CN107516191A - " more rule unifications " " figure " Project cooperation approval system, method and instrument - Google Patents
" more rule unifications " " figure " Project cooperation approval system, method and instrument Download PDFInfo
- Publication number
- CN107516191A CN107516191A CN201710729214.6A CN201710729214A CN107516191A CN 107516191 A CN107516191 A CN 107516191A CN 201710729214 A CN201710729214 A CN 201710729214A CN 107516191 A CN107516191 A CN 107516191A
- Authority
- CN
- China
- Prior art keywords
- project
- approval
- examination
- data
- rule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000010276 construction Methods 0.000 claims abstract description 61
- 238000013439 planning Methods 0.000 claims abstract description 57
- 238000012732 spatial analysis Methods 0.000 claims abstract description 27
- 238000007726 management method Methods 0.000 claims abstract description 19
- 238000004458 analytical method Methods 0.000 claims abstract description 15
- 238000003860 storage Methods 0.000 claims description 38
- 238000004590 computer program Methods 0.000 claims description 19
- 238000012552 review Methods 0.000 claims description 17
- 230000000977 initiatory effect Effects 0.000 claims description 9
- 238000005516 engineering process Methods 0.000 claims description 8
- 230000008859 change Effects 0.000 claims description 5
- 238000001514 detection method Methods 0.000 claims description 4
- 238000011156 evaluation Methods 0.000 claims description 3
- 235000013399 edible fruits Nutrition 0.000 claims description 2
- 230000006870 function Effects 0.000 description 10
- 230000007613 environmental effect Effects 0.000 description 7
- 239000000463 material Substances 0.000 description 7
- 238000005457 optimization Methods 0.000 description 5
- 238000013523 data management Methods 0.000 description 4
- 238000012795 verification Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008520 organization Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000012550 audit Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000004549 pulsed laser deposition Methods 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of " more rule unifications " " figure " Project cooperation approval system, method and instrument, the system includes project data transceiver module, " figure " system module and project management module;Project data transceiver module, the data of the copending project for receiving current approval stage, and synchronously it is sent to each departments of examination and approval's terminal corresponding with the currently approval stage;" figure " system module, for the data according to copending project and annual planning project library, the plan land used for treating examination and approval project carries out spatial analysis, and analysis result between generation;Project management module, the suggestions made after examination of the copending project generated for receiving each departments of examination and approval's terminal based on the data of spatial analysis result and copending project, and the suggestions made after examination of comprehensive each departments of examination and approval's terminal, generate approval results.Using the present invention, the examination & approval difficulty of engineering construction project can be reduced, it is more convenience-for-people, and examination & approval duration can be shortened.
Description
Technical field
The present invention relates to field of computer technology, more particularly to a kind of " more rule unifications " " figure " Project cooperation examination & approval system
System, method and instrument.
Background technology
Construction project examine with landing be related to city hair change, plan, the coordination of twenties departments such as territory, flow
On generally comprise approve and initiate a project and (contain preliminary planning), grant land use right, planning report are built, construction permits, multiple administration such as final acceptance of construction
Link is examined, and is serially connected between each administrative examination and approval link, there is strict sequencing.Due to the work of current all departments
Independently of each other, information data is separate, and therefore, often there are the following problems:
1) project construction unit repetition report is built:Project construction unit handles project proposal, permission notes for location, land used choosing
During the items such as location, land used preliminary hearing, project verification reply, plan for land license, it is related to numerous departments, it is often necessary to only in multiple departments
Building window (window is typically built up in the government affair centre in city) progress from the report set up, repeatedly report is built.
2) project report construction material repeats to submit:Done as construction project land used preliminary hearing by the land departments in city
Reason and project site selection position paper is typically handled by planning department, either construction project land used preliminary hearing, or project site selection
Position paper, report may be required for build unit and submit the general character such as the e-file of applicant's proof of identification, letter of authority, topographic map
Material, traditional series model Items in order report build unit and repeat to submit.
3) the construction project examination & approval time is tediously long:Traditional construction project series connection examination & approval pattern, each examination & approval thing
Preposition each other, i.e., previous item, which is handled, to be finished, and could start next examination and approval procedure, using the project verification of agent-construction organization as
Example, the item that project initiation phase needs to handle generally comprises the reply of agent-construction organization recommendation, construction project environment influences
Preliminary opinion, construction project permission notes for location etc. are evaluated, under traditional mode, typically handles construction project item in environmental administration
Mesh environmental impact assessment and after providing preliminary opinion, could handle construction project permission notes for location in planning department,
After having handled the preliminary opinion of construction project environmental impact assessment and construction project permission notes for location, political affairs can be just handled
The reply of mansion investment project proposal is handled, and causes construction project to examine overlong time.
4) " more rule unifications " achievement fails effectively to apply, and project landing is difficult:Do not work out " more rule unifications " " one
Figure " achievement, otherwise " figure " achievement woven, without sharing, causes the choosing of daily construction project between all departments
Location does not meet urban-rural master planning either, does not meet overall plan for land use either or do not meet environmental protection plans, want
Conservancy separate item planning etc. is not met, causes construction project to be difficult to land.
5) project examination object information can not be shared:Same construction project from approve and initiate a project, land used preliminary hearing, planning
Report is built, construction permits to final acceptance of construction, lives through the examination & approval of many departments, procedural information that projects are examined or is currently examined
Progress msg can not be shared, and problems are brought to urban planning and development control.
The content of the invention
The embodiment of the present invention proposes a kind of " more rule unifications " " figure " Project cooperation approval system and method, can reduce
The examination & approval difficulty of engineering construction project, it is more convenience-for-people, and examination & approval duration can be shortened.
A kind of " more rule unifications " " figure " Project cooperation approval system provided in an embodiment of the present invention, including project data
Transceiver module, " figure " system module and project management module;
The project data transceiver module, the data of the copending project for receiving current approval stage, and by described in
The data of copending project is synchronously sent to each departments of examination and approval's terminal corresponding with the currently approval stage;
" figure " system module, for the data according to copending project and the annual planning project previously generated
Storehouse, spatial analysis is carried out to the plan land used of the copending project, and generate corresponding spatial analysis result;
The project management module, it is based on the spatial analysis result for receiving each departments of examination and approval's terminal and described treats
The suggestions made after examination of the copending project of the data generation of examination and approval project, and the examination & approval meaning of comprehensive each departments of examination and approval's terminal
See, generate the approval results of current approval stage.
Preferably, the approval stage includes following five stages:Authorize to Invest stage, grant land use right stage, land used are examined
Criticize stage, construction permits and acceptance stage;
The spatial analysis includes planning collision detection analysis, control line analysis and project site selection analysis.
Preferably, in addition to:Annual planning project library generation module, for based on " more rule unification " " figure " to providing
Project data to be put in storage carry out review of compliance, annual plan project then will be determined by the project of review of compliance,
And be put in storage to annual planning project library.
Preferably, the annual planning project library generation module includes project data receiving unit, overall merit unit, rule
Draw pre- selected cell and review of compliance unit;
The project data receiving unit, sent out for receiving project data to be put in storage, and by the project data to be declared
Deliver to the overall merit unit;
The overall merit unit, change departmental terminals for the project data to be put in storage to be sent to hair, and receive institute
State the comprehensive evaluation result that hair changes departmental terminals return;
The pre- selected cell of planning, for the project data to be declared according to and " more rule unifications " addressing rule, obtain
Obtain the pre- addressing result of item goal programming to be put in storage corresponding to the project data to be put in storage;
The review of compliance unit, for according to default review of compliance standard to the item goal programming to be put in storage
Pre- addressing result examined, and in described pass, and the project data to be put in storage is determined into annual plan then
Project, and be put in storage to annual planning project library.
Preferably, described " more rule unification " " figure " Project cooperation approval system, include " more rule are unified " " one
Figure " data update module;
" more rule unifications " " figure " data update module, the examination & approval for " figure " system generation according to
As a result, the position of the control line in " more rule unifications " " figure " data is updated.
Preferably, described " more rule unifications " " figure " Project cooperation approval system, in addition to control line coordination committee hair
Play module and " more rule unifications " " figure " data update module;
The control line coordination committee initiation module, coordinate departmental terminals for connecting each control line, initiate control line
Coordination committee, and generate corresponding control line coordination result according to the minutes of the control line coordination committee;
" more rule unifications " " figure " data update module, for controlling line coordination result according to described, to described
The position of control line in " more rule unifications " " figure " data is updated.
Preferably, described " more rule unifications " " figure " data are generated based on GIS data;It is described that " more rule are closed
One " " figure " Project cooperation approval system is generated based on workflow technology.
Present invention also offers a kind of " more rule unifications " " figure " Project cooperation measures and procedures for the examination and approval, including:
The data of the copending project of current approval stage is received, and the data of the copending project is synchronously sent to
Each departments of examination and approval's terminal corresponding with the currently approval stage;
According to the data of copending project and the annual planning project library previously generated, the plan to the copending project
Land used carries out spatial analysis, and generates corresponding spatial analysis result;
Receive what each departments of examination and approval's terminal was generated based on the data of the spatial analysis result and the copending project
The suggestions made after examination of the copending project, and the suggestions made after examination of comprehensive each departments of examination and approval's terminal, generate current approval stage
Approval results.
Present invention also offers a kind of " more rule unifications " " figure " Project cooperation approval tool, including processor, storage
Device and it is stored in the memory and is configured as by the computer program of the computing device, the computing device
" more rule unifications " " figure " the Project cooperation measures and procedures for the examination and approval described above are realized during the computer program.
Present invention also offers a kind of computer-readable recording medium, the computer-readable recording medium includes storage
Computer program, wherein, equipment where controlling the computer-readable recording medium when the computer program is run performs
" more rule unifications " " figure " the Project cooperation measures and procedures for the examination and approval described above.
Implement the embodiment of the present invention, have the advantages that:
" more rule unifications " " figure " Project cooperation approval system, methods and instruments and storage provided in an embodiment of the present invention are situated between
Whether matter, the plan land used that can treat examination and approval project automatically mutually conflict with the planned land use of annual planning project library and are examined
Survey, and the result of detection is sent to each departments of examination and approval so that each departments of examination and approval can be according to the testing result to pending
The project of criticizing is examined;The suggestions made after examination of each departments of examination and approval, and the suggestions made after examination of comprehensive each departments of examination and approval can also be collected,
Obtain final approval results.Therefore, the embodiment of the present invention can be by Fa Gai departments, land departments, planning department, construction department
And involved departments of examination and approval join together during multiple project examinations such as environmental administration, realize the letter between each department
Breath is shared, avoids the afoul phenomenon of approval results between different departments of examination and approval, and the examination & approval for reducing engineering construction project are difficult
Degree, and the phenomenon that project material can be avoided to submit repeatedly, it is more convenience-for-people, and the duration of project examination can be shortened.
Brief description of the drawings
Fig. 1 is a preferred embodiment of " more rule unifications " " figure " Project cooperation approval system provided by the invention
Structural representation;
Fig. 2 is that another of " more rule unification " provided by the invention " figure " Project cooperation approval system is preferably implemented
The structural representation of example;
Fig. 3 is the schematic diagram for generating annual planning project library;
Fig. 4 is that the technology of " more rule unifications " " figure " Project cooperation approval system provided by the invention realizes frame diagram;
Fig. 5 is the first examination & approval of " more rule unifications " " figure " Project cooperation approval system provided in an embodiment of the present invention
Ideograph;
Fig. 6 is second of examination & approval ideograph of Project cooperation approval system provided in an embodiment of the present invention;
Fig. 7 is the third examination & approval of " more rule unifications " " figure " Project cooperation approval system provided in an embodiment of the present invention
Ideograph;
Fig. 8 is the 4th kind of examination & approval of " more rule unifications " " figure " Project cooperation approval system provided in an embodiment of the present invention
Ideograph;
Fig. 9 is a preferred embodiment of " more rule unifications " " figure " the Project cooperation measures and procedures for the examination and approval provided by the invention
Schematic flow sheet.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
The present invention can treat examination and approval project automatically by structure " more rule unifications " " figure " Project cooperation approval system
Plan land used whether mutually conflict with the planned land use of annual planning project library and detected, and the result of detection is sent to each
Individual departments of examination and approval so that each departments of examination and approval can treat examination and approval project according to the testing result and be examined.The Project cooperation
Approval system can also collect the suggestions made after examination of each departments of examination and approval, and the suggestions made after examination of comprehensive each departments of examination and approval, obtain most
Whole approval results.Therefore, the present invention can be by Fa Gai departments, land departments, planning department, construction department and environmental administration
Joined together etc. involved departments of examination and approval during multiple project examinations, realize the information sharing between each department, avoid
The afoul phenomenon of approval results between different departments of examination and approval, reduces the examination & approval difficulty of engineering construction project, and can keep away
Exempt from the phenomenon that project material is submitted repeatedly, it is more convenience-for-people, and the duration of project examination can be shortened.
As shown in figure 1, being " more rule unification " provided by the invention " figure " Project cooperation approval system (i.e. in Fig. 1
Project cooperation is examined) a preferred embodiment structural representation, including project data transceiver module 11, " one figure " system
Module 12 of uniting and project management module 13, wherein:
The project data transceiver module 11, the data of the copending project for receiving current approval stage, and by institute
The data for stating copending project is synchronously sent to each departments of examination and approval's terminal corresponding with the currently approval stage.
" figure " system module 12, for the data according to copending project and the annual planning item previously generated
Mesh storehouse, spatial analysis is carried out to the plan land used of the copending project, and generate corresponding spatial analysis result.
The project management module 13, the spatial analysis result and described is based on for receiving each departments of examination and approval's terminal
The suggestions made after examination of the copending project of the data generation of copending project, and the examination & approval meaning of comprehensive each departments of examination and approval's terminal
See, generate the approval results of current approval stage.
It should be noted that in the present embodiment, for the examination & approval addressee of construction project, distinguished by original each departments of examination and approval
Addressee, it is changed to by the 11 unified addressee of project data transceiver module, during addressee, disposably needs an approval stage all departments
The data whole typing wanted uploads to the system, is examined for each departments of examination and approval with reference to using, realizes an approval stage, once
Submission data, the data of each approval stage can share use.
Wherein, as shown in Fig. 2 in the present embodiment, it typically may include following five approval stage:
1st, the Authorize to Invest stage:The money of approving and initiate a project submitted for construction unit by the project data transceiver module 11
Material, is taken the lead by Fa Gai departments, is audited for application materials.Each departments of examination and approval of the approval stage can be by system side
Just the every space planning for calling the project related is checked, detected and analyzed, and whether analysis project, which meets project verification, requires.
2nd, the grant land use right stage:For the project by Authorize to Invest, taken the lead by land departments and carry out grant land use right, examination & approval
All departments can share all data that early stage, construction unit submitted, and can also share all departments' examination & approval data.Meanwhile Ke Yitong
Cross the spatial analysis result that " figure " system checks every planning of the project.
3rd, planning report builds the stage:Taken the lead by planning department, each departments of examination and approval's collaboration participates in, and completes planning report and builds examining for stage
Criticize work.Examination & approval all departments can share all data that early stage, construction unit submitted, and can also share all departments' examination & approval data.
Meanwhile every planning space analysis result of the project can be checked by " figure " system.
4th, the construction permits stage:Taken the lead by construction department, each departments of examination and approval's collaboration participates in, and completes construction stage work.Examine
All data that early stage, construction unit submitted can be shared by criticizing all departments, can also share all departments' examination & approval data.Meanwhile can be with
Every planning space analysis result of the project is checked by " figure " system.
5th, final acceptance of construction:Acceptance stage, taken the lead by construction department or set up special group and take the lead, each departments of examination and approval
Collaboration participates in, and completes stage work.Examination & approval all departments can share all data that early stage, construction unit submitted, and can also be total to
Enjoy all departments' examination & approval data.Meanwhile it can check that every planning space of the project analyzes situation by " figure " system.
It should be noted that the present embodiment, which is based on the project management module 13, can realize that " tabular form " is examined:With with
, it is necessary to handle construction land letter of ratification, land use permit exemplified by ground approval stage, construction land letter of ratification typically by
Land departments are responsible for examination & approval with handling, and land use permit is typically responsible for examination & approval with handling by planning department, territory portion
Land used scope line is compared, tied according to analysis by item optimization approval tool by door with overall plan for land use
Fruit provides suggestions made after examination, and planning department is carried out land used scope line and overall city planning by item optimization approval tool
Analysis is compared, and suggestions made after examination are provided according to analysis result, the suggestions made after examination of Liang Ge departments directly can be shown on a table.
It is understood that the Project cooperation approval system that the embodiment of the present invention is provided can also be carried out for each terminal
Information inquiry.Specifically, " more rule unifications " " figure " data that each terminal can be inquired about in " figure " system module, from
And check the situation of current planned land use;Each terminal can be with queried for items management module, so as to check copending project
Relevant information (such as bullets, project code, project name, administrative area, land area, project category, investment where project
Source, enterprise nature, construction unit's title, WorkPhone, contact name, contact person's mobile phone, construction unit address etc.),
Examine relevant information of progress msg, approval results and sundry item etc..
The Project cooperation approval system for including " figure " system module that the embodiment of the present invention is provided, can be automatically right
Whether the plan land used of copending project mutually conflicts with the planned land use of annual planning project library is detected, and by spatial analysis
As a result send to each departments of examination and approval so that each departments of examination and approval can treat examination and approval project according to spatial analysis result and be examined
Batch;The approval results of each departments of examination and approval, and the approval results of comprehensive each departments of examination and approval can also be collected, obtain final item
Mesh approval results.Therefore, the embodiment of the present invention can be by Fa Gai departments, land departments, planning department, construction department and environmental protection
Involved departments of examination and approval join together during multiple project examinations such as department, realize the information sharing between each department,
The afoul phenomenon of approval results between different departments of examination and approval is avoided, reduces the examination & approval difficulty of engineering construction project, and energy
The phenomenon for enough avoiding project material from submitting repeatedly, it is more convenience-for-people, and the duration of project examination can be shortened.
In a preferred embodiment, before collaboration examination & approval are carried out, Mr. is needed into annual planning project library, it is every to ensure
Year construction project can either meet all departments' project construction needs, again all departments' project can be enabled preferably to complete
Pre- addressing, and the preliminary inquiry of all departments, guarantee project tentatively meet all departments' management and control requirement.When project generates, changed by hair,
The departments such as planning, territory carry out preliminary inquiry, guarantee project can fall with regard to conditions such as project investment, pre- addressing, land use index
Ground, generated by project, establish annual planning project library.
Therefore, as shown in figure 3, " more rule unifications " " figure " the Project cooperation approval system also includes:
Annual planning project library generation module, for treating that storage project provides to offer based on " more rule unifications " " figure "
Material carries out review of compliance, by the annual plan project of project determination then by review of compliance, and is put in storage to year metric
Draw project library.
Wherein, the annual planning project library generation module includes project data receiving unit, overall merit unit, planning
Pre- selected cell and review of compliance unit;
The project data receiving unit, sent out for receiving project data to be put in storage, and by the project data to be declared
Deliver to the overall merit unit.
Wherein, the project application base of oneself department is submitted in system by the respective government agencies of government's application planning item then
This information and data.
The overall merit unit, change departmental terminals for the project data to be put in storage to be sent to hair, and receive institute
State the comprehensive evaluation result that hair changes departmental terminals return.
Wherein, taken the lead by Fa Gai departments, it is right according to capital scale then, the factor such as land use situation, item importance degree
The project plan carries out overall balance adjustment.
The pre- selected cell of planning, for the project data to be put in storage according to and " more rule unifications " addressing rule, obtain
Obtain the pre- addressing result of item goal programming to be put in storage corresponding to the project data to be put in storage.
Wherein, for preliminary project project, it is responsible for by planning department, by " more rule unifications " siting analysis instrument, to item
Mesh carries out planning pre- addressing.
The review of compliance unit, for according to default review of compliance standard to the item goal programming to be put in storage
Pre- addressing result examined, and in described pass, and the project data to be put in storage is determined into annual plan then
Project, and be put in storage to annual planning project library.
Wherein, after carrying out the pre- addressing of project by the system, pre- addressing analysis result is sent into each Duo Gui examining departments, it is more
Advise examining department to be required according to the examination & verification of respective department, audit opinion is provided in system.The meter all passed through for all departments
The project of drawing, represent review of compliance by being put in storage link, the project not passed through for review of compliance, root into planning item
According to review of compliance situation, next step way is discussed together by all departments, for needing the project be put in storage then, then re-start
Pre- addressing is planned, for what can not be examined again then, it is determined that the project is postpones being put in storage, and row considers again after.
In yet another preferred embodiment, on the basis of above-described embodiment, " more rule unifications " " figure " item
Mesh cooperates with approval system, in addition to " more rule unifications " " figure " data update module;
" more rule unifications " " figure " data update module, the examination & approval for " figure " system generation according to
As a result, the position of the control line in " more rule unifications " " figure " data is updated.
It should be noted that can also include " more rule unifications " in above-mentioned Project cooperation approval system, " figure " data are more
New module, for being adjusted to the position of the control line in " more rule unifications " " figure " data.
In yet another preferred embodiment, on the basis of above-described embodiment, " more rule unifications " " figure " item
Mesh cooperates with approval system, in addition to control line coordination committee initiation module and " more rule unifications " " figure " data renewal mould
Block;
The control line coordination committee initiation module, coordinate departmental terminals for connecting each control line, initiate control line
Coordination committee, and generate corresponding control line coordination result according to the minutes of the control line coordination committee;
" more rule unifications " " figure " data update module, for controlling line coordination result according to described, to described
The position of control line in " more rule unifications " " figure " data is updated.
It should be noted that in above-mentioned Project cooperation approval system can also include control line coordination committee initiation module and
" more rule unifications " " figure " data update module.Wherein, the control line coordination committee initiation module is by combining each control
Line coordination departmental terminals, control line coordination meeting is concurrently played, so that each control line coordination department can be to control line
Adjustment is held consultation.The control line coordination committee initiation module also has notice of meeting, conference management, meeting summary management and meeting
The functions such as data management are discussed, corresponding control line coordination result can also be generated according to the minutes of control line coordination committee.
After control line coordination result is obtained, above-mentioned " more rule unifications " " figure " data update module can assist according to the control line
Result is adjusted to be adjusted the position of the control line in " more rule unifications " " figure " data.
It is highly preferred that " more rule unifications " " figure " data are generated based on GIS data;" more rule
Unification " " figure " Project cooperation approval system is generated based on workflow technology.
It should be noted that above-mentioned " more rule unifications " " figure " data are the numbers in being based on GIS (GIS-Geographic Information System)
According to generation;Above-mentioned " more rule unifications " " figure " Project cooperation approval system is generated based on WorkFlow (workflow technology)
's.
Specifically, as shown in figure 4, " more rule unifications " " figure " the Project cooperation examination & approval system that the embodiment of the present invention is provided
System is realized based on SOA (Enterprise SOA) and using layered model.The Project cooperation approval system can be divided into number
According to management level, basic middleware layer, Business Logic and application presentation layer etc..
Data management layer, the Various types of data required for above-mentioned Project cooperation approval system is realized based on database management tools
Management.Wherein, database management tools can both select the business database management software such as Oracle, MS SQL, can also
Select the PostgreSQL database management softwares such as MY SQL.
Basic middleware layer, two containers of basic general purpose module and business logic processing component can be divided into.Wherein, it is basic
The main effect of general purpose module container is to provide infrastructure component, including data management for the exploitation of above-mentioned Project cooperation approval system
Adapter (e.g., Oracle adapters, MS SQL adapters etc.), flow engine (e.g., draw by Work Flow Engine workflows
Hold up), text editing component (e.g., Office edits plug-in unit etc.), spatial data management and service infrastructure component (e.g., Arc GIS,
The infrastructure component of the spatial data management software such as SuperMap GIS) etc. specific aim general purpose module;In addition, also include SOA,
The realization of the page presentations such as HTML/Excel, JDBC, JSON/XML, database connection, fault-tolerant management, the basic of web services are led to
Use component.
Business Logic, comprising by Developing Workflow Engine instrument, the above-mentioned Project cooperation approval system of secondary development
General service component and permit business logic module.
Using presentation layer, the exhibition of application is realized by front-end technology such as Jquery, css3/boostrap, Ajax, Html5
It is existing, the displaying based on terminal devices such as computer, flat board and mobile phones can be supported.
It is highly preferred that different for current China each place government building engineering approval information degree, the present invention is implemented
" more rule unifications " " figure " Project cooperation approval system that example provides provides four kinds of examination & approval patterns:
The first pattern:Local offices directly use this without construction project approval system, all departments without operation system
" more rule unifications " " figure " Project cooperation approval system that inventive embodiments provide realizes that construction project is examined, and specific pattern is such as
Shown in Fig. 5.
Second of pattern:Local offices are without construction project approval system, but there are operation system in all departments, and the present invention is in fact
" more rule unifications " " figure " the Project cooperation approval system and all departments' operation system for applying example offer use parallel, realize and build
Engineering is examined, and specific pattern is as indicated with 6.
The third pattern:Local offices construction project approval system, but support function is analyzed without space number, and
All departments are without operation system." more rule unifications " " figure " Project cooperation approval system provided in an embodiment of the present invention is with having built
Engineering approval system uses parallel, is provided engineering from construction project approval system to " more rule unifications " optimization approval tool and was examined
Number of passes evidence, " more rule unifications " " figure " Project cooperation approval system provide spatial analysis work(to construction project approval system
Can, mutual shared data, realize that construction project is examined, specific pattern is as shown in Figure 7.
4th kind of pattern:Local offices construction project approval system, but support function is analyzed without space number, and
There are operation system in all departments." more rule unifications " " figure " Project cooperation approval system provided in an embodiment of the present invention is with having built
Engineering approval system uses parallel, is provided engineering from construction project approval system to " more rule unifications " optimization approval tool and was examined
Number of passes evidence, " more rule unifications " optimization approval tool provide spatial analysis functions to construction project approval system, mutually shared number
According to realizing that construction project is examined, specific pattern is as shown in Figure 8.
The present invention is by providing four kinds of examination & approval patterns, so as to be adapted to China each place government building engineering approval information
It is different degrees of, add the present invention the scope of application and applicability.
Correspondingly, the present invention also provides a kind of " more rule unifications " " figure " Project cooperation measures and procedures for the examination and approval, using above-mentioned item
Mesh collaboration approval system realizes the examination & approval for treating examination and approval project.
As shown in figure 9, for one of " more rule unification " provided by the invention " figure " Project cooperation measures and procedures for the examination and approval preferably
Embodiment schematic flow sheet, including body following steps:
S101, the data of the copending project of current approval stage is received, and the data of the copending project is synchronous
It is sent to each departments of examination and approval's terminal corresponding with the currently approval stage;
S102, according to the data of copending project and the annual planning project library previously generated, to the copending project
Plan land used carry out spatial analysis, and generate corresponding spatial analysis result;
S103, receive each departments of examination and approval's terminal and given birth to based on the data of the spatial analysis result and the copending project
Into the copending project suggestions made after examination, and suggestions made after examination of comprehensive each departments of examination and approval's terminal generate current examination & approval rank
The approval results of section.
The embodiment of the present invention additionally provides a kind of " more rule unifications " " figure " Project cooperation approval tool.The embodiment
Project cooperation approval tool includes:Processor, memory and it is stored in the memory and can transports on the processor
Capable computer program.Realize that above-mentioned each Project cooperation measures and procedures for the examination and approval are implemented described in the computing device during computer program
Step in example, such as step S41~S44 shown in Fig. 8.Or realized described in the computing device during computer program
The function of each module/unit in above-mentioned each device embodiment.
Exemplary, the computer program can be divided into one or more module/units, one or more
Individual module/unit is stored in the memory, and by the computing device, to complete the present invention.It is one or more
Individual module/unit can be the series of computation machine programmed instruction section that can complete specific function, and the instruction segment is used to describe institute
State implementation procedure of the computer program in the Project cooperation approval tool.
The Project cooperation approval tool can be desktop PC, notebook, palm PC and cloud server etc.
Computing device.The Project cooperation approval tool may include, but be not limited only to, processor, memory.
Alleged processor can be CPU (Central Processing Unit, CPU), can also be it
His general processor, digital signal processor (Digital Signal Processor, DSP), application specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other PLDs, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor can also be any conventional processor
Deng the processor is the control centre of the Project cooperation approval tool, utilizes various interfaces and the whole public sentiment of connection
The various pieces of information extraction terminal device.
The memory can be used for storing the computer program and/or module, and the processor is by running or performing
The computer program and/or module being stored in the memory, and the data being stored in memory are called, described in realization
Public feelings information extracts the various functions of terminal device.The memory can mainly include storing program area and storage data field, its
In, storing program area can storage program area, application program (such as sound-playing function, image needed at least one function
Playing function etc.) etc.;Storage data field can store uses created data (such as voice data etc.) etc. according to mobile phone.This
Outside, memory can include high-speed random access memory, can also include nonvolatile memory, such as hard disk, internal memory, insert
Connect formula hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash memory
Block (Flash Card), at least one disk memory, flush memory device or other volatile solid-state parts.
Wherein, if module/unit that the Project cooperation approval tool integrates is realized in the form of SFU software functional unit
And as independent production marketing or in use, it can be stored in a computer read/write memory medium.Based on such
Understand, the present invention realizes all or part of flow in above-described embodiment method, can also instruct phase by computer program
The hardware of pass is completed, and described computer program can be stored in a computer-readable recording medium, the computer program exists
When being executed by processor, can be achieved above-mentioned each embodiment of the method the step of.Wherein, the computer program includes computer journey
Sequence code, the computer program code can be source code form, object identification code form, executable file or some middle shapes
Formula etc..The computer-readable medium can include:Any entity or device, the note of the computer program code can be carried
Recording medium, USB flash disk, mobile hard disk, magnetic disc, CD, computer storage, read-only storage (ROM, Read-Only Memory),
Random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium
Deng.It should be noted that the content that the computer-readable medium includes can be real according to legislation in jurisdiction and patent
The requirement trampled carries out appropriate increase and decrease, such as in some jurisdictions, according to legislation and patent practice, computer-readable medium
Do not include electric carrier signal and telecommunication signal.
It should be noted that device embodiment described above is only schematical, wherein described be used as separating component
The unit of explanation can be or may not be physically separate, can be as the part that unit is shown or can also
It is not physical location, you can with positioned at a place, or can also be distributed on multiple NEs.Can be according to reality
Need to select some or all of module therein to realize the purpose of this embodiment scheme.In addition, device provided by the invention
In embodiment accompanying drawing, the annexation between module represents there is communication connection between them, specifically can be implemented as one or
A plurality of communication bus or signal wire.Those of ordinary skill in the art are without creative efforts, you can to understand
And implement.
Described above is the preferred embodiment of the present invention, it is noted that for those skilled in the art
For, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as
Protection scope of the present invention.
Claims (9)
- A kind of 1. " more rule unifications " " figure " Project cooperation approval system, it is characterised in that including project data transceiver module, " figure " system module and project management module;The project data transceiver module, the data of the copending project for receiving current approval stage, and will be described pending The data for the project of criticizing synchronously is sent to each departments of examination and approval's terminal corresponding with the currently approval stage;" the one figure " system module, for the data according to copending project and the annual planning project library previously generated, Spatial analysis is carried out to the plan land used of the copending project, and generates corresponding spatial analysis result;The project management module, the spatial analysis result and described copending is based on for receiving each departments of examination and approval's terminal The suggestions made after examination of the copending project of the data generation of project, and the suggestions made after examination of comprehensive each departments of examination and approval's terminal, it is raw Into the approval results of current approval stage.
- 2. " more rule unifications " " figure " Project cooperation approval system according to claim 1, it is characterised in thatThe approval stage includes following five stages:Authorize to Invest stage, grant land use right stage, grant land use right stage, construction License and acceptance stage;The spatial analysis includes planning collision detection analysis, control line analysis and project site selection analysis.
- 3. " more rule unifications " " figure " Project cooperation approval system according to claim 1, it is characterised in that also wrap Include:Annual planning project library generation module, for being entered based on " more rule unifications " " figure " to the project data to be put in storage of offer Row review of compliance, by the annual plan project of project determination then by review of compliance, and be put in storage to annual planning item Mesh storehouse.
- 4. " more rule unifications " " figure " Project cooperation approval system as claimed in claim 3, it is characterised in that the year Planned project storehouse generation module includes project data receiving unit, overall merit unit, the pre- selected cell of planning and compliance Examine unit;The project data receiving unit, for receiving project data to be put in storage, and by the project data to be declared send to The overall merit unit;The overall merit unit, change departmental terminals for the project data to be put in storage to be sent to hair, and receive the hair Change the comprehensive evaluation result of departmental terminals return;The pre- selected cell of planning, for the project data to be declared according to and " more rule unifications " addressing rule, obtain institute State the pre- addressing result of item goal programming to be put in storage corresponding to project data to be put in storage;The review of compliance unit, for being preselected according to default review of compliance standard to the item goal programming to be put in storage Location result examined, and in described pass, and the project data to be put in storage is determined into annual plan project then, And be put in storage to annual planning project library.
- 5. " more rule unifications " " figure " Project cooperation approval system as claimed in claim 1, it is characterised in that described " more Rule unification " " figure " Project cooperation approval system, in addition to " more rule unifications " " figure " data update module;" more rule unifications " " figure " data update module, the examination & approval knot for " figure " system generation according to Fruit, the position of the control line in " more rule unifications " " figure " data is updated.
- 6. " more rule unifications " " figure " Project cooperation approval system as claimed in claim 1, it is characterised in that described " more Rule unification " " figure " Project cooperation approval system, in addition to control line coordination committee initiation module and " more rule unifications " " one Open figure " data update module;The control line coordination committee initiation module, coordinate departmental terminals for connecting each control line, initiate control line coordination Meeting, and generate corresponding control line coordination result according to the minutes of the control line coordination committee;" more rule unifications " " figure " data update module, for controlling line coordination result according to described, to " more rule The position of control line in unification " " figure " data is updated.
- 7. " more rule unifications " " figure " Project cooperation approval system as any one of claim 1 to 6, its feature exist In " more rule unifications " " figure " data are generated based on GIS data;The Project cooperation approval system base Generated in workflow technology.
- A kind of 8. " more rule unifications " " figure " Project cooperation measures and procedures for the examination and approval, it is characterised in that including:Receive the data of the copending project of current approval stage, and the data of the copending project is synchronously sent to and institute State each departments of examination and approval's terminal corresponding to current approval stage;According to the data of copending project and the annual planning project library previously generated, to the plan land used of the copending project Spatial analysis is carried out, and generates corresponding spatial analysis result;Each departments of examination and approval's terminal is received based on described in the generation of the data of the spatial analysis result and the copending project The suggestions made after examination of copending project, and the suggestions made after examination of comprehensive each departments of examination and approval's terminal, generate the examination & approval of current approval stage As a result.
- 9. a kind of " more rule unifications " " figure " Project cooperation approval tool, including processor, memory and it is stored in described In memory and it is configured as by the computer program of the computing device, described in the computing device during computer program Realize " more rule unifications " " figure " the Project cooperation measures and procedures for the examination and approval as claimed in claim 8.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710683533 | 2017-08-10 | ||
CN2017106835338 | 2017-08-10 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107516191A true CN107516191A (en) | 2017-12-26 |
CN107516191B CN107516191B (en) | 2020-09-04 |
Family
ID=60723718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710729214.6A Active CN107516191B (en) | 2017-08-10 | 2017-08-22 | Multi-rule-in-one and one-graph project collaborative approval system, method and tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107516191B (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108241966A (en) * | 2018-01-23 | 2018-07-03 | 广州明城信息服务有限公司 | A kind of use system suitable for technological project management |
CN108537504A (en) * | 2018-03-27 | 2018-09-14 | 四川国际招标有限责任公司 | One kind, which is approved and initiate a project, joins auditing system |
CN109034730A (en) * | 2018-07-02 | 2018-12-18 | 武汉珞珈德毅科技股份有限公司 | A kind of layout data measures and procedures for the examination and approval, system, terminal device and storage medium |
CN109409833A (en) * | 2018-10-22 | 2019-03-01 | 广州力挚网络科技有限公司 | A kind of defect handling method and device |
CN109829683A (en) * | 2018-12-25 | 2019-05-31 | 航天信息股份有限公司 | A kind of measures and procedures for the examination and approval and system in parallel based on traffic control stream |
CN111191100A (en) * | 2019-11-08 | 2020-05-22 | 腾讯科技(深圳)有限公司 | Government affair information processing method and device and computer readable storage medium |
CN111881234A (en) * | 2020-06-29 | 2020-11-03 | 广州市城市规划勘测设计研究院 | Land planning method and device, terminal equipment and storage medium |
CN113379377A (en) * | 2021-06-02 | 2021-09-10 | 南方电网能源发展研究院有限责任公司 | Power grid engineering construction approval processing method and device |
CN114491051A (en) * | 2022-04-02 | 2022-05-13 | 四川省大数据中心 | Project approval system for building site |
CN114488346A (en) * | 2022-01-28 | 2022-05-13 | 广州市城市规划勘测设计研究院 | Underground space abnormal body detection method, device, equipment and medium |
CN114862276A (en) * | 2022-06-21 | 2022-08-05 | 华南理工大学 | Method and system for collaborative analysis and application of large data of producing city |
CN115660296A (en) * | 2022-12-27 | 2023-01-31 | 吉奥时空信息技术股份有限公司 | Method for automatically issuing non-compliance project suggestion scheme based on machine learning |
CN117291530A (en) * | 2023-09-25 | 2023-12-26 | 广东省城乡规划设计研究院有限责任公司 | Gauge control examination system and method based on multi-rule translation |
CN118014523A (en) * | 2024-02-22 | 2024-05-10 | 西南交通大学 | Engineering collaborative management system, method and electronic equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101163067A (en) * | 2007-02-13 | 2008-04-16 | 杭州智通装饰网络管理有限公司 | Building industry cooperation network management system and management method thereof |
CN101702215A (en) * | 2009-11-06 | 2010-05-05 | 山东浪潮电子政务软件有限公司 | Design method for setting dependence item in operating room in working flow |
CN101706889A (en) * | 2009-11-17 | 2010-05-12 | 深圳市监察局 | Method and system for electronic supervising of administrative examination and approval |
CN105354267A (en) * | 2015-10-23 | 2016-02-24 | 广州绘宇智能勘测科技有限公司 | Method for realizing ''more rules one'' electronic approval of multi-type planning scheme |
-
2017
- 2017-08-22 CN CN201710729214.6A patent/CN107516191B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101163067A (en) * | 2007-02-13 | 2008-04-16 | 杭州智通装饰网络管理有限公司 | Building industry cooperation network management system and management method thereof |
CN101702215A (en) * | 2009-11-06 | 2010-05-05 | 山东浪潮电子政务软件有限公司 | Design method for setting dependence item in operating room in working flow |
CN101706889A (en) * | 2009-11-17 | 2010-05-12 | 深圳市监察局 | Method and system for electronic supervising of administrative examination and approval |
CN105354267A (en) * | 2015-10-23 | 2016-02-24 | 广州绘宇智能勘测科技有限公司 | Method for realizing ''more rules one'' electronic approval of multi-type planning scheme |
Non-Patent Citations (1)
Title |
---|
李洪祥: "大数据支持下的城乡治理方法与实践——以天河区"三规合一"决策支持平台为例", 《 第十七届中国科协年会——分16 大数据与城乡治理研讨会论文集》 * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108241966A (en) * | 2018-01-23 | 2018-07-03 | 广州明城信息服务有限公司 | A kind of use system suitable for technological project management |
CN108537504A (en) * | 2018-03-27 | 2018-09-14 | 四川国际招标有限责任公司 | One kind, which is approved and initiate a project, joins auditing system |
CN109034730A (en) * | 2018-07-02 | 2018-12-18 | 武汉珞珈德毅科技股份有限公司 | A kind of layout data measures and procedures for the examination and approval, system, terminal device and storage medium |
CN109409833A (en) * | 2018-10-22 | 2019-03-01 | 广州力挚网络科技有限公司 | A kind of defect handling method and device |
CN109829683A (en) * | 2018-12-25 | 2019-05-31 | 航天信息股份有限公司 | A kind of measures and procedures for the examination and approval and system in parallel based on traffic control stream |
CN111191100B (en) * | 2019-11-08 | 2023-05-23 | 腾讯科技(深圳)有限公司 | Government information processing method, government information processing device and computer readable storage medium |
CN111191100A (en) * | 2019-11-08 | 2020-05-22 | 腾讯科技(深圳)有限公司 | Government affair information processing method and device and computer readable storage medium |
CN111881234A (en) * | 2020-06-29 | 2020-11-03 | 广州市城市规划勘测设计研究院 | Land planning method and device, terminal equipment and storage medium |
CN113379377A (en) * | 2021-06-02 | 2021-09-10 | 南方电网能源发展研究院有限责任公司 | Power grid engineering construction approval processing method and device |
CN114488346A (en) * | 2022-01-28 | 2022-05-13 | 广州市城市规划勘测设计研究院 | Underground space abnormal body detection method, device, equipment and medium |
CN114491051A (en) * | 2022-04-02 | 2022-05-13 | 四川省大数据中心 | Project approval system for building site |
CN114862276B (en) * | 2022-06-21 | 2023-01-24 | 华南理工大学 | Method and system for collaborative analysis and application of large data of producing city |
CN114862276A (en) * | 2022-06-21 | 2022-08-05 | 华南理工大学 | Method and system for collaborative analysis and application of large data of producing city |
CN115660296A (en) * | 2022-12-27 | 2023-01-31 | 吉奥时空信息技术股份有限公司 | Method for automatically issuing non-compliance project suggestion scheme based on machine learning |
CN117291530A (en) * | 2023-09-25 | 2023-12-26 | 广东省城乡规划设计研究院有限责任公司 | Gauge control examination system and method based on multi-rule translation |
CN118014523A (en) * | 2024-02-22 | 2024-05-10 | 西南交通大学 | Engineering collaborative management system, method and electronic equipment |
Also Published As
Publication number | Publication date |
---|---|
CN107516191B (en) | 2020-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107516191A (en) | " more rule unifications " " figure " Project cooperation approval system, method and instrument | |
Raidén et al. | Social value in construction | |
Rocha-Lona et al. | Building quality management systems: selecting the right methods and tools | |
Dakhil et al. | Critical success competencies for the BIM implementation process: UK construction clients | |
Barbour et al. | Smart growth planning for climate protection: Evaluating California's Senate Bill 375 | |
Yu et al. | Application of value management in project briefing | |
Van Den Berg et al. | Policy consultancy in comparative perspective: Patterns, nuances and implications of the contractor state | |
Whyte | Managing digital coordination of design: emerging hybrid practices in an institutionalized project setting | |
CN107784603A (en) | A kind of intellectual property operation system and method | |
Kartashova et al. | Educational activity of national research universities as a basis for integration of science, education and industry in regional research and educational complexes | |
Lawrence et al. | A life-cycle perspective of professionalism in services | |
Ullah et al. | BIM adoption in the AEC/FM industry–the case for issuing building permits | |
Edwards | Testing the discourse of declining policy capacity: Rail policy and the Department of Transport | |
Loyarte et al. | Technology roadmapping (TRM) and strategic alignment for an applied research centre: a case study with methodological contributions | |
Alvarenga et al. | Scenarios for population health inequalities in 2030 in Europe: the EURO-HEALTHY project experience | |
Solli-Sather | A framework for analysing interoperability in electronic government | |
Clemens | Environmental scanning and scenario planning: a 12 month perspective on applying the viable systems model to developing public sector foresight | |
MasUtha | Small business incubators in South Africa: Emergence, geography and local impacts | |
Arthurson et al. | Urban planning and health: revitalising the alliance | |
Bui et al. | Carbon toolmaking: Responding to multiple interacting logics in carbon management | |
Manu et al. | Making sense of knowledge transfer and social capital generation for a Pacific island aid infrastructure project | |
Gilmour et al. | Urban regeneration indicators: A proxy for assessing common good | |
Abebe | E-government based land administration framework; trends, challenges and prospects | |
Henri Maurice Veillard et al. | The PATH project in eight European countries: an evaluation | |
CN113052547A (en) | Capital transfer management method and management system for construction project in petrochemical industry |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |