CN107447777A - Anchor anti-sliding piled barricade is put in a kind of hole - Google Patents

Anchor anti-sliding piled barricade is put in a kind of hole Download PDF

Info

Publication number
CN107447777A
CN107447777A CN201710815947.1A CN201710815947A CN107447777A CN 107447777 A CN107447777 A CN 107447777A CN 201710815947 A CN201710815947 A CN 201710815947A CN 107447777 A CN107447777 A CN 107447777A
Authority
CN
China
Prior art keywords
anchor
slope
friction pile
sliding
anchoring section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710815947.1A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Fanda Mechanical Technology Co Ltd
Original Assignee
Wuhu Fanda Mechanical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Fanda Mechanical Technology Co Ltd filed Critical Wuhu Fanda Mechanical Technology Co Ltd
Priority to CN201710815947.1A priority Critical patent/CN107447777A/en
Publication of CN107447777A publication Critical patent/CN107447777A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors

Abstract

The invention belongs to slope treatment field and disclose point anchor anti-sliding piled barricade in a kind of novel hole, including top of the slope, friction pile, point anchor, anchoring section and horizontal slump arch, friction pile is provided between the top of the slope and bottom of slope, friction pile surface intermittent is provided with anchor cable, described anchor cable one end is provided with anchoring section, point anchor is provided between the anchor cable and friction pile, horizontal slump arch is provided between described anchor with vertical slump to encircle, the sliding plane of fracture is provided between the anchoring section and anchor cable and anchoring section is arranged inside the sliding plane of fracture, point anchor technology integrates the advantages of piled anchor and point anchor method in stake of the present invention, construction time structure safety can be ensured, and can reduces construction costs;There is identical construction method with traditional pile-anchor system;Pile body physical dimension is small, reinforcing bar is few, low cost, short time limit;Avoid disadvantage of the conventional point anchor method for protecting support without vertical supporting.

Description

Anchor anti-sliding piled barricade is put in a kind of hole
Technical field
The present invention relates to a kind of barricade, point anchor anti-sliding piled barricade in more particularly to a kind of novel hole.
Background technology
It is well known that now, the difficulty that In Slope Engineering Design faces is:1) in urban construction, the limitation of environmental condition and Complexity increases considerably;2) because environmental condition limits, geological conditions non-selectivity;3) calamity such as earthquake, heavy rain, accidental shock Changing environment limitation increase.Under the limitation of these conditions, In Slope Engineering Design becomes very difficult, and friction pile is goed deep into through slopes In the pile of slider bed, to support the sliding force of gliding mass, stable side slope can be played a part of, it mainly utilizes Sliding Plane The anchor tube effect for stablizing rock stratum below balances landslide Thrust with passive resisting force.With caused by China's earthquake increasingly frequency Numerous, various slope geological disasters caused by earthquake occur also more and more frequently, harnessing landslide just become one it is more and more important Engineering, compared with other Anti-slide engineerings, for example long and short anchor arm, anchor pole etc. are compared, and friction pile has antiskid kinetic force strong, suitable With scope it is wide the features such as, especially suitable for administering the deeper major landslip of sliding surface, as landslide control generally uses friction pile, Various forms of friction pile layers can not go out, and is essentially all first excavation pit still, then ties up steel reinforcement cage, finally pour coagulation Soil, so not only construct cumbersome, and start to play the time length of AsA -GSH cycle after constructing, it is difficult to prevent some accidents, Therefore, we provide point anchor anti-sliding piled barricade in a kind of novel hole.
The content of the invention
The technical problem to be solved in the present invention overcomes the defects of existing, there is provided point anchor anti-sliding piled barricade in a kind of novel hole, Effectively can solve the problems, such as in background technology.
In order to solve the above-mentioned technical problem, the invention provides following technical scheme:
The present invention provides and anchor anti-sliding piled barricade is put in a kind of novel hole, point anchor anti-sliding piled barricade in a kind of novel hole, including Top of the slope, friction pile, point anchor, anchoring section and horizontal slump arch, are provided with friction pile, the friction pile table between the top of the slope and bottom of slope Face intermittent is provided with anchor cable, and described anchor cable one end is provided with anchoring section, and point anchor, described anchor are provided between the anchor cable and friction pile Between be provided with horizontal slump arch with vertical slump encircle, between the anchoring section and anchor cable be provided with sliding the plane of fracture and anchoring section setting Inside the sliding plane of fracture.
As a preferred technical solution of the present invention, the friction pile bottom is arranged in bottom of slope soil layer.
The beneficial effect that is reached of the present invention is:Point anchor technology integrates the advantages of piled anchor and point anchor method in stake, can Ensure construction time structure safety, and can reduces construction costs;There is identical construction method with traditional pile-anchor system;Pile body structure Size is small, reinforcing bar is few, low cost, short time limit;Avoid disadvantage of the conventional point anchor method for protecting support without vertical supporting.
Brief description of the drawings
Accompanying drawing is used for providing a further understanding of the present invention, and a part for constitution instruction, the reality with the present invention Apply example to be used to explain the present invention together, be not construed as limiting the invention.
In the accompanying drawings:
Fig. 1 is to put anchor anti-sliding piled barricade overall structure diagram in a kind of novel hole described in the embodiment of the present invention;
Fig. 2 is that the flat slump arch signal of anchor anti-sliding piled barricade water between stake is put in a kind of novel hole described in the embodiment of the present invention Figure;
Fig. 3 is to put point structural model on anchor anti-sliding piled barricade friction pile in a kind of novel hole described in the embodiment of the present invention to show It is intended to;
Label in figure:1st, top of the slope;2nd, friction pile;3rd, anchor is put;4th, bottom of slope;5th, anchor cable;6th, anchoring section;7th, the plane of fracture is slid; 8th, horizontal slump arch;9th, vertical slump arch.
Embodiment
The preferred embodiments of the present invention are illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein preferred real Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment:Fig. 1-3 are referred to, anchor anti-sliding piled barricade, including top of the slope 1, friction pile are put in a kind of novel hole of the present invention 2nd, anchor 3, anchoring section 6 and horizontal slump arch 8 are put, friction pile 2, the surface of friction pile 2 are provided between the top of the slope 1 and bottom of slope 4 Intermittent is provided with anchor cable 5, and described one end of anchor cable 5 is provided with anchoring section 6, and point anchor 3, institute are provided between the anchor cable 5 and friction pile 2 State and horizontal slump arch 8 and vertical slump arch 9 are provided between an anchor 3, be provided between the anchoring section 6 and anchor cable 5 and slide the plane of fracture 7 and anchoring section 6 be arranged at sliding the plane of fracture 7 inside.
The bottom of friction pile 2 is arranged in the soil layer of bottom of slope 4.
It should be noted that the present invention is point anchor anti-sliding piled barricade in a kind of novel hole, by the girder construction of traditional friction pile A structural computational model is changed to, an anchor point is formed by anchor cable 5 and local stake, horizontal slump arch 8 can be formed between anchor point with hanging down Straight slump arch 9.Soil pressure in slump arch is solely subjected on breast boards and non-anchor stake, side slope thrust is born by anchor point, anchor point Vertical supporting is provided by pile body, the purpose for the arrangement is that moment of flexure huge on friction pile is avoided, and this is exactly the master of piled anchor barricade Cost part is wanted, the purpose for significantly lowering engineering cost is reached with this, anchor technology collection piled anchor and point anchor method are put in stake The advantages of, it is ensured that construction time structure safety, and can reduce construction costs, there is identical to apply with traditional pile-anchor system Work method, without separately adding other methods.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic. Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., it should be included in the present invention's Within protection domain.

Claims (2)

1. point anchor anti-sliding piled barricade in a kind of novel hole, including top of the slope (1), friction pile (2), point anchor (3), anchoring section (6) and water (8) are encircleed in flat slump, it is characterised in that:Friction pile (2), friction pile (2) table are provided between the top of the slope (1) and bottom of slope (4) Face intermittent is provided with anchor cable (5), and described anchor cable (5) one end is provided with anchoring section (6), set between the anchor cable (5) and friction pile (2) There is an anchor (3), be provided with horizontal slump arch (8) between described anchor (3) encircles (9) with vertical slump, the anchoring section (6) and anchor cable (5) the sliding plane of fracture (7) is provided between and anchoring section (6) is arranged at the sliding plane of fracture (7) inside.
2. point anchor anti-sliding piled barricade in a kind of novel hole according to claim 1, it is characterised in that the friction pile (2) Bottom is arranged in bottom of slope (4) soil layer.
CN201710815947.1A 2017-09-11 2017-09-11 Anchor anti-sliding piled barricade is put in a kind of hole Pending CN107447777A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710815947.1A CN107447777A (en) 2017-09-11 2017-09-11 Anchor anti-sliding piled barricade is put in a kind of hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710815947.1A CN107447777A (en) 2017-09-11 2017-09-11 Anchor anti-sliding piled barricade is put in a kind of hole

Publications (1)

Publication Number Publication Date
CN107447777A true CN107447777A (en) 2017-12-08

Family

ID=60496159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710815947.1A Pending CN107447777A (en) 2017-09-11 2017-09-11 Anchor anti-sliding piled barricade is put in a kind of hole

Country Status (1)

Country Link
CN (1) CN107447777A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4097226B2 (en) * 2005-10-14 2008-06-11 大和クレス株式会社 Retaining wall structure
CN203412200U (en) * 2013-07-12 2014-01-29 东南大学 Slotting clamping piece prestress fiber reinforcing compound material rope anchoring device
CN203412198U (en) * 2013-07-12 2014-01-29 东南大学 Prestress fiber reinforced composite material cable anchoring device adopting spiral slot clamping piece
CN108005103A (en) * 2017-09-04 2018-05-08 叶晓明 In-hole point-anchored slide-resistant pile retaining wall and forming method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4097226B2 (en) * 2005-10-14 2008-06-11 大和クレス株式会社 Retaining wall structure
CN203412200U (en) * 2013-07-12 2014-01-29 东南大学 Slotting clamping piece prestress fiber reinforcing compound material rope anchoring device
CN203412198U (en) * 2013-07-12 2014-01-29 东南大学 Prestress fiber reinforced composite material cable anchoring device adopting spiral slot clamping piece
CN108005103A (en) * 2017-09-04 2018-05-08 叶晓明 In-hole point-anchored slide-resistant pile retaining wall and forming method thereof

Similar Documents

Publication Publication Date Title
CN201771516U (en) Supporting structure of district passing through cavern and underground river for tunnel
CN206279545U (en) A kind of mini pile and Antiskid pile combination retaining structure of arc arrangement
CN206220122U (en) Novel self-balanced retaining wall
CN203594035U (en) Multilevel combined protection structure for shallow hole blasting excavation bridge foundation pit construction
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN201665875U (en) Light gravity-type anti-earthquake concrete retaining wall
CN103470268B (en) The asymmetric double-hole tunnel structure of zero spacing and construction method thereof
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN204151798U (en) A kind of steel reinforced concrete anti-slide pile structure
CN204419187U (en) Vertical deep supporting and protection structure
CN107447777A (en) Anchor anti-sliding piled barricade is put in a kind of hole
CN207484509U (en) Anchor anti-sliding piled barricade is put in hole
CN204662246U (en) steep slope bridge pier structure
CN204238239U (en) Pile foundation prestressd anchor cable height wall-retaining structure
CN203905044U (en) Overhead deep foundation pit crossing construction elevator beam plate type base structure
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN109322315A (en) A kind of retaining structure and its construction method for high Steep Slope Embankment location
CN105696701A (en) Along-slope shear wall building development platform and construction method thereof
CN204475350U (en) Bored pile construction system under high-voltage line
CN203924072U (en) The retaining wall supporting and protection structure of the super dark hand excavated pile of a kind of super large
CN202247830U (en) Novel underwater steel platform
CN208472775U (en) Structure is built along subinverse construction room on a kind of basement
CN208415254U (en) A kind of device of removing obstacles stake
CN203188220U (en) Deep foundation pit supporting structure
CN202644528U (en) Improved hinge type large-tonnage anchor apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171208

WD01 Invention patent application deemed withdrawn after publication