- CN205778929U CN205778929U CN201620723092.0U CN201620723092U CN205778929U CN 205778929 U CN205778929 U CN 205778929U CN 201620723092 U CN201620723092 U CN 201620723092U CN 205778929 U CN205778929 U CN 205778929U
- Authority
- CN
- China
- Prior art keywords
- culvert
- door frame
- arch
- template
- sleiding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
This utility model discloses a kind of for arch form culvert, the sleiding form device of passage construction, be mainly used in arch form culvert, passage contains body, arch ring concreting, version is traveling type, sleiding form device is mainly made up of mounting system and template, the main load-bearing of mounting system and support, and template is the shape design according to arch culvert section, this device has walking track, employing external force traction is walked, the adjusting screw location demoulding, can realize oscilaltion, left and right gathering, move forward and backward.This utility model be simple in construction, easy accessibility, flexible operation (only need five workmans can complete all operations), safe and reliable, can the turnover of multiple building sites use, can well be applicable to arch form culvert, passage construction;Contain in body construction at any arch form culvert, passage, can move freely, lift, stop.Improve efficiency of construction, reduce construction cost.
Description
Technical field
This utility model relates to highway technology application, a kind of for arch form culvert, the slip of passage construction
Plate device.
Background technology
Since entering 21st century, the highway fast development of China, while highway extends in all direction, respectively
Class arch form culvert, number of channels also grow with each passing day, and the requirement to arch form culvert, passage building technology is the highest.Arch form
Culvert, passage construction are important steps in highway construction, the through indirect restriction by roadbed of its construction speed
The tempo of engineering.Therefore bridge arch type culvert, passage are it is necessary to have construction speed, good construction quality faster.But,
Along with the mountain area of China's highway complicated landform more remote to Midwest extends, thus have in the face of more complicated gas
Waiting environment, increasing along with arch form culvert, passage proportion and version, the construction to arch form culvert, passage proposes
Higher requirement.
The arch form culvert of tradition routine, passage technology, in highway arch form culvert, passage construction, for support shuttering, one
As use raft support method carry out contain body, arch ring construction, when the complete form removal of concreting, need to all be removed by support can
Proceeding to next construction paragraph, have template, support and disposably put into greatly, utilization rate is low, personnel's work efficiency is low, operability in turnover
The shortcoming such as loaded down with trivial details.In order to solve the problem of above-mentioned existence, need a kind of sleiding form dress that can be used for arch form culvert, passage construction badly
Put.
Utility model content
The purpose of this utility model is to solve the problems referred to above, it is proposed that one can be used for arch form culvert, passage construction
Sleiding form device.Realizing above-mentioned purpose the technical solution of the utility model is: a kind of for arch form culvert, passage construction
Sleiding form device, including inner support system and support arm system, includes the inner track on the basis of being arranged on, outer siding track respectively
Road and be respectively used to inner side assembly pulley, the outside slip wheels walked in orbit, above-mentioned assembly pulley composition sleiding form device
Running gear, inner support system has inner support door frame, the medial support leading screw being connected with inner support door frame and inner side regulation
Screw mandrel drives the inner side template connected by inner side template connection system to realize rising and falling and shrinking of whole inner support system;Outer
Frame system has outer support door frame, and the outside-supporting leading screw being connected with outer support door frame and outside regulation screw mandrel drive by outside
The outboard template that template connection system connects realizes rising and falling and shrinking of whole support arm system.
Preferably, described inner side template, and outboard template is respectively by inner side template connection system and outboard template connection
The template that system forms described sleiding form device is overall.
In any of the above-described scheme preferably, described inner side template and outboard template respectively with inner side regulation screw mandrel and outward
Side regulation screw mandrel is bolted to be connected with inner support door frame and outer support door frame and forms described inner support system and outward respectively
Mounting system.
In any of the above-described scheme preferably, described inner support door frame and outer support door frame are respectively by welding with described
Medial support leading screw and outside-supporting leading screw connect, and form the support system of this sleiding form device.
In any of the above-described scheme preferably, described support system is fixed on described inner support door by being respectively welded
Inner side assembly pulley, outside slip wheels on frame and outer support door frame act on the inner side being arranged on arch form culvert, channel base
Track, outer side track, it is achieved the walking of this sleiding form device.
In any of the above-described scheme preferably, described running gear includes stopping means.
In any of the above-described scheme preferably, this sleiding form device also includes trailer system, and this trailer system is by rolling up
Machine of raising realizes walking by rope traction.
In any of the above-described scheme preferably, template uses 86 series masks, inner support door frame and outer support door frame to adopt
With double 20# channel-section steels and 18# I-steel assembly welding.
Utilize that the technical solution of the utility model makes for arch culvert, the sleiding form device of passage construction, knot
Structure is simple, easy accessibility, flexible operation (only needing five workmans can complete all operations), safe and reliable, can multiple building sites week
Turn use, can well be applicable to arch culvert, passage construction;Any arch culvert, passage culvert body construction all may be used
To move freely, lift, to stop, improve efficiency of construction, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is the generalized section of the inner support system of sleiding form device of the present utility model;
In figure, 1, inner track;2, inner side assembly pulley;3, inner side regulation screw mandrel;4, medial support screw mandrel;5, inner support door
Frame;6, inner side template connection system;7, inner side template;
Fig. 2 is the generalized section of the support arm system of sleiding form device of the present utility model;
In figure, 8, outer side track;9, outside slip wheels;10, outside-supporting screw mandrel;11, outside regulation screw mandrel;12, outside
Template connection system;13, outboard template;14, outer support door frame;
Fig. 3 is generalized section during sleiding form device operation of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings the technical solution of the utility model is specifically described.
A kind of for arch form culvert, the sleiding form device of passage construction, including inner support system and support arm system, point
Do not include inner side assembly pulley 2 that the inner track 1 on the basis of being arranged on, outer side track 8 and being respectively used to walk in orbit,
Outside slip wheels 9, the running gear of above-mentioned assembly pulley composition sleiding form device, inner support system has inner support door frame 5, with
Medial support leading screw 4 and inner side regulation screw mandrel 3 that inner support door frame 5 connects drive by inner side template connection system 6 connection
Inner side template 7 realizes rising and falling and shrinking of whole inner support system;Support arm system has outer support door frame 14, with outer support door
Outside-supporting leading screw 10 and outside regulation screw mandrel 11 that frame 14 connects drive the outside connected by outboard template connection system 12
Template 13 realizes rising and falling and shrinking of whole support arm system.
Described inner side template 7 and outboard template 13 are respectively by inner side template connection system 6 and outboard template connection system
The 12 template entirety forming described sleiding form device.
Described inner side template 7 and outboard template 13 pass through bolt with inner side regulation screw mandrel 3 and outside regulation screw mandrel 11 respectively
Connect to be connected with inner support door frame 5 and outer support door frame 14 and form described inner support system and support arm system respectively.
Described inner support door frame 5 and outer support door frame 14 are respectively by welding and described medial support leading screw 4 and lateral branch
Support wire thick stick 10 connects, and forms the support system of this sleiding form device.
Described support system is by being respectively welded the inner side being fixed on described inner support door frame 5 and outer support door frame 14
Assembly pulley 2, outside slip wheels 9 act on inner track 1, the outer side track 8 being arranged on arch form culvert, channel base, it is achieved
The walking of this sleiding form device.
Described running gear includes stopping means.
This sleiding form device also includes trailer system, and this trailer system is realized row by hoist engine by rope traction
Walk.
Template uses 86 series masks, inner support door frame 5 and outer support door frame 14 to use double 20# channel-section steel and 18# I-steel
Assembly welding.
This arch form culvert section a size of 6 meters is wide, and stalk is high 4 meters, and basis uses C25 concrete, and in concave shape, basis is executed
Work completes the assembling construction that laggard luggage is put.
According to on-the-spot physical condition, this sleiding form device uses 25T crane, artificial jack, and loader coordinates.Unit is even
Connecing employing bolt and being welded to connect, door frame uses I-steel and channel-section steel to be bolted, door frame bearing capacity meet arch form culvert,
Passage wall body and the requirement of arch ring construction.Each position and details are checked, polish after completing by assembly, and smearing release agent.
Device assembly carries out inside and outside siding track installation, the width of inner track 1 3.5 meters, the width of outer side track 8 after completing
Being 13.7 meters, track installation requires accurate positioning, firmly installs, and once mounting length is not less than 12 meters.
Track installation is in place by interior arrangement after completing, and is positioned by the stopping means of inner side assembly pulley 2, medial branch
Support wire bar 4 and inner side regulation screw mandrel 3 regulate inner side template 7 to design attitude.Carrying out reinforcing bar binding afterwards, reinforcing bar binding is according to setting
Meter drawing requirement is constructed, and is moved to standard by track and running gear by external device (ED) through after the assay was approved after having constructed
Really position, is adjusted outside device after fixing, and regulates screw mandrel 11 by outside-supporting screw mandrel 10 and outside and regulates outer side mold
Plate 13 to design attitude, installs bulkhead and subsiding crack material, carries out concrete pouring construction after the assay was approved.
Wedge mouth is reserved at arch culvert top, and its width is 30-50cm, and arch ring intensity reaches to close up when more than 70%.
After concrete reaches 2.5Mpa, dismountable outboard template, arch ring intensity can carry out inner side template after reaching 75% and tear open
Removing, outboard template 13 is formed by 3 pieces, outboard template connection system 12 is separated during dismounting, afterwards by adjusting outside shrinking
Joint screw mandrel 11 so that template separates with concrete;Inner side template 7 is formed by 3 pieces, inner side template connection system 6 is entered during dismounting
Row separates, and regulates screw mandrel 3 by collapsed inner side afterwards so that template separates with concrete, moves to next by running gear and executes
Work order unit, carries out polishing, brushing releasing agent, prepares next step construction, form removable complete after concrete carry out in time covering,
Maintenance.
This sleiding form device is made up of trailer system, running gear, door frame, template, support system.Different arch culvertes
Hole, channel height are adjusted by bottom, edge leading screw.The culvert height being suitable for is up to 7000mm, minimum 6000mm,
Sleiding form length presses wall height degree and the configuration of arch ring length.Side shuttering uses the regulation of screw mandrel door, supports, and component is connected by
Bolt.Package unit design nearly weighs 18t.
Although this utility model being described above by referring to specific embodiment, but art technology people
Member should be appreciated that in principle disclosed in this utility model and scope, can be for configuration and details disclosed in this utility model
Make many amendments.Protection domain of the present utility model is determined by appended claim, and claim is intended to
Whole amendments that in claim, the equivalent literal meaning of technical characteristic or scope are comprised.
Claims (8)
1. one kind is used for arch form culvert, the sleiding form device of passage construction, it is characterised in that includes inner support system and props up outward
Frame system, includes the inner track on the basis of being arranged on (1), outer side track (8) respectively and is respectively used to walk in orbit
Inner side assembly pulley (2), outside slip wheels (9), above-mentioned assembly pulley composition sleiding form device running gear, inner support system
Having inner support door frame (5), the medial support leading screw (4) being connected with inner support door frame (5) and inner side regulation screw mandrel (3) drive logical
Cross the inner side template (7) that inner side template connection system (6) connects and realize rising and falling and shrinking of whole inner support system;Support arm system
System has outer support door frame (14), the outside-supporting leading screw (10) being connected with outer support door frame (14) and outside regulation screw mandrel (11)
The outboard template (13) connected by outboard template connection system (12) is driven to realize rising and falling and shrinking of whole support arm system.
The most according to claim 1 for arch form culvert, the sleiding form device of passage construction, it is characterised in that described
Inner side template (7) and outboard template (13) are respectively by inner side template connection system (6) and outboard template connection system (12) shape
The template becoming described sleiding form device is overall.
The most according to claim 1 for arch form culvert, the sleiding form device of passage construction, it is characterised in that described
Inner side template (7) and outboard template (13) are bolted with inner side regulation screw mandrel (3) and outside regulation screw mandrel (11) respectively
It is connected with inner support door frame (5) and outer support door frame (14) and forms described inner support system and support arm system respectively.
The most according to claim 1 for arch form culvert, the sleiding form device of passage construction, it is characterised in that described
Inner support door frame (5) and outer support door frame (14) are respectively by welding and described medial support leading screw (4) and outside-supporting leading screw
(10) connect, form the support system of this sleiding form device.
The most according to claim 4 for arch form culvert, the sleiding form device of passage construction, it is characterised in that described
Support system by being respectively welded the inner side assembly pulley being fixed on described inner support door frame (5) and outer support door frame (14)
(2), outside slip wheels (9) act on inner track (1), the outer side track (8) being arranged on arch form culvert, channel base, in fact
The now walking of this sleiding form device.
The most according to claim 1 for arch form culvert, the sleiding form device of passage construction, it is characterised in that described
Running gear includes stopping means.
The most according to claim 1 for arch form culvert, the sleiding form device of passage construction, it is characterised in that this is sliding
Form plate device also includes trailer system, and this trailer system is realized walking by hoist engine by rope traction.
The most according to claim 1 for arch form culvert, the sleiding form device of passage construction, it is characterised in that template
86 series masks, inner support door frame (5) and outer support door frame (14) is used to use double 20# channel-section steel and 18# I-steel assembly welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620723092.0U CN205778929U (en) | 2016-07-10 | 2016-07-10 | A kind of for arch form culvert, the sleiding form device of passage construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620723092.0U CN205778929U (en) | 2016-07-10 | 2016-07-10 | A kind of for arch form culvert, the sleiding form device of passage construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205778929U true CN205778929U (en) | 2016-12-07 |
Family
ID=58125354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620723092.0U Expired - Fee Related CN205778929U (en) | 2016-07-10 | 2016-07-10 | A kind of for arch form culvert, the sleiding form device of passage construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205778929U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677135A (en) * | 2016-12-29 | 2017-05-17 | 中国人民解放军63926部队 | Underground gallery movable wood beam plywood formwork trolley |
CN106872670A (en) * | 2017-05-01 | 2017-06-20 | 刘华 | A kind of horizontal sliding type soil arching effect experimental rig and its application method |
CN109869164A (en) * | 2019-03-29 | 2019-06-11 | 中铁七局集团有限公司 | Combination hydraulic formwork jumbo pours the construction method of porous separate tunnel |
-
2016
- 2016-07-10 CN CN201620723092.0U patent/CN205778929U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677135A (en) * | 2016-12-29 | 2017-05-17 | 中国人民解放军63926部队 | Underground gallery movable wood beam plywood formwork trolley |
CN106872670A (en) * | 2017-05-01 | 2017-06-20 | 刘华 | A kind of horizontal sliding type soil arching effect experimental rig and its application method |
CN109869164A (en) * | 2019-03-29 | 2019-06-11 | 中铁七局集团有限公司 | Combination hydraulic formwork jumbo pours the construction method of porous separate tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103967050B (en) | Construction system of subway station | |
CN105370298B (en) | Loess tunnel once lining hydraulic template trolley | |
CN208416560U (en) | A kind of equipment for the construction of single-track tunnel inverted arch | |
CN102704949A (en) | No-pull rod side wall construction method for underground tunnel and formwork trolley for construction | |
CN205778929U (en) | A kind of for arch form culvert, the sleiding form device of passage construction | |
CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
CN107100074A (en) | A kind of lower bearing arch bridge concrete bridge deck construction method | |
CN104499434A (en) | Movable formwork for casting of wide-body box girder and construction method | |
CN105926464A (en) | Inverted hanging type trapezoid inclined climbing form traveler | |
CN105780646A (en) | Bridge overhauling equipment capable of automatically walking | |
CN106223983A (en) | A kind of diversion tunnel inclined shaft, flat section tunneling boring primary steel mould trolley | |
CN110130937A (en) | A kind of tunnel construction trolley | |
CN108221694B (en) | The method for installing long-span arch bridge tie-rod | |
CN105019357B (en) | The installation method of abnormity prefabricated bridge on a kind of arch bridge uncovered lattice girder steel | |
CN103388305A (en) | Railway T-beam cast-in-site bridge deck forming machine | |
CN206512605U (en) | A kind of overall demolition, installation anticollision wall form and its walking track crane move system | |
CN202359510U (en) | Multi-functional working vehicle for concrete anti-collision guardrail of bridge | |
CN105484166B (en) | A kind of ladder type masts type cantilever loop wheel machine | |
CN110468743A (en) | A kind of traveling cradle and construction method for the transformation of old pier coping | |
CN110529146B (en) | Equipment for single-track tunnel inverted arch construction and construction method thereof | |
CN110173281A (en) | A kind of sliding mode system for circular tunnel concreting | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN105839550A (en) | Oppressive traveling mechanism used for cantilever hanging basket and cantilever hanging basket | |
CN205529915U (en) | Ladder type masts type hangs pieces together loop wheel machine | |
CN109519199B (en) | Shield tunnel segment supporting trolley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161207 Termination date: 20210710 |
|
CF01 | Termination of patent right due to non-payment of annual fee |