CN104929135A - Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof - Google Patents

Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof Download PDF

Info

Publication number
CN104929135A
CN104929135A CN201510351859.1A CN201510351859A CN104929135A CN 104929135 A CN104929135 A CN 104929135A CN 201510351859 A CN201510351859 A CN 201510351859A CN 104929135 A CN104929135 A CN 104929135A
Authority
CN
China
Prior art keywords
diaphragm wall
pile
churning pile
rotary
enclosure structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510351859.1A
Other languages
Chinese (zh)
Inventor
宣云干
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Research Institute of Building Science Co Ltd
Original Assignee
Jiangsu Research Institute of Building Science Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Research Institute of Building Science Co Ltd filed Critical Jiangsu Research Institute of Building Science Co Ltd
Priority to CN201510351859.1A priority Critical patent/CN104929135A/en
Publication of CN104929135A publication Critical patent/CN104929135A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to a deep foundation pit underground diaphragm wall enclosure structure and a chemical churning pile water stop construction method thereof. The enclosure structure comprises an underground diaphragm wall, a leakage point, a sealing steel plate and a diversion steel pipe, wherein the sealing steel plate is placed on the underground diaphragm wall surface, four corners of the sealing steel plate are fixed on the underground diaphragm wall through expansion bolts, the leakage point is aligned with the diversion steel pipe, a valve is arranged on the diversion steel pipe, and at the same time, an edge sealing material is used for edge sealing along a seam of the sealing plate and the underground diaphragm wall surface; the chemical churning pile water stop construction method of the enclosure structure comprises the steps of positioning-guide hole drilling-in position of a chemical churning pile machine-jet grouting-rotary lifting-pile forming-reinjection-single pile completion. According to the enclosure structure and the chemical churning pile water stop construction method, sealing and treatment can be performed timely when piping occurs to the diaphragm wall surface while smooth operation of a foundation pit project can be guaranteed, personal and property safety of a construction person is guaranteed, and a necessary technical support is provided for the smooth operation of the construction.

Description

Deep foundation ditch underground continuous wall-enclosure structure and rotary churning pile water stopping construction method thereof
[technical field]
The present invention relates to a kind of deep foundation ditch underground continuous wall-enclosure structure and rotary churning pile water stopping construction method thereof, belong to deep foundation ditch waterproof and leaking stoppage technology field.
[background technology]
According to place hydrogeological conditions and the excavation of foundation pit degree of depth, larger on foundation ditch impact is shallow-layer diving and deep water in confined.When base pit engineering excavates; face severe artesian water problem; for the surrounding enviroment of protection construction; base pit engineering diaphragm wall enters rock stratum and cuts off artesian water inside and outside foundation ditch; but the underground water affecting base pit engineering is the diving of superficial part and the artesian water in deep, adopt two filter dewatering well to carry out precipitation for these two kinds of underground water, top filter is positioned at diving position; bottom filter is positioned at soil with confined aquifer, therefore the sealing performance of diaphragm wall seam is most important to excavation of foundation pit safety.If do not reach stagnant water effect, easily there is percolating water situation in diaphragm wall in Excavation Process, causes foundation ditch periphery earth's surface water level decreasing, cause ground settlement, crisis surrounding building safety, if process not in time, then develop into water burst risk.
Cement paste jet surrounding is protected with compressed air, and along with rotation and the lifting of jet pipe, water under high pressure mud jet cutting destroys the soil body, and the energy simultaneously starching jet is comparatively large, cement paste and clay is mixed and stirs formation pile body; Compressed gas also plays and rises the effect of displacement of raising, and the part soil body of cutting is emerged from aperture, after cement paste and soil body mixture consolidation, and reinforcing body required for being formed.
In order to implement process to foundation ditch " water burst, gush sand " accident effectively in an orderly manner, " water burst, gush sand " degree is avoided to expand to greatest extent, make every effort to timely prevention " Sand " phenomenon, reduce the subsequent construction pressure of excavation of foundation pit, event harm is dropped to minimum point, proposes a kind of deep foundation ditch underground continuous wall-enclosure structure and rotary churning pile water stopping construction method thereof.
[summary of the invention]
The object of the invention is to: for defect and the deficiency of prior art, provide a kind of deep foundation ditch underground continuous wall-enclosure structure and rotary churning pile water stopping construction method thereof, this space enclosing structure and rotary churning pile water stopping construction method, while the carrying out smoothly of base pit engineering can be ensured, when there is piping in continuous metope, carrying out shutoff and process timely, ensure that the person and the property safety of constructor, is the technical guarantee carrying out providing necessity smoothly of constructing.
For achieving the above object, the technical solution used in the present invention is:
A kind of deep foundation ditch underground continuous wall-enclosure structure, it is characterized in that: comprise diaphragm wall, leakage point, shutoff steel plate and water conservancy diversion steel pipe, adhere on diaphragm wall face with shutoff steel plate, and with expansion bolt by the Corner Strapped of shutoff steel plate on diaphragm wall, leakage point and water conservancy diversion steel pipe just right, water conservancy diversion steel pipe is provided with valve, carries out edge sealing with edging material along the gap in shutoff steel plate and diaphragm wall face simultaneously.
In the present invention: a kind of rotary churning pile water stopping construction method of deep foundation ditch diaphragm wall, comprises the following steps:
(1), location: after surveying setting-out, mobile geological drilling rig, to finger fixed pile, first makes boring reach design verticality, then does level correction, makes its drill rod axis aim at drill center position;
(2), guide hole is bored: after driller insertion, open drill hole of drilling machine, ensure that drill hole of drilling machine position and design attitude deviation are not more than 20mm, whole Kong Houyong sand pocket clogs aperture, to prevent foreign material from falling in hole, ensures that job site is dry, before drilling construction, according to the axis of rotary churning pile, the mud ditch of an excavation 350 × 350mm, prevents the overflow everywhere of mud or waste pulp;
(3), churning pile-forming machine perching: after guide hole pore-forming terminates, rotary churning pile machine is placed on drilling pile position, make center, bit central mating holes position, contraposition deviation more than 20mm, must not guarantee that final pile position deviation must not be greater than 50mm, by spirit level adjustment stake machine level and slip casting verticality, guarantee into pile verticality and be not more than 1%, by rotary churning pile core pipe patchhole, in catheterization procedure, for preventing silt blocking nozzle, can limit jetting, limit intubate;
(4), jet groutinl: special rotary jetting apparatus is provided with adjustable rotary and Hoisting System, after rotary jetting apparatus Installation and Debugging in place complete, is inserted to by playpipe at the bottom of hole, starts mortar pumping slurry, returns after slurry undertaken penetrating slurry by the technical data of schematic design until aperture;
(5), rotary lifting: after slip casting, promote with the technical data that rotary jetting apparatus returns by schematic design after slurry until aperture, hoisting velocity 0.10 ~ 0.20m/min, rotary speed 10 ~ 25r/min;
(6), pile: rotary churning pile diameter is 0.8m, and pitch-row is 600mm, and rotary churning pile adopts strength grade to be 42.5 grades and above Portland cement and water/binder ratio 1:1;
(7), recharge: at slurries AEI After End of Injection, in spray-hole, carry out static pressure fill grouting, until slurry face no longer sinks;
(8) single pile completes.
After adopting said method, beneficial effect of the present invention is: this space enclosing structure and rotary churning pile water stopping construction method, while the carrying out smoothly of base pit engineering can be ensured, when there is piping in continuous metope, carry out shutoff and process timely, ensure that the person and the property safety of constructor, is the technical guarantee carrying out providing necessity smoothly of constructing.
[accompanying drawing explanation]
Accompanying drawing described herein is used to provide a further understanding of the present invention, forms a application's part, but does not form inappropriate limitation of the present invention, in the accompanying drawings:
Fig. 1 is the lateral view of space enclosing structure in the present invention;
Fig. 2 is the elevation of space enclosing structure in the present invention;
Fig. 3 is the schematic flow sheet of the rotary churning pile water stopping construction method in the present invention.
In figure: 1. diaphragm wall; 2. edging material; 3. expansion bolt; 4. leakage point; 5. valve; 6. water conservancy diversion steel pipe; 7. shutoff steel plate.
[detailed description of the invention]
Describe the present invention in detail below in conjunction with accompanying drawing and specific embodiment, illustrative examples wherein and explanation are only used for explaining the present invention, but not as a limitation of the invention.
As shown in Figure 1-2, a kind of deep foundation ditch underground continuous wall-enclosure structure, comprise diaphragm wall 1, leakage point 4, shutoff steel plate 7 and water conservancy diversion steel pipe 6, adhere on diaphragm wall 1 with shutoff steel plate 7, and with expansion bolt 3 by the Corner Strapped of shutoff steel plate 7 on diaphragm wall 1, leakage point 4 is just right with water conservancy diversion steel pipe 6, and water conservancy diversion steel pipe 6 is provided with valve 5, carries out edge sealing with the edging material 2 that cotton sand and grease material mix along the gap of shutoff steel plate 7 and diaphragm wall 1 simultaneously.
A rotary churning pile water stopping construction method for deep foundation ditch diaphragm wall, comprises the following steps:
(1), location: after surveying setting-out, mobile geological drilling rig, to finger fixed pile, first makes boring reach design verticality, then does level correction, makes its drill rod axis aim at drill center position;
(2), guide hole is bored: after driller insertion, open drill hole of drilling machine, ensure that drill hole of drilling machine position and design attitude deviation are not more than 20mm, whole Kong Houyong sand pocket clogs aperture, to prevent foreign material from falling in hole, ensures that job site is dry, before drilling construction, according to the axis of rotary churning pile, the mud ditch of an excavation 350 × 350mm, prevents the overflow everywhere of mud or waste pulp;
(3), churning pile-forming machine perching: after guide hole pore-forming terminates, rotary churning pile machine is placed on drilling pile position, make center, bit central mating holes position, contraposition deviation more than 20mm, must not guarantee that final pile position deviation must not be greater than 50mm, by spirit level adjustment stake machine level and slip casting verticality, guarantee into pile verticality and be not more than 1%, by rotary churning pile core pipe patchhole, in catheterization procedure, for preventing silt blocking nozzle, can limit jetting, limit intubate;
(4), jet groutinl: special rotary jetting apparatus is provided with adjustable rotary and Hoisting System, after rotary jetting apparatus Installation and Debugging in place complete, is inserted to by playpipe at the bottom of hole, starts mortar pumping slurry, returns after slurry undertaken penetrating slurry by the technical data of schematic design until aperture;
(5), rotary lifting: after slip casting, promote with the technical data that rotary jetting apparatus returns by schematic design after slurry until aperture, hoisting velocity 0.10 ~ 0.20m/min, rotary speed 10 ~ 25r/min;
(6), pile: rotary churning pile diameter is 0.8m, and pitch-row is 600mm, and rotary churning pile adopts strength grade to be 42.5 grades and above Portland cement and water/binder ratio 1:1;
(7), recharge: at slurries AEI After End of Injection, in spray-hole, carry out static pressure fill grouting, until slurry face no longer sinks;
(8) single pile completes.
The above is only better embodiment of the present invention, therefore all equivalences done according to structure, feature and the principle described in patent claim of the present invention change or modify, and are included in patent claim of the present invention.

Claims (2)

1. a deep foundation ditch underground continuous wall-enclosure structure, it is characterized in that: comprise diaphragm wall, leakage point, shutoff steel plate and water conservancy diversion steel pipe, adhere on diaphragm wall face with shutoff steel plate, and with expansion bolt by the Corner Strapped of shutoff steel plate on diaphragm wall, leakage point and water conservancy diversion steel pipe just right, water conservancy diversion steel pipe is provided with valve, carries out edge sealing with edging material along the gap in shutoff steel plate and diaphragm wall face simultaneously.
2. a rotary churning pile water stopping construction method for deep foundation ditch diaphragm wall, is characterized in that: comprise the following steps:
(1), location: after surveying setting-out, mobile geological drilling rig, to finger fixed pile, first makes boring reach design verticality, then does level correction, makes its drill rod axis aim at drill center position;
(2), guide hole is bored: after driller insertion, open drill hole of drilling machine, ensure that drill hole of drilling machine position and design attitude deviation are not more than 20mm, whole Kong Houyong sand pocket clogs aperture, to prevent foreign material from falling in hole, ensures that job site is dry, before drilling construction, according to the axis of rotary churning pile, the mud ditch of an excavation 350 × 350mm, prevents the overflow everywhere of mud or waste pulp;
(3), churning pile-forming machine perching: after guide hole pore-forming terminates, rotary churning pile machine is placed on drilling pile position, make center, bit central mating holes position, contraposition deviation more than 20mm, must not guarantee that final pile position deviation must not be greater than 50mm, by spirit level adjustment stake machine level and slip casting verticality, guarantee into pile verticality and be not more than 1%, by rotary churning pile core pipe patchhole, in catheterization procedure, for preventing silt blocking nozzle, can limit jetting, limit intubate;
(4), jet groutinl: special rotary jetting apparatus is provided with adjustable rotary and Hoisting System, after rotary jetting apparatus Installation and Debugging in place complete, is inserted to by playpipe at the bottom of hole, starts mortar pumping slurry, returns after slurry undertaken penetrating slurry by the technical data of schematic design until aperture;
(5), rotary lifting: after slip casting, promote with the technical data that rotary jetting apparatus returns by schematic design after slurry until aperture, hoisting velocity 0.10 ~ 0.20m/min, rotary speed 10 ~ 25r/min;
(6), pile: rotary churning pile diameter is 0.8m, and pitch-row is 600mm, and rotary churning pile adopts strength grade to be 42.5 grades and above Portland cement and water/binder ratio 1:1;
(7), recharge: at slurries AEI After End of Injection, in spray-hole, carry out static pressure fill grouting, until slurry face no longer sinks;
(8) single pile completes.
CN201510351859.1A 2015-06-24 2015-06-24 Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof Pending CN104929135A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510351859.1A CN104929135A (en) 2015-06-24 2015-06-24 Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510351859.1A CN104929135A (en) 2015-06-24 2015-06-24 Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof

Publications (1)

Publication Number Publication Date
CN104929135A true CN104929135A (en) 2015-09-23

Family

ID=54116543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510351859.1A Pending CN104929135A (en) 2015-06-24 2015-06-24 Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof

Country Status (1)

Country Link
CN (1) CN104929135A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297743A (en) * 2015-11-03 2016-02-03 中国电建集团华东勘测设计研究院有限公司 Diaphragm wall defect leakage water stop and drainage structure and construction method thereof
CN109707057A (en) * 2019-01-24 2019-05-03 四汇建设集团有限公司 The plugging structure and its construction method of Basement Main Wall Crack infiltration
CN111827260A (en) * 2020-07-17 2020-10-27 中铁六局集团有限公司 Defect repairing and leaking stoppage construction method for underground diaphragm wall
CN113089655A (en) * 2021-04-08 2021-07-09 启东建筑集团有限公司 Construction method in three-pipe rotary spraying pile pit in flowing water environment
CN114293559A (en) * 2021-12-23 2022-04-08 上海市机械施工集团有限公司 Horizontal MJS construction method
CN114855842A (en) * 2022-05-25 2022-08-05 中国建筑一局(集团)有限公司 Device and method for rapidly plugging serious leakage of underground diaphragm wall
CN115369917A (en) * 2022-09-23 2022-11-22 中铁七局集团西安铁路工程有限公司 Cover digs contrary subway station waterproof construction that does of doing

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09279566A (en) * 1996-04-10 1997-10-28 Kazuo Iki High pressure jet-agitating pile construction method and device therefor
JP2001336144A (en) * 2000-05-29 2001-12-07 East Japan Railway Co Double structural cured pile with cylindrical steel member inserted therein and construction method therefor
CN101122135A (en) * 2007-07-09 2008-02-13 河北建设集团有限公司 Deep foundation pit supporting structure water-leakage hollow expansion bolt plugging stopper and application thereof
CN104120712A (en) * 2013-04-28 2014-10-29 杨哲 Construction method for underground diaphragm wall
CN203924140U (en) * 2014-07-02 2014-11-05 中铁二局股份有限公司 Foundation Pit with Confined Water diaphragm wall seam percolating water plugging device
CN104141308A (en) * 2014-07-21 2014-11-12 杭州华能大坝安全工程技术有限公司 Drill hole prepacked aggregate concrete construction method
CN104563101A (en) * 2015-01-14 2015-04-29 济南轨道交通集团有限公司 Composite pile structure serving as main structure stand column and construction method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09279566A (en) * 1996-04-10 1997-10-28 Kazuo Iki High pressure jet-agitating pile construction method and device therefor
JP2001336144A (en) * 2000-05-29 2001-12-07 East Japan Railway Co Double structural cured pile with cylindrical steel member inserted therein and construction method therefor
CN101122135A (en) * 2007-07-09 2008-02-13 河北建设集团有限公司 Deep foundation pit supporting structure water-leakage hollow expansion bolt plugging stopper and application thereof
CN104120712A (en) * 2013-04-28 2014-10-29 杨哲 Construction method for underground diaphragm wall
CN203924140U (en) * 2014-07-02 2014-11-05 中铁二局股份有限公司 Foundation Pit with Confined Water diaphragm wall seam percolating water plugging device
CN104141308A (en) * 2014-07-21 2014-11-12 杭州华能大坝安全工程技术有限公司 Drill hole prepacked aggregate concrete construction method
CN104563101A (en) * 2015-01-14 2015-04-29 济南轨道交通集团有限公司 Composite pile structure serving as main structure stand column and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡向川等: "《高压旋喷桩在天津津塔深基坑工程中的应用》", 《建筑技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297743A (en) * 2015-11-03 2016-02-03 中国电建集团华东勘测设计研究院有限公司 Diaphragm wall defect leakage water stop and drainage structure and construction method thereof
CN105297743B (en) * 2015-11-03 2017-09-29 中国电建集团华东勘测设计研究院有限公司 A kind of ground-connecting-wall defect seepage stops discharge structure and its construction method
CN109707057A (en) * 2019-01-24 2019-05-03 四汇建设集团有限公司 The plugging structure and its construction method of Basement Main Wall Crack infiltration
CN111827260A (en) * 2020-07-17 2020-10-27 中铁六局集团有限公司 Defect repairing and leaking stoppage construction method for underground diaphragm wall
CN113089655A (en) * 2021-04-08 2021-07-09 启东建筑集团有限公司 Construction method in three-pipe rotary spraying pile pit in flowing water environment
CN114293559A (en) * 2021-12-23 2022-04-08 上海市机械施工集团有限公司 Horizontal MJS construction method
CN114855842A (en) * 2022-05-25 2022-08-05 中国建筑一局(集团)有限公司 Device and method for rapidly plugging serious leakage of underground diaphragm wall
CN115369917A (en) * 2022-09-23 2022-11-22 中铁七局集团西安铁路工程有限公司 Cover digs contrary subway station waterproof construction that does of doing

Similar Documents

Publication Publication Date Title
AU2020103672A4 (en) Construction method of rotary drilling hole-forming and jet mixing cement-soil occlusion curtain piles
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
CN104929135A (en) Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN104895098A (en) Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof
CN101691756B (en) Construction method of foundation pit pressurized water-lowering well for inrushing emergency
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN108086296B (en) Dynamic and static combined grouting foundation reinforcing construction method
CN109881696B (en) HPPG (high Performance Poly propylene glycol) bottom sealing construction method
CN102454167A (en) Construction method for large ultra-deep well
CN103993603A (en) Top-down construction method for anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation
CN104695456B (en) Construction method vertical shaft horizontal rotation jet grouting pile foundation pit lateral wall water stopping curtain
CN203924137U (en) Serious seepage block structure of underground continuous wall
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN103835648A (en) Raise-boring technology for improving rock stratum performance through ground grouting
CN108755723A (en) A kind of removable dewatering well well mouth sealing device and slip casting plugging construction method
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN109385992A (en) The construction method of pore-forming in artificial Backfilled Stone Layer
CN107587502B (en) Construction method for rotary drilling hole-forming pressure-grouting cement soil occlusion curtain pile
CN104695457B (en) The construction method of a kind of Novel silo horizontal jet grouting pile foundation hole back cover water barrier
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN103628507A (en) Anti-floating construction method for passing through seabed shallow buried soil for pipe jacking
CN102587400A (en) Leakage-plugging method for water-stopping curtain
CN207862925U (en) A kind of slip casting casing device
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150923

WD01 Invention patent application deemed withdrawn after publication