * 2021-01-19 2021-06-01 中天建设集团有限公司 ALC (autoclaved lightweight concrete) plate and main body synchronous construction structure and construction method
CN114347229A (en) * 2022-01-10 2022-04-15 秦皇岛和信基业建筑科技有限公司 Vertical forging die for prefabricated wallboard of fabricated building and production process
CN114673370A (en) * 2022-04-01 2022-06-28 吴力森 Be used for quick location erection equipment of prefabricated building
CN117052032A (en) * 2023-08-03 2023-11-14 浙江正立高科建设有限公司 Precast beam slab based on BIM construction technology and installation method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015565A (en) * 2012-09-09 2013-04-03 黑龙江宇辉新型建筑材料有限公司 Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method
CN103422672A (en) * 2013-08-29 2013-12-04 杜新智 Construction method for reinforced concrete prefabricated house
CN103883024A (en) * 2013-12-16 2014-06-25 清华大学建筑设计研究院有限公司 Short-leg shear wall structure assembled on basis of large hidden-beam prefabricated concrete wallboards with grooves on two sides and construction method of short-leg shear wall structure
CN105781125A (en) * 2016-03-04 2016-07-20 李藏柱 Installation method for assembly type building
US20160281355A1 (en) * 2008-04-03 2016-09-29 Paladin Industrial, Llc Wall forming system and kit thereof
WO2016168916A1 (en) * 2015-04-20 2016-10-27 Integrated Concrete Forming Ltd. Insulated concrete form construction method and system
CN206220490U (en) * 2016-09-18 2017-06-06 江苏南通三建集团股份有限公司 A kind of side template reinforcement system without split bolt

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160281355A1 (en) * 2008-04-03 2016-09-29 Paladin Industrial, Llc Wall forming system and kit thereof
CN103015565A (en) * 2012-09-09 2013-04-03 黑龙江宇辉新型建筑材料有限公司 Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method
CN103422672A (en) * 2013-08-29 2013-12-04 杜新智 Construction method for reinforced concrete prefabricated house
CN103883024A (en) * 2013-12-16 2014-06-25 清华大学建筑设计研究院有限公司 Short-leg shear wall structure assembled on basis of large hidden-beam prefabricated concrete wallboards with grooves on two sides and construction method of short-leg shear wall structure
WO2016168916A1 (en) * 2015-04-20 2016-10-27 Integrated Concrete Forming Ltd. Insulated concrete form construction method and system
CN105781125A (en) * 2016-03-04 2016-07-20 李藏柱 Installation method for assembly type building
CN206220490U (en) * 2016-09-18 2017-06-06 江苏南通三建集团股份有限公司 A kind of side template reinforcement system without split bolt

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘加华: "南京青奥会议中心预制轻质水泥夹芯实心隔墙板安装技术", 《施工技术》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505352A (en) * 2018-11-29 2019-03-22 仇国辉 Integrated hollow wall assembly construction technology synchronous with concrete frame structure
CN109914823B (en) * 2019-04-15 2021-03-02 锦汇建设集团有限公司 Method for installing prefabricated wall board of prefabricated building
CN109914823A (en) * 2019-04-15 2019-06-21 谷尚坤 A kind of assembled architecture prefabricated panel installation method
CN110451890A (en) * 2019-08-27 2019-11-15 广东粤腾建设有限公司 The impervious leakage-proof construction method of secondary structure
CN110451890B (en) * 2019-08-27 2021-09-07 广东粤腾建设有限公司 Secondary structure anti-seepage and anti-leakage construction method
CN110792202B (en) * 2019-11-01 2022-05-03 江苏省华建建设股份有限公司 Surface crack prevention and control process for assembly type partition plate joint
CN110792202A (en) * 2019-11-01 2020-02-14 江苏省华建建设股份有限公司 Surface crack prevention and control process for assembly type partition plate joint
CN111005444A (en) * 2019-12-26 2020-04-14 滨州市宏基建材有限公司 Synchronous construction method for wall body and main body frame in steel structure building
CN112878665A (en) * 2021-01-19 2021-06-01 中天建设集团有限公司 ALC (autoclaved lightweight concrete) plate and main body synchronous construction structure and construction method
CN114347229A (en) * 2022-01-10 2022-04-15 秦皇岛和信基业建筑科技有限公司 Vertical forging die for prefabricated wallboard of fabricated building and production process
CN114673370A (en) * 2022-04-01 2022-06-28 吴力森 Be used for quick location erection equipment of prefabricated building
CN114673370B (en) * 2022-04-01 2024-03-12 安徽芮艺建筑工程有限公司 Be used for prefabricated assembled house quick positioning erection equipment
CN117052032A (en) * 2023-08-03 2023-11-14 浙江正立高科建设有限公司 Precast beam slab based on BIM construction technology and installation method thereof

Also Published As

Publication number Publication date
CN108005387B (en) 2021-02-02

Similar Documents

Publication Publication Date Title
CN108005387A (en) A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers
CN107023099A (en) Prefabricated superimposed sheet double combined overlapped shear wall and its construction method
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN109706846B (en) High and narrow bridge capping beam through steel bar construction method for slope foundation
CN112854745A (en) Construction process of assembled building aluminum alloy template
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN110777983A (en) Synchronous construction structure and method for concrete filled wall and cast-in-place structure
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN1452678A (en) Construction of high-rise building with large modular units
CN103615053A (en) Construction method for post-cast belt of cast-in-place reinforced concrete structure
CN109537895A (en) Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame
CN113006321B (en) Construction method for connecting joints between combined precast concrete wall bodies
CN104060760B (en) High Rise Building Transfer Floor Structure concrete super large beam construction in layer method
CN111851825A (en) Fabricated form-removal-free prefabricated steel bar truss floor and construction method thereof
CN104295003A (en) Structural column construction method
CN112575886A (en) Low-level and multi-level fully-prefabricated assembled concrete structure and design, production and installation method
CN108005255A (en) Wall construction method
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN113833263A (en) Integral lantern type support circulating hoisting construction method for frame column
CN211499326U (en) Synchronous construction structures of concrete infilled wall and cast-in-place structure
CN111851827A (en) Assembly type prefabricated steel bar truss disassembly-free template system and manufacturing method thereof
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN108951643B (en) Super high-rise deep foundation pit basement core tube large-span large-area support changing construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant