CN105109632A - Fixed-point floating hoisting construction platform - Google Patents

Fixed-point floating hoisting construction platform Download PDF

Info

Publication number
CN105109632A
CN105109632A CN201510573528.2A CN201510573528A CN105109632A CN 105109632 A CN105109632 A CN 105109632A CN 201510573528 A CN201510573528 A CN 201510573528A CN 105109632 A CN105109632 A CN 105109632A
Authority
CN
China
Prior art keywords
platform
buoyancy aid
anchor
fixed
floating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510573528.2A
Other languages
Chinese (zh)
Inventor
宋伟俊
齐占国
张海顺
齐伟智
李向海
张庆
游祖群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201510573528.2A priority Critical patent/CN105109632A/en
Publication of CN105109632A publication Critical patent/CN105109632A/en
Pending legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention provides a fixed-point floating hoisting construction platform, comprising a floating body, a Bailey platform, a platform base plate, a crane and supporting body systems. The floating body is formed through splicing a plurality of floating tanks, the Bailey platform is formed through splicing Bailey trusses, the Bailey platform is fixed to the upper end face of the floating body, the platform base plate is paved on the upper end face of the Bailey platform, four corners of the floating body are respectively provided with one supporting body system, the supporting body systems comprise anchor heads, landing legs, supports, bolt pins and hydraulic lifting equipment, longitudinally-distributed bolt pin holes are formed in the landing legs, through holes correspondingly communicated with the bolt pin holes of the landing legs are formed in the supports, the bolt pins are correspondingly inserted and connected into the bolt pin holes and the through holes which are communicated, and the hydraulic lifting equipment is used for controlling the corresponding landing legs to be lifted. The fixed-point floating hoisting construction platform has the beneficial effects that the fixed-point floating hoisting construction platform can perform lifting, loading and unloading, and fixed-point construction at ports, is not affected by tidal waves and is simple in layout, quick in construction, high in efficiency, safe and reliable.

Description

A kind of lifting operation platform of floating of fixing a point
Technical field
The invention belongs to crane equipment field, especially relate to a kind of lifting operation platform of floating of fixing a point.
Background technology
When needing to use weight-lifting equipment in the operation of waters, usually on square boat deck, multi-form hoisting crane is set, it can carry out bank and ship, loading and unloading operation between ship and ship, and it is from heavy and light, takes up an area few, work efficiency is high, job stabilization is good, goes slick, and is ideal handling equipment.Nowadays waters effect adopt the operation platform of hoisting crane to be traditional floating platform, its arrangement and method for construction is all using barge container as carrier mostly, assembled beam in length and breadth and Lift-on/Lift-off System on barge.But barge by the restriction in waters, and can be subject to the impact of tide wave, can produce unstable situation during weight-lifting equipment work.
Summary of the invention
In view of this, the present invention is intended to the lifting operation platform proposing a kind of floating of fixing a point, and can carry out lift at harbour, and fixed point construction, does not affect by tide great waves, and layout is simple, and quick construction, efficiency is high and safe and reliable.
For achieving the above object, technical scheme of the present invention is achieved in that
A kind of lifting operation platform of floating of fixing a point, comprise buoyancy aid, shellfish thunder platform, platform backing plate, hoisting crane and supporter system, described buoyancy aid is spliced to form by several buoyancy tanks, described shellfish thunder platform is spliced to form by Bailey bracket, described shellfish thunder platform is fixed on the upper surface of described buoyancy aid, described platform backing plate is laid on the upper surface of described shellfish thunder platform, the corner place of described buoyancy aid is respectively provided with a supporter system, described support system turnkey draws together anchor head, supporting leg, bearing, pin and hydraulic lifting equipment, described supporting leg is provided with the pin hole of genesis analysis, described bearing is provided with the corresponding through hole be communicated with in described pin hole with described supporting leg, described pin correspondence is plugged in the described pin hole and described through hole that are communicated with each other, described hydraulic lifting equipment correspondence controls the lifting of described supporting leg
Further, described hoisting crane comprises base, control cabin, rotating mechanism and lifting appliance, described base is flexibly connected by snap close with described platform backing plate, described rotating mechanism is arranged between described base and described control cabin, and described control cabin correspondence controls the lifting activity of described lifting appliance.
Further, described buoyancy aid is provided with Bower Anchor, stern anchor and side anchor, and described Bower Anchor is arranged on the front end of described buoyancy aid, and described stern anchor is arranged on the rear end of described buoyancy aid, and described side anchor is arranged on the both sides of described buoyancy aid.
Relative to prior art, the lifting operation platform of fixed point floating of the present invention has following advantage:
The irony buoyancy tank that buoyancy aid of the present invention is customized by several modularizations is spliced to form, so buoyancy aid can according to the actual conditions at construction harbour, and the size and form being become to satisfy the demands by buoyancy tank free splicing; Shellfish thunder platform is also that the Bailey bracket customized by modularization is spliced to form, so shellfish thunder platform can regulate according to the size and form of buoyancy aid, use flexibly, the basic operation platform structure be made up of buoyancy aid and the shellfish thunder platform that is laid on buoyancy aid upper surface is simple, compact in design, meets the actual geographic situation of construction; When the supporting leg of supporter system is packed up, whole operation platform can rely on buoyancy suffered in buoyancy aid encroached water to bear gravity load, conveniently the present invention is transported to the construction area of specifying; After arriving job location, Bower Anchor, stern anchor and the side anchor that buoyancy aid can be relied on to be provided with carry out temporary fixed, the present invention is located temporarily, when supporting leg by hydraulic lifting equipment control transfer to touch the end to anchor head time, after continuing to utilize hydraulic lifting equipment operation platform to be risen from the water surface one segment distance again, in the pin hole that pin grafting can be utilized to enter be communicated with each other and through hole, thus supporting leg and bearing are fixed, namely operation platform of the present invention has been fixed in job location, because buoyancy aid exceeds the water surface one segment distance, so do not affect by tide great waves.
Accompanying drawing explanation
The accompanying drawing forming a part of the present invention is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation that the present invention fixes a point in construction operation;
Fig. 2 is the structural representation that the present invention does not fix a point when constructing;
Fig. 3 is the plan sketch of depression angle of the present invention.
Description of reference numerals:
1-buoyancy aid, 11-buoyancy tank, 12-Bower Anchor, 13-stern anchor, 14-side anchor, 2-shellfish thunder platform, 21-Bailey bracket, 3-platform backing plate, 4-hoisting crane, 41-base, 42-control cabin, 43-rotating mechanism, 44-lifting appliance, 5-supporter system, 51-anchor head, 52-supporting leg, 53-bearing, 54-pin, 55-hydraulic lifting equipment, 56-pin hole.
Detailed description of the invention
It should be noted that, when not conflicting, the embodiment in the present invention and the feature in embodiment can combine mutually.
Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
As Fig. 1, shown in 2, the invention provides a kind of lifting operation platform of floating of fixing a point, comprise buoyancy aid 1, shellfish thunder platform 2, platform backing plate 3, hoisting crane 4 and supporter system 5, described buoyancy aid 1 is spliced to form by several buoyancy tanks 11, described shellfish thunder platform 2 is spliced to form by Bailey bracket 21, described shellfish thunder platform 2 is fixed on the upper surface of described buoyancy aid 1, described platform backing plate 3 is laid on the upper surface of described shellfish thunder platform 2, the corner place of described buoyancy aid 1 is respectively provided with a supporter system 5, described supporter system 5 comprises anchor head 51, supporting leg 52, bearing 53, pin 54 and hydraulic lifting equipment 55, described supporting leg 52 is provided with the pin hole 56 of genesis analysis, described bearing 53 is provided with the corresponding through hole be communicated with in described pin hole 56 with described supporting leg 52, described pin 54 correspondence is plugged in the described pin hole 56 and described through hole that are communicated with each other, described hydraulic lifting equipment 55 correspondence controls the lifting of described supporting leg 52.
Described hoisting crane 4 comprises base 41, control cabin 42, rotating mechanism 43 and lifting appliance 44, described base 41 is flexibly connected by snap close with described platform backing plate 3, described rotating mechanism 43 is arranged between described base 41 and described control cabin 42, and described control cabin 42 correspondence controls the lifting activity of described lifting appliance 44.
As shown in Figure 3, described buoyancy aid 1 is provided with Bower Anchor 12, stern anchor 13 and side anchor 14, and described Bower Anchor 12 is arranged on the front end of described buoyancy aid 1, and described stern anchor 13 is arranged on the rear end of described buoyancy aid 1, and described side anchor 14 is arranged on the both sides of described buoyancy aid 1.
The working process of this example: needing the bank in bridge pier region in construction water, by attaching parts, multiple oblong steel buoyancy tank 11 is assembled into square horizontal buoyancy aid 1, square horizontal buoyancy aid 1 utilize several Bailey brackets 21 to be spliced into shellfish thunder platform 2, and ensure that shellfish thunder platform 2 is firmly connected with buoyancy aid, then on shellfish thunder platform 2, platform backing plate 3 is laid, at the corner place of buoyancy aid 1, a supporter system 5 is respectively installed, finally erecting crane 4 on platform backing plate 3, buoyancy aid 1, shellfish thunder platform 2, platform backing plate 3, hoisting crane 4 and supporter system 5 form operation platform, Power Vessel is utilized to consign to waters of constructing the operation platform after assembling, operation platform is located by recycling jack slide device, utilize Bower Anchor 12, stern anchor 13, multiple temporary fastening devices that side anchor 14 forms carry out temporary fixed, the supporting leg 52 of supporter system 5 is controlled to carry out transferring to seabed by hydraulic lifting equipment 55, after continuing to utilize hydraulic lifting equipment 55 that buoyancy aid 1 is risen to more than the water surface one segment distance again, in the pin hole 56 and through hole that utilize pin 54 grafting to enter to be communicated with each other, operation platform is fixed, hoisting crane 4 is utilized to participate in lifting operation, after hoisting crane 4 operation, remove Bower Anchor 12, stern anchor 13, multiple temporary fastening devices that side anchor 14 forms, take out pin 54, hydraulic lifting equipment 55 is utilized to be regained by supporting leg 52, again the buoyancy overcoming self gravitation making buoyancy aid 1 rely on producing in encroached water, utilize jack slide device that operation platform is moved to next construction place.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (3)

1. the lifting operation platform of a floating of fixing a point, it is characterized in that: comprise buoyancy aid, shellfish thunder platform, platform backing plate, hoisting crane and supporter system, described buoyancy aid is spliced to form by several buoyancy tanks, described shellfish thunder platform is spliced to form by Bailey bracket, described shellfish thunder platform is fixed on the upper surface of described buoyancy aid, described platform backing plate is laid on the upper surface of described shellfish thunder platform, the corner place of described buoyancy aid is respectively provided with a supporter system, described support system turnkey draws together anchor head, supporting leg, bearing, pin and hydraulic lifting equipment, described supporting leg is provided with the pin hole of genesis analysis, described bearing is provided with the corresponding through hole be communicated with in described pin hole with described supporting leg, described pin correspondence is plugged in the described pin hole and described through hole that are communicated with each other, described hydraulic lifting equipment correspondence controls the lifting of described supporting leg.
2. the lifting operation platform of fixed point floating according to claim 1, it is characterized in that: described hoisting crane comprises base, control cabin, rotating mechanism and lifting appliance, described base is flexibly connected by snap close with described platform backing plate, described rotating mechanism is arranged between described base and described control cabin, and described control cabin correspondence controls the lifting activity of described lifting appliance.
3. the lifting operation platform of fixed point floating according to claim 1, it is characterized in that: described buoyancy aid is provided with Bower Anchor, stern anchor and side anchor, described Bower Anchor is arranged on the front end of described buoyancy aid, and described stern anchor is arranged on the rear end of described buoyancy aid, and described side anchor is arranged on the both sides of described buoyancy aid.
CN201510573528.2A 2015-09-09 2015-09-09 Fixed-point floating hoisting construction platform Pending CN105109632A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510573528.2A CN105109632A (en) 2015-09-09 2015-09-09 Fixed-point floating hoisting construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510573528.2A CN105109632A (en) 2015-09-09 2015-09-09 Fixed-point floating hoisting construction platform

Publications (1)

Publication Number Publication Date
CN105109632A true CN105109632A (en) 2015-12-02

Family

ID=54657825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510573528.2A Pending CN105109632A (en) 2015-09-09 2015-09-09 Fixed-point floating hoisting construction platform

Country Status (1)

Country Link
CN (1) CN105109632A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107472922A (en) * 2017-08-10 2017-12-15 三海洋重工有限公司 Floating dock and shipment method
CN111005399A (en) * 2019-12-04 2020-04-14 天津大学 Equipment and method for prefabricating offshore wind power barrel type foundation at wharf front edge
CN115045276A (en) * 2022-07-11 2022-09-13 广东省水利水电第三工程局有限公司 Mobile positioning pile splicing platform device for steel pipe piles in water and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040237871A1 (en) * 1999-11-12 2004-12-02 Moise Benjamin Clay Lift boat
CN101032997A (en) * 2006-03-12 2007-09-12 严建军 Waterborne lattice structure
CN200958209Y (en) * 2006-03-10 2007-10-10 刘晓东 Base construction equipment at deep-water torrent
CN101062751A (en) * 2007-05-31 2007-10-31 何富荣 Beach working hoister
CN203294295U (en) * 2013-06-05 2013-11-20 昆明市福保文化城有限公司 Water floating platform
CN103950845A (en) * 2014-04-28 2014-07-30 浙江省围海建设集团宁波宏阳建设有限公司 Crane with floatable hydraulic slab
CN204057763U (en) * 2014-07-02 2014-12-31 徐工集团工程机械股份有限公司 Off-shore operation hoisting device and off-shore operation weight-lifting equipment
CN204916101U (en) * 2015-09-09 2015-12-30 中国铁建大桥工程局集团有限公司 Jack -up construction platform of fixed point floating

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040237871A1 (en) * 1999-11-12 2004-12-02 Moise Benjamin Clay Lift boat
CN200958209Y (en) * 2006-03-10 2007-10-10 刘晓东 Base construction equipment at deep-water torrent
CN101032997A (en) * 2006-03-12 2007-09-12 严建军 Waterborne lattice structure
CN101062751A (en) * 2007-05-31 2007-10-31 何富荣 Beach working hoister
CN203294295U (en) * 2013-06-05 2013-11-20 昆明市福保文化城有限公司 Water floating platform
CN103950845A (en) * 2014-04-28 2014-07-30 浙江省围海建设集团宁波宏阳建设有限公司 Crane with floatable hydraulic slab
CN204057763U (en) * 2014-07-02 2014-12-31 徐工集团工程机械股份有限公司 Off-shore operation hoisting device and off-shore operation weight-lifting equipment
CN204916101U (en) * 2015-09-09 2015-12-30 中国铁建大桥工程局集团有限公司 Jack -up construction platform of fixed point floating

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107472922A (en) * 2017-08-10 2017-12-15 三海洋重工有限公司 Floating dock and shipment method
CN111005399A (en) * 2019-12-04 2020-04-14 天津大学 Equipment and method for prefabricating offshore wind power barrel type foundation at wharf front edge
CN115045276A (en) * 2022-07-11 2022-09-13 广东省水利水电第三工程局有限公司 Mobile positioning pile splicing platform device for steel pipe piles in water and construction method

Similar Documents

Publication Publication Date Title
KR100949891B1 (en) On-ground building method for conventional type of ship with transverse load-out
JP2020513364A (en) Self-propelled integrated vessel for transportation and installation of submerged tunnel submerged pipes
KR20060066520A (en) A method for shipbuilding on the ground and launching ships using a skid launching system
CN102019998A (en) Erection embarking method of upper and lower water side cabins
CN105109632A (en) Fixed-point floating hoisting construction platform
CN103693170A (en) Floating type offshore wind power assembly platform and method using floating type offshore wind power assembly platform for assembly offshore wind turbine
CN105604072A (en) Steel pile casing cofferdam and steel pile casing settling and positioning method applying same
CN204916101U (en) Jack -up construction platform of fixed point floating
CN101306768A (en) Ship block transfer apparatus and method of transfering ship block
CN102409650A (en) Installation method of shallow water ocean jacket platform
CN101781887A (en) Overhang installation method for upper structure of offshore platform
CN103171976B (en) Hoisting method for shipyard gantry crane
CN103964300B (en) Jacking type increases equipment
CN109244942A (en) A kind of dedicated floating body platform of River Network transmission line construction
CN211281408U (en) A assistance-localization real-time frock that is used for different positions of engineering ship to fall mound
JP2017014940A (en) Method for assembling wind power generator, decomposition method for wind power generator, installation method for wind power generator, and working ship for wind power generator
KR20120057993A (en) Technology of Shiprepair on Ground
JP2012112370A (en) Ship for installing offshore wind turbine and method for installing offshore wind turbine using the same
CN102206938A (en) Novel method for installing upper part block of offshore platform
CN106379495B (en) A kind of Pile Foundation of Wharf underwater maintenance apparatus for work having from the ability of boat
CN205442370U (en) Whole horse mounting structure and fluid reservoir of hanging of fluid reservoir
JP6138149B2 (en) Method for transporting a hydroelectric turbine system
CN209492679U (en) A kind of dedicated floating body platform of River Network transmission line construction
RU2309221C2 (en) Marine ice-resistant adjustable platform mounting system and method for platform transportation and mounting by means of mounting system
CN112706903A (en) Ship berth and ship transfer method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151202