CN107503363B - Coastal waters weak soil property relief well of deep foundation pit processing method - Google Patents

Coastal waters weak soil property relief well of deep foundation pit processing method Download PDF

Info

Publication number
CN107503363B
CN107503363B CN201610419661.7A CN201610419661A CN107503363B CN 107503363 B CN107503363 B CN 107503363B CN 201610419661 A CN201610419661 A CN 201610419661A CN 107503363 B CN107503363 B CN 107503363B
Authority
CN
China
Prior art keywords
relief well
pit
water
steel pipe
periphery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610419661.7A
Other languages
Chinese (zh)
Other versions
CN107503363A (en
Inventor
杨卜
张静
芦涛
秦保仁
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201610419661.7A priority Critical patent/CN107503363B/en
Publication of CN107503363A publication Critical patent/CN107503363A/en
Application granted granted Critical
Publication of CN107503363B publication Critical patent/CN107503363B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to a kind of deep basal pits, more particularly to a kind of relief well of deep foundation pit processing method.A kind of coastal waters weak soil property relief well of deep foundation pit processing method, it includes: step 1, the preparation before relief well closure;Step 2 is led to the water in relief well in the bright ditch sump of deep basal pit basis periphery by water pump;Step 3, the working face cleaning of relief well surface, brick catch pit;Step 4, relief well catch pit bottom cover cover board, must cover tightly cover board, can pour brick relief well catch pit later;Step 5, deep basal pit base foundation cushion construction pour the groove of laying steel pipe in work progress together;Step 6 after base concrete solidification, carries out the bright ditch sump in deep basal pit basis periphery and blocks, method is poured with concrete;Step 7 especially pours closure relief well and dredges steel pipe when pouring bright ditch sump;Step 8, the whole water burst situation for checking basis and periphery, then construction finishes if there is no problem.The present invention can be improved relief well and block primary success rate.

Description

Coastal waters weak soil property relief well of deep foundation pit processing method
Technical field
The present invention relates to a kind of deep basal pits, more particularly to a kind of relief well of deep foundation pit processing method.
Background technique
With developing on an unprecedented scale for China's geotechnical engineering, China's base pit engineering quantity is more and more, and scale is also increasing, base The depth in hole also with and deepen, and complicated subsurface geology condition makes base pit dewatering science rapidly growing.Currently, China Larger and deeper depth foundation pit is more, after such pit earthwork excavates, after overburden layer more than pressure water head is die-offed, Foundation Pit Pouring phenomenon easily occurs, taking relief well to draw water is to guarantee that anti-dash forward of base plate of foundation pit gushes stable effective ways.However, this The closure of the relief well of class foundation pit is extremely difficult, and because such foundation pit hydraulic pressure is big, water is big, once stopping pumping, water level is sharply Rise, success or not of shunting in a well, the time is just particularly important.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of coastal waters weak soil property relief well of deep foundation pit processing side is provided Method.The present invention can be improved relief well and block primary success rate.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows: a kind of coastal waters weak soil property relief well of deep foundation pit Processing method, it includes
Step 1, the preparation before relief well closure;
After foundation pit substrate is excavated to absolute altitude, filter pipe in relief well is truncated to the absolute altitude 550mm of bed course lower surface, mesh Be remove filter pipe water outlet position sposh;
Water pump inside relief well continues to draw water, and so that water level is maintained at water outlet hereinafter, to guarantee the water outlet cleared up Position weak soil face is relatively hard;
Step 2 is led to the water in relief well in the bright ditch sump of deep basal pit basis periphery by water pump;
Water pump junction nylon tube is connect using the steel pipe with elbow with nylon tube at relief well drainage nozzle, curved Upside down;
With leading to the water in relief well with elbow steel pipe in the bright ditch sump of basic periphery, steel is laid in groove Pipe, steel pipe top do not backfill, are poured together when bed course pours with concrete;
Step 3, the working face cleaning of relief well surface, brick catch pit;
In this step, it should be noted that building the steel pipe with elbow in bright ditch sump, pay attention to building close;
Step 4, relief well catch pit bottom cover cover board, must cover tightly cover board, can pour brick relief well later and catchment Hole;
If water burst is larger to block water pump in relief well;
If little without water burst or hydraulic pressure, water pump and nylon tube are taken out, only stays steel pipe in relief well;
Step 5, deep basal pit base foundation cushion construction pour the groove of laying steel pipe in work progress together;
After the completion of pouring, notice that whether there is or not arch cambers, cracking phenomena for observation relief well position and its periphery bed course;
After the completion of bed course, the construction of deep basal pit base foundation is carried out;
Step 6 after base concrete solidification, carries out the bright ditch sump in deep basal pit basis periphery and blocks, method is with mixed Solidifying soil pours;
Step 7 especially pours closure relief well and dredges steel pipe when pouring bright ditch sump.
Step 8, the whole water burst situation for checking basis and periphery, then construction finishes if there is no problem.
The present invention greatly improves the successively success rate of relief well closure, ensures that foundation pit construction is gone on smoothly.For hydraulic pressure compared with It is still available under the big or geological conditions of water burst.
Specific embodiment
The present invention is implemented as follows: a kind of coastal waters weak soil property relief well of deep foundation pit processing method, it includes
Step 1, the preparation before relief well closure;
After foundation pit substrate is excavated to absolute altitude, filter pipe in relief well is truncated to the absolute altitude 550mm of bed course lower surface, mesh Be remove filter pipe water outlet position sposh;
Water pump inside relief well continues to draw water, and so that water level is maintained at water outlet hereinafter, to guarantee the water outlet cleared up Position weak soil face is relatively hard;
Step 2 is led to the water in relief well in the bright ditch sump of deep basal pit basis periphery by water pump;
Water pump junction nylon tube is connect using the steel pipe with elbow with nylon tube at relief well drainage nozzle, curved Upside down;
With leading to the water in relief well with elbow steel pipe in the bright ditch sump of basic periphery, steel is laid in groove Pipe, steel pipe top do not backfill, are poured together when bed course pours with concrete;
Step 3, the working face cleaning of relief well surface, brick catch pit;
In this step, it should be noted that building the steel pipe with elbow in bright ditch sump, pay attention to building close;
Step 4, relief well catch pit bottom cover cover board, must cover tightly cover board, can pour brick relief well later and catchment Hole;
If water burst is larger to block water pump in relief well;
If little without water burst or hydraulic pressure, water pump and nylon tube are taken out, only stays steel pipe in relief well;
Step 5, deep basal pit base foundation cushion construction pour the groove of laying steel pipe in work progress together;
After the completion of pouring, notice that whether there is or not arch cambers, cracking phenomena for observation relief well position and its periphery bed course;
After the completion of bed course, the construction of deep basal pit base foundation is carried out;
Step 6 after base concrete solidification, carries out the bright ditch sump in deep basal pit basis periphery and blocks, method is with mixed Solidifying soil pours;
Step 7 especially pours closure relief well and dredges steel pipe when pouring bright ditch sump.
Step 8, the whole water burst situation for checking basis and periphery, then construction finishes if there is no problem.
The relief well diameter 600mm in certain building site, drainage pipe diameter 500mm, filter pipe water outlet away from bed course bottom 550mm, Having a size of 1400mm*1400mm*400mm outside brick sump, base thickness, wall thickness are 200mm, the depth of brick sump 400mm can the extent of the destruction of soil property be adjusted according to the actual situation and around water outlet.Water pump is placed in relief well inner cushion layer Below the absolute altitude of bottom at 2-3m.The bottom plate cover board of brick catch pit is that δ is 10mm steel plate, long 1000mm, width 1000mm, bottom detent The high 100mm of plate, long 800mm, bottom plate and 2 pieces of block board connection types are welding, and weld seam is full, and connection is reliable.It catchments brick Around hole and basis when bright ditch catch pit, concrete absolute altitude can be properly increased according to on-site actual situations, construction period or is adopted With leak stopping king.

Claims (1)

1. a kind of coastal waters weak soil property relief well of deep foundation pit processing method, it is characterised in that: it includes
Step 1, the preparation before relief well closure;
After foundation pit substrate is excavated to absolute altitude, filter pipe in relief well is truncated to the absolute altitude 550mm of bed course lower surface, it is therefore an objective to Remove the sposh at filter pipe water outlet position;
Water pump inside relief well continues to draw water, and so that water level is maintained at water outlet hereinafter, to guarantee that the water outlet position of cleaning is soft Native face is relatively hard;
Step 2 is led to the water in relief well in the bright ditch sump of deep basal pit basis periphery by water pump;
Water pump junction nylon tube is connect using the steel pipe with elbow with nylon tube, elbow court at relief well drainage nozzle Under;
With leading to the water in relief well with elbow steel pipe in the bright ditch sump of basic periphery, steel pipe, steel are laid in groove It does not backfill above pipe, is poured together when bed course pours with concrete;
Step 3, the working face cleaning of relief well surface, brick catch pit;
In this step, it should be noted that building the steel pipe with elbow in bright ditch sump, pay attention to building close;
Step 4, relief well catch pit bottom cover cover board, must cover tightly cover board, can pour brick relief well catch pit later;
If water burst is larger to block water pump in relief well;
If little without water burst or hydraulic pressure, water pump and nylon tube are taken out, only stays steel pipe in relief well;
Step 5, deep basal pit base foundation cushion construction pour the groove of laying steel pipe in work progress together;
After the completion of pouring, notice that whether there is or not arch cambers, cracking phenomena for observation relief well position and its periphery bed course;
After the completion of bed course, the construction of deep basal pit base foundation is carried out;
Step 6 after base concrete solidification, carries out the bright ditch sump in deep basal pit basis periphery and blocks, method is to use concrete It pours;
Step 7 especially pours closure relief well and dredges steel pipe when pouring bright ditch sump;
Step 8, the whole water burst situation for checking basis and periphery, then construction finishes if there is no problem.
CN201610419661.7A 2016-06-14 2016-06-14 Coastal waters weak soil property relief well of deep foundation pit processing method Active CN107503363B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610419661.7A CN107503363B (en) 2016-06-14 2016-06-14 Coastal waters weak soil property relief well of deep foundation pit processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610419661.7A CN107503363B (en) 2016-06-14 2016-06-14 Coastal waters weak soil property relief well of deep foundation pit processing method

Publications (2)

Publication Number Publication Date
CN107503363A CN107503363A (en) 2017-12-22
CN107503363B true CN107503363B (en) 2019-04-26

Family

ID=60679214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610419661.7A Active CN107503363B (en) 2016-06-14 2016-06-14 Coastal waters weak soil property relief well of deep foundation pit processing method

Country Status (1)

Country Link
CN (1) CN107503363B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114045848A (en) * 2021-11-17 2022-02-15 中建八局第四建设有限公司 Construction method for pit foundation in water inrush pit

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004068485A (en) * 2002-08-08 2004-03-04 Sakamoto Shokai:Kk Method of forcedly removing surface water in deep well construction method
CN103334444B (en) * 2013-07-09 2016-04-20 中国一冶集团有限公司 A kind of method for blocking of foundation pit dewatering well pressure release type
CN103526766B (en) * 2013-10-12 2015-06-03 中建八局第三建设有限公司 Method for plugging relief well of deep foundation pit

Also Published As

Publication number Publication date
CN107503363A (en) 2017-12-22

Similar Documents

Publication Publication Date Title
CN102537517B (en) Construction technology for jacking pipe in river or lake
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN104805854B (en) A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment
CN104196034A (en) Foundation pit construction method employing steel sheet piles as support cofferdam
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN104895098A (en) Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof
CN103031837A (en) Method for reinforcing deep and soft soil foundation by combining well-points dewatering with preloading
CN206706792U (en) Deep foundation pit precipitation well construction
CN108487276A (en) A kind of embed-type shallow-layer combined water drain pipe and construction method
CN109385992A (en) The construction method of pore-forming in artificial Backfilled Stone Layer
CN106894428A (en) Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN108755723A (en) A kind of removable dewatering well well mouth sealing device and slip casting plugging construction method
CN104929135A (en) Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN204728353U (en) Piping plugging structure outside deep foundation ditch diaphragm wall
CN104563271A (en) Plastic inspection well and construction method thereof
CN110409511B (en) Water stopping method for joint of secant pile and diaphragm wall
CN114606964B (en) Foundation pit dewatering method used under complex geological conditions
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN111206610A (en) Construction method for treating piping of exploration hole of foundation pit by curtain grouting method
CN110306581A (en) One kind new old pipeline connection well and its construction method in water rich strata
CN103628507A (en) Anti-floating construction method for passing through seabed shallow buried soil for pipe jacking
CN105484277A (en) Component for tubular well precipitation construction in elevator foundation pit or sump and construction method
CN103147450A (en) Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant