CN107472922A - Floating dock and shipment method - Google Patents
Floating dock and shipment method Download PDFInfo
- Publication number
- CN107472922A CN107472922A CN201710681039.8A CN201710681039A CN107472922A CN 107472922 A CN107472922 A CN 107472922A CN 201710681039 A CN201710681039 A CN 201710681039A CN 107472922 A CN107472922 A CN 107472922A
- Authority
- CN
- China
- Prior art keywords
- hull
- guide pile
- floating dock
- bank
- transport
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/002—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles
- B65G63/004—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles for containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/008—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for bulk material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/06—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-vertical transit
- B65G63/062—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-vertical transit for articles
- B65G63/065—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-vertical transit for articles for containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/06—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-vertical transit
- B65G63/067—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-vertical transit for bulk material
Landscapes
- Ship Loading And Unloading (AREA)
Abstract
The invention provides a kind of floating dock and shipment method, belong to technical field of transportation.Floating dock includes hull, positioner and conveying arrangement, and positioner includes mobilizable guide pile for being connected to hull, and guide pile is used to stretch into river bed, and conveying arrangement is located at hull and is used for the cargo transport of transport lash ship to bank.The floating dock can be moved to the position for needing to unload by hull, goods is transported through by conveying arrangement after being positioned by the guide pile on hull, when specifically used, too many fixed quay is not needed, one floating dock can handle the handling goods of different places, and can realize the rapid transport of goods.Its is reasonable in design, and construction cost is relatively low, and overall using effect is preferable, and market application potential is huge.The transhipment of goods can be fast and effectively realized by the shipment method.
Description
Technical field
The present invention relates to technical field of transportation, in particular to a kind of floating dock and shipment method.
Background technology
With the development of China's inland water transport, existing inland terminal depot is concentrated mainly on several large- and-medium size cities, it is difficult to meets
Growing cargo handling demand, and Yangtze river basin mileage is grown, by being transported again through land highway after existing stevedoring goods
It is defeated, considerably increase cargo cost, for this reason, it may be necessary to along the Yangtze River increase scale not wait several harbours, with meet goods fill
Needs are unloaded, traditional method is to build fixed harbour in correct position along the Yangtze River, excavates basin navigation channel, the dress for goods
Unload, but it is very high, it is necessary to undertake the construction of harbour, build stockyard, purchase of equipment, excavate basin navigation channel etc., small-sized code to build harbour cost
Costly to reach several hundred million yuan, medium-and-large-sized dockage is up to billions of members.
Inventor has found that traditional harbour at least has the following disadvantages under study for action:
Construction cost is too high;
Using effect is poor.
The content of the invention
Object of the present invention is to provide a kind of floating dock, improves the deficiencies in the prior art, it can pass through hull
The position for needing to unload is moved to, goods is transported through by conveying arrangement after being positioned by the guide pile on hull, is had
For body in use, not needing too many fixed quay, a floating dock can handle the handling goods of different places, and can realize
The rapid transport of goods.Its is reasonable in design, and construction cost is relatively low, and overall using effect is preferable, and market application potential is huge.
, can be fast and effectively real by the shipment method another object of the present invention is to provide a kind of shipment method
The transhipment of stock thing.
What embodiments of the invention were realized in:
The embodiment provides a kind of floating dock, and it includes hull, positioner and conveying arrangement, positioning dress
Put including mobilizable guide pile for being connected to hull, guide pile is used to stretch into river bed, and conveying arrangement is located at hull and for inciting somebody to action
The cargo transport of lash ship is transported to bank.
Specifically, the floating dock can be moved to the position for needing to unload by hull, pass through the guide pile on hull
Goods is transported through by conveying arrangement after being positioned, when specifically used, it is not necessary to too many fixed quay, a floating code
Head can handle the handling goods of different places, and can realize the rapid transport of goods.Its is reasonable in design, and construction cost is relatively low,
Overall using effect is preferable, and market application potential is huge.
Optionally, the quantity of positioner is three, and the guide pile of three positioners presses Triangle-Profile.
Optionally, positioner also includes locating bodies, and locating bodies are connected with hull, and guide pile is slidably connected to
Locating bodies, the actuator for driving guide pile is preset with locating bodies.
Optionally, floating dock also includes control device, and control device is used for the driving for controlling each positioner respectively
Part.
Optionally, conveying arrangement includes gantry crane, and gantry crane includes gantry crane body and the suspender for transport container, hull are pre-
Provided with the first track, gantry crane body is connected to hull and can fixed relative to hull, gantry crane sheet with the first track is mobilizable
Body is preset with the second track, and suspender is connected to gantry crane body with the second track is mobilizable.
Optionally, conveying arrangement also includes gate seat, and gate seat includes gate seat body, support frame and for capturing grabbing for bulk cargo
Bucket, gate seat body is mobilizable to be connected to hull and can be fixed relative to hull, and support frame is mobilizable to be connected to gate seat sheet
Body, grab bucket are connected to support frame and moved with the movable of support frame.
Embodiments of the invention additionally provide a kind of shipment method, and using floating dock mentioned above, this method includes:
Determine relative position of the hull relative to bank;
Guide pile is transferred, guide pile is stretched into river bed and hull is fixed relative to bank;
Conveying arrangement is driven, by the cargo transport transported on lash ship to bank.
Optionally, the quantity of positioner is three, and the guide pile of three positioners presses Triangle-Profile;
Positioner also includes locating bodies, and locating bodies are connected with hull, and guide pile is slidably connected to positioning originally
Body, the actuator for driving guide pile is preset with locating bodies;
Floating dock also includes control device, and control device controls the actuator of each positioner respectively, and it is each fixed to make
Predeterminated position corresponding to the stake arrival of position.
Optionally, conveying arrangement includes gantry crane, and gantry crane includes gantry crane body and the suspender for transport container, hull are pre-
Provided with the first track, gantry crane body is connected to hull and can fixed relative to hull, gantry crane sheet with the first track is mobilizable
Body is preset with the second track, and suspender is connected to gantry crane body with the second track is mobilizable;
Suspender is transferred and clamps the container on transport lash ship, and suspender moves up and container is moved with the movement of suspender
Move to bank, suspender and transfer and container is placed on bank.
Optionally, conveying arrangement also includes gate seat, and gate seat includes gate seat body, support frame and for capturing grabbing for bulk cargo
Bucket, gate seat body is mobilizable to be connected to hull and can be fixed relative to hull, and support frame is mobilizable to be connected to gate seat sheet
Body, grab bucket are connected to support frame and moved with the movable of support frame;
Capture the bulk cargo on transport lash ship and by support frame by bulk transportation to bank, grab bucket is transferred to predetermined
Bulk cargo is simultaneously placed on bank by position.
Compared with prior art, the beneficial effect of the embodiment of the present invention is:
In summary, the floating dock can be moved to the position for needing to unload by hull, pass through the positioning on hull
Stake by conveying arrangement is transported through goods after being positioned, when specifically used, it is not necessary to too many fixed quay, a floating
Harbour can handle the handling goods of different places, and can realize the rapid transport of goods.Its is reasonable in design, construction cost compared with
Low, overall using effect is preferable, and market application potential is huge.
The transhipment of goods can be fast and effectively realized by the shipment method.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by embodiment it is required use it is attached
Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not construed as pair
The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this
A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the structural representation for the first floating dock that the embodiment of the present invention 1 provides;
Fig. 2 is the schematic diagram under the working condition of the floating dock shown in Fig. 1;
Fig. 3 is the structural representation for second of floating dock that the embodiment of the present invention 2 provides;
Fig. 4 is the schematic diagram under the working condition of the floating dock shown in Fig. 3.
Icon:100- floating docks;10- hulls;The tracks of 101- first;20- positioners;21- locating bodies;22- determines
Position stake;221- sharp portions;23- actuators;30- gantry cranes;31- gantry crane bodies;The tracks of 311- second;32- suspenders;40- gate seats;
41- gate seat bodies;42- support frames;43- grabs bucket;200- banks;201- trucies;300- transports lash ship;301- containers;302-
Bulk cargo.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
Part of the embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings
The component of example can be configured to arrange and design with a variety of.
Therefore, below the detailed description of the embodiments of the invention to providing in the accompanying drawings be not intended to limit it is claimed
The scope of the present invention, but be merely representative of the present invention selected embodiment.It is common based on the embodiment in the present invention, this area
The every other embodiment that technical staff is obtained under the premise of creative work is not made, belong to the model that the present invention protects
Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.
In the description of the invention, it is necessary to explanation, the orientation or position of the instruction such as term " on ", " under ", " interior ", " outer "
Put relation be based on orientation shown in the drawings or position relationship, or the invention product using when the orientation or position usually put
Relation is put, it is of the invention necessary with simplified description, rather than the device or element of instruction or hint meaning to be for only for ease of description
With specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that indicating or implying relatively important
Property.
In the description of the invention, it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ",
" installation ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or integratedly be connected
Connect;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can
To be the connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood with concrete condition
Concrete meaning in the present invention.
Embodiment 1
Fig. 1 and Fig. 2 are refer to, present embodiments provides a kind of floating dock 100, it includes hull 10, positioner 20
And conveying arrangement, positioner 20 include mobilizable guide pile 22 for being connected to hull 10, guide pile 22 is used to stretch into river bed,
Conveying arrangement is located at hull 10 and is used for the cargo transport of transport lash ship 300 to bank 200.
Similarly, can also be by the cargo transport on bank 200 to transport lash ship 300.
Truck 201 has often been parked on bank 200, to realize the rapid transport of goods.
Specifically, the floating dock 100 can be moved to the position for needing to unload by hull 10, by hull 10
Guide pile 22 by conveying arrangement is transported through goods after being positioned, when specifically used, it is not necessary to too many fixed quay, one
Individual floating dock 100 can handle the handling goods of different places, and can realize the rapid transport of goods.Its is reasonable in design, builds
It is set as relatively low, overall using effect is preferable, and market application potential is huge.
Optionally, the quantity of positioner 20 is three, and the guide pile 22 of three positioners 20 presses Triangle-Profile.
Three 22 distributions triangular in shape of guide pile, triangle have stability, it is preferred that triangle triangle at an acute angle
Shape.
Optionally, positioner 20 also includes locating bodies 21, and locating bodies 21 are connected with hull 10, and guide pile 22 can be slided
The dynamic actuator 23 for being connected to locating bodies 21, being preset with for driving guide pile 22 in locating bodies 21.
Guide pile 22 can be made from columned metal material, be easy to slide, and can realize that guide pile 22 is quickly stretched
Enter river bed to be positioned, or fast lifting realizes that hull 10 is removable.
Through hole can be opened up on locating bodies 21, the guide pile 22 wears through hole, to reach preferable stablizing effect.This is fixed
The end of position stake 22 is provided with spiny sharp portion 221, can extend into riverbed bottom, avoids hull 10 from shifting at work.
The actuator 23 can select cylinder, oil cylinder or motor.
Optionally, floating dock 100 also includes control device, and control device is used to control each positioner 20 respectively
Actuator 23.
The control device can be computer board or PLC.
The situation of river bed is often uncertain, for example some places river bed sandstone is more, and some places soil is more, fixed
Position stake 22 insert river bed depth be certainly it is different, can be by installing pressure-detecting device, so as to detect in real time
Guide pile 22 stretches into the resistance being subject to during river bed, so that it is determined that the end of guide pile 22 needs the depth inserted.Pass through control device
The state of the effective and independent each guide pile 22 of control can be realized, to reach preferable stablizing effect.
Optionally, conveying arrangement includes gantry crane 30, and gantry crane 30 includes gantry crane body 31 and hanging for transport container 301
Tool 32, hull 10 are preset with the first track 101, and gantry crane body 31 is connected to hull 10 and energy with the first track 101 is mobilizable
Enough to be fixed relative to hull 10, gantry crane body 31 is preset with the second track 311, and suspender 32 is with 311 mobilizable company of the second track
It is connected to gantry crane body 31.
Gantry crane 30 be also known as shore container crane or bridge crane, be on bank 200 to the container 301 on ship
The equipment loaded and unloaded.
First track 101 of hull 10 so that gantry crane body 31 can move relative to hull 10, preferable to reach
Working condition.
A kind of floating dock 100 provided according to embodiments of the present invention, the course of work of floating dock 100 are:
When needing to carry out cargo transfer, truck 201 rests on 200 suitable position of bank, and transport lash ship 300 also is moved into
Suitable position, hull 10 are positioned after reaching the position specified by guide pile 22.
Suspender 32 is moved to the top of transport lash ship 300 by the second track 311, then transfers, and reaches transport lash ship 300
Container 301 is fixed behind relevant position, suspender 32 moves up and the top of truck 201 is transferred to the second track 311, then hangs
The decentralization of tool 32, container 301 is transported on truck 201.
Explanation is needed exist for, is transported in the present embodiment on lash ship 300 and is loaded with substantial amounts of container 301, it is necessary to enter
Row transhipment.Similarly need the cargo transport on truck 201 to when transporting on lash ship 300, the course of work is similar.
The orientation titles such as top described herein, decentralization, it is using the relative position in Fig. 2 as description, and operates letter
Singleization processing, when it is implemented, allowing for other operating procedures.
Embodiment 2
Fig. 3 and Fig. 4 are refer to, the present embodiment also provides a kind of floating dock 100, the technical scheme that embodiment 1 describes
The present embodiment is equally applicable to, 1 published technical scheme of embodiment is not repeated to describe.
Specifically, the present embodiment and the difference of embodiment 1 are, conveying arrangement also includes gate seat 40, and gate seat 40 includes door
Seat body 41, support frame 42 and the grab bucket 43 for capturing bulk cargo 302, gate seat body 41 is mobilizable to be connected to hull 10 and energy
Enough to be fixed relative to hull 10, support frame 42 is mobilizable to be connected to gate seat body 41, grab bucket 43 be connected to support frame 42 and with
Support frame 42 movable and move.
Gate seat 40, can also be called high pedestal jib crane, and high pedestal jib crane is that a kind of typical cycle turns arm support
Type rail operation type crane.High pedestal jib crane one door of outer image, so claiming high pedestal jib crane.High pedestal jib crane is wide
It is general to be used for harbour, the cargo handling of harbour, in the construction and installation in shipyard and the construction project of large hydropower station.In seat type
On the support of crane, the rotating mechanism equipped with crane, door shape support is actually the supporting part of crane.Door shape support
Below have travelling mechanism, can ground set track on walk.The arm of lifting mechanism is also equipped with above rotating mechanism
Frame and jib lubbing mechanism.Four mechanisms cooperate, and can carry out the handling operation of goods.
Therefore, on hull 10 can also predetermined trajectory, to realize the removable of gate seat body 41.
Embodiment 3
The present embodiment also provides a kind of shipment method, using floating dock 100 mentioned above, floating dock 100
Structure may be referred to embodiment 1 or 2.
This method includes:
Determine relative position of the hull 10 relative to bank 200;Guide pile 22 is transferred, guide pile 22 is stretched into river bed and makes
Hull 10 is fixed relative to bank 200;Conveying arrangement is driven, by the cargo transport transported on lash ship 300 to bank 200.
Control device controls the actuator 23 of each positioner 20 respectively, reaches each guide pile 22 corresponding default
Position.
When conveying arrangement selects gantry crane 30, suspender 32 is transferred and clamps the container 301 on transport lash ship 300, suspender
32 are moved up and container 301 is moved to bank 200 with moving for suspender 32, and suspender 32 is transferred and places container 301
On bank 200.
When conveying arrangement selects gate seat 40, grab bucket 43 captures the bulk cargo 302 on transport lash ship 300 and by support frame 42
Bulk cargo 302 is transported to bank 200, the decentralization of grab bucket 43 and is placed on bank 200 to precalculated position and by bulk cargo 302.
The container 301 or bulk cargo 302 for being placed on bank 200 are transported by the truck 201 on bank 200, or are directly put
Put on truck 201 and transported by truck 201.
In summary, the invention provides a kind of floating dock 100, the floating dock 100 to be moved by hull 10
The position unloaded to needs, goods is transported through after being positioned by the guide pile 22 on hull 10 by conveying arrangement, is had
For body in use, not needing too many fixed quay, a floating dock 100 can handle the handling goods of different places, and can
Realize the rapid transport of goods.Its is reasonable in design, and construction cost is relatively low, and overall using effect is preferable, and market application potential is huge.
The transhipment of goods can be fast and effectively realized by the shipment method.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should be included in the scope of the protection.
Claims (10)
1. a kind of floating dock (100), it is characterised in that described fixed including hull (10), positioner (20) and conveying arrangement
Position device (20) includes mobilizable guide pile (22) for being connected to the hull (10), and the guide pile (22) is used to stretch into river
Bottom, the conveying arrangement are located at the hull (10) and are used for the cargo transport of transport lash ship (300) to bank (200).
2. floating dock (100) according to claim 1, it is characterised in that the quantity of the positioner (20) is three
Individual, the guide pile (22) of three positioners (20) presses Triangle-Profile.
3. floating dock (100) according to claim 2, it is characterised in that the positioner (20) also includes positioning
Body (21), the locating bodies (21) are connected with the hull (10), and the guide pile (22) is slidably connected to described
Locating bodies (21), the interior actuator (23) being preset with for driving the guide pile (22) of the locating bodies (21).
4. floating dock (100) according to claim 3, it is characterised in that the floating dock (100) also includes control
Device, the control device are used for the actuator (23) for controlling each positioner (20) respectively.
5. the floating dock (100) according to claim any one of 1-4, it is characterised in that the conveying arrangement includes bank
Bridge (30), the gantry crane (30) include gantry crane body (31) and the suspender (32) for transport container (301), the hull
(10) be preset with the first track (101), the gantry crane body (31) with first track (101) it is mobilizable be connected to it is described
Hull (10) and can be fixed relative to the hull (10), the gantry crane body (31) is preset with the second track (311), described
Suspender (32) is connected to the gantry crane body (31) with second track (311) is mobilizable.
6. the floating dock (100) according to claim any one of 1-4, it is characterised in that the conveying arrangement also includes
Gate seat (40), the gate seat (40) include gate seat body (41), support frame (42) and the grab bucket for capturing bulk cargo (302)
(43), the gate seat body (41) is mobilizable is connected to the hull (10) and can be fixed relative to the hull (10),
Support frame as described above (42) is mobilizable to be connected to the gate seat body (41), and the grab bucket (43) is connected to support frame as described above (42)
And moved with the movable of support frame as described above (42).
7. a kind of shipment method, it is characterised in that usage right requires the floating dock (100) described in any one of 1-6, the fortune
Pallet piling up method includes:
Determine relative position of the hull (10) relative to bank (200);
The guide pile (22) is transferred, the guide pile (22) is stretched into river bed and makes the hull (10) relative to bank
(200) it is fixed;
The conveying arrangement is driven, by the cargo transport transported on lash ship (300) to bank (200).
8. shipment method according to claim 7, it is characterised in that the quantity of the positioner (20) be three, three
The guide pile (22) of the individual positioner (20) presses Triangle-Profile;
The positioner (20) also includes locating bodies (21), and the locating bodies (21) are connected with the hull (10), institute
State guide pile (22) and be slidably connected to the locating bodies (21), be preset with the locating bodies (21) for driving institute
State the actuator (23) of guide pile (22);
The floating dock (100) also includes control device, and the control device controls each positioner (20) respectively
Actuator (23), make each guide pile (22) reach corresponding to predeterminated position.
9. shipment method according to claim 8, it is characterised in that the conveying arrangement includes gantry crane (30), the bank
Bridge (30) includes gantry crane body (31) and the suspender (32) for transport container (301), and the hull (10) is preset with first
Track (101), the gantry crane body (31) are connected to the hull (10) and can with first track (101) is mobilizable
Fixed relative to the hull (10), the gantry crane body (31) is preset with the second track (311), and the suspender (32) is with described
Second track (311) is mobilizable to be connected to the gantry crane body (31);
The suspender (32) is transferred and clamps the container (301) on transport lash ship (300), and the suspender (32) moves up and made
Container (301) moves with the suspender (32) and is moved to bank (200), suspender (32) decentralization and by container
(301) it is placed on bank (200).
10. shipment method according to claim 8, it is characterised in that the conveying arrangement also includes gate seat (40), described
Gate seat (40) includes gate seat body (41), support frame (42) and the grab bucket (43) for capturing bulk cargo (302), the gate seat body
(41) mobilizable to be connected to the hull (10) and be fixed relative to the hull (10), support frame as described above (42) can live
Dynamic is connected to the gate seat body (41), and the grab bucket (43) is connected to support frame as described above (42) and with support frame as described above (42)
It is movable and move;
The grab bucket (43) captures the bulk cargo (302) in transport lash ship (300) and by support frame as described above (42) by bulk cargo
(302) transport to bank (200), grab bucket (43) decentralization is placed on bank (200) to precalculated position and by bulk cargo (302).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710681039.8A CN107472922A (en) | 2017-08-10 | 2017-08-10 | Floating dock and shipment method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710681039.8A CN107472922A (en) | 2017-08-10 | 2017-08-10 | Floating dock and shipment method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107472922A true CN107472922A (en) | 2017-12-15 |
Family
ID=60600112
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710681039.8A Pending CN107472922A (en) | 2017-08-10 | 2017-08-10 | Floating dock and shipment method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107472922A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4442943A (en) * | 1981-11-19 | 1984-04-17 | Triplett James T | Floating crane stabilizer |
JP2003312987A (en) * | 2002-04-26 | 2003-11-06 | Sumitomo Heavy Industries Construction Crane Co Ltd | Floating crane |
CN101062751A (en) * | 2007-05-31 | 2007-10-31 | 何富荣 | Beach working hoister |
CN105109632A (en) * | 2015-09-09 | 2015-12-02 | 中国铁建大桥工程局集团有限公司 | Fixed-point floating hoisting construction platform |
CN105366555A (en) * | 2015-11-26 | 2016-03-02 | 三一海洋重工有限公司 | Quayside container crane |
-
2017
- 2017-08-10 CN CN201710681039.8A patent/CN107472922A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4442943A (en) * | 1981-11-19 | 1984-04-17 | Triplett James T | Floating crane stabilizer |
JP2003312987A (en) * | 2002-04-26 | 2003-11-06 | Sumitomo Heavy Industries Construction Crane Co Ltd | Floating crane |
CN101062751A (en) * | 2007-05-31 | 2007-10-31 | 何富荣 | Beach working hoister |
CN105109632A (en) * | 2015-09-09 | 2015-12-02 | 中国铁建大桥工程局集团有限公司 | Fixed-point floating hoisting construction platform |
CN105366555A (en) * | 2015-11-26 | 2016-03-02 | 三一海洋重工有限公司 | Quayside container crane |
Non-Patent Citations (3)
Title |
---|
张弦等: "《物流设施设备应用与管理》", 31 October 2009 * |
张阳、柴仕贞等: "《港口集装箱机械构造与维修》", 30 June 2015 * |
黎红、陈御钗: "《物流设施设备基础与实训》", 31 May 2011 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100812485B1 (en) | The carrier transferring load and unload system of low frame bridge type between the shore side crane and the stack field crane | |
CN106586826B (en) | It is a kind of to be grabbed bucket based on the four-degree-of-freedom of parallel institution from steady casing | |
KR20070104201A (en) | Arrangement scheme of a container wharf and the container loading and unloading process | |
WO2019103611A2 (en) | A method for installation of a pylon section of an off shore wind turbine and a vessel for performing such a method | |
KR20070093791A (en) | Container transportation carrier and contatiner transportation system | |
CN204823711U (en) | Three degrees of freedom are from steady box grab bucket based on parallel mechanism | |
CN110817490A (en) | Grab ship unloader and operation method thereof | |
CN205419566U (en) | Automatic container terminals handling operation system of basin formula | |
CN204661166U (en) | Harbour import and export of goods handling machinery | |
CN107472922A (en) | Floating dock and shipment method | |
CN209290620U (en) | Large-scale component lifting transport installation integrated ship | |
CN205204317U (en) | Container loading and unloading system | |
KR101149499B1 (en) | Unloading system and method of container | |
CN101020540A (en) | Container loading and unloading process | |
CN204057317U (en) | One is transferred handling carrying ship | |
KR20150019523A (en) | Load and unload system of container and container lift appartus thereof | |
CN209492671U (en) | The motor-driven trestle of seashore loading and unloading self-propelled | |
CN106185370A (en) | A kind of harbour automatic loading/unloading conveying device | |
CN102837978B (en) | Shipment method combining large constructional element rolling and floating crane | |
CN206203450U (en) | A kind of Returned formula bucket-wheel stacker reclaimer | |
CN205740096U (en) | Many revolution pivoted arm container cranes | |
CN109533209A (en) | Large-scale component lifting transport installation integrated ship and construction technology | |
CN210214614U (en) | Cargo sampling device for port transportation | |
CN111776954A (en) | Intelligent crane based on infrared measurement | |
KR101096890B1 (en) | Container Transfer Port System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180727 Address after: 410100 101-104, 1101010 building, 31 industrial town, Xingsha Town, Changsha County, Changsha, Hunan Applicant after: Hunan 31 Logistics Co., Ltd. Address before: 519000 room 310, building 336, Shengping Road East, Ping Sha town, Jin Wan District, Zhuhai, Guangdong Applicant before: 31 ocean heavy industry Co., Ltds |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171215 |