CN107489265A - A kind of construction method of overhanging scaffold - Google Patents

A kind of construction method of overhanging scaffold Download PDF

Info

Publication number
CN107489265A
CN107489265A CN201610409634.1A CN201610409634A CN107489265A CN 107489265 A CN107489265 A CN 107489265A CN 201610409634 A CN201610409634 A CN 201610409634A CN 107489265 A CN107489265 A CN 107489265A
Authority
CN
China
Prior art keywords
scaffold
steel
cantilever
construction method
steel girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610409634.1A
Other languages
Chinese (zh)
Inventor
孙建强
何年红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIXING ZHOUTIE TOWN SHENGLI DRILLING MACHINERY FACTORY
Original Assignee
YIXING ZHOUTIE TOWN SHENGLI DRILLING MACHINERY FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YIXING ZHOUTIE TOWN SHENGLI DRILLING MACHINERY FACTORY filed Critical YIXING ZHOUTIE TOWN SHENGLI DRILLING MACHINERY FACTORY
Priority to CN201610409634.1A priority Critical patent/CN107489265A/en
Publication of CN107489265A publication Critical patent/CN107489265A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Abstract

The invention discloses a kind of construction method of overhanging scaffold, comprise the following steps:A, unwrapping wire is positioned in building structure and the earth anchor that will encorbelment is nuzzled in beam slab in advance;B, beam slab concrete is poured into a mould;C, steel I-beam is arranged on the inside of structural outside layers cage bar, with earth anchor of encorbelmenting it is into T-shaped when full weld connect into cantilever steel girder;D, in cantilever steel girder both ends vertical welding rod;E, start in cantilever steel girder structure along building edge, progressively lay level bridge outward;F, the single-row of scaffold for being assembled ground with tower crane is hung on level bridge;G, pessimistic securit net is completely hung in the outside of scaffold.The scaffold building methodological science of the present invention is reasonable, and I-steel welding is encorbelmented to encorbelment compared to steel wire rope and has higher stability and security, and is mounted and dismounted conveniently, and economic benefit and social benefit are notable.

Description

A kind of construction method of overhanging scaffold
Technical field
The present invention relates to technical field of buildings, and in particular to a kind of overhanging scaffold
Construction method.
Background technology
In modern architecture work progress, scaffold is a kind of essential auxiliary construction instrument, it may ensure that the safety of work high above the ground, meets the needs that operation, material are banked up and transported.Conventional scaffold building method is console mode scaffold and overhanging scaffold.Console mode scaffold is that disposable tower is set to top, and total height is usually no more than 30 meters, can not meet the needs of skyscraper, and steel pipe and fastener input amount are big, service life length;Overhanging scaffold uses steel wire rope discharging type scaffold mostly, although height of encorbelmenting up to more than 45 meters, exists and sets up the shortcomings such as stability is poor, safety coefficient is low.
The content of the invention
The technical problem to be solved in the present invention is in view of the shortcomings of the prior art, there is provided one
The construction method for the overhanging scaffold that kind is safer, more stable, cost is low.
The present invention adopts the following technical scheme that:
A kind of construction method of overhanging scaffold, comprises the following steps:
A, unwrapping wire is positioned in building structure and the earth anchor that will encorbelment is nuzzled in beam slab in advance;
B, beam slab concrete is poured into a mould, after concrete strength reaches 12Mpa, then carries out the installation of I-steel Cantilever Beams;
C, steel I-beam is arranged on the inside of structural outside layers cage bar, with earth anchor of encorbelmenting it is into T-shaped when full weld connect into cantilever steel girder;
Multiple slidable suspension ring are set on cantilever steel girder both ends vertical welding rod, rod d,;
E, start in cantilever steel girder structure along building edge, progressively lay level bridge outward;
F, the single-row of scaffold for being assembled ground with tower crane is hung on level bridge, and is connected with right-angle coupler and suspension ring;
G, pessimistic securit net is completely hung in the outside of scaffold.
The single-row of scaffold steel pipe is using long 5m, diameter 50mm, the mm of wall thickness 3.6 steel pipe.
In the junction of cantilever steel girder and rod reinforcement repair welding is carried out with triangular steel.
Compared with prior art, beneficial effects of the present invention are as follows:
The scaffold building methodological science of the present invention is reasonable, and I-steel welding is encorbelmented to encorbelment compared to steel wire rope and has higher stability and security, and is mounted and dismounted conveniently, and economic benefit and social benefit are notable.
Embodiment
The invention will be further described with reference to embodiments.
A kind of construction method of overhanging scaffold of the present invention, comprises the following steps:
A, unwrapping wire is positioned in building structure and the earth anchor that will encorbelment is nuzzled in beam slab in advance;
B, beam slab concrete is poured into a mould, after concrete strength reaches 12Mpa, then carries out the installation of I-steel Cantilever Beams;
C, steel I-beam is arranged on the inside of structural outside layers cage bar, with earth anchor of encorbelmenting it is into T-shaped when full weld connect into cantilever steel girder;
D, in the vertical spot welding rod in cantilever steel girder both ends, and reinforcement repair welding is carried out with triangular steel in the top and the bottom of junction, left and right portion, multiple slidable suspension ring is set on rod;
E, start in cantilever steel girder structure along building edge, progressively lay level bridge outward;
F, the single-row of scaffold for being assembled ground with tower crane is hung on level bridge, and is connected with right-angle coupler and suspension ring, and the single-row of scaffold steel pipe is using long 5m, diameter 50mm, the mm of wall thickness 3.6 steel pipe;
G, pessimistic securit net is completely hung in the outside of scaffold.

Claims (3)

1. a kind of construction method of overhanging scaffold, it is characterised in that comprise the following steps:
A, unwrapping wire is positioned in building structure and the earth anchor that will encorbelment is nuzzled in beam slab in advance;
B, beam slab concrete is poured into a mould, after concrete strength reaches 12Mpa, then carries out the installation of I-steel Cantilever Beams;
C, steel I-beam is arranged on the inside of structural outside layers cage bar, with earth anchor of encorbelmenting it is into T-shaped when full weld connect into cantilever steel girder;
Multiple slidable suspension ring are set on cantilever steel girder both ends vertical welding rod, rod d,;
E, start in cantilever steel girder structure along building edge, progressively lay level bridge outward;
F, the single-row of scaffold for being assembled ground with tower crane is hung on level bridge, and is connected with right-angle coupler and suspension ring;
G, pessimistic securit net is completely hung in the outside of scaffold.
A kind of 2. construction method of overhanging scaffold according to claim 1, it is characterised in that:The single-row of scaffold steel pipe is using long 5m, diameter 50mm, the mm of wall thickness 3.6 steel pipe.
A kind of 3. construction method of overhanging scaffold according to claim 1, it is characterised in that:In the junction of cantilever steel girder and rod reinforcement repair welding is carried out with triangular steel.
CN201610409634.1A 2016-06-13 2016-06-13 A kind of construction method of overhanging scaffold Pending CN107489265A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610409634.1A CN107489265A (en) 2016-06-13 2016-06-13 A kind of construction method of overhanging scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610409634.1A CN107489265A (en) 2016-06-13 2016-06-13 A kind of construction method of overhanging scaffold

Publications (1)

Publication Number Publication Date
CN107489265A true CN107489265A (en) 2017-12-19

Family

ID=60641902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610409634.1A Pending CN107489265A (en) 2016-06-13 2016-06-13 A kind of construction method of overhanging scaffold

Country Status (1)

Country Link
CN (1) CN107489265A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962850A (en) * 2020-06-05 2020-11-20 贵州建工集团第四建筑工程有限责任公司 Construction method of overhanging scaffold

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444203A (en) * 2011-09-15 2012-05-09 浙江城建建设集团有限公司 High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN103993735A (en) * 2014-06-06 2014-08-20 山东义泰建设工程有限公司 Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN203961258U (en) * 2014-05-23 2014-11-26 中天建设集团有限公司天津分公司 Builder's jack foot guard structure
CN205296798U (en) * 2015-11-24 2016-06-08 中国建筑第八工程局有限公司 Pre -buried fixing device of builder's jack shaped steel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444203A (en) * 2011-09-15 2012-05-09 浙江城建建设集团有限公司 High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN203961258U (en) * 2014-05-23 2014-11-26 中天建设集团有限公司天津分公司 Builder's jack foot guard structure
CN103993735A (en) * 2014-06-06 2014-08-20 山东义泰建设工程有限公司 Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN205296798U (en) * 2015-11-24 2016-06-08 中国建筑第八工程局有限公司 Pre -buried fixing device of builder's jack shaped steel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962850A (en) * 2020-06-05 2020-11-20 贵州建工集团第四建筑工程有限责任公司 Construction method of overhanging scaffold

Similar Documents

Publication Publication Date Title
CN102444203B (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN103924505B (en) Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate
CN104088467B (en) A kind of large Steel Cantilever truss structure high-altitude construction Deformation monitoring method
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN211447708U (en) Super high-rise building construction elevator feeding platform support system that encorbelments
CN102535845A (en) Construction method of bearing frame of corridor structure
CN104060542B (en) Compound beam cable stayed bridge direction across bridge prestress application device and applying method thereof
CN103526929A (en) Super high-rise steel pipe column interior concrete pouring construction method
CN215254604U (en) Template support system encorbelments
CN203441073U (en) Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN103882813A (en) Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN103147582A (en) Overhead cantilever formwork construction method
CN201420385Y (en) Overhanging type unloading platform for building construction
CN203947421U (en) Compound beam cable stayed bridge direction across bridge prestress application device
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN103993739B (en) The construction method of granulation tower spraying layer stiff beam
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN102733599A (en) Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam
CN110409318B (en) Assembling and erecting method for large-span simply-supported steel-concrete composite beam
CN204359161U (en) A kind of cooling stack with horizontal adapter ring girder construction
CN107489265A (en) A kind of construction method of overhanging scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171219