CN109034730A - A kind of layout data measures and procedures for the examination and approval, system, terminal device and storage medium - Google Patents
A kind of layout data measures and procedures for the examination and approval, system, terminal device and storage medium Download PDFInfo
- Publication number
- CN109034730A CN109034730A CN201810710140.6A CN201810710140A CN109034730A CN 109034730 A CN109034730 A CN 109034730A CN 201810710140 A CN201810710140 A CN 201810710140A CN 109034730 A CN109034730 A CN 109034730A
- Authority
- CN
- China
- Prior art keywords
- layout data
- layer
- copending
- approval
- planning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of layout data measures and procedures for the examination and approval, system, terminal device and storage mediums, the method include that receiving the copending layout data of input, and according to the file format of the copending layout data, classification storage to database;The copending layout data in the database is called, planning figure layer is generated according to the copending layout data;It chooses association figure layer and the planning figure layer carries out collision detection;The collision detection is obtained as a result, and the result is submitted examination & approval each department.By carrying out collision detection to layout data classification storage, then to the planning figure layer of generation in the present invention, enables and examine data integrated treatment, realize " one figure of more rule ", examination & approval efficiency is substantially increased, while reducing examination & approval error rate, reduces the workload of declaration and examination & approval.
Description
Technical field
The present invention relates to field of software development more particularly to a kind of layout data measures and procedures for the examination and approval, system, terminal device and deposit
Storage media.
Background technique
Always it is related to declaration process before land development, in order to guarantee making rational planning for for land development, needs to planning number
According to progress sifting.In practice, national economy and social development planning, urban and rural planning, overall plan for land use, ecological ring
The data standard disunity of a variety of planning rule data such as border protective plan, and be difficult to unify display management to numerous data, cause
Examination and approval procedures complexity and heavy workload.
Currently, being directed to this problem, more common method is layout data to be distributed to corresponding department, each department is independent
Data collision is analyzed, this examination & approval mode is difficult to realize each department's coordination, causes to examine easy error, another kind is in view of data class
It is not inconsistent, cause advise it is unified separately carried out with collision detection, this sample loading mode due to data the coordination committee consuming time, thus
Efficiency is lower.
Therefore, it is necessary to propose one kind can unified plan data, and carry out the method and system of collision detection declaration
Summary of the invention
In view of this, the embodiment of the invention provides a kind of method of data synchronization, server and storage medium, to solve to examine
Batch data is difficult to coordinate and the problem of low efficiency.
The embodiment of the present invention in a first aspect, providing a kind of layout data measures and procedures for the examination and approval, comprising:
The copending layout data of input is received, and according to the file format of the copending layout data, classification storage
To database;
The copending layout data in the database is called, planning figure layer is generated according to the copending layout data;
It chooses association figure layer and the planning figure layer carries out collision detection;
The collision detection is obtained as a result, and the result is submitted examination & approval each department.
The second aspect of the embodiment of the present invention provides a kind of layout data approval system, comprising:
Memory module: copending layout data for receiving input, and according to the file of the copending layout data
Format, classification storage to database;
Generation module: for calling the copending layout data in the database, according to the copending layout data
Generate planning figure layer;
Detection module: collision detection is carried out for choosing association figure layer and the planning figure layer;
Submit module: for obtaining the collision detection as a result, and the result is submitted examination & approval each department.
The third aspect of the embodiment of the present invention, provides a kind of terminal device, including memory, processor and is stored in
In the memory and the computer program that can run on the processor, when the processor executes the computer program
It realizes such as the step of first aspect of embodiment of the present invention the method.
The fourth aspect of the embodiment of the present invention, provides a kind of computer readable storage medium, described computer-readable to deposit
Storage media is stored with computer program, realizes that first aspect of the embodiment of the present invention mentions when the computer program is executed by processor
The step of the method for confession.
In the embodiment of the present invention, by carrying out collision detection to layout data classification storage, then to the planning figure layer of generation,
The result of generation is reported, enables and examines data integrated treatment, " one figure of more rule " is realized, substantially increases and examine effect
Rate, while the examination & approval of each department being avoided to occur coordinating error, examination & approval error rate is reduced, the work of declaration and examination & approval is largely reduced
It measures.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some
Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is one embodiment flow chart of the layout data measures and procedures for the examination and approval provided in an embodiment of the present invention;
Fig. 2 is another embodiment flow chart of the layout data measures and procedures for the examination and approval provided in an embodiment of the present invention;
Fig. 3 is layout data approval system structural schematic diagram provided in an embodiment of the present invention;
Fig. 4 is the structural schematic diagram of terminal device provided in an embodiment of the present invention.
Specific embodiment
The embodiment of the invention provides a kind of layout data measures and procedures for the examination and approval, system, terminal device and storage mediums, for more
Data declaration is advised, examination & approval efficiency is improved.
In order to make the invention's purpose, features and advantages of the invention more obvious and easy to understand, below in conjunction with the present invention
Attached drawing in embodiment, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that disclosed below
Embodiment be only a part of the embodiment of the present invention, and not all embodiment.Based on the embodiments of the present invention, this field
Those of ordinary skill's all other embodiment obtained without making creative work, belongs to protection of the present invention
Range.
Embodiment one:
Referring to Fig. 1, the flow diagram of the layout data measures and procedures for the examination and approval provided in an embodiment of the present invention, including following step
It is rapid:
S101, the copending layout data for receiving input, and according to the file format of the copending layout data, classification
Store database;
The copending layout data may include but be not limited to present status of land utilization, the object of planning, supply and demand analysis and soil
Utilize structure and layout etc. data, predominantly land character, Land arrangement, Structure Planning etc. data.Due to planning
The file format of data is different, needs conversion of classifying to it, facilitates utilization, and the layout data generally comprises raster data and arrow
Measure data.
Optionally, as follows to the copending layout data processing:
When the copending layout data is raster data, data storage is carried out by slicing mode, slice can be square
Just it accesses, promotes access efficiency.
When the copending layout data is vector data, the copending layout data is gone into CGCS2000 coordinate
After system, it imported into postgresql spatial database.Data after conversion can inquire database by SQL statement and obtain.
Copending layout data in S102, the calling database generates planning according to the copending layout data
Figure layer;
According to copending layout data, parameter is set, figure layer is automatically generated, reallocation of land feelings are simulated in the figure layer
Condition.
Optionally, above-mentioned pending batch data and the figure layer of generation can regard declaration material, be sent to according to content corresponding
Department, specifically:
Corresponding departments of examination and approval are distributed to after the copending layout data and the planning figure layer of generation are arranged;
The opinion of each departments of examination and approval is obtained, and summarizes the opinion, it, can be with initiating conference when summarizing opinion disunity
It discusses and determines, form the opinion finally summarized.According to the opinion after summarizing, determine whether to pass through examination & approval.
Optionally, the primitive rule of layout data is set, the copending layout data is detected, when the copending planning
When data and the primitive rule reach error threshold, prompt is generated, user is fed back to.The primitive rule is parameter setting
Threshold value and correlation, by detecting these data parameters, it can be found that the layout data of mistake,
S103, association figure layer and planning figure layer progress collision detection are chosen;
It is described association figure layer be according to have layout data generate there are the figure layers of space correlation with the planning figure layer.
Collision detection is in order to find copending planning with having and plan occur conflicting or inconsistent problem, in the embodiment of the present invention
In, the available conflict figure spot of collision detection, the conflict figure spot can be used as the reference of subsequent examination & approval, and realize more rule data
It is shown in a figure layer, facilitates management.
Optionally, the collision detection basic principle are as follows:
Frame selects the figure spot set of the association figure layer and the planning figure layer respectively;
The land character attribute chosen in the figure spot set of the planning figure spot set and the association figure layer is inconsistent
The figure spot is added to conflict figure spot set by figure spot;
Data conversion is carried out to the conflict figure spot set and obtains conflict figure spot figure layer.
S104, the collision detection is obtained as a result, and the result is submitted examination & approval each department.
The collision detection result generally conflict figure spot figure layer, the result, which refers to, can be all figure spots, be also possible to
A certain region figure spot is it is not limited here.
Optionally, according to the difference of departments of examination and approval, rushing for a certain layout data can also be carried out in the department privilege
Prominent detection.
Preferably, in method provided in an embodiment of the present invention, further include distributing permission for departments of examination and approval, obtain corresponding
Examine data.
In embodiments of the present invention, the storage and collision detection of layout data can not only facilitate data management, Er Qiefen
It can reinforce coordinating with examination & approval content and permission, improve examination & approval efficiency
Embodiment two:
On the basis of Fig. 1, data approval process is described in detail in conjunction with Fig. 2, it is as follows
Fig. 2 is approval process schematic diagram provided in an embodiment of the present invention, and numbering step described in the figure is not meant to execute
Sequence it is successive.
The data of typing in S201 can be arbitrarily recognizable format.It can include but is not limited to the file uploaded, figure
Piece etc. is also possible to the text information directly filled in.
The pending batch data inputted in S201 can be deposited into database after classification storage, be called for system.It can
Choosing, the examination & approval data preparation of typing can be chosen pending batch data and sent by system according to the difference of departments of examination and approval in S202
To corresponding department.
The data being stored in database can generate planning figure layer through S203, specifically, the layout data in database is called,
According to the layout data configuration diagram layer parameter, to generate figure layer.The planning figure layer of generation is to show soil in a planar form
The space structure of planning.The figure layer of generation can also be distributed to each department, and departments of examination and approval can get information about rule by figure layer
The project of drawing.
Preferably, departments of examination and approval can request to generate figure layer according to data with existing, and the figure layer is only for the departments' reference.
The available conflict figure spot figure layer of collision detection, the conflict figure spot figure layer are carried out with figure layer is associated with to planning figure layer
It can be used as examination & approval reference and be distributed to corresponding department.The collision detection in S205 freely can add or reduce figure layer, so that
Layout data can all be shown in the form of figure layer, and can obtain conflict graph spot.This way it is possible to realize mostly one, rule is schemed,
Convenient for the management of layout data.
In S206, different departments corresponds to different examination & approval contents, and the association based on department, needs for different portions
Door distribution permission.According to the permission of affiliated function, corresponding examination & approval data can be viewed, associated department, Ke Yijin occurs
The alternating transmission of row data or application distribution.
In S207 and S208, layout data will do it after each department examines and be aggregated to form final opinion, work as opinion
When inconsistent, according to meeting as a result, obtaining final suggestions made after examination, it can decide whether to pass through with initiating conference.
In embodiments of the present invention by distribution permission, and then distributes for each departments of examination and approval and examine data, this automatic point
Hair, the method for coordinating examination & approval can ensure examination & approval efficiency, save human cost.
Embodiment three:
A kind of layout data measures and procedures for the examination and approval are essentially described above, a kind of layout data approval system will be carried out below detailed
Thin description.
Fig. 3 shows the structural schematic diagram of layout data approval system provided in an embodiment of the present invention, comprising:
Memory module 310: copending layout data for receiving input, and according to the text of the copending layout data
Part format, classification storage to database;
Optionally, the memory module 310 includes:
Classification storage unit: when the copending layout data is raster data, data is carried out by slicing mode and are deposited
Storage;When the copending layout data is vector data, after the copending layout data is gone to CGCS2000 coordinate system,
It imported into postgresql spatial database.
Generation module 320: for calling the copending layout data in the database, according to the copending planning number
Figure layer is planned according to generating;
Optionally, the generation module 320 further include:
Data detecting unit: for setting the primitive rule of layout data, the copending layout data is detected, when described
When copending layout data and the primitive rule reach error threshold, prompt is generated, user is fed back to.
Detection module 330: collision detection is carried out for choosing association figure layer and the planning figure layer;
Wherein, it is described association figure layer be according to have layout data generate there are space correlations with the planning figure layer
Figure layer.
Optionally, the detection module 330 includes:
Frame-choosing unit: the figure spot set of the association figure layer and the planning figure layer is selected for frame respectively;
Selection unit: the land character in figure spot set for choosing the planning figure spot set and the association figure layer
The figure spot is added to conflict figure spot set by the inconsistent figure spot of attribute;
Converting unit: conflict figure spot figure layer is obtained for carrying out data conversion to the conflict figure spot set.
Submit module 340: for obtaining the collision detection as a result, and the result is submitted examination & approval each department.
Preferably, the data approval system further include:
Approval module 350: for being distributed to correspondence after arranging the planning figure layer of the copending layout data and generation
Departments of examination and approval;The opinion of each departments of examination and approval is obtained, and summarizes the opinion;According to the opinion after summarizing, determine whether to lead to
Cross examination & approval.
Authority distribution module 360: for distributing the permission of all departments of examination and approval, to carry out examination & approval content distribution.
Embodiment 4:
Fig. 4 is the structural schematic diagram of the terminal installation for the layout data examination & approval that one embodiment of the invention provides.The terminal
Equipment, to have the mobile computer device of touch screen, including but not limited to smart phone, smartwatch, notebook, plate electricity
Brain, POS machine include even vehicle-mounted computer.As shown in figure 4, the terminal device 4 of the embodiment includes: memory 410, processor
420, the memory 410 includes the program 4101 run of storage thereon, it will be understood by those skilled in the art that in Fig. 4
The terminal device structure shown does not constitute the restriction to terminal device, may include components more more or fewer than diagram, or
Person combines certain components or different component layouts.
It is specifically introduced below with reference to each component parts of the Fig. 4 to terminal device:
Memory 410 can be used for storing software program and module, and processor 420 is stored in memory 410 by operation
Software program and module, thereby executing the various function application and data processing of terminal.Memory 410 can mainly include
Storing program area and storage data area, wherein storing program area can application journey needed for storage program area, at least one function
Sequence (such as sound-playing function, image player function etc.) etc.;Storage data area can be stored to be created according to using for terminal
Data (such as audio data, phone directory etc.) etc..It, can be in addition, memory 410 may include high-speed random access memory
Including nonvolatile memory, for example, at least a disk memory, flush memory device or other volatile solid-states
Part.
Method comprising projects initialization on memory 410 runs program 4101, described to run program
4101 can be divided into one or more module/units, and one or more of module/units are stored in the memory
It in 410, and is executed by processor 420, with the transmitting of completion notice and obtains notice realization process, one or more of moulds
Block/unit can be the series of computation machine program instruction section that can complete specific function, the instruction segment by describe it is described based on
Implementation procedure of the calculation machine program 4101 in the terminal device 4.For example, the computer program 4101 can be divided into and deposit
Storage module, detection module, submits module at generation module.
Processor 420 is the control centre of terminal device, utilizes each of various interfaces and the entire terminal device of connection
A part by running or execute the software program and/or module that are stored in memory 410, and calls and is stored in storage
Data in device 410 execute the various functions and processing data of terminal, to carry out integral monitoring to terminal.Optionally, it handles
Device 420 may include one or more processing units;Preferably, processor 420 can integrate application processor and modulation /demodulation processing
Device, wherein the main processing operation system of application processor, user interface and application program etc., modem processor is mainly located
Reason wireless communication.It is understood that above-mentioned modem processor can not also be integrated into processor 420.
Terminal device may also include at least one sensor, such as optical sensor, motion sensor and other sensors,
A kind of input equipment, for example, touch screen, keyboard and other, a kind of output equipment, for example, loudspeaker, display and other.Other
Details are not described herein for component parts.
In embodiments of the present invention, what processor 420 included by the terminal executed runs program specifically:
A kind of method of the layout data measures and procedures for the examination and approval, comprising:
The copending layout data of input is received, and according to the file format of the copending layout data, classification storage
To database;
The copending layout data in the database is called, planning figure layer is generated according to the copending layout data;
It chooses association figure layer and the planning figure layer carries out collision detection;
The collision detection is obtained as a result, and the result is submitted examination & approval each department.
Further, the file format classification storage according to the copending layout data is to database specifically:
When the copending layout data is raster data, data storage is carried out by slicing mode;
When the copending layout data is vector data, the copending layout data is gone into CGCS2000 coordinate
After system, it imported into postgresql spatial database.
Further, the copending layout data called in the database, according to the copending layout data
Generate planning figure layer further include:
Corresponding departments of examination and approval are distributed to after the copending layout data and the planning figure layer of generation are arranged;
The opinion of each departments of examination and approval is obtained, and summarizes the opinion;
According to the opinion after summarizing, determine whether to pass through examination & approval.
It is further, described that planning figure layer is generated according to the copending layout data further include:
Set the primitive rule of layout data, detect the copending layout data, when the copending layout data with
When the primitive rule reaches error threshold, prompt is generated, user is fed back to.
Further, it is described association figure layer be according to have layout data generate there are space passes with the planning figure layer
The figure layer of connection.
Further, the selection association figure layer and the planning figure layer carry out collision detection specifically:
Frame selects the figure spot set of the association figure layer and the planning figure layer respectively;
The land character attribute chosen in the figure spot set of the planning figure spot set and the association figure layer is inconsistent
The figure spot is added to conflict figure spot set by figure spot;
Data conversion is carried out to the conflict figure spot set and obtains conflict figure spot figure layer.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment
The part of load may refer to the associated description of other embodiments.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment
The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that each embodiment described in conjunction with the examples disclosed in this document
Module, unit and/or method and step can be realized with the combination of electronic hardware or computer software and electronic hardware.This
A little functions are implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Specially
Industry technical staff can use different methods to achieve the described function each specific application, but this realization is not
It is considered as beyond the scope of this invention.
In several embodiments provided herein, it should be understood that disclosed system, device and method can be with
It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the unit
It divides, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components
It can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, it is shown or
The mutual coupling, direct-coupling or communication connection discussed can be through some interfaces, the indirect coupling of device or unit
It closes or communicates to connect, can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-described embodiment side
All or part of the process in method can also instruct relevant hardware to complete, the computer by computer program
Program can be stored in a computer readable storage medium, and the computer program is when being executed by processor, it can be achieved that above-mentioned each
The step of a embodiment of the method.Wherein, the computer program includes computer program code, the computer program code
It can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable medium can
With include: can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic disk,
CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random
Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that the computer
The content that readable medium includes can carry out increase and decrease appropriate according to the requirement made laws in jurisdiction with patent practice, such as
It does not include electric carrier signal and telecommunication signal according to legislation and patent practice, computer-readable medium in certain jurisdictions.
The above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although referring to before
Stating embodiment, invention is explained in detail, those skilled in the art should understand that: it still can be to preceding
Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these
It modifies or replaces, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (10)
1. a kind of layout data measures and procedures for the examination and approval characterized by comprising
The copending layout data of input is received, and according to the file format of the copending layout data, classification storage to number
According to library;
The copending layout data in the database is called, planning figure layer is generated according to the copending layout data;
It chooses association figure layer and the planning figure layer carries out collision detection;
The collision detection is obtained as a result, and the result is submitted examination & approval each department.
2. the method according to claim 1, wherein the file format according to the copending layout data
Classification storage is to database specifically:
When the copending layout data is raster data, data storage is carried out by slicing mode;
When the copending layout data is vector data, the copending layout data is gone into CGCS2000 coordinate system
Afterwards, it imported into postgresql spatial database.
3. the method according to claim 1, wherein the copending planning number called in the database
According to according to the copending layout data generation planning figure layer further include:
Corresponding departments of examination and approval are distributed to after the copending layout data and the planning figure layer of generation are arranged;
The opinion of each departments of examination and approval is obtained, and summarizes the opinion;
According to the opinion after summarizing, determine whether to pass through examination & approval.
4. the method according to claim 1, wherein described generate planning chart according to the copending layout data
Layer further include:
Set the primitive rule of layout data, detect the copending layout data, when the copending layout data with it is described
When primitive rule reaches error threshold, prompt is generated, user is fed back to.
5. the method according to claim 1, wherein the association figure layer is to be generated according to existing layout data
There are the figure layers of space correlation with the planning figure layer.
6. according to claim 1 or 5 described in any item methods, which is characterized in that 1. layers of the selection associated diagram and the rule
It draws figure layer and carries out collision detection specifically:
Frame selects the figure spot set of the association figure layer and the planning figure layer respectively;
The planning figure spot set figure spot inconsistent with the land character attribute in the figure spot set of the association figure layer is chosen,
The figure spot is added to conflict figure spot set;
Data conversion is carried out to the conflict figure spot set and obtains conflict figure spot figure layer.
7. a kind of layout data approval system characterized by comprising
Memory module: copending layout data for receiving input, and according to the file format of the copending layout data,
Classification storage is to database;
Generation module: it for calling the copending layout data in the database, is generated according to the copending layout data
Plan figure layer;
Detection module: collision detection is carried out for choosing association figure layer and the planning figure layer;
Submit module: for obtaining the collision detection as a result, and the result is submitted examination & approval each department.
8. server according to claim 6, which is characterized in that the detection module includes:
Frame-choosing unit: the figure spot set of the association figure layer and the planning figure layer is selected for frame respectively;
Selection unit: the land character attribute in figure spot set for choosing the planning figure spot set and the association figure layer
The figure spot is added to conflict figure spot set by inconsistent figure spot;
Converting unit: conflict figure spot figure layer is obtained for carrying out data conversion to the conflict figure spot set.
9. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor
The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 6 when executing the computer program
Any one of described in the layout data measures and procedures for the examination and approval the step of.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists
In the step that realization layout data as described in any one of claims 1 to 6 is examined when the computer program is executed by processor
Suddenly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810710140.6A CN109034730A (en) | 2018-07-02 | 2018-07-02 | A kind of layout data measures and procedures for the examination and approval, system, terminal device and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810710140.6A CN109034730A (en) | 2018-07-02 | 2018-07-02 | A kind of layout data measures and procedures for the examination and approval, system, terminal device and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109034730A true CN109034730A (en) | 2018-12-18 |
Family
ID=65521239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810710140.6A Pending CN109034730A (en) | 2018-07-02 | 2018-07-02 | A kind of layout data measures and procedures for the examination and approval, system, terminal device and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109034730A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111881234A (en) * | 2020-06-29 | 2020-11-03 | 广州市城市规划勘测设计研究院 | Land planning method and device, terminal equipment and storage medium |
CN112085357A (en) * | 2020-08-27 | 2020-12-15 | 东南大学 | System and method for recognizing and processing important points of conflict of plot planning conditions |
CN113344527A (en) * | 2021-06-04 | 2021-09-03 | 内蒙古自治区锡林郭勒盟中级人民法院 | Method and platform for integrally managing and storing judicial advice information |
CN113344348A (en) * | 2021-05-25 | 2021-09-03 | 中国平安人寿保险股份有限公司 | Generation method, device, equipment and storage medium of multi-class material approval document |
CN113793063A (en) * | 2021-09-28 | 2021-12-14 | 广东电网有限责任公司 | Method and device for detecting conflict of power distribution network planning project schemes |
CN114596049A (en) * | 2022-01-19 | 2022-06-07 | 北京吉威数源信息技术有限公司 | Natural resource graph approval method, device, equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7053893B1 (en) * | 2003-12-15 | 2006-05-30 | Nvidia Corporation | Position conflict detection and avoidance in a programmable graphics processor using tile coverage data |
CN106971260A (en) * | 2017-03-07 | 2017-07-21 | 广州市城市规划勘测设计研究院 | " many rule unifications " " figure " Planning preparation achievement inspection method and device |
CN107146026A (en) * | 2017-05-09 | 2017-09-08 | 南京市城市规划编制研究中心 | A kind of space planning land used difference automatic synchronization method |
CN107516191A (en) * | 2017-08-10 | 2017-12-26 | 广州市城市规划勘测设计研究院 | " more rule unifications " " figure " Project cooperation approval system, method and instrument |
CN107563624A (en) * | 2017-08-22 | 2018-01-09 | 广州市城市规划勘测设计研究院 | Location Selection of Construction Project method, apparatus and system based on " three rule unifications " |
-
2018
- 2018-07-02 CN CN201810710140.6A patent/CN109034730A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7053893B1 (en) * | 2003-12-15 | 2006-05-30 | Nvidia Corporation | Position conflict detection and avoidance in a programmable graphics processor using tile coverage data |
CN106971260A (en) * | 2017-03-07 | 2017-07-21 | 广州市城市规划勘测设计研究院 | " many rule unifications " " figure " Planning preparation achievement inspection method and device |
CN107146026A (en) * | 2017-05-09 | 2017-09-08 | 南京市城市规划编制研究中心 | A kind of space planning land used difference automatic synchronization method |
CN107516191A (en) * | 2017-08-10 | 2017-12-26 | 广州市城市规划勘测设计研究院 | " more rule unifications " " figure " Project cooperation approval system, method and instrument |
CN107563624A (en) * | 2017-08-22 | 2018-01-09 | 广州市城市规划勘测设计研究院 | Location Selection of Construction Project method, apparatus and system based on " three rule unifications " |
Non-Patent Citations (1)
Title |
---|
安国辉: "《规划学与决策规划》", 30 September 2017 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111881234A (en) * | 2020-06-29 | 2020-11-03 | 广州市城市规划勘测设计研究院 | Land planning method and device, terminal equipment and storage medium |
CN112085357A (en) * | 2020-08-27 | 2020-12-15 | 东南大学 | System and method for recognizing and processing important points of conflict of plot planning conditions |
CN112085357B (en) * | 2020-08-27 | 2021-06-04 | 东南大学 | System and method for recognizing and processing important points of conflict of plot planning conditions |
CN113344348A (en) * | 2021-05-25 | 2021-09-03 | 中国平安人寿保险股份有限公司 | Generation method, device, equipment and storage medium of multi-class material approval document |
CN113344527A (en) * | 2021-06-04 | 2021-09-03 | 内蒙古自治区锡林郭勒盟中级人民法院 | Method and platform for integrally managing and storing judicial advice information |
CN113793063A (en) * | 2021-09-28 | 2021-12-14 | 广东电网有限责任公司 | Method and device for detecting conflict of power distribution network planning project schemes |
CN113793063B (en) * | 2021-09-28 | 2024-08-02 | 广东电网有限责任公司 | Method and device for detecting conflict of planning project scheme of power distribution network |
CN114596049A (en) * | 2022-01-19 | 2022-06-07 | 北京吉威数源信息技术有限公司 | Natural resource graph approval method, device, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109034730A (en) | A kind of layout data measures and procedures for the examination and approval, system, terminal device and storage medium | |
CN104732306B (en) | Rapid development system and method for business application system | |
CN110673848B (en) | Enterprise information management system configuration device based on JavaWeb | |
CN103970527B (en) | It is the method and system of report generation provided auxiliary covering | |
US7574379B2 (en) | Method and system of using artifacts to identify elements of a component business model | |
CN107832567B (en) | System efficiency collaborative evaluation system and evaluation method | |
CN107533453A (en) | System and method for generating data visualization application | |
CN111881662A (en) | Form generation method, device, processing equipment and storage medium | |
CN109634490A (en) | A kind of list display method, device, equipment and storage medium | |
WO2018093493A1 (en) | Method and system for multi-modal lineage tracing & impact assessment in a concept lineage data flow network | |
CN110249356B (en) | Sharing method and system for user-defined ERP function | |
CN108804402A (en) | Report generating system based on big data platform and method | |
CN110347383A (en) | The front end development approach and device of cross-platform desktop application | |
CN115358204A (en) | Report generation method and device, electronic equipment and storage medium | |
CN112329184A (en) | Network architecture configuration information generation method and device, storage medium and electronic equipment | |
CN105824991B (en) | A kind of cloud platform and resource allocation method of the design of Aviation applicating cooperation | |
CN108108986A (en) | A kind of design method of CRM system, device and electronic equipment | |
CN109360106A (en) | Portrait construction method, system, medium and computer system | |
CN101576922A (en) | Access system and access method | |
CN110533396A (en) | Material binding method, material binding device and terminal device | |
CN109840201A (en) | UI test method, device, electronic equipment and computer readable storage medium | |
CN112596711A (en) | Personalized authority management setting method and system based on Web system | |
CN110427388A (en) | A kind of data processing method and device, storage medium | |
CN103699649B (en) | Handle interface element and the system and its implementation of data mapping | |
CN116521158A (en) | Federal learning algorithm component generation system and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |
|
RJ01 | Rejection of invention patent application after publication |