CN108385869A - A kind of wall element of overlapped shear wall and construction method using its progress - Google Patents
A kind of wall element of overlapped shear wall and construction method using its progress Download PDFInfo
- Publication number
- CN108385869A CN108385869A CN201810225291.2A CN201810225291A CN108385869A CN 108385869 A CN108385869 A CN 108385869A CN 201810225291 A CN201810225291 A CN 201810225291A CN 108385869 A CN108385869 A CN 108385869A
- Authority
- CN
- China
- Prior art keywords
- layer
- steel wire
- insulating layer
- wire net
- net rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 239000010410 layer Substances 0.000 claims abstract description 68
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 54
- 239000010959 steel Substances 0.000 claims abstract description 54
- 239000011178 precast concrete Substances 0.000 claims abstract description 21
- 239000011241 protective layer Substances 0.000 claims abstract description 19
- 230000003014 reinforcing Effects 0.000 claims abstract description 17
- 239000004567 concrete Substances 0.000 claims abstract description 13
- 238000009434 installation Methods 0.000 claims abstract description 12
- 238000004873 anchoring Methods 0.000 claims abstract description 8
- 230000002787 reinforcement Effects 0.000 claims description 8
- 210000001513 Elbow Anatomy 0.000 claims description 5
- 238000004132 cross linking Methods 0.000 claims description 4
- 238000009413 insulation Methods 0.000 abstract description 4
- 238000005266 casting Methods 0.000 abstract description 2
- 238000009415 formwork Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 8
- 238000009417 prefabrication Methods 0.000 description 7
- 210000003205 Muscles Anatomy 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000903 blocking Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000000116 mitigating Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
- E04B1/6116—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by locking means on lateral surfaces
Abstract
The construction method carried out the present invention relates to a kind of wall element of overlapped shear wall and using it,The wall element includes steel wire net rack and the insulating layer being filled on steel wire net rack and pouring layer,Insulating layer is embedded in steel wire net rack,Pouring layer is to be set to the precast concrete protective layer of insulating layer side,Precast concrete protective layer outer end face is provided with installation mounting hole,Auxiliary tension member is embedded with inside precast concrete protective layer,It is successively installed when construction,Vertical applied force reinforcing bar is set on the inside of thermal insulation board and is connected with auxiliary tension member by anchoring tension member,Formwork for placing is set on the outside of vertical applied force reinforcing bar,Then cavity carries out pouring to form cast-in-place concrete layer between insulating layer and template,It is fixedly connected by fixing piece and bolt between neighbouring wall element,It then carries out template-setup and pours work,The shear wall that the construction method is built,Work progress can either be greatly simplified,But also with the intensity of formed by integrally casting formula wall,The requirement of high fit shear wall.
Description
Technical field
The present invention relates to technical field of buildings, and in particular to a kind of wall element of overlapped shear wall and uses its progress
Construction method.
Background technology
Shear wall is to replace the beam column in frame structure with reinforced concrete wall panel, can be undertaken in caused by all kinds of loads
Power, and can effective control structure horizontal force, shear wall structure largely used in high-story house.Existing shear wall is being constructed
When there are mainly two types of mode, pour and to be formed one is coagulation soil scene, this mode is affected in construction by site environment,
Complexity of constructing is higher, and required manpower is more, long construction period, in order to eliminate the influence of above-mentioned factor, opens in the prior art
Another form of construction work has been sent out, shear-wall element module has been manufactured in factory, is then combined multiple shear-wall element modules
It is fixed, to form whole shear wall structure, but this form of construction work is used, the connection between shear-wall element module is strong
Degree, cooperation precision all can existing defects, therefore, for shear wall construction method needs be improved.
Invention content
The present invention makes up for the shortcomings of the prior art and provide a kind of wall element of overlapped shear wall and using its into
Capable construction method, the wall element use the steel wire net rack Prefabricated block with insulating layer of side precast concrete, this is pre-
Molding block is transported to scene and carries out splicing installation and the cast in situs other side, not only saves construction period, but also make the wall of shear wall
Bonding strength, cooperation precision significantly improve between body unit.
The specific technical solution of the present invention is:
A kind of wall element of overlapped shear wall, the wall element include steel wire net rack and are filled on steel wire net rack
Insulating layer and pouring layer, key point be, the insulating layer is embedded in steel wire net rack, and pouring layer is be set to insulating layer side pre-
Concrete shield processed, precast concrete protective layer outer end face are provided with installation mounting hole, and precast concrete protective layer inside is pre-
It is embedded with auxiliary tension member.
The steel wire net rack is truss structure form, and one end that steel wire net rack is located in precast concrete protective layer is vertical
Lateral cross bar-mat reinforcement, it is vertically and transversely cross-linking bar-mat reinforcement or Unidirectional steel that steel wire net rack, which is located at insulating layer not pouring one end of side,
Muscle.
The installation mounting hole is unthreaded hole or bolt hole.
The auxiliary tension member is nut casing, U-shaped or Ω steel bars, the open end of nut casing, U-shaped or Ω shaped steel
The elbow end of muscle is run through and is overhung at outside insulating layer.
Using the construction method for the overlapped shear wall that wall element as described above carries out, key point is the construction method
Include the following steps:
A, prefabricated wall element is transported on working face and is fixed, do not poured side in the steel wire net rack of wall element and set
Vertical applied force reinforcing bar is set, anchoring tension member is connected on auxiliary tension member, setting, which pours, on the outside of vertical applied force reinforcing bar uses mould
Plate, then the cavity between insulating layer and template carry out pouring to form cast-in-place concrete layer;
B, wall element upper surface installs upper layer wall element and vertical applied force reinforcing bar is arranged in step, is drawn in auxiliary
Tie and connect anchoring tension member on part, on the outside of vertical applied force reinforcing bar setting pour with template, on the outside of upper wall unit and its
Vertical fixing piece is set between on the outside of the wall element of lower section, fixes and connects by bolt between fixing piece and two wall elements
It connects;
C, the cavity between upper wall unit insulating layer and template is poured, and forms cast-in-place concrete layer;
D, overlapped shear wall is formed after form removal, bolt, fixing piece, construction finishes;
E, step B, C, D is repeated until desired height.
The wall element sets the barrel for being provided through steel wire net rack in installation fixed hole position, and barrel port is provided with
Plug;In the step B, fixing piece coordinates wall list by upper wall unit and below by the locking of bolt and barrel
Member is fixedly connected.
The beneficial effects of the invention are as follows:The present invention is used as by the steel wire net rack with insulating layer and side precast concrete
Wall element is constructed, and steel wire net rack is prefabricated concrete shield and connect and consolidates with insulating layer in the wall element formed
It is fixed, the module of dimensionally stable is formed, in the work of assembled in situ wall, greatly reducing most site operation amount, with
After be transported to scene and carry out assembly fixation, pour steel wire net rack inboard portion, the cast-in-place work in the part can significantly increase phase up and down
Bonding strength between adjacent wall element is carried out by vertical fixing piece and lateral bolt between two wall elements
Pre-connection, between the two outside flatness be consistent with fixing piece, avoid each module of assembled wall in the prior art
Between regularity adjustment repeatedly, only need to lift and carry out pre-connection can be realized up and down to just, mitigating significantly to positive workload
And complexity, while upper wall unit is fixed by lower layer's wall element, construction is simple, connection are reliable, avoid
Ground and the complex work that support construction is arranged before upper wall unit, construction are more convenient;
Description of the drawings
Fig. 1 is the structural schematic diagram of wall element in the specific embodiment of the invention.
Fig. 2 is the assembling structure schematic diagram of first layer wall element in the specific embodiment of the invention.
Fig. 3 is the assembling structure schematic diagram between two wall elements in the specific embodiment of the invention.
Fig. 4 is the structural schematic diagram in wall element prefabrication process in the specific embodiment of the invention.
In attached drawing, 1, precast concrete protective layer, 2, insulating layer, 3, cast-in-place concrete layer, 4, steel wire net rack, 5, installation it is solid
Determine hole, 6, auxiliary tension member, 7, vertical applied force reinforcing bar, 8, anchoring tension member, 9, supporting block, 10, fixing piece, 11, bolt,
12, barrel, 13, plug, 14, rectangle pour framework.
Specific implementation mode
The present invention relates to a kind of wall element of overlapped shear wall and the construction method for using it to carry out, the wall lists
Member includes steel wire net rack 4 and the insulating layer 2 and pouring layer that are filled on steel wire net rack 4, and the insulating layer 2 is embedded in steel wire net rack 4
In, pouring layer is to be set to the precast concrete protective layer 1 of 2 side of insulating layer, and 1 outer end face of precast concrete protective layer is provided with
Mounting hole 5 is installed, auxiliary tension member 6 is embedded with inside precast concrete protective layer 1;The wall element of above structure composition is in work
Factory is prefabricated, is fixed after transport to scene and 2 inboard portion of cast-in-place thermal-insulating layer, formation cast-in-place concrete layer 3 are then successively solid
Determine and pour, form overlapped shear wall structure, the detailed process of construction is unfolded to illustrate by specific embodiment.
Specific embodiment, as shown in Figure 1, steel wire net rack 4 is truss structure form, steel wire net rack 4 is located at precast concrete
One end in protective layer 1 is vertically and transversely cross-linking bar-mat reinforcement, and it is in length and breadth that steel wire net rack 4, which is located at insulating layer 2 not pouring one end of side,
To cross wise reinforcement net or one-way reinforcement;The installation mounting hole 5 of 1 outer end face of precast concrete protective layer be unthreaded hole or bolt hole,
In specific prefabrication process, the barrel 12 that steel wire net rack 4 is provided through in mounting hole 5 is installed, blocking up when to avoid prefabricated pour
Plug, 12 port of barrel is provided with plug 13;Auxiliary tension member 6 is nut casing, U-shaped or Ω steel bars, the opening of nut casing
End, U-shaped or Ω steel bars elbow end are run through and are overhung at outside insulating layer 2, and the form that U-shaped steel muscle is chosen in the present embodiment is made
For auxiliary tension member, the construction of overlapped shear wall is carried out based on the wall element of above structure, it is as shown in Figures 2 and 3, described
Construction method includes the following steps:
A, prefabricated wall element is transported on working face and is fixed, side is not poured in the steel wire net rack 4 of wall element
Vertical applied force reinforcing bar 7 is set, is overhung on the elbow end outside insulating layer 2 in U-shaped steel muscle and connects anchoring tension member 8, anchoring
It is the reinforcing bar of drag hook to select both ends with tension member 8, is poured with template in the setting of the outside of vertical applied force reinforcing bar 7, then to insulating layer 2
Cavity between template carries out pouring to form cast-in-place concrete layer 3;
B, wall element upper surface installs upper layer wall element and vertical applied force reinforcing bar 7 is arranged in step, and the layer is vertical
7 lower end of steel bar stress is fixedly connected with 7 upper end of first layer vertical applied force reinforcing bar, and anchor is connected at this layer of U-shaped steel muscle elbow end
Admittedly using tension member 8, poured with template, upper wall unit outside and wall list below in the 7 outside setting of vertical applied force reinforcing bar
Vertical fixing piece 10 is set between first outside, and fixing piece 10 selects steel fixed plate, and flatness is good, is unlikely to deform, fixing piece
It is fixedly connected by bolt 11 between 10 and two wall elements, wall element is provided through in 5 position of installation mounting hole
The barrel 12 of steel wire net rack 4,12 port of barrel are provided with plug 13, and when fixed installation dismantles plug 13, fixing piece 10 by
Bolt 11 and the locking of barrel 12 coordinate wall element by upper wall unit and to be below fixedly connected.
C, the cavity between upper wall unit insulating layer 2 and template is poured, and forms cast-in-place concrete layer 3;
D, overlapped shear wall is formed after form removal, bolt 11, fixing piece 10, construction finishes;
E, step B, C, D is repeated until desired height.
The prefabrication process of wall element intersects at the prior art there is also difference in the present invention, as shown in figure 4, prefabrication process
Include the following steps:
A, prefabricated middle part carries the steel wire net rack 4 of insulating layer 2;
B, the rectangle that setting upper end opens pours framework 14, and steel wire net rack 4 is positioned over rectangle along upper end opening to be poured
In framework 14, insulating layer 2 is horizontal direction and its side pours 14 4 sides of framework with rectangle and is in contact respectively;In order to carry
The support strength of high steel wire net rack 4 is put into before rectangle pours framework 14 in steel wire net rack 4, in 4 bottom of steel wire net rack and its
One group of supporting block 9 is evenly arranged between middle part insulating layer 2;
C, the steel wire net rack 4 positioned at 2 top of insulating layer is poured, rectangle is removed after molding and pours framework 14, is formed
Wall element.
The prefabrication process of wall element takes full advantage of the supporting role of insulating layer, steel wire net rack, and insulating layer level is put
The steel wire net rack for pouring its upper layer is postponed, concrete layer is gradually adhesively fixed with insulating layer upper surface in maintenance processes, steel wire
Rack also acts as the position-limiting action of supporting role and heat-insulation unit, meanwhile, compared to after first pouring heat-insulation unit is bonded on upper layer
Mode, the application prefabrication process avoid insulating layer caused by bleed layering during concrete curing bond it is insecure even
The phenomenon that failure, the connection effect between entire insulating layer and precast concrete protective layer greatly promote, and it is more firm to form integraty
The precast wall body unit module leaned on.
The present invention carries out site operation by prefabricated wall element, is not poured using in wall element in work progress
Side carries out cast in situs, and the bonding strength between wall element is significantly improved, which both has modularization
The convenient advantage of constructing of assembled wall body, but also with the intensity of formed by integrally casting formula wall, high fit shear wall intensity requirement;
It is realized by the locking of precast concrete protective layer, fixing piece and bolt and barrel between upper and lower wall unit reliable
Be fixedly connected, and be not necessarily between the two it is additional to just, the operation of alignment and angular adjustment, cumbersome degree drops significantly
It is low;In addition, the connection that the prefabrication system of wall element greatly improves between heat-insulation unit and precast concrete protective layer is strong
Degree, the integrated degree higher of wall element.
Claims (6)
1. a kind of wall element of overlapped shear wall, which includes steel wire net rack (4) and is filled in steel wire net rack (4)
On insulating layer (2) and pouring layer, which is characterized in that the insulating layer (2) be embedded in steel wire net rack (4) in, pouring layer be setting
Precast concrete protective layer (1) in insulating layer (2) side, precast concrete protective layer (1) outer end face are provided with installation and fix
Hole (5), precast concrete protective layer (1) is internal to be embedded with auxiliary tension member (6).
2. a kind of wall element of overlapped shear wall according to claim 1, which is characterized in that the steel wire net rack
(4) it is truss structure form, it is vertically and transversely cross-linking bar-mat reinforcement, steel wire that steel wire net rack, which is located at one end in precast concrete protective layer,
It is vertically and transversely cross-linking bar-mat reinforcement or one-way reinforcement that rack, which is located at insulating layer not pouring one end of side,.
3. a kind of wall element of overlapped shear wall according to claim 1, which is characterized in that the installation is fixed
Hole (5) is unthreaded hole or bolt hole.
4. a kind of wall element of overlapped shear wall according to claim 1, which is characterized in that the auxiliary drawknot
Part (6) is nut casing, U-shaped or Ω steel bars, and the open end of nut casing, U-shaped or Ω steel bars elbow end are run through and hanged
It is external to stretch in insulating layer (2).
5. using the construction method for the overlapped shear wall that wall element as described in claim 1 carries out, which is characterized in that described to apply
Work method includes the following steps:
A, prefabricated wall element is transported on working face and is fixed, do not poured side in the steel wire net rack (4) of wall element and set
Vertical applied force reinforcing bar (7) is set, connection anchoring is with tension member (8) in auxiliary tension member (6), on the outside of vertical applied force reinforcing bar (7)
Setting is poured with template, then pour forming cast-in-place concrete layer (3) to cavity of the insulating layer (2) between template;
B, wall element upper surface installs upper layer wall element and vertical applied force reinforcing bar (7) is arranged in step, in auxiliary drawknot
Anchoring is connected on part (6) with tension member (8), on the outside of vertical applied force reinforcing bar setting pour with template, on the outside of upper wall unit
Vertical fixing piece (10) is set between the outside of wall element below, is borrowed between fixing piece (10) and two wall elements
Bolt (11) is helped to be fixedly connected;
C, it is poured in cavity of the upper wall unit insulating layer (2) between template, forms cast-in-place concrete layer (3);
D, form removal, bolt (11), fixing piece (10) form overlapped shear wall afterwards, and construction finishes;
E, step B, C, D is repeated until desired height.
6. according to claim 5 a kind of prefabricated with the cast-in-place shear wall construction method being combined, which is characterized in that described
Wall element be provided through the barrels (12) of steel wire net rack (4), the setting of barrel (12) port in installation mounting hole (5) position
There is plug (13);In the step B, fixing piece (10) coordinates by the locking of bolt (11) and barrel (12) by upper wall list
Member and wall element below are fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810225291.2A CN108385869B (en) | 2018-03-19 | 2018-03-19 | Construction method using wall unit for superposed shear wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810225291.2A CN108385869B (en) | 2018-03-19 | 2018-03-19 | Construction method using wall unit for superposed shear wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108385869A true CN108385869A (en) | 2018-08-10 |
CN108385869B CN108385869B (en) | 2020-06-09 |
Family
ID=63067196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810225291.2A Active CN108385869B (en) | 2018-03-19 | 2018-03-19 | Construction method using wall unit for superposed shear wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108385869B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653399A (en) * | 2018-11-05 | 2019-04-19 | 河北晶达建筑科技股份有限公司 | A kind of construction technology of building |
CN110965676A (en) * | 2019-12-20 | 2020-04-07 | 山东创伟外墙保温材料集团有限公司 | Combined type superposed wall and construction method |
CN112606180A (en) * | 2020-12-16 | 2021-04-06 | 西安建筑科技大学 | Preparation process of heat-insulating wall for passive house |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195193A (en) * | 2013-04-24 | 2013-07-10 | 石家庄晶达建筑体系有限公司 | Structure and construction method of cast-in-site style welded steel frame composite concrete shear wall |
CN105332446A (en) * | 2015-11-24 | 2016-02-17 | 绍兴宝业西伟德混凝土预制件有限公司 | Heat preservation and decoration integrating composite shear wall and construction method thereof |
CN206800622U (en) * | 2017-06-19 | 2017-12-26 | 深圳中海建筑有限公司 | A kind of assembled integral concrete shear force wall balcony attachment structure |
CN206916990U (en) * | 2016-11-18 | 2018-01-23 | 哈尔滨鸿盛房屋节能体系研发中心 | Assembled cast-in-place concrete sandwiched thermal-insulating wall steel skeleton template system and connector |
-
2018
- 2018-03-19 CN CN201810225291.2A patent/CN108385869B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195193A (en) * | 2013-04-24 | 2013-07-10 | 石家庄晶达建筑体系有限公司 | Structure and construction method of cast-in-site style welded steel frame composite concrete shear wall |
CN105332446A (en) * | 2015-11-24 | 2016-02-17 | 绍兴宝业西伟德混凝土预制件有限公司 | Heat preservation and decoration integrating composite shear wall and construction method thereof |
CN206916990U (en) * | 2016-11-18 | 2018-01-23 | 哈尔滨鸿盛房屋节能体系研发中心 | Assembled cast-in-place concrete sandwiched thermal-insulating wall steel skeleton template system and connector |
CN206800622U (en) * | 2017-06-19 | 2017-12-26 | 深圳中海建筑有限公司 | A kind of assembled integral concrete shear force wall balcony attachment structure |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653399A (en) * | 2018-11-05 | 2019-04-19 | 河北晶达建筑科技股份有限公司 | A kind of construction technology of building |
CN110965676A (en) * | 2019-12-20 | 2020-04-07 | 山东创伟外墙保温材料集团有限公司 | Combined type superposed wall and construction method |
CN112606180A (en) * | 2020-12-16 | 2021-04-06 | 西安建筑科技大学 | Preparation process of heat-insulating wall for passive house |
CN112606180B (en) * | 2020-12-16 | 2022-02-01 | 西安建筑科技大学 | Preparation process of heat-insulating wall for passive house |
Also Published As
Publication number | Publication date |
---|---|
CN108385869B (en) | 2020-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108385869A (en) | A kind of wall element of overlapped shear wall and construction method using its progress | |
CN102230315B (en) | Prefabricated part and semi-prefabricated construction method for multistory building | |
CN103422672A (en) | Construction method for reinforced concrete prefabricated house | |
CN102912900A (en) | Prefabricated assembled superposed plate type concrete shear wall and construction method thereof | |
CN103935911B (en) | Tower crane attached wall supporting construction and construction method thereof | |
CN110258333A (en) | The jig structure and its application method of leveling connection are quickly positioned for Precast Pier Columns | |
CN107476583A (en) | A kind of concrete assembled building builds construction method | |
CN109441099A (en) | Basement single side formwork system and the method for utilizing its outer wall of basement of constructing | |
CN101555709B (en) | Mounting process for composite insulating concrete shear wall | |
CN104532953B (en) | 3D printing based assembly type special-shaped column framework structure and construction method thereof | |
CN202925721U (en) | Prefabricated superimposed sheet-type concrete shear wall structure | |
CN105544815B (en) | One kind is cast-in-place to build prefabricated whole assembly heat preservation exterior sheathing assembling structure free of demolition | |
CN110644371A (en) | Prefabricated capping beam installation method and system | |
CN109610707A (en) | A kind of design and rapid constructing method of prefabricated girder steel and floor fit flush | |
CN107100322B (en) | Post stretching vertical prestressing cast-in-place concrete rod structure and construction method | |
CN205382595U (en) | Integral shear force wall of steel pipe concrete edge constraint coincide | |
KR100860592B1 (en) | Temporary system for vertical structure using precast concreat block | |
CN208918024U (en) | Connecting joint structure and assembled architecture | |
CN109441151A (en) | Prefabricated toilet and its construction and installation method | |
CN106032705A (en) | Integrated casting molding construction method of reinforced concrete floor system | |
CN109895239B (en) | Fabricated concrete stair slow platform beam slab and construction method thereof | |
CN214940227U (en) | Ultra-deep working well with overlapped top plate | |
CN206090998U (en) | Empty stomach sandwich panel | |
CN211007241U (en) | Steel construction building assembled floor fixed knot constructs | |
CN113445744B (en) | Grouting-free sleeve assembly integral beam-column structure UHPC connection construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |