CN107503285A - Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment - Google Patents

Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment Download PDF

Info

Publication number
CN107503285A
CN107503285A CN201710601718.XA CN201710601718A CN107503285A CN 107503285 A CN107503285 A CN 107503285A CN 201710601718 A CN201710601718 A CN 201710601718A CN 107503285 A CN107503285 A CN 107503285A
Authority
CN
China
Prior art keywords
cross beam
middle cross
module
walking
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710601718.XA
Other languages
Chinese (zh)
Other versions
CN107503285B (en
Inventor
王祥国
郑祥峰
魏宏亮
修佳岳
李爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Road & Bridge Construction Group Co ltd
China State Railway Investment Construction Group Co Ltd
Original Assignee
Luqiao Liaoning Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luqiao Liaoning Construction Group Co Ltd filed Critical Luqiao Liaoning Construction Group Co Ltd
Priority to CN201710601718.XA priority Critical patent/CN107503285B/en
Publication of CN107503285A publication Critical patent/CN107503285A/en
Application granted granted Critical
Publication of CN107503285B publication Critical patent/CN107503285B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment, belong to bridge construction technical field of auxiliary equipment, when being constructed to solve existing bowstring arch bridge using first beam rear arch construction, the problem of being influenceed and have a negative impact to channel safe by river flood season, the equipment include main hanging module, being arranged on the main walking module hung in module, multigroup be arranged on main hang and be used for the dead man module for pulling up walking suspension rod, supporting module in module and pour built module.With using simply, can reuse, the beneficial effect not influenceed by river discharge size, and the length for pouring built module can be adjusted so that the both ends for pouring built module are more bonded the binder at both ends, reduce leaking for concrete.

Description

Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment
Technical field
The invention belongs to bridge construction technical field of auxiliary equipment, hangs mould equipment more particularly to one kind, and in particular to one Cast-in-place across the navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment of kind.
Background technology
Because bowstring arch bridge has many advantages, such as handsome in appearance, construction is succinct, on both sides of the Changjiang River built extensively in China Use, middle cross beam construction is the critical process that bowstring arch bridge is built.The construction of bowstring arch bridge at present is constructed using first beam rear arch more Form, first beam rear arch construction is more using the construction method that full framing pours is set up, due to needing that full hall is set up under bridge It support, can thus be influenceed by current size, be influenceed that whole year will be caused because of the relation in flood season by current size Engineering time be very limited;When making in this way in navigation channel of opening the navigation or air flight, structure sheet can be only reached to navigation channel passing ship Body all causes king-sized potential safety hazard;And full framing steel material is big, strutting system precompressed cycle length, completed pouring , can be because the obstruction of top bridge causes just to complete to extract work after cut portion support when extracting full framing afterwards Make, result in after substantial amounts of support is cut can not be continuing with follow-up work.
With human cost more and more higher, the ratio that human cost occupies enterprise's totle drilling cost is increasing, reduce manpower into This is more and more important for the cost for reducing enterprise, and modern comfort automaticity is higher, more can reduce the human cost used, So increase automaticity seems extremely important.
The content of the invention
According to above the deficiencies in the prior art, the technical problems to be solved by the invention are to propose a kind of cast-in-place across navigation channel system Bar arch bridge middle cross beam self-propelled adjustable lifting mould equipment, constructed for solving existing bowstring arch bridge using first beam rear arch construction When, the problem of influenceed and have a negative impact to channel safe by river flood season, have using simply, can repeat to make With, the beneficial effect not influenceed by river discharge size, and the length for pouring built module can be adjusted so that pour built module Both ends are more bonded the binder at both ends, reduce leaking for concrete.
The technical solution adopted by the present invention is:
A kind of cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment, the equipment include it is main hang module, The main walking module hung in module is arranged on, multigroup main hang be arranged on and be used for the dead man module for pulling up walking suspension rod, branch in module Hold mode block and pour built module.
The master hangs module and is arranged on master including a main couple, four hydraulic pressure supports being arranged on main couple, more Middle cross beam bed die suspension rod on truss, the walking suspension rod being arranged on main couple.The upper end of the hydraulic pressure support is consolidated with main couple Fixed connection, the axis and horizontal plane of hydraulic pressure support, hydraulic pressure support include hydraulically extensible bar and are arranged under hydraulically extensible bar The contact chip at end, the upper end of hydraulically extensible bar are fixedly connected with main couple, and the middle part of contact chip is provided with two lugs, is set on lug There is connecting hole, the lower end of hydraulically extensible bar is provided with the second connecting hole, connecting shaft is additionally provided with contact chip, connecting shaft passes through connecting hole With the second connecting hole so that contact chip is movably connected with hydraulically extensible bar.The dead man module includes being arranged on main couple Mounting bracket, two expansion links being arranged on mounting bracket, the rotating wheel being arranged on expansion link and being arranged on mounting bracket are used for The motor for driving rotating wheel to rotate.The supporting module includes traveling wheel suspension bracket, is arranged on traveling wheel suspension bracket Walking beam and the sill being arranged on walking beam.The walking module is set including two rail being arranged on binder, four Put the voluntarily steel wheel below main couple and two voluntarily motors being arranged on below main couple, two voluntarily motor driving is voluntarily Steel wheel rotates.The built module that pours includes a set of middle cross beam side form and a set of middle cross beam bed die.Wear on the top of the walking suspension rod Main couple is crossed, walking suspension rod is provided with suspension rod nut through one end of main couple and top cross-arm beam, the bottom for suspension rod of walking are worn Middle cross beam is crossed, one end of walking suspension rod through middle cross beam is provided with traveling wheel suspension bracket, walking beam is provided with traveling wheel suspension bracket, Walking beam is connected close to one end of the middle cross beam poured with middle cross beam bed die boom foot, and sill is arranged on walking beam Top.Often set middle cross beam side form includes two groups of middle cross beam side form units being parallel to each other, and each middle cross beam side form unit includes more Individual middle cross beam side form module, the bottom of middle cross beam side form are connected with middle cross beam bed die by hinge, set at the top of middle cross beam side form There is the second mounting hole, the second mounting hole is provided with pull bar.The main couple is provided with control module and signal receiving module, control Module is connected with movable motor by wire, and signal receiving module is connected with control module by wire.
Present invention has the advantages that:With using simply, it can reuse, not had by what river discharge size was influenceed Beneficial effect, and the length for pouring built module can be adjusted so that the both ends for pouring built module are more bonded the binder at both ends, reduce mixed Solidifying soil leaks.
Brief description of the drawings
The content expressed by this specification accompanying drawing and the mark in figure are briefly described below:
Fig. 1 is cast-in-place across the navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment of the specific embodiment of the invention Sectional view;
Fig. 2 is cast-in-place across the navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment of the specific embodiment of the invention Partial enlarged drawing;
Fig. 3 is cast-in-place across the navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment of the specific embodiment of the invention Structure chart;
Fig. 4 is that cast-in-place across the navigation channel bowstring arch bridge middle cross beam of the specific embodiment of the invention is poured with self-propelled adjustable lifting mould equipment Built module moves the structure chart of bed die.
Embodiment
Below by the description to embodiment, the shape of for example involved each component of embodiment of the invention, structure Make, the mutual alignment between each several part and annexation, the effect of each several part and operation principle, manufacturing process and the side of operating with Method etc., is described in further detail, completeer to help those skilled in the art to have inventive concept of the invention, technical scheme Whole, accurate and deep understanding.
Using the bowstring arch bridge of first beam rear arch construction construction when proceeding to middle cross beam and pouring, two binder is Completion of processing, so can pours middle cross beam using binder auxiliary during work in-process crossbeam.A kind of cast-in-place across navigation channel tied arch Bridge middle cross beam self-propelled adjustable lifting mould equipment, the equipment include a main couple, two rail being arranged on binder, four Be arranged on the voluntarily steel wheel below main couple, two voluntarily motors being arranged on below main couple, four hydraulic pressure supports, in more Crossbeam bed die suspension rod, eight walking suspension rods, four steel bearing beams, multigroup be arranged on are used for the dead man for pulling up walking suspension rod on main couple Module, more top cross-arm beams, multiple suspension rod nuts, multiple hydraulic tops, a set of middle cross beam side form, a set of middle cross beam bed die, two Root sill, two walking beams, four traveling wheel suspension brackets, a set of full protection anti-fall anti-throwing platform, two staircases and a remote control Device.
Voluntarily steel wheel is divided into two groups described in four, and every group includes two voluntarily steel wheels, and two groups are separately positioned on main couple Both ends.Two one steel rails are separately positioned on the top of two binders, and two one steel rails are parallel to each other.It is arranged on main couple both ends voluntarily Steel wheel is arranged on rail, two voluntarily motor be separately positioned on the both ends of main couple and be used to drive the voluntarily steel at main couple both ends Wheel.Voluntarily steel wheel is driven by voluntarily motor so that main couple can move on rail.For Auxiliary support, the main truss The both ends of frame are respectively provided with two hydraulic pressure supports, and the both ends of hydraulic pressure support connect main couple and binder, the upper end of hydraulic pressure support respectively It is fixedly connected with main couple, the axis and horizontal plane of hydraulic pressure support, hydraulic pressure support includes hydraulically extensible bar and is arranged on liquid The contact chip of expansion link lower end is pressed, the upper end of hydraulically extensible bar is fixedly connected with main couple, and the middle part of contact chip is convex provided with two Ear, lug are provided with connecting hole, and the lower end of hydraulically extensible bar is provided with the second connecting hole, the diameter of the second connecting hole and connecting hole Diameter is equal, is additionally provided with connecting shaft on contact chip, and the diameter of connecting shaft is equal to the diameter of connecting hole, connecting shaft through connecting hole and Second connecting hole so that contact chip is movably connected with hydraulically extensible bar, and contact chip can rotate around the axis of connecting shaft.So, i.e., Make the upper surface of binder uneven, contact chip also can keep good contact with the upper surface of binder, reduce pressure.On main couple also Provided with more middle cross beam bed die suspension rods, main couple is provided with multiple vertical mounting holes, middle cross beam bed die suspension rod insertion middle cross beam Bed die suspension rod, the upper end of middle cross beam bed die suspension rod are provided with suspension rod nut and top cross-arm beam, and middle cross beam bed die suspension rod passes through suspension rod Nut and top cross-arm beam are hung on main couple, and the bottom of middle cross beam bed die suspension rod is provided with sill, and sill is provided with a set of Middle cross beam bed die, middle cross beam bed die are provided with a set of middle cross beam side form, and wherein the middle cross beam is just in middle cross beam side form and middle cross beam bottom Space between mould pours.The dead man module include be arranged on main couple mounting bracket, two be arranged on mounting bracket Expansion link, the rotating wheel being arranged on expansion link and be arranged on mounting bracket be used for drive rotating wheel rotate motor.
In order to further support middle cross beam bed die when pouring, with pour or prepare to pour it is adjacent Vertical duct is all reserved with two middle cross beams for having poured completion, adjacent two have been poured with pouring or preparing Walking suspension rod is provided with duct on middle cross beam through pouring completion, the walking suspension rod of the upper end in duct is provided with steel bearing beam, OK The top for walking suspension rod passes through main couple, and one end of walking suspension rod through main couple is provided with suspension rod nut and top cross-arm beam.OK The bottom for walking suspension rod passes through middle cross beam, and one end of walking suspension rod through middle cross beam is provided with traveling wheel suspension bracket 16, traveling wheel Walking beam is provided with suspension bracket 16, walking beam is connected close to one end of the middle cross beam poured with middle cross beam bed die boom foot, Sill is arranged on the top of walking beam.
Often set middle cross beam side form includes two groups of middle cross beam side form units being parallel to each other, and each middle cross beam side form unit includes Multiple middle cross beam side form modules.The bottom of middle cross beam side form is connected by hinge with middle cross beam bed die, the top of middle cross beam side form Provided with the second mounting hole, the second mounting hole is provided with pull bar, fixes middle cross beam side form by pull bar, and then cause in middle cross beam side The angle between middle cross beam side form and middle cross beam bed die is kept when being poured in mould.
Because the levelness of the side of binder is poor, and the linearity of binder can not be completely secured well, in order that Obtaining the both ends of middle cross beam side form and middle cross beam bed die can contact well with binder so that the both ends for pouring built module are more bonded two The binder at end, reduce leaking for concrete.The both ends of middle cross beam bed die are respectively provided with a mobile bed die, the both ends of middle cross beam bed die A driving expansion link is respectively provided with, drives one end of expansion link to be fixedly connected with middle cross beam bed die, driving expansion link is away from middle horizontal stroke One end of beam bottom board is fixedly connected with mobile bed die, is moved by driving the telescopic drive of expansion link to move bed die.In order to seal Mobile bed die and the gap of binder contact position, the mobile one end of bed die away from middle cross beam bed die are provided with sheet rubber, when mobile bottom Sheet rubber is squeezed after mould contacts with binder, and then seals mobile bed die and the gap of binder contact position.
The main couple is provided with control module and signal receiving module, and control module is connected with movable motor by wire Connect, signal receiving module is connected with control module by wire, and the remote control sends signal, and signal receiving module receives letter Control module, the rotation of control module control movable motor and rotation direction are passed to after number.
In order to facilitate main couple above and below worker, the both ends of the main couple are respectively provided with a staircase.
In order to protect the worker operated on main couple, the top both sides of the main couple are provided with the anti-fall anti-throwing of full protection Platform, the anti-fall anti-throwing platform of full protection can facilitate worker to walk, moreover it is possible to prevent article from dropping in river.
The present invention is exemplarily described above in conjunction with accompanying drawing, it is clear that present invention specific implementation is not by aforesaid way Limitation, as long as the improvement of the various unsubstantialities of inventive concept and technical scheme of the present invention progress is employed, or without changing Enter and the design of the present invention and technical scheme are directly applied into other occasions, within protection scope of the present invention.This hair Bright protection domain should be determined by the scope of protection defined in the claims.

Claims (10)

  1. A kind of 1. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment, it is characterised in that:The equipment includes It is main to hang module, be arranged on the main walking module hung in module, multigroup be arranged on main hang and be used to pull up pulling out for walking suspension rod in module Bar module, supporting module and pour built module.
  2. 2. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 1, its feature It is:The master hangs module and is arranged on main couple including a main couple, four hydraulic pressure supports being arranged on main couple, more On middle cross beam bed die suspension rod, the walking suspension rod that is arranged on main couple.
  3. 3. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 2, its feature It is:The upper end of the hydraulic pressure support is fixedly connected with main couple, the axis and horizontal plane of hydraulic pressure support, hydraulic pressure support bag Including hydraulically extensible bar and be arranged on the contact chip of hydraulically extensible bar lower end, the upper end of hydraulically extensible bar is fixedly connected with main couple, The middle part of contact chip is provided with two lugs, and lug is provided with connecting hole, and the lower end of hydraulically extensible bar is provided with the second connecting hole, contact Connecting shaft is additionally provided with piece, connecting shaft passes through connecting hole and the second connecting hole so that contact chip is movably connected with hydraulically extensible bar.
  4. 4. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 1, its feature It is:Mounting bracket that the dead man module includes being arranged on main couple, two expansion links being arranged on mounting bracket, it is arranged on Rotating wheel on expansion link and it is arranged on the motor for being used to drive rotating wheel to rotate on mounting bracket.
  5. 5. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 1, its feature It is:The supporting module includes traveling wheel suspension bracket, the walking beam being arranged on traveling wheel suspension bracket and is arranged on walking beam On sill.
  6. 6. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 1, its feature It is:The walking module include two rail being arranged on binder, four voluntarily steel wheels being arranged on below main couple and Two voluntarily motors being arranged on below main couple, two voluntarily voluntarily steel wheel rotates for motor driving.
  7. 7. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 1, its feature It is:The built module that pours includes a set of middle cross beam side form and a set of middle cross beam bed die.
  8. 8. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 2, its feature It is:The top of the walking suspension rod passes through main couple, and one end of walking suspension rod through main couple is provided with suspension rod nut and top Portion's cross-arm beam, the bottom for suspension rod of walking pass through middle cross beam, and one end of walking suspension rod through middle cross beam is provided with traveling wheel suspension bracket 16, walking beam is provided with traveling wheel suspension bracket 16, walking beam is hung close to one end of the middle cross beam poured with middle cross beam bed die Bar bottom connects, and sill is arranged on the top of walking beam.
  9. 9. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 7, its feature It is:Often set middle cross beam side form includes two groups of middle cross beam side form units being parallel to each other, and each middle cross beam side form unit includes more Individual middle cross beam side form module, the bottom of middle cross beam side form are connected with middle cross beam bed die by hinge, set at the top of middle cross beam side form There is the second mounting hole, the second mounting hole is provided with pull bar.
  10. 10. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 2, its feature It is:The main couple is provided with control module and signal receiving module, and control module is connected with movable motor by wire, letter Number receiving module is connected with control module by wire.
CN201710601718.XA 2017-07-21 2017-07-21 Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment Active CN107503285B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710601718.XA CN107503285B (en) 2017-07-21 2017-07-21 Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710601718.XA CN107503285B (en) 2017-07-21 2017-07-21 Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment

Publications (2)

Publication Number Publication Date
CN107503285A true CN107503285A (en) 2017-12-22
CN107503285B CN107503285B (en) 2019-08-27

Family

ID=60689295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710601718.XA Active CN107503285B (en) 2017-07-21 2017-07-21 Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment

Country Status (1)

Country Link
CN (1) CN107503285B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792038A (en) * 2019-11-11 2020-02-14 山东交通学院 Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008214940A (en) * 2007-03-02 2008-09-18 Sumitomo Mitsui Construction Co Ltd Movable suspension timbering
CN203188121U (en) * 2013-03-01 2013-09-11 浙江省交通工程建设集团有限公司 Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN203947771U (en) * 2014-07-16 2014-11-19 北京万兴建筑集团有限公司 A kind of Bailey beam pendent form support system
CN205557336U (en) * 2015-11-26 2016-09-07 柳州欧维姆机械股份有限公司 Construct high mound from promoting walking template device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008214940A (en) * 2007-03-02 2008-09-18 Sumitomo Mitsui Construction Co Ltd Movable suspension timbering
CN203188121U (en) * 2013-03-01 2013-09-11 浙江省交通工程建设集团有限公司 Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN203947771U (en) * 2014-07-16 2014-11-19 北京万兴建筑集团有限公司 A kind of Bailey beam pendent form support system
CN205557336U (en) * 2015-11-26 2016-09-07 柳州欧维姆机械股份有限公司 Construct high mound from promoting walking template device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐凯峰: "贝雷桁架式挂篮的设计和施工", 《中国西部科技》 *
殷奇等: "五尺沟大跨度钢管混凝土简支系杆拱桥施工方法研究", 《第十七届全国桥梁学术会议》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792038A (en) * 2019-11-11 2020-02-14 山东交通学院 Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
CN110792038B (en) * 2019-11-11 2021-06-25 山东交通学院 Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam

Also Published As

Publication number Publication date
CN107503285B (en) 2019-08-27

Similar Documents

Publication Publication Date Title
CN105365042B (en) A kind of preparation method of prefabricated small box girder
CN105649654B (en) Automatic hydraulic inverted arch trestle chassis and its construction method
CN206538790U (en) Interior mould trolley is used in a kind of cast-in-place pipe gallery construction
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN106593469B (en) A kind of trolley for inverted arch construction
CN204754941U (en) All -hydraulic self -propelled tunnel lining platform truck
CN113235472A (en) Concrete placement platform truck is contained to apron
CN109304795A (en) The hydraulic gliding model of T beam and operating method
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN205954489U (en) Stride cast -in -place space of business line steel structure construction protection on bridge and move movable support
CN204851287U (en) Big section moving as a whole formula formwork support
CN205400756U (en) Variable section platform truck
CN104533461B (en) A kind of tunnel construction trolley horizontal mobile device
CN107503285A (en) Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN207063995U (en) Can assembled detachable chassis
CN205778929U (en) A kind of for arch form culvert, the sleiding form device of passage construction
CN108252218A (en) A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device
CN203583439U (en) Concrete faced rockfill dam plastic water stop construction trolley
CN103556603B (en) Rock plastic sealing construction trolley and construction method
CN206205905U (en) A kind of chassis suitable for City Subway Station abnormity big cross section lining cutting one-piece casting
CN208009267U (en) A kind of middle cross beam tensioning protective platform
CN107829368A (en) Cast-in-place across navigation channel bowstring arch bridge middle cross beam hangs mould equipment with self-propelled
CN205955749U (en) Tunnel invert construction equipment
CN209469456U (en) A kind of tunnel ditch template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201210

Address after: No.34, Lanjun Road, Tiexi District, Shenyang, Liaoning Province, 110000

Patentee after: LIAONING TRAFFIC ENGINEERING Co.,Ltd.

Patentee after: CHINA STATE RAILWAY INVESTMENT CONSTRUCTION GROUP Co.,Ltd.

Address before: 110000 No. 7 glide Road, Tiexi District, Shenyang, Liaoning

Patentee before: LIAONING ROAD & BRIDGE CONSTRUCTION GROUP Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 110000 No. 7 glide Road, Tiexi District, Shenyang, Liaoning

Patentee after: LIAONING ROAD & BRIDGE CONSTRUCTION GROUP CO.,LTD.

Patentee after: CHINA STATE RAILWAY INVESTMENT CONSTRUCTION GROUP Co.,Ltd.

Address before: No.34, Lanjun Road, Tiexi District, Shenyang, Liaoning Province, 110000

Patentee before: LIAONING TRAFFIC ENGINEERING Co.,Ltd.

Patentee before: CHINA STATE RAILWAY INVESTMENT CONSTRUCTION GROUP Co.,Ltd.

CP03 Change of name, title or address