A kind of double main beam structures of monoblock type
Technical field
Double girder wherein equipment are the utility model is related to, more particularly to it is a kind of suitable for double girder bridge-types, gantry crane
And the double main beam structures of monoblock type of other crane gears.
Background technology
At present, as the industry-by-industry such as the rapid development of domestic economy, steel, thermoelectricity, petrochemical industry, mine, harbour is also fast
Speed forms the scale of oneself, and higher and higher requirement is it is also proposed to safe efficient, the energy-conservation of engineer equipment.Crane has
Simple in construction, the advantages that loading capacity is big, and floor space is small, be that mechanization is realized in workshop, stock ground, warehouse, mitigates muscle power
The important haulage equipment work, raised labour productivity, thus have a wide range of applications in the industry.In electrical equipment assembly line, smelting
The places such as golden industry, railway transportation, container terminal, warehouse dispatching, everywhere it can be seen that various cranes.Crane
Welcome new market on the export trade, but the influence of crane acceptor's beam length of domestic traditional type, it can not carry out
Container is delivered, and is mainly delivered with loose unpacked material, so not only need the freight charges of costliness can also because marine various adverse circumstances because
Element influence and influence the product quality of crane.
Today in constantly improve and progressively ripe for market economic system, for Novel crane research and development work
Propose higher requirement, traditional design concept, it is difficult to adapt to Socialist Market Economy Development and faced new
The needs of situation, it is more difficult to solve the new problem, the new situation that occur in development, it is therefore desirable to perfect grind is carried out to existing product
Study carefully and development.On the one hand, by the optimization of system, arrangement, so as to simplify production procedure, efficiency is improved, and then improve and produce
Quality;On the one hand, summary, mass, standardization are manufactured by improve crane products, improve operating efficiency,
On the other hand, by optimizing structure design, change traditional main beam structure, design new main beam structure pattern and mount scheme, drop
Low cost of transportation, shortening is manufactured, the in-site installation cycle.
Because former double girder lifting device girders of the prior art use steel plate assembly welding shaping, girder is conducted oneself with dignity larger.It is double
When girder crane gear is used for outdoor, the influence of wind load is considered when calculating cart operation power of motor, when crane
When span is larger, because being limited by transport, it is necessary to disintegrate to girder, complexity is not only made at disintegration, also compare expense during installation
When.When double girder crane gears export, because the size of subject container limits, very big be stranded is brought for old-fashioned structure
It is difficult.Need to carry out bulk delivery, sea-freight can corrode lacquer painting, influence crane gear quality, while ocean freight in bulk is very
It is high.Double girders are influenceed by tonnage and span, and the section of girder and structure type are more, are made cumbersome.Factory needs to carry out sheet material
Library storage it is standby, the utilization rate of sheet material is not high, produce waste.Acceptor's beam length limits, and separate unit haulage vehicle can not more liftings
Equipment transport simultaneously, and cost of transportation is high.When girder is longer, hall space is required, place is too small to be given birth to
Production makes.Box girder heavier-weight, when tonnage, span are larger, the lifting capacity of the crane in factory building is required, tonnage
It is too small to be manufactured.Former girder disintegration joint is two pieces of flanges of welding at disintegration, is matched somebody with somebody in ring flange surrounding
Bore, scene is attached by bolt.In the inside and outside lining plate of girder, inside and outside liner plate and girder web plate, upper and lower cover plate are carried out
With brill, hand hole is opened on girder web plate, is attached by bolt.Bolt is main stressed member.Multi-sheets are needed to be matched somebody with somebody
Bore, make cumbersome, fabrication cycle length, and only bolt connection, assembly precision is low during in-site installation, influences product quality, only
It is inconvenient using multiple bolt connections, in-site installation.Trolley travelling track needs scene to be welded, and influences the outer of crane gear
Appearance quality.
Therefore, prior art needs further improvement and developed.
Utility model content
In view of above-mentioned the deficiencies in the prior art, the purpose of this utility model is to provide a kind of entirety for crane gear
The double main beam structures of formula, reduce double girder manufacturing costs.
In order to solve the above technical problems, the utility model includes:
A kind of double main beam structures of monoblock type, it includes the first girder and the second girder, the first girder and the second main beam structure
Identical, the first girder and the second girder are arranged in parallel, and trolley equipment is provided between the first girder and the second girder, its
In, the first girder is the truss being made up of upper cover plate, lower cover, trolley track, and upper cover plate is arranged on the upper plane of truss, lower cover
Plate is arranged on the lower plane of truss, and the upper surface of the first girder is provided with upper cover plate, and the lower surface of the first girder is provided with lower cover
Plate, trolley track are located at upper cover plate upper surface;First girder is provided with maintenance platform in the side mutually deviated from the second girder, the
Two girders are provided with trolley electric power system in the side mutually deviated from the first girder.
The double main beam structures of described monoblock type, wherein, above-mentioned first girder and the second girder by rectangular tube, square tube, channel-section steel,
The shaped steel splicing group weldering such as angle steel, H profile steel, welded still pipe, I-steel or round steel forms.
The utility model provides a kind of double main beam structures of monoblock type, reduces stock's specification of sheet material and section bar, can
Make the double main beam structure fast transportations of monoblock type and quick assembling, and use the frame mode of alignment pin and positioning sleeve,
Alignment pin after assembling and positioning sleeve be main stressed member, ensure that combination beam assemble after intensity, its is simple in construction, zero
In number of components, all parts are all welded on girder, in the absence of Wrong, missing hair and field assembly position not to the problems such as, carry
High installation progress, the upper and lower cover plate of girder are steel plate, and trolley travelling track is that square steel uses inserting mode, not direct with girder
It is welded as a whole, and the truss element of fit module, the assembling of double girders is improved with splitting efficiency, can shorten double masters
Beam assembles the time of a quarter.Girder by sectionally assembled assembled, girder cucurbit can be coordinated for lifting mechanism and
Other winding type dollies use, and bearing pin is main stress members, and bolt only serves connection function, and double girders that are particularly suitable for use in rise
Heavy-duty machine(Bridge-type, gantry crane etc.)Equipment, due to being spliced using section bar, older box-type structure fabrication is simple, soon
Victory, reduce welding capacity, reduce wlding usage amount.
Brief description of the drawings
Fig. 1 is the structural representation of the double main beam structures of monoblock type in the utility model;
Fig. 2 is the structural representation of trolley track junction in the utility model;
Fig. 3 is the fractionation structural representation for combining connector in the utility model between modularization truss element;
Fig. 4 is the assembling structure schematic diagram of Fig. 3 combination connector;
Fig. 5 is the structural representation of maintenance platform in the utility model;
Fig. 6 is the structural representation of alignment pin in the utility model;
Fig. 7 is the structural representation that lid is held out against in the utility model;
Fig. 8 is the structural representation of T-shaped connecting plate in the utility model.
Embodiment
The utility model provides a kind of double main beam structures of monoblock type, for make the purpose of this utility model, technical scheme and
Effect is clearer, clear and definite, and the utility model is further described below.It is it should be appreciated that described herein specific real
Example is applied only to explain the utility model, is not used to limit the utility model.
The utility model provides a kind of double main beam structures of monoblock type, as shown in Figure 1, and it includes the first girder 1 and the
Two girders 2, the first girder 1 is identical with the structure of the second girder 2, and the first girder 1 is arranged in parallel with the second girder 2, the first girder 1 with
Trolley equipment 3 is provided between second girder 2, trolley equipment 3 can be by the way of electric block.Wherein,
One girder 1 is the truss being made up of upper cover plate 6, lower cover 7, trolley track 8, and upper cover plate 6 is arranged on the upper plane of truss, lower cover
Plate 7 is arranged on the lower plane of truss, and the upper surface of the first girder 1 is provided with upper cover plate 6, and the lower surface of the first girder 1 is provided with
Lower cover 7, trolley track 8 are located at the upper surface of upper cover plate 6;First girder 1 is provided with dimension in the side deviated from the phase of the second girder 3
Equating platform 9, the second girder 2 are provided with trolley electric power system in the side deviated from the phase of the first girder 1, for for lifting it is small
Vehicle device 3 provides power source.And the above-mentioned girder 2 of first girder 1 and second by rectangular tube, square tube, channel-section steel, angle steel, H profile steel,
The shaped steel splicing group weldering such as welded still pipe, I-steel or round steel forms.
Of course for the performance of the further double main beam structures of optimization monoblock type, as shown in Figures 1 and 2, the first girder 1
Modular construction mode can be used with the second girder 2, the first girder 1 includes multiple first modularization truss elements 4 and second
The unit of modularization truss 5, the second modularization truss element 5 double as end carriage, facilitate the installation of the double main beam structures of monoblock type.It is multiple
First modularization truss element 4 is in turn connected to form the first girder truss, and corresponding second modularization truss element 5 is connected to
One girder truss respective end forms above-mentioned first girder 1, the junction and corresponding first of adjacent first modularization truss element 4
Modularization truss element 4 is provided with the junction of corresponding second modularization truss element 5 and combines connector, so that accordingly
Modularization truss element is stronger to link together.And the first modularization truss element 4, the second modularization truss element 5
And formed by rectangular tube, square tube, channel-section steel, angle steel, H profile steel, welded still pipe, I-steel or round steel splicing group weldering.
As shown in Fig. 3, Fig. 4 and Fig. 8, combinations thereof connector includes being arranged on the first modularization truss element 4 or the
The T-shaped connecting plate 18 of the corresponding position of two modularization truss element 5, the both sides of T-shaped connecting plate 18 are provided with the first installation position 20, and one
Alignment pin 21 is provided with individual first installation position, positioning sleeve 22 is provided with another first installation position;Link together
Two T-shaped connecting plates 18 between be provided with the T-shaped connecting plate 23 of transition, the both sides of the T-shaped connecting plate 23 of transition are provided with second
Installation position 24, the second installation position 24 are adapted with corresponding alignment pin 21, two T-shaped connecting plates 18 and the T-shaped connection of transition
Plate 23 is bolted together by corresponding, the junction or corresponding first modularization purlin of adjacent first modularization truss element 4
Frame unit 4 is pacified with the alignment pin 21 of the T-shaped connecting plate of the junction of corresponding second modularization truss element 5 through corresponding second
Dress position 24 is inserted into the positioning sleeve 22 of relative T-shaped connecting plate, and alignment pin welds together with relative positioning sleeve, and it is fixed to make
Position bearing pin 21 turns into primary structure member with relative positioning sleeve 22, passes through T-shaped connecting plate 18, the T-shaped connecting plate 23 of transition, alignment pin
21 with the cooperation of positioning sleeve 22, make two adjacent the first modularization truss elements 4 or the first modularization truss element 4 and the
Two modularization truss elements 5 connect more firm, so as to ensure that the intensity of the double main beam structures of monoblock type.That is, the first modularization
When truss element 4 is attached with the first modularization truss element 4 to be linked together, a first modularization truss element
The left side of T-shaped connecting plate 18 is alignment pin 21 on 4, and right side is positioning sleeve 22, then the first modularization purlin to be linked together
The left side of T-shaped connecting plate 18 is positioning sleeve 22 on frame unit 4, and right side is alignment pin 21, alignment pin 21 is just passed through pair
Answer in the second installation position 24 insertion positioning sleeve 22, while play a part of positioning, then combination beam is carried out by high-strength bolt
Connection fastening, facilitates staff to carry out subsequent operation.
Further, as shown in Figure 1, upper cover plate 6 is provided with the upside of the first girder truss, the first girder truss
Under be provided with lower cover 7, be provided with upper cover plate 6 for for trolley equipment 3 walk trolley track 8;Such as Fig. 2 and figure
Shown in 5, maintenance platform 9 is provided with the lower cover of the lower cover of the first girder 1 or the second girder 2, hereafter with maintenance platform 9
It is arranged on exemplified by the first girder 1 and illustrates.The double main beam structures of existing monoblock type are split as several modular units, can
Make combined type double-beam fast transportation and quick assembling.
In another preferred embodiment of the present utility model, as shown in Figure 2, above-mentioned trolley track 8 is by multiple track lists
Body 10 is formed, and the connection end of track monomer 10 is provided with connection gap 11, connects and is provided with multiple gap connecting holes on gap 11
12, transition connector 13 is provided between the connection end of adjacent orbit monomer 10, and the both ends of transition connector 13 are respectively arranged with
Plug 14 is connected, connects and is provided with multiple plug connecting holes 15 on plug 14, gap connecting hole 12 is fitted with the phase of plug connecting hole 15
Match somebody with somebody, connection plug 15 inserts corresponding connection gap 12, and connection plug 14 passes through sunk screw 16, pin 17 and corresponding track
The connection end of monomer 10 is connected.By trolley track 8 be split as multiple track monomers 10 according to the first modularization truss element 4 with
The installation progress synchronization installation carriage track 8 of second modularization truss 5, the installation progress of the double main beam structures of monoblock type is improved,
And when certain section of trolley track 8 is damaged, individually the corresponding position of track 8 can be changed, reduce user's
Maintenance cost.
In another preferred embodiment of the present utility model, the end set of above-mentioned alignment pin 21 has neck 25, positioning
Bearing pin 21 is plugged in together with corresponding positioning sleeve 22, and the termination of alignment pin 21 is exposed at the corresponding outside of positioning sleeve 22, alignment pin
The termination of axle 21, which is configured with, holds out against lid 26, holds out against lid 26 and the corresponding position of neck 25 is being provided with card rib 27, the end of alignment pin 21
Head is provided with screw along the line of alignment pin axle 21, holds out against lid 26 and is configured with fastening bolt 28, holds out against lid 26 and be buckled in alignment pin
21 terminations, fastening bolt 28 are screwed into screw through holding out against lid 26, can be more firm with alignment pin 21 so that holding out against lid 26
Be combined together so that T-shaped connecting plate 18, the T-shaped connecting plate 23 of transition, alignment pin 21 and positioning sleeve 22 form integral type
Structure, even if without welding, also meet double requirements of the main beam structure to intensity of monoblock type.
Certain, the connection end of above-mentioned first modularization truss element 4 is provided with two combinations thereof connectors up and down;The
The connection end of two modularization truss elements 5 is provided with two combinations thereof connectors up and down, so that adjacent first modularization purlin
The junction of frame unit 4 and the corner of the junction of corresponding first modularization truss element 4 and the second modularization truss element 5
Positioned by combining connector, alignment pin 21 is main stress members, and bolt only serves connection function, improves overall group
The stability of box-like twin beams.
Certainly, described above is only preferred embodiment of the present utility model, and the utility model is not limited to enumerate above-mentioned
Embodiment, it should be noted that for any those skilled in the art under the teaching of this specification, that is made is all etc.
With replacement, obvious variant, all fall within the essential scope of this specification, ought to be by protection of the present utility model.