CN107476649A - A kind of Assembled enclosing wall construction method - Google Patents

A kind of Assembled enclosing wall construction method Download PDF

Info

Publication number
CN107476649A
CN107476649A CN201710712395.1A CN201710712395A CN107476649A CN 107476649 A CN107476649 A CN 107476649A CN 201710712395 A CN201710712395 A CN 201710712395A CN 107476649 A CN107476649 A CN 107476649A
Authority
CN
China
Prior art keywords
prefabricated
prefabricated panel
installation
prefabricated post
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710712395.1A
Other languages
Chinese (zh)
Inventor
房岭锋
马骏
钱毅
袁清云
胡春华
徐笑非
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201710712395.1A priority Critical patent/CN107476649A/en
Publication of CN107476649A publication Critical patent/CN107476649A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of Assembled enclosing wall construction method, comprise the following steps:S1, transport material:Prefabricated post, prefabricated panel are transported to job site;S2, make enclosure wall basis:Steel bar template installation and concreting are carried out at the construction field (site), complete enclosure wall basis;S3, installation prefabricated post:Pillar position cross hairs is ejected according to drawing size before installation, handles reserved rim of a cup, it is levelling in reserved rim of a cup bottom pea gravel concreten according to the setting height(from bottom) of setting, prefabricated post, adjustment prefabricated post position are installed;S4, installation prefabricated panel:The surface on levelling enclosure wall basis before installation, lifts and fixes prefabricated panel;S5, installation enclosure wall bear down on one:Installation prefabricated panel bears down on one respectively bears down on one with prefabricated post;S6, processing gap:Fill the gap between prefabricated panel and corresponding prefabricated post groove.Compared with prior art, the present invention has the advantages that to avoid waste of material, saving manpower, saving time, cost controllable.

Description

A kind of Assembled enclosing wall construction method
Technical field
The present invention relates to enclosure wall construction technology, more particularly, to a kind of Assembled enclosing wall construction method.
Background technology
By the factorial praluction of component, the substantial amounts of repetitive operation in job site can be utilized high mechanization and oneself The prefabricated production line of dynamicization carries out industrialized production, in conjunction with the regularization and standardization of component, so that efficiency is notable Improve.In prefabrication and assembly construction construction, structure manufacture man-hour accounts for 65% during chief engineer, and installation accounts for 20%~25%, and transport accounts for 10%~ 15%.It follows that substantial amounts of work is transferred to factory from scene, so as to significantly shorten the construction period.
The characteristics of building industrialization and civil engineering assembled technology itself, is perfectly in harmony with the theory of current conversion station assembled construction, Civil engineering assembled technology is promoted, current conversion station civil Engineering Design can be made to accomplish to standardize as far as possible, is finally reached and builds quick, peace Entirely, high-quality, environment influence that small, maintenance work amoun is small, integrated cost preferably standardizes the purpose of current conversion station.Through investigation, state Interior current prefabricated building construction technology is constructed also in the prefabricated of incipient stage, particularly industrial building, and PC hanging plates connect Mouth positioning and connection use industrial glue, bolt connection and reserved embedded part or reinforcement welding mode mostly, and the high temperature of welding can be to mixed Coagulating native prefabricated concrete board has certain influence.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of Assembled enclosing wall is applied Work method.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of Assembled enclosing wall construction method, comprises the following steps:
S1, transport material:Prefabricated post, prefabricated panel are transported to job site;
S2, make enclosure wall basis:Steel bar template installation and concreting are carried out at the construction field (site), complete enclosure wall basis;
S3, installation prefabricated post:Pillar position cross hairs is ejected according to drawing size before installation, handles reserved rim of a cup, according to The setting height(from bottom) of setting is levelling in reserved rim of a cup bottom pea gravel concreten, installs prefabricated post, adjustment prefabricated post position;
S4, installation prefabricated panel:The surface on levelling enclosure wall basis before installation, lifts and fixes prefabricated panel;
S5, installation enclosure wall bear down on one:Installation prefabricated panel bears down on one respectively bears down on one with prefabricated post;
S6, processing gap:Fill the gap between prefabricated panel and corresponding prefabricated post groove.
Reserved rim of a cup is handled in the step S3 to specifically include to all reserved rim of a cup side wall dabbings and clean out.
Prefabricated post position is adjusted in the step S3 to specifically include:
Enclosure wall both ends pillar is aligned according to cross line position, the elongated construction line of pull-up, is sequentially adjusted in middle each pillar, After every pillar adjustment, first fixed temporarily with wooden wedge, after integrally inspection is errorless, with microdilatancy pea gravel concreten by rim of a cup Gap fill up, wooden wedge removed after concrete reaches setting intensity.
Lifted in the step S4 and fixed prefabricated panel specifically includes:
Groove of the both ends of prefabricated panel along prefabricated post side is inserted from capital, every piece of prefabricated panel insertion levelling Afterwards, inserted with wooden wedge at the gap of prefabricated post groove and prefabricated panel so that prefabricated panel keeps vertical.
The step S6 is specifically included:
Gap between prefabricated panel and corresponding prefabricated post groove is filled with pea gravel concreten, plate stitch above and below prefabricated panel Silicone weather resistant glue is beaten in outside by place.
The prefabricated post is shaped as cube, and the length of its cross section and wide size are all 250~350mm, and prefabricated post is pacified The side of dress prefabricated panel is provided with groove.
A length of 2300~2700mm of the prefabricated panel, a height of 2000~2400mm, the width of prefabricated panel are less than in advance The width of post lateral grooves processed.
Prefabricated panel is installed provided with the hole corresponding with the steel bar end that prefabricated post is reserved in the both ends that the prefabricated panel bears down on one The steel bar end grafting reserved when bearing down on one with prefabricated post, the section that the prefabricated post is beared down on one is " work " font.
Compared with prior art, the present invention uses Assembled enclosing wall structure, and structural elements is in factory pre- Mr. as needed Production, avoids waste of material, greatly reduces the workload of wet trade, save manpower and time so that cost and duration are controllable; Using the production line balance of mechanical automation, information system management, the destruction of job site human factor is avoided, obtains quality Control;Maintenance frequency and maintenance cost can be reduced in the long-term use of fabricated construction building in the completed, due to raw in factory The component of production has more preferable durability, reduces later maintenance number, and the enclosure wall assembling structure of separate type, is enclosure wall portion again The maintenance and replacing of part provide possibility, greatly improve the service life of building, reduce maintenance cost.
Brief description of the drawings
Fig. 1 is Assembled enclosing wall construction method flow chart of the present invention.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
Enclosure wall construction is carried out using assembled, very quickly transformer station region can be closed, create good apply Work environment, Assembled enclosing wall prefabricated components mainly have prefabricated post, prefabricated panel and prefabricating coping.
As shown in figure 1, a kind of Assembled enclosing wall construction method, comprises the following steps:
S1, transport material:Prefabricated post, prefabricated panel are transported to job site;
S2, make enclosure wall basis:Steel bar template installation and concreting are carried out at the construction field (site), complete enclosure wall basis;
S3, installation prefabricated post:Pillar position cross hairs is ejected according to drawing size before installation, to all reserved rim of a cup side walls Dabbing is simultaneously cleaned out, and levelling in reserved rim of a cup bottom pea gravel concreten according to the setting height(from bottom) of setting, prefabricated post uses 8t vapour Car lifting is in place, after the completion of enclosure wall segmental hoisting, adjusts prefabricated post position;
S4, installation prefabricated panel:Before installation, enclosure wall base surface absolute altitude need to be checked, uneven place's pea gravel concreten It is levelling, ensure after curtain wall penel installation in same absolute altitude, prefabricated panel installation is in place using the lifting of 8t truck cranes, after the completion of to prefabricated Wallboard is further fixed;
S5, installation enclosure wall bear down on one:Installation prefabricated panel bears down on one respectively bears down on one with prefabricated post;
S6, processing gap:Fill the gap between prefabricated panel and corresponding prefabricated post groove.
Prefabricated post position is adjusted in step S3 to specifically include:
Enclosure wall both ends pillar is aligned according to cross line position, the elongated construction line of pull-up, is sequentially adjusted in middle each pillar, After every pillar adjustment, first fixed temporarily with wooden wedge, after integrally inspection is errorless, with microdilatancy pea gravel concreten by rim of a cup Gap fill up, wooden wedge removed after concrete reaches setting intensity.
In step S4 hoisting prefabricated wallboard and further fixation specifically include:
Groove of the both ends of prefabricated panel along prefabricated post side is inserted from capital, every piece of prefabricated panel insertion levelling Afterwards, inserted with wooden wedge at the gap of prefabricated post groove and prefabricated panel so that prefabricated panel keeps vertical.
Step S6 is specifically included:
Gap between prefabricated panel and corresponding prefabricated post groove is filled with pea gravel concreten, plate stitch above and below prefabricated panel Silicone weather resistant glue is beaten in outside by place.
Wherein, prefabricated post is shaped as cube, and the length of its cross section and wide size are all 250~350mm, the present embodiment In, prefabricated post cross sectional dimensions is 300mm × 300mm, and the side of prefabricated post installation prefabricated panel is provided with groove.
A length of 2300~2700mm of prefabricated panel, a height of 2000~2400mm, the width of prefabricated panel are less than prefabricated post The width of lateral grooves, in the present embodiment, prefabricated panel long 2500mm, high 2200mm.
Bear down on one provided with the hole corresponding with the steel bar end that prefabricated post is reserved, installation prefabricated panel at the both ends that prefabricated panel bears down on one When with prefabricated post reserve steel bar end grafting, the section that prefabricated post is beared down on one is " work " font.

Claims (8)

1. a kind of Assembled enclosing wall construction method, it is characterised in that comprise the following steps:
S1, transport material:Prefabricated post, prefabricated panel are transported to job site;
S2, make enclosure wall basis:Steel bar template installation and concreting are carried out at the construction field (site), complete enclosure wall basis;
S3, installation prefabricated post:Pillar position cross hairs is ejected according to drawing size before installation, reserved rim of a cup is handled, according to setting Setting height(from bottom) it is levelling in reserved rim of a cup bottom pea gravel concreten, prefabricated post, adjustment prefabricated post position are installed;
S4, installation prefabricated panel:The surface on levelling enclosure wall basis before installation, lifts and fixes prefabricated panel;
S5, installation enclosure wall bear down on one:Installation prefabricated panel bears down on one respectively bears down on one with prefabricated post;
S6, processing gap:Fill the gap between prefabricated panel and corresponding prefabricated post groove.
2. a kind of Assembled enclosing wall construction method according to claim 1, it is characterised in that handled in the step S3 pre- Stay rim of a cup to specifically include to all reserved rim of a cup side wall dabbings and clean out.
3. a kind of Assembled enclosing wall construction method according to claim 1, it is characterised in that adjusted in the step S3 pre- Post position processed specifically includes:
Enclosure wall both ends pillar is aligned according to cross line position, the elongated construction line of pull-up, be sequentially adjusted in middle each pillar, every After pillar adjustment, first fixed temporarily with wooden wedge, after integrally check it is errorless after, with microdilatancy pea gravel concreten by the seam in rim of a cup Gap is filled up, and removes wooden wedge after concrete reaches setting intensity.
4. a kind of Assembled enclosing wall construction method according to claim 1, it is characterised in that lifted simultaneously in the step S4 Fixed prefabricated panel specifically includes:
Groove of the both ends of prefabricated panel along prefabricated post side is inserted from capital, after every piece of prefabricated panel insertion levelling, used Wooden wedge is inserted at the gap of prefabricated post groove and prefabricated panel so that prefabricated panel keeps vertical.
5. a kind of Assembled enclosing wall construction method according to claim 1, it is characterised in that the step S6 is specifically wrapped Include:
Gap between prefabricated panel and corresponding prefabricated post groove is filled with pea gravel concreten, prefabricated panel up and down at plate stitch outside Silicone weather resistant glue is beaten in side.
6. a kind of Assembled enclosing wall construction method according to claim 1, it is characterised in that the prefabricated post is shaped as standing Cube, the length of its cross section and wide size are all 250~350mm, and the side of prefabricated post installation prefabricated panel is provided with groove.
A kind of 7. Assembled enclosing wall construction method according to claim 6, it is characterised in that the prefabricated panel it is a length of 2300~2700mm, a height of 2000~2400mm, the width of prefabricated panel are less than the width of prefabricated post lateral grooves.
8. a kind of Assembled enclosing wall construction method according to claim 1, it is characterised in that what the prefabricated panel beared down on one The steel bar end that both ends are reserved provided with the hole corresponding with the steel bar end that prefabricated post is reserved, installation prefabricated panel when bearing down on one with prefabricated post Grafting, the section that the prefabricated post is beared down on one are " work " font.
CN201710712395.1A 2017-08-18 2017-08-18 A kind of Assembled enclosing wall construction method Pending CN107476649A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710712395.1A CN107476649A (en) 2017-08-18 2017-08-18 A kind of Assembled enclosing wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710712395.1A CN107476649A (en) 2017-08-18 2017-08-18 A kind of Assembled enclosing wall construction method

Publications (1)

Publication Number Publication Date
CN107476649A true CN107476649A (en) 2017-12-15

Family

ID=60600992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710712395.1A Pending CN107476649A (en) 2017-08-18 2017-08-18 A kind of Assembled enclosing wall construction method

Country Status (1)

Country Link
CN (1) CN107476649A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222656A (en) * 2018-01-30 2018-06-29 重庆中航建设(集团)有限公司 The construction method of Prefabricated enclosure wall
CN110616947A (en) * 2019-08-26 2019-12-27 广东建宇建筑科技有限公司 Construction method of assembled fair-faced concrete enclosure wall
CN110847699A (en) * 2019-11-28 2020-02-28 松塔知识产权运营武汉有限公司 High-performance concrete prefabricated wall
CN114837491A (en) * 2022-05-20 2022-08-02 山西建投远大建筑工业股份有限公司 Prefabricated enclosure of assembled

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110098533A (en) * 2010-02-26 2011-09-01 성균관대학교산학협력단 A prefabricated fence
CN102644408A (en) * 2012-05-10 2012-08-22 芦哲 Assembly type reinforced concrete prefabricated wall
CN102758526A (en) * 2012-07-03 2012-10-31 湖北省输变电工程公司 Industrial prefabricated assembly type enclosing wall construction technology
CN202850596U (en) * 2012-07-03 2013-04-03 湖北省输变电工程公司 Industrialized prefabricated assembly type fence
CN203394170U (en) * 2013-08-16 2014-01-15 四川电力建设三公司 Prefabricated enclosing wall
CN203769424U (en) * 2014-03-07 2014-08-13 上海市城市建设设计研究总院 Prefabricated assembled wall
CN104264865A (en) * 2014-09-23 2015-01-07 国家电网公司 Assembly type firewall
CN204112860U (en) * 2014-09-24 2015-01-21 窦秀香 Detachable enclosure wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110098533A (en) * 2010-02-26 2011-09-01 성균관대학교산학협력단 A prefabricated fence
CN102644408A (en) * 2012-05-10 2012-08-22 芦哲 Assembly type reinforced concrete prefabricated wall
CN102758526A (en) * 2012-07-03 2012-10-31 湖北省输变电工程公司 Industrial prefabricated assembly type enclosing wall construction technology
CN202850596U (en) * 2012-07-03 2013-04-03 湖北省输变电工程公司 Industrialized prefabricated assembly type fence
CN203394170U (en) * 2013-08-16 2014-01-15 四川电力建设三公司 Prefabricated enclosing wall
CN203769424U (en) * 2014-03-07 2014-08-13 上海市城市建设设计研究总院 Prefabricated assembled wall
CN104264865A (en) * 2014-09-23 2015-01-07 国家电网公司 Assembly type firewall
CN204112860U (en) * 2014-09-24 2015-01-21 窦秀香 Detachable enclosure wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222656A (en) * 2018-01-30 2018-06-29 重庆中航建设(集团)有限公司 The construction method of Prefabricated enclosure wall
CN110616947A (en) * 2019-08-26 2019-12-27 广东建宇建筑科技有限公司 Construction method of assembled fair-faced concrete enclosure wall
CN110847699A (en) * 2019-11-28 2020-02-28 松塔知识产权运营武汉有限公司 High-performance concrete prefabricated wall
CN114837491A (en) * 2022-05-20 2022-08-02 山西建投远大建筑工业股份有限公司 Prefabricated enclosure of assembled

Similar Documents

Publication Publication Date Title
CN107476649A (en) A kind of Assembled enclosing wall construction method
CN204826619U (en) Mould is hung to superimposed sheet instrument formula
CN104947831A (en) Prefabricated assembly type profile steel concrete shear wall and construction method thereof
CN102230315A (en) Prefabricated part and semi-prefabricated construction method for multistory building
CN206128292U (en) Prefabricated node and prefabricated fabricated frame structure
CN107476583A (en) A kind of concrete assembled building builds construction method
CN101922141B (en) Structure and construction method of bearing pad stone
CN101748887B (en) Bin wall template construction device of cylinder bin with large diameter
CN102116051A (en) Layer-by-layer overhanging structure lifting method
CN104032904A (en) Combined assembled type stairway
CN207499427U (en) Assembly integrated precast superimposed sheet support system
CN210316690U (en) Roof elevator machine room structure
CN103485574A (en) Method for constructing reinforced concrete structure of tower top of prilling tower
CN104675112A (en) Steel stair formwork and constructing method for once pouring forming of building staircase
CN107152112A (en) A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN104989422B (en) A kind of tunnel is by half prefabricated short-term training construction of central division wall technique
CN103321153A (en) Construction method for medium and small span trough girder bridge
CN108385869A (en) A kind of wall element of overlapped shear wall and construction method using its progress
CN109083456A (en) Assembled mill construction and its method of construction
CN102493345A (en) Manufacture method for prefabricating support-free system bridge sections
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN204876210U (en) Structure wallboard of coincide decorative layer and heat preservation
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN104110132B (en) A kind of adjustable composite stairway steel formwork for highrise building and assemble method thereof
CN211113728U (en) Assembled cantilever retaining wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215

RJ01 Rejection of invention patent application after publication