CN107445056A - A kind of integrated main girder construction for being used for double girder crane gears - Google Patents
A kind of integrated main girder construction for being used for double girder crane gears Download PDFInfo
- Publication number
- CN107445056A CN107445056A CN201710662676.0A CN201710662676A CN107445056A CN 107445056 A CN107445056 A CN 107445056A CN 201710662676 A CN201710662676 A CN 201710662676A CN 107445056 A CN107445056 A CN 107445056A
- Authority
- CN
- China
- Prior art keywords
- girder
- cover plate
- truss
- trolley
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C6/00—Girders, or track-supporting structures, specially adapted for cranes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of integrated main girder construction for being used for double girder crane gears, it includes the first girder and the second girder, first girder is identical with the second main beam structure, first girder and the second girder are arranged in parallel, trolley equipment is provided between first girder and the second girder, wherein, first girder is by upper cover plate, lower cover, the truss that trolley track is formed, upper cover plate is arranged on the upper plane of truss, lower cover is arranged on the lower plane of truss, the upper surface of first girder is provided with upper cover plate, the lower surface of first girder is provided with lower cover, trolley track is located at upper cover plate upper surface;First girder is provided with maintenance platform in the side mutually deviated from the second girder, and the second girder is provided with trolley electric power system in the side mutually deviated from the first girder.Reduce stock's specification of sheet material and section bar, combined type double-beam fast transportation and quick assembling can be made.
Description
Technical field
The present invention relates to double girders wherein equipment, more particularly to it is a kind of be applied to double girder bridge-types, gantry crane and its
The integrated main girder construction of his crane gear.
Background technology
At present, as the industry-by-industry such as the rapid development of domestic economy, steel, thermoelectricity, petrochemical industry, mine, harbour is also fast
Speed forms the scale of oneself, and higher and higher requirement is it is also proposed to safe efficient, the energy-conservation of engineer equipment.Crane has
Simple in construction, the advantages that loading capacity is big, and floor space is small, be that mechanization is realized in workshop, stock ground, warehouse, mitigates muscle power
The important haulage equipment work, raised labour productivity, thus have a wide range of applications in the industry.In electrical equipment assembly line, smelting
The places such as golden industry, railway transportation, container terminal, warehouse dispatching, everywhere it can be seen that various cranes.Crane
Welcome new market on the export trade, but the influence of crane acceptor's beam length of domestic traditional type, it can not carry out
Container is delivered, and is mainly delivered with loose unpacked material, so not only need the freight charges of costliness can also because marine various adverse circumstances because
Element influence and influence the product quality of crane.
Today in constantly improve and progressively ripe for market economic system, for Novel crane research and development work
Propose higher requirement, traditional design concept, it is difficult to adapt to Socialist Market Economy Development and faced new
The needs of situation, it is more difficult to solve the new problem, the new situation that occur in development, it is therefore desirable to perfect grind is carried out to existing product
Study carefully and development.On the one hand, by the optimization of system, arrangement, so as to simplify production procedure, efficiency is improved, and then improve and produce
Quality;On the one hand, summary, mass, standardization are manufactured by improve crane products, improve operating efficiency,
On the other hand, by optimizing structure design, change traditional main beam structure, design new main beam structure pattern and mount scheme, drop
Low cost of transportation, shortening is manufactured, the in-site installation cycle.
Because former double girder lifting device girders of the prior art use steel plate assembly welding shaping, girder is conducted oneself with dignity larger.It is double
When girder crane gear is used for outdoor, the influence of wind load is considered when calculating cart operation power of motor, when crane
When span is larger, because being limited by transport, it is necessary to disintegrate to girder, complexity is not only made at disintegration, also compare expense during installation
When.When double girder crane gears export, because the size of subject container limits, very big be stranded is brought for old-fashioned structure
It is difficult.Need to carry out bulk delivery, sea-freight can corrode lacquer painting, influence crane gear quality, while ocean freight in bulk is very
It is high.Double girders are influenceed by tonnage and span, and the section of girder and structure type are more, are made cumbersome.Factory needs to carry out sheet material
Library storage it is standby, the utilization rate of sheet material is not high, produce waste.Acceptor's beam length limits, and separate unit haulage vehicle can not more liftings
Equipment transport simultaneously, and cost of transportation is high.When girder is longer, hall space is required, place is too small to be given birth to
Production makes.Box girder heavier-weight, when tonnage, span are larger, the lifting capacity of the crane in factory building is required, tonnage
It is too small to be manufactured.Former girder disintegration joint is two pieces of flanges of welding at disintegration, is matched somebody with somebody in ring flange surrounding
Bore, scene is attached by bolt.In the inside and outside lining plate of girder, inside and outside liner plate and girder web plate, upper and lower cover plate are carried out
With brill, hand hole is opened on girder web plate, is attached by bolt.Bolt is main stressed member.Multi-sheets are needed to be matched somebody with somebody
Bore, make cumbersome, fabrication cycle length, and only bolt connection, assembly precision is low during in-site installation, influences product quality, only
It is inconvenient using multiple bolt connections, in-site installation.Trolley travelling track needs scene to be welded, and influences the outer of crane gear
Appearance quality.
Therefore, prior art needs further improvement and developed.
The content of the invention
In view of above-mentioned the deficiencies in the prior art, double it is an object of the invention to provide a kind of monoblock type for crane gear
Main beam structure, reduce double girder manufacturing costs.
In order to solve the above technical problems, the present invention program includes:
A kind of integrated main girder construction for being used for double girder crane gears, it includes the first girder and the second girder, the first girder
Identical with the second main beam structure, the first girder and the second girder are arranged in parallel, and have been provided between the first girder and the second girder
The small vehicle device of weight, wherein, the first girder is the truss being made up of upper cover plate, lower cover, trolley track, and upper cover plate is arranged on truss
Upper plane, lower cover is arranged on the lower plane of truss, and the upper surface of the first girder is provided with upper cover plate, the following table of the first girder
Face is provided with lower cover, and trolley track is located at upper cover plate upper surface;First girder is set in the side mutually deviated from the second girder
There is maintenance platform, the second girder is provided with trolley electric power system in the side mutually deviated from the first girder.
Described integrated main girder construction, wherein, above-mentioned first girder and the second girder are by rectangular tube, square tube, channel-section steel, angle
The shaped steel splicing group weldering such as steel, H profile steel, welded still pipe, I-steel or round steel forms.
The invention provides a kind of integrated main girder construction for being used for double girder crane gears, reduce sheet material and section bar
Stock's specification, the double main beam structure fast transportations of monoblock type and quick assembling can be made, and use alignment pin and positioning sleeve
Frame mode, be alignment pin after assembling and positioning sleeve be main stressed member, ensure that combination beam assemble after intensity,
Its is simple in construction, and in amount of parts, all parts are all welded on girder, in the absence of Wrong, missing hair and field assembly position
Not to the problems such as, improve installation progress, the upper and lower cover plate of girder be steel plate, and trolley travelling track uses inserting mode for square steel, and
It is non-to be directly welded as a whole with girder, and the truss element of fit module, the assembling of double girders is improved with splitting efficiency,
The time of double girder assembling a quarters can be shortened.For girder by sectionally assembled assembled, girder can coordinate cucurbit
Used for lifting mechanism and other winding type dollies, bearing pin is main stress members, and bolt only serves connection function, especially suitable
For double girder cranes(Bridge-type, gantry crane etc.)Equipment, due to being spliced using section bar, older box-type structure
Make simply, fast, reduce welding capacity, reduce wlding usage amount.
Brief description of the drawings
Fig. 1 is the structural representation of integrated main girder construction in the present invention;
Fig. 2 is the structural representation of trolley track junction in the present invention;
Fig. 3 is the fractionation structural representation for combining connector in the present invention between modularization truss element;
Fig. 4 is the assembling structure schematic diagram of Fig. 3 combination connector;
Fig. 5 is the structural representation of maintenance platform in the present invention;
Fig. 6 is the structural representation of alignment pin in the present invention;
Fig. 7 is the structural representation that lid is held out against in the present invention;
Fig. 8 is the structural representation of T-shaped connecting plate in the present invention.
Embodiment
The invention provides a kind of integrated main girder construction for being used for double girder crane gears, for make the purpose of the present invention,
Technical scheme and effect are clearer, clear and definite, and the present invention is described in more detail below.It is it should be appreciated that described herein
Specific embodiment only to explain the present invention, is not intended to limit the present invention.
The invention provides a kind of integrated main girder construction for being used for double girder crane gears, as shown in Figure 1, it includes
First girder 1 and the second girder 2, the first girder 1 is identical with the structure of the second girder 2, the first girder 1 and 2 parallel cloth of the second girder
Put, trolley equipment 3 is provided between the first girder 1 and the second girder 2, trolley equipment 3 can use electric block
Mode.Wherein, the first girder 1 is the truss being made up of upper cover plate 6, lower cover 7, trolley track 8, and upper cover plate 6 is arranged on purlin
The upper plane of frame, lower cover 7 are arranged on the lower plane of truss, and the upper surface of the first girder 1 is provided with upper cover plate 6, the first girder 1
Lower surface be provided with lower cover 7, trolley track 8 is located at the upper surface of upper cover plate 6;First girder 1 deviates from the phase of the second girder 3
Side be provided with maintenance platform 9, the second girder 2 is provided with trolley power supply system in the side deviated from the phase of the first girder 1
System, for providing power source for trolley equipment 3.And the above-mentioned girder 2 of first girder 1 and second is by rectangular tube, square tube, groove
The shaped steel splicing group weldering such as steel, angle steel, H profile steel, welded still pipe, I-steel or round steel forms.
Of course for the performance of further optimization integrated main girder construction, as shown in Figures 1 and 2, the first girder 1 with
Second girder 2 can use modular construction mode, and the first girder 1 includes multiple first modularization truss elements 4 and the second mould
The unit of block truss 5, the second modularization truss element 5 double as end carriage, facilitate the installation of the double main beam structures of monoblock type.Multiple
One modularization truss element 4 is in turn connected to form the first girder truss, and corresponding second modularization truss element 5 is connected to first
Girder truss respective end forms above-mentioned first girder 1, the junction of adjacent first modularization truss element 4 and corresponding first mould
Block truss element 4 is provided with the junction of corresponding second modularization truss element 5 and combines connector, so that respective mode
Block truss element is stronger to link together.And the first modularization truss element 4, the second modularization truss element 5
It is to be formed by rectangular tube, square tube, channel-section steel, angle steel, H profile steel, welded still pipe, I-steel or round steel splicing group weldering.
As shown in Fig. 3, Fig. 4 and Fig. 8, combinations thereof connector includes being arranged on the first modularization truss element 4 or the
The T-shaped connecting plate 18 of the corresponding position of two modularization truss element 5, the both sides of T-shaped connecting plate 18 are provided with the first installation position 20, and one
Alignment pin 21 is provided with individual first installation position, positioning sleeve 22 is provided with another first installation position;Link together
Two T-shaped connecting plates 18 between be provided with the T-shaped connecting plate 23 of transition, the both sides of the T-shaped connecting plate 23 of transition are provided with second
Installation position 24, the second installation position 24 are adapted with corresponding alignment pin 21, two T-shaped connecting plates 18 and the T-shaped connection of transition
Plate 23 is bolted together by corresponding, the junction or corresponding first modularization purlin of adjacent first modularization truss element 4
Frame unit 4 is pacified with the alignment pin 21 of the T-shaped connecting plate of the junction of corresponding second modularization truss element 5 through corresponding second
Dress position 24 is inserted into the positioning sleeve 22 of relative T-shaped connecting plate, and alignment pin welds together with relative positioning sleeve, and it is fixed to make
Position bearing pin 21 turns into primary structure member with relative positioning sleeve 22, passes through T-shaped connecting plate 18, the T-shaped connecting plate 23 of transition, alignment pin
21 with the cooperation of positioning sleeve 22, make two adjacent the first modularization truss elements 4 or the first modularization truss element 4 and the
Two modularization truss elements 5 connect more firm, so as to ensure that the intensity of the double main beam structures of monoblock type.That is, the first modularization
When truss element 4 is attached with the first modularization truss element 4 to be linked together, a first modularization truss element
The left side of T-shaped connecting plate 18 is alignment pin 21 on 4, and right side is positioning sleeve 22, then the first modularization purlin to be linked together
The left side of T-shaped connecting plate 18 is positioning sleeve 22 on frame unit 4, and right side is alignment pin 21, alignment pin 21 is just passed through pair
Answer in the second installation position 24 insertion positioning sleeve 22, while play a part of positioning, then combination beam is carried out by high-strength bolt
Connection fastening, facilitates staff to carry out subsequent operation.
Further, as shown in Figure 1, upper cover plate 6 is provided with the upside of the first girder truss, the first girder truss
Under be provided with lower cover 7, be provided with upper cover plate 6 for for trolley equipment 3 walk trolley track 8;Such as Fig. 2 and figure
Shown in 5, maintenance platform 9 is provided with the lower cover of the lower cover of the first girder 1 or the second girder 2, hereafter with maintenance platform 9
It is arranged on exemplified by the first girder 1 and illustrates.The double main beam structures of existing monoblock type are split as several modular units, can
Make combined type double-beam fast transportation and quick assembling.
In another preferred embodiment of the present invention, as shown in Figure 2, above-mentioned trolley track 8 is by multiple track monomers 10
Form, the connection end of track monomer 10 is provided with connection gap 11, connects and is provided with multiple gap connecting holes 12, phase on gap 11
Transition connector 13 is provided between the connection end of adjacent track monomer 10, the both ends of transition connector 13 are respectively arranged with connection and inserted
First 14, connect and be provided with multiple plug connecting holes 15 on plug 14, gap connecting hole 12 is adapted with plug connecting hole 15, connection
Plug 15 connects gap 12 corresponding to inserting, and connection plug 14 passes through sunk screw 16, pin 17 and corresponding track monomer 10
Connection end be connected.Trolley track 8 is split as multiple track monomers 10 according to the first modularization truss element 4 and the second mould
The installation progress synchronization installation carriage track 8 of block truss 5, improves the installation progress of the double main beam structures of monoblock type, and works as
When certain section of trolley track 8 is damaged, individually the corresponding position of track 8 can be changed, reduce the maintenance of user into
This.
In another preferred embodiment of the present invention, the end set of above-mentioned alignment pin 21 has neck 25, alignment pin
21 are plugged in together with corresponding positioning sleeve 22, and the termination of alignment pin 21 is exposed at the corresponding outside of positioning sleeve 22, alignment pin 21
Termination be configured with and hold out against lid 26, hold out against lid 26 and the corresponding position of neck 25 be provided with card rib 27, the termination edge of alignment pin 21
The line of alignment pin axle 21 is provided with screw, holds out against lid 26 and is configured with fastening bolt 28, holds out against lid 26 and is buckled in the end of alignment pin 21
Head, fastening bolt 28 are screwed into screw through holding out against lid 26, can be with 21 stronger knot of alignment pin so that holding out against lid 26
It is combined, so that T-shaped connecting plate 18, the T-shaped connecting plate 23 of transition, alignment pin 21 form integral type knot with positioning sleeve 22
Structure, even if without welding, also meet double requirements of the main beam structure to intensity of monoblock type.
Certain, the connection end of above-mentioned first modularization truss element 4 is provided with two combinations thereof connectors up and down;The
The connection end of two modularization truss elements 5 is provided with two combinations thereof connectors up and down, so that adjacent first modularization purlin
The junction of frame unit 4 and the corner of the junction of corresponding first modularization truss element 4 and the second modularization truss element 5
Positioned by combining connector, alignment pin 21 is main stress members, and bolt only serves connection function, improves overall group
The stability of box-like twin beams.
Certainly, described above is only presently preferred embodiments of the present invention, and the present invention is not limited to enumerate above-described embodiment, should
When explanation, any those skilled in the art are all equivalent substitutes for being made, bright under the teaching of this specification
Aobvious variant, all falls within the essential scope of this specification, ought to be protected by the present invention.
Claims (2)
1. a kind of integrated main girder construction for being used for double girder crane gears, it includes the first girder and the second girder, the first master
Beam is identical with the second main beam structure, and the first girder and the second girder are arranged in parallel, and are provided between the first girder and the second girder
Trolley equipment, it is characterised in that the first girder is the truss being made up of upper cover plate, lower cover, trolley track, and upper cover plate is set
The upper plane in truss is put, lower cover is arranged on the lower plane of truss, and the upper surface of the first girder is provided with upper cover plate, the first master
The lower surface of beam is provided with lower cover, and trolley track is located at upper cover plate upper surface;First girder is mutually deviating from the second girder
Side is provided with maintenance platform, and the second girder is provided with trolley electric power system in the side mutually deviated from the first girder.
2. integrated main girder construction according to claim 1, it is characterised in that above-mentioned first girder and the second girder are by square
Shape pipe, square tube, channel-section steel, angle steel, H profile steel, welded still pipe, I-steel or round steel splicing group weldering form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710662676.0A CN107445056A (en) | 2017-08-04 | 2017-08-04 | A kind of integrated main girder construction for being used for double girder crane gears |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710662676.0A CN107445056A (en) | 2017-08-04 | 2017-08-04 | A kind of integrated main girder construction for being used for double girder crane gears |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107445056A true CN107445056A (en) | 2017-12-08 |
Family
ID=60490808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710662676.0A Pending CN107445056A (en) | 2017-08-04 | 2017-08-04 | A kind of integrated main girder construction for being used for double girder crane gears |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107445056A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108584713A (en) * | 2018-04-04 | 2018-09-28 | 中交第三公路工程局有限公司 | A kind of prefabricated member lifting new process and equipment |
CN112744697A (en) * | 2020-12-28 | 2021-05-04 | 江阴市凯力起重电机有限公司 | Double-drive-wheel anti-deviation ultra-low end beam structure suspension crane |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2776280A1 (en) * | 1998-03-19 | 1999-09-24 | Reel Sa | Modular beam for lifting equipment |
CN202080828U (en) * | 2011-03-23 | 2011-12-21 | 大连大起产业开发有限公司 | Double-girder hoist crane |
CN202322011U (en) * | 2011-09-19 | 2012-07-11 | 冯锡兴 | Novel electric double-beam bridge crane girder |
CN202864734U (en) * | 2012-07-16 | 2013-04-10 | 安徽威萨重工机械有限公司 | Novel double-beam bridge crane |
RU135633U1 (en) * | 2013-06-05 | 2013-12-20 | Открытое акционерное общество Научно-производственное объединение "ВНИИПТМАШ" (ОАО НПО "ВНИИПТМАШ") | DEVICE FOR CREATION OF CONSTRUCTION LIFT ON VERTICAL WALLS OF SPAN BEAMS OF THE BRIDGE CRANE |
JP6026638B2 (en) * | 2012-03-30 | 2016-11-16 | テレックス エムハーペーエス アイピー マネジメント ゲーエムベーハー | Crane with at least one crane girder, in particular bridge crane or gantry crane |
CN106586843A (en) * | 2016-11-04 | 2017-04-26 | 合肥市春华起重机械有限公司 | Double-beam bridge type crane |
CN207016361U (en) * | 2017-08-04 | 2018-02-16 | 长春市兴泰起重机械有限公司 | A kind of double main beam structures of monoblock type |
-
2017
- 2017-08-04 CN CN201710662676.0A patent/CN107445056A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2776280A1 (en) * | 1998-03-19 | 1999-09-24 | Reel Sa | Modular beam for lifting equipment |
CN202080828U (en) * | 2011-03-23 | 2011-12-21 | 大连大起产业开发有限公司 | Double-girder hoist crane |
CN202322011U (en) * | 2011-09-19 | 2012-07-11 | 冯锡兴 | Novel electric double-beam bridge crane girder |
JP6026638B2 (en) * | 2012-03-30 | 2016-11-16 | テレックス エムハーペーエス アイピー マネジメント ゲーエムベーハー | Crane with at least one crane girder, in particular bridge crane or gantry crane |
CN202864734U (en) * | 2012-07-16 | 2013-04-10 | 安徽威萨重工机械有限公司 | Novel double-beam bridge crane |
RU135633U1 (en) * | 2013-06-05 | 2013-12-20 | Открытое акционерное общество Научно-производственное объединение "ВНИИПТМАШ" (ОАО НПО "ВНИИПТМАШ") | DEVICE FOR CREATION OF CONSTRUCTION LIFT ON VERTICAL WALLS OF SPAN BEAMS OF THE BRIDGE CRANE |
CN106586843A (en) * | 2016-11-04 | 2017-04-26 | 合肥市春华起重机械有限公司 | Double-beam bridge type crane |
CN207016361U (en) * | 2017-08-04 | 2018-02-16 | 长春市兴泰起重机械有限公司 | A kind of double main beam structures of monoblock type |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108584713A (en) * | 2018-04-04 | 2018-09-28 | 中交第三公路工程局有限公司 | A kind of prefabricated member lifting new process and equipment |
CN108584713B (en) * | 2018-04-04 | 2020-04-24 | 中交第三公路工程局有限公司 | Novel process and equipment for hoisting assembly type component |
CN112744697A (en) * | 2020-12-28 | 2021-05-04 | 江阴市凯力起重电机有限公司 | Double-drive-wheel anti-deviation ultra-low end beam structure suspension crane |
CN112744697B (en) * | 2020-12-28 | 2023-06-23 | 江阴市凯力起重电机有限公司 | Double-drive wheel anti-deviation ultralow end beam structure suspension crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105780989B (en) | A kind of twin beams building cover structure | |
CN207016359U (en) | A kind of double main beam structures of combined type | |
CN107445056A (en) | A kind of integrated main girder construction for being used for double girder crane gears | |
CN102284820B (en) | Method for overturning box beam | |
CN207016361U (en) | A kind of double main beam structures of monoblock type | |
CN103015453B (en) | Dual-connection type tower crane foundation | |
CN207016360U (en) | A kind of monoblock type list main beam structure | |
CN107458962B (en) | A kind of combined type main beam structure for double girder lifting equipments | |
CN107720542B (en) | Hoisting track composite beam | |
CN207226840U (en) | A kind of combined type list main beam structure | |
CN107215775B (en) | A kind of combined type main beam structure for single girder lifting equipment | |
CN107458963A (en) | A kind of integrated main girder construction for single girder crane gear | |
CN201372163Y (en) | Bailey truss combined gantry crane | |
CN216338968U (en) | Railway double-track box girder static load bending test beam | |
CN205222516U (en) | Stand and track crossbeam connection structure between assembled maintenance | |
CN104234188A (en) | Combined steel structure of prefabricated house | |
CN204738229U (en) | Two bearing plate cable -stay bridge cable wire tower steel anchor case anchor structures | |
CN102535507A (en) | Combined tower base | |
CN203127803U (en) | Support device for rolling-on and rolling-off of heavy ocean structure | |
CN202913357U (en) | Conveniently maintained space truss bridge erecting machine | |
CN201024038Y (en) | Suspension girder for two trolleys synchronous hoisting | |
CN206069242U (en) | Combination type arm support and crane gear | |
CN210111378U (en) | Box transformer substation and steel platform integrated device | |
CN202805398U (en) | Instrumental auxiliary turning system and turning stand | |
CN109956395A (en) | A kind of steel vestibule integrally promotes shackle structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171208 |