CN107458963A - A kind of integrated main girder construction for single girder crane gear - Google Patents

A kind of integrated main girder construction for single girder crane gear Download PDF

Info

Publication number
CN107458963A
CN107458963A CN201710662679.4A CN201710662679A CN107458963A CN 107458963 A CN107458963 A CN 107458963A CN 201710662679 A CN201710662679 A CN 201710662679A CN 107458963 A CN107458963 A CN 107458963A
Authority
CN
China
Prior art keywords
truss
integrated main
main girder
girder construction
lower cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710662679.4A
Other languages
Chinese (zh)
Inventor
张海兵
吴超
詹旭东
穆跃光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Xingtai Lifting Machinery Co Ltd
Original Assignee
Changchun Xingtai Lifting Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Xingtai Lifting Machinery Co Ltd filed Critical Changchun Xingtai Lifting Machinery Co Ltd
Priority to CN201710662679.4A priority Critical patent/CN107458963A/en
Publication of CN107458963A publication Critical patent/CN107458963A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C6/00Girders, or track-supporting structures, specially adapted for cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/01General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of integrated main girder construction for single girder crane gear, wherein, the integrated main girder construction is made up of upper cover plate, lower cover and truss, upper cover plate is arranged on truss upper surface, lower cover is arranged on truss lower surface, and lower cover doubles as electric block track, and electric block is arranged on lower cover, cucurbit electric power system is provided with upper cover plate, cucurbit electric power system is connected with electric block circuit.Reduce stock's specification of sheet material and section bar, integrated main girder construction fast transportation and quick assembling can be made, and using alignment pin and the frame mode of positioning shaft sleeve.

Description

A kind of integrated main girder construction for single girder crane gear
Technical field
The present invention relates to single-beam crane, more particularly to a kind of integrated main girder construction for single girder crane gear, It is suitable for the crane girders such as bridge-type, gate-type.
Background technology
At present, as the industry-by-industry such as the rapid development of domestic economy, steel, thermoelectricity, petrochemical industry, mine, harbour is also fast Speed forms the scale of oneself, and higher and higher requirement is it is also proposed to safe efficient, the energy-conservation of engineer equipment.Crane has Simple in construction, the advantages that loading capacity is big, and floor space is small, be that mechanization is realized in workshop, stock ground, warehouse, mitigates muscle power The important haulage equipment work, raised labour productivity, thus have a wide range of applications in the industry.In electrical equipment assembly line, smelting The places such as golden industry, railway transportation, container terminal, warehouse dispatching, everywhere it can be seen that various cranes.Crane Welcome new market on the export trade, but the influence of crane acceptor's beam length of domestic traditional type, it can not carry out Container is delivered, and is mainly delivered with loose unpacked material, so not only need the freight charges of costliness can also because marine various adverse circumstances because Element influence and influence the product quality of crane.
Today in constantly improve and progressively ripe for market economic system, for Novel crane research and development work Propose higher requirement, traditional design concept, it is difficult to adapt to Socialist Market Economy Development and faced new The needs of situation, it is more difficult to solve the new problem, the new situation that occur in development, it is therefore desirable to perfect grind is carried out to existing product Study carefully and development.On the one hand, by the optimization of system, arrangement, so as to simplify production procedure, efficiency is improved, and then improve and produce Quality;On the one hand, summary, mass, standardization are manufactured by improve crane products, improve operating efficiency, On the other hand, by optimizing structure design, change traditional integrated main girder construction, design novel integral main beam structure pattern and Mount scheme, cost of transportation is reduced, shortening is manufactured, the in-site installation cycle.
Because girder of the prior art is using steel plate indent or by steel plate assembly welding shaping, larger, the single lifting of girder deadweight When machine is used for outdoor, the influence of wind load is considered when calculating cart operation power of motor.When the span of crane is larger, Because being limited by transport, it is necessary to disintegrate to girder, complexity is not only made at disintegration, it is also relatively time-consuming during installation.When single-beam rises When heavy-duty machine exports, because the size of subject container limits, very big difficulty is brought for old-fashioned structure.Need to carry out hair in bulk Goods, sea-freight can corrode to lacquer painting, influence crane gear quality, while ocean freight in bulk is very high.Girder by tonnage and across Degree influences, and the section of girder and structure type are more, makes cumbersome.Factory needs the library storage for carrying out sheet material standby, the profit of sheet material It is not high with rate, waste is produced, it is standby to carry out library storage, equipment delivery cycle length.Acceptor's beam length limits, separate unit haulage vehicle Can not more crane gears transport simultaneously, cost of transportation height.Box girder heavier-weight, it is right when tonnage, span are larger The lifting capacity of crane in factory building requires, and tonnage is too small to be manufactured.Former girder disintegration joint is to disintegrate Place welding two pieces of flanges, ring flange surrounding carry out with bore, scene be attached by bolt, be in the inside and outside lining plate of girder, Inside and outside liner plate and girder web plate, upper and lower cover plate with boring, hand hole is opened on girder web plate, is attached by bolt, Bolt is main stressed member, and its girder firmness and stability are poor.Multi-sheets are needed to carry out, with boring, making cumbersome, system Make cycle length.Flange weight is larger, waste of material, multiple bolt connections, and in-site installation is inconvenient, and only bolt connection, existing Assembly precision is low during the installation of field, influences product quality.Because the liner plate of girder joint is more, it may appear that leakage is sent out or showed during delivery Group to position not to the problems such as, the problems such as having a generation group is to installation after sale and repeatedly, postpone installation progress.
Therefore, prior art needs further improvement and developed.
The content of the invention
In view of above-mentioned the deficiencies in the prior art, it is an object of the invention to provide a kind of for the whole of single girder crane gear Body formula main beam structure, existing integrated main girder construction is split as several modular units, ensures integrated main girder construction On the premise of intensity, reduce stock's specification of sheet material and section bar.
In order to solve the above technical problems, the present invention program includes:
A kind of integrated main girder construction for single girder crane gear, wherein, the integrated main girder construction is by upper cover plate, lower cover Plate is formed with truss, and upper cover plate is arranged on truss upper surface, and lower cover is arranged on truss lower surface, and lower cover doubles as electric block Track, electric block are arranged on lower cover, and cucurbit electric power system, cucurbit electric power system and electric block are provided with upper cover plate Circuit connects.
Described integrated main girder construction, wherein, above-mentioned truss is by rectangular tube, square tube, channel-section steel, angle steel, H profile steel, welding The shaped steel splicing group weldering such as steel pipe, I-steel or round steel forms.
A kind of integrated main girder construction for single girder crane gear provided by the invention, reduce sheet material and section bar Stock's specification, integrated main girder construction fast transportation and quick assembling can be made, and use alignment pin and positioning shaft sleeve Frame mode, after integrated main girder construction is assembled be alignment pin and positioning shaft sleeve is main stressed member, be ensure that whole Intensity after the assembling of body formula main beam structure.Due to being spliced using section bar, older box-type structure fabrication is simple, fast; Welding supply and demand is reduced, reduces wlding usage amount;Do not limited by order, girder " modular unit " can be subjected to running stock; Because truss girder is spliced using shaped steel, steel utilization ratio is high, improves corporate profit, and in outdoor application, can be with Ignore the influence of wind load.Designed using " modular unit ", girder only selects several specifications " modular unit " can With tonnage and span all standing, stock's specification of reduction sheet material and section bar;Because the crane main screw lift of truss reduces, then add Upper girder is designed using " modular unit ", and acceptor's beam length does not limit land transport vehicle, can the more same cars of crane gear Transport, reduce cost of transportation;Using fabricated structure, girder point " modular unit " makes, and can improve factory building utilization rate.It is main Beam is not limited when making by the crane load in factory building, and large-tonnage crane gear need not be installed in factory building and coordinates production system Make, reduce energy consumption, connection between " modular unit " is attached using bearing pin and bolt, and bearing pin is main stressed member, spiral shell Bolt simply plays a part of connection, is not involved in stress, and design is more reasonable, safety, positioning precision are high;One-time positioning is completed, scene For group to convenient, fast, T-shaped connecting plate replaces original polylith lining plate structure, reduces the usage amount of steel plate, weight reduction, reduces into This.Simple in construction, in amount of parts, all parts are all welded on girder, in the absence of Wrong, missing hair and field assembly position Not to the problems such as, improve installation progress.
Brief description of the drawings
Fig. 1 is the schematic diagram of integrated main girder construction in the present invention;
Fig. 2 is the schematic diagram of T-shaped connecting plate in the present invention;
Fig. 3 is the schematic diagram with alignment pin with the T-shaped connecting plate of positioning shaft sleeve in the present invention;
Fig. 4 is the schematic diagram of the first modularization truss element in the present invention;
Fig. 5 is the schematic diagram of the second modularization truss element in the present invention.
Embodiment
The invention provides a kind of integrated main girder construction for single girder crane gear, for make the purpose of the present invention, Technical scheme and effect are clearer, clear and definite, and the present invention is described in more detail below.It is it should be appreciated that described herein Specific embodiment only to explain the present invention, is not intended to limit the present invention.
The invention provides a kind of integrated main girder construction for single girder crane gear, as shown in Figure 1, the entirety Formula main beam structure is made up of upper cover plate 15, lower cover 7 and truss 16, and upper cover plate 15 is arranged on the upper surface of truss 16, and lower cover 7 is set Put and double as electric block track in truss lower surface, lower cover 7, electric block is arranged on lower cover 7, set on upper cover plate 15 There is cucurbit electric power system, cucurbit electric power system is connected with electric block circuit, and power source is provided for electric block.Above-mentioned truss by The shaped steel splicing group weldering such as rectangular tube, square tube, channel-section steel, angle steel, H profile steel, welded still pipe, I-steel or round steel forms.
Of course for the performance of further optimization integrated main girder construction, integrated main girder construction can use modularization Unit truss forms, and above-mentioned truss 16 includes multiple first modularization truss elements 1 and the second modularization truss element 2, multiple First modularization truss element 1 is in turn connected to form truss 16, and corresponding second modularization truss element connection 2 is in truss 16 Respective end forms above-mentioned integrated main girder construction;The junction of adjacent first modularization truss element 1 and corresponding first module Change truss element 2 is provided with the junction of corresponding second modularization truss element combines connector.
In another preferred embodiment of the present invention, as shown in Figure 2 and Figure 3, combinations thereof connector includes being arranged on First modularization truss element 1 or the T-shaped connecting plate 3 of the corresponding position of the second modularization truss element 2, the both sides of T-shaped connecting plate 3 are equal Installation position 4 is provided with, alignment pin 5 is provided with an installation position 4, positioning shaft sleeve 6 is provided with another installation position 4;Phase The junction of adjacent first modularization truss element 1 or corresponding first modularization truss element 1 and corresponding second modularization truss list The alignment pin 5 of the T-shaped connecting plate 3 of the junction of member 2 is inserted into the positioning shaft sleeve 6 of relative T-shaped connecting plate 3, alignment pin Axle 5 welds together with relative positioning shaft sleeve 6, alignment pin 5 and relative positioning shaft sleeve 6 is turned into primary structure member.Also It is to say, the first modularization truss element 1 is attached with the first modularization truss element 1 to be linked together to be made, one The left side of T-shaped connecting plate 3 is alignment pin 5 on one modularization truss element 1, and right side is positioning shaft sleeve 6, then to link together The left side of 1 T-shaped connecting plate 3 of the first modularization truss element be positioning shaft sleeve 6, right side is alignment pin 5, makes alignment pin 5 Just insert in positioning shaft sleeve 6, while play a part of positioning, then fastening is attached to combination beam by high-strength bolt, Staff is facilitated to carry out subsequent operation.
For example the junction of adjacent first modularization truss element 1 and corresponding first modularization truss element can be used 1 is positioned with the corner of the junction of corresponding second modularization truss element 2 by alignment pin and positioning shaft sleeve, Ran Houtong The bolt hole for crossing T-shaped connecting plate 3 is attached with bolt, and alignment pin 5 is main stress members, and bolt only serves connection Effect, as primary structure member, the intensity with the common guarantee integrated main girder construction of alignment pin 5.
It is of course possible to be provided with two combination connectors up and down in the connection end of above-mentioned first modularization truss element 1;The The connection end of two modularization truss elements 2 is provided with two combination connectors up and down, so that adjacent first modularization truss list The connection of member 1 and corresponding first modularization truss element 1 and corresponding second modularization truss element 2 is more firm, improves whole The stability of body integrated main girder construction.
In another preferred embodiment of the present invention, as shown in Figure 4, above-mentioned first modularization truss element 1 includes frame Frame 8, multiple reinforcement connecting rods 9 are disposed with framework 8.Framework 8 is cube shape framework, such as rectangular frame, square frame etc..
Further, as shown in Figure 5, above-mentioned second modularization truss element 2 includes the first crossbearer 10, the first crossbearer 10 one end is provided with the vertical stand 11 arranged vertically, and the other end of vertical stand 11 is provided with the second crossbearer 12, the first crossbearer 12 Parallel with the second crossbearer 10, the length of the first crossbearer 10 is more than the length of the second crossbearer 12, the first crossbearer 10 and the second crossbearer The oblique pull frame 13 being in tilted layout is provided between 12, the first crossbearer 10, the second crossbearer 12, vertical stand 11 and oblique pull frame 13 are formed The framework of the second modularization truss element 2 is stated, multiple reinforcement connecting rods 14 are disposed with the framework of the second modularization truss element 2; Combinations thereof connector is arranged in vertical stand 11, so as to so that the first modularization truss element 1 and the second modularization truss Unit 2 more easily connects.And above-mentioned first modularization truss element 1, the second modularization truss element 2 are by rectangular tube, side Pipe, channel-section steel, angle steel, H profile steel, welded still pipe, I-steel or round steel splicing group weldering form.
Certainly, described above is only presently preferred embodiments of the present invention, and the present invention is not limited to enumerate above-described embodiment, should When explanation, any those skilled in the art are all equivalent substitutes for being made, bright under the teaching of this specification Aobvious variant, all falls within the essential scope of this specification, ought to be protected by the present invention.

Claims (2)

1. a kind of integrated main girder construction for single girder crane gear, it is characterised in that the integrated main girder construction is by upper Cover plate, lower cover and truss are formed, and upper cover plate is arranged on truss upper surface, and lower cover is arranged on truss lower surface, and lower cover is simultaneous Make electric block track, electric block is arranged on lower cover, and cucurbit electric power system, cucurbit electric power system are provided with upper cover plate It is connected with electric block circuit.
2. integrated main girder construction according to claim 1, it is characterised in that above-mentioned truss is by rectangular tube, square tube, groove Steel, angle steel, H profile steel, welded still pipe, I-steel or round steel splicing group weldering form.
CN201710662679.4A 2017-08-04 2017-08-04 A kind of integrated main girder construction for single girder crane gear Pending CN107458963A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710662679.4A CN107458963A (en) 2017-08-04 2017-08-04 A kind of integrated main girder construction for single girder crane gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710662679.4A CN107458963A (en) 2017-08-04 2017-08-04 A kind of integrated main girder construction for single girder crane gear

Publications (1)

Publication Number Publication Date
CN107458963A true CN107458963A (en) 2017-12-12

Family

ID=60548549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710662679.4A Pending CN107458963A (en) 2017-08-04 2017-08-04 A kind of integrated main girder construction for single girder crane gear

Country Status (1)

Country Link
CN (1) CN107458963A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111377355A (en) * 2018-12-28 2020-07-07 宝山钢铁股份有限公司 Three-web crane beam structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202214125U (en) * 2011-06-24 2012-05-09 中国二十冶集团有限公司 Crane girder combined hoisting device with auxiliary truss
CN202766132U (en) * 2012-03-30 2013-03-06 德马格起重机及部件有限公司 Crane
CN205634649U (en) * 2016-05-04 2016-10-12 河南省大方重型机器有限公司 Purlin derrick crane girder
CN207016360U (en) * 2017-08-04 2018-02-16 长春市兴泰起重机械有限公司 A kind of monoblock type list main beam structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202214125U (en) * 2011-06-24 2012-05-09 中国二十冶集团有限公司 Crane girder combined hoisting device with auxiliary truss
CN202766132U (en) * 2012-03-30 2013-03-06 德马格起重机及部件有限公司 Crane
CN205634649U (en) * 2016-05-04 2016-10-12 河南省大方重型机器有限公司 Purlin derrick crane girder
CN207016360U (en) * 2017-08-04 2018-02-16 长春市兴泰起重机械有限公司 A kind of monoblock type list main beam structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111377355A (en) * 2018-12-28 2020-07-07 宝山钢铁股份有限公司 Three-web crane beam structure

Similar Documents

Publication Publication Date Title
CN106438212B (en) A kind of folding spelling formula tubbiness tower
CN207016360U (en) A kind of monoblock type list main beam structure
CN107215775A (en) It is a kind of to be used for the combined main girder construction of single girder crane gear
CN107458963A (en) A kind of integrated main girder construction for single girder crane gear
CN207226840U (en) A kind of combined type list main beam structure
CN207016359U (en) A kind of double main beam structures of combined type
CN107445056A (en) A kind of integrated main girder construction for being used for double girder crane gears
CN207016361U (en) A kind of double main beam structures of monoblock type
CN202703845U (en) Bottom structure of container ship
CN201999659U (en) Strengthened jib support and crane with same
CN105484945A (en) Polygonal wind power tower and manufacturing method thereof
CN107458962B (en) A kind of combined type main beam structure for double girder lifting equipments
CN203298984U (en) Tower crane general test platform
CN216338968U (en) Railway double-track box girder static load bending test beam
CN204738229U (en) Two bearing plate cable -stay bridge cable wire tower steel anchor case anchor structures
CN109555268A (en) Prefabricated support column and its construction method based on H profile steel
CN205222516U (en) Stand and track crossbeam connection structure between assembled maintenance
CN104359539A (en) Reinforced concrete double-T-beam weighing platform
CN203127803U (en) Support device for rolling-on and rolling-off of heavy ocean structure
CN202755982U (en) Hinged type needle beam
CN203161451U (en) Modular wind driven generator tower barrel
CN207144835U (en) A kind of skid-mounted type pylon
CN207293992U (en) The railway track construction for possessing stem height regulatory function is hung with just beam is traversing
CN205533022U (en) Polygon wind power tower
CN205472319U (en) Between maintenance of combination mobile formula

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171212

RJ01 Rejection of invention patent application after publication