CN208415254U - A kind of device of removing obstacles stake - Google Patents
A kind of device of removing obstacles stake Download PDFInfo
- Publication number
- CN208415254U CN208415254U CN201821044928.XU CN201821044928U CN208415254U CN 208415254 U CN208415254 U CN 208415254U CN 201821044928 U CN201821044928 U CN 201821044928U CN 208415254 U CN208415254 U CN 208415254U
- Authority
- CN
- China
- Prior art keywords
- pile
- obstacle
- feeder
- stake
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 abstract description 13
- 238000000034 method Methods 0.000 abstract description 10
- 238000007373 indentation Methods 0.000 abstract description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011017 operating method Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Abstract
The utility model discloses a kind of devices of removing obstacles stake, including obstacle pile, jack, Pile feeder and reaction frame;The obstacle pile is the pile foundation for influencing subway tunnel shield, obstacle pile passes through subway tunnel, obstacle pile top surface is equipped with Pile feeder, the cross sectional shape of Pile feeder is identical as obstacle stake cross sectional shape, Pile feeder is more piece, uses flanged joint between Pile feeder, Pile feeder top is equipped with jack, reaction frame is installed, reaction frame is anchored on the ground beam of building above jack.The utility model is exactly obstacle pile indentation tunnel bottom not to be influenced a kind of method of the position of shield to release the obstacle of shield machine construction, using building self weight as counter-force, obstacle pile, which is pressed onto subway tunnel bottom not, with reaction frame and dedicated Pile feeder influences the position of shield, and finally Pile feeder is taken out and uses grave hole.The utility model has the advantages that the construction period is short, expense is low, surrounding environment influence is small low with difficulty of construction etc..
Description
Technical field
The utility model relates to constructing metro tunnel fields, and in particular to a kind of when subway tunnel crossing Old building pile foundation
The device of removing obstacles stake.
Background technique
In recent years, subway engineering was being built in numerous domestic city.Subway line route selection is often over business district and passes through
Existing building, and to the building with pile foundation, also face the cleaning problem of obstacle pile.Since these obstacle piles are mostly reinforcing bar
Concrete precast pile when shield machine passes through, is constructed extremely difficult, therefore in Practical Project, often using after removing obstacles stake again
Carry out shield.Therefore, huge to removing obstacles stake technology development potentiality in China.To existing removing obstacles stake key technology into
Row reorganizing research is particularly important and has huge Business Studies to be worth.Removing obstacles stake used at present is mostly pile pulling
Method is the method that the stake of influence subway tunnel shield is extracted, and is pulled out again after existing building is needed to remove before pile pulling
Original building is moved back to original place again after pile pulling, the workload thus greatly increased by stake.It and is influence with the method for piling
The method for the position that the stake indentation rail base of subway tunnel shield does not influence shield does not need these complicated processes, Ke Yizhi
It connects and constructs at one layer.Have that the construction period is short, expense is lower, difficulty of construction is lower, surrounding environment influence is small and the construction time
Between upper floor can continue to use and the stake subdued can do the basis of subway.
Utility model content
Purpose of the utility model is to solve the obstacle pile problems encountered when subway tunnel shield, provide a kind of removing
The device of obstacle pile has the advantages that the construction period is short, expense is low, surrounding environment influence is small low with difficulty of construction etc..
The technical solution adopted in the utility model is: a kind of device of removing obstacles stake, including obstacle pile, jack, send
Stake device and reaction frame;
The obstacle pile is the pile foundation for influencing subway tunnel shield, and obstacle pile passes through subway tunnel, the installation of obstacle pile top surface
There is Pile feeder, the cross sectional shape of Pile feeder is identical as obstacle stake cross sectional shape, and Pile feeder is more piece, uses flange between Pile feeder
Connection, Pile feeder top are equipped with jack, reaction frame are equipped with above jack, and reaction frame is anchored at the ground beam of building
On.
As preferred: selected Pile feeder preferably selects 2m or so.
A kind of operating method of the device of above-mentioned removing obstacles stake.The following steps are included:
1) first jack, Pile feeder and reaction frame are installed, reaction frame height is arranged according to Pile feeder height, with building
Object self weight is counter-force, presses jack;Selected four side of jack is symmetrically placed, and symmetrically presses jack, to prevent stress not
Uniformly obstacle pile is caused to tilt, after Pile feeder is pressed into corresponding position, accesses next Pile feeder, used between Pile feeder
Flanged joint circuits sequentially;
2) after obstacle pile enters subway tunnel bottom not and influences the position of shield, stop pressing jack, pile follower
Device takes out and sealing of hole.
The utility model has the advantages that the utility model construction method is simple, obstacle pile indentation tunnel bottom is not exactly influenced shield
A kind of method of position releases the obstacle of shield machine construction, there is that the construction period is short, expense is lower, difficulty of construction is lower, all
Collarette border, which influences small and construction period upper floor, can continue to use and the advantages that the stake subdued can do the basis of subway.
The utility model is very suitable to use in practical projects.
Detailed description of the invention
Fig. 1 is the schematic device of removing obstacles stake
Fig. 2 is that obstacle pile removes front and back schematic diagram.
Specific embodiment
Specific embodiment of the present utility model is further described with reference to the accompanying drawing:
As shown in Figure 1, a kind of device of removing obstacles stake, including obstacle pile 4, jack 2, Pile feeder 3 and reaction frame 1;
The obstacle pile 4 is the pile foundation for influencing subway tunnel shield, and obstacle pile 4 passes through subway tunnel, 4 top surface of obstacle pile peace
Equipped with Pile feeder 3, the cross sectional shape of Pile feeder 3 is identical as 4 cross sectional shape of obstacle pile, and Pile feeder 3 is more piece, between Pile feeder 3
Using flanged joint, 3 top of Pile feeder is equipped with jack 2, and jack 2 is equipped with reaction frame 1 above, and reaction frame 1 is anchored at
On the ground beam of building.Selected Pile feeder 3 preferably selects 2m or so.
A kind of operating method of the device of above-mentioned removing obstacles stake.The following steps are included:
1) first jack, Pile feeder and reaction frame are installed, reaction frame height is arranged according to Pile feeder height, with building
Object self weight is counter-force, presses jack;Selected four side of jack is symmetrically placed, and symmetrically presses jack, to prevent stress not
Uniformly obstacle pile is caused to tilt, after Pile feeder is pressed into corresponding position, accesses next Pile feeder, used between Pile feeder
Flanged joint circuits sequentially;
2) after obstacle pile enters subway tunnel bottom not and influences the position of shield, stop pressing jack, pile follower
Device takes out and sealing of hole.
Fig. 2 show the schematic diagram that obstacle pile removes front and back, and the stake top position before obstacle pile is removed is 5, subway tunnel top
It is 7 for 6, subway tunnel bottom, the stake top position after obstacle pile removing is 8, the stake bottom position before obstacle pile removing is 9 and obstacle pile
Stake bottom position after removing is 10.
The reaction frame of the utility model is anchored on ground beam, then obstacle pile is pressed onto ground using reaction frame and jack
Iron tunnel bottom does not influence the position of shield, and to meet for geological conditions does not influence shield obstacle pile indentation tunnel bottom
The requirement of position and the bigger situation of obstacle pile length are simpler than with the method for pile pulling with the method for piling in this case
Very much.
The embodiments of the present invention is described in detail in conjunction with attached drawing above, but the utility model is not limited to institute
The embodiment of description.For those of ordinary skill in the art, in the range of the principles of the present invention and technical idea
It is interior, a variety of variations, modification, replacement and deformation are carried out to these embodiments and still fallen in the protection scope of the utility model.
Claims (2)
1. a kind of device of removing obstacles stake, it is characterised in that: including obstacle pile, jack, Pile feeder and reaction frame;
The obstacle pile is the pile foundation for influencing subway tunnel shield, and obstacle pile passes through subway tunnel, and obstacle pile top surface, which is equipped with, to be sent
Stake device, the cross sectional shape of Pile feeder is identical as obstacle stake cross sectional shape, and Pile feeder is more piece, is connected between Pile feeder using flange
It connects, Pile feeder top is equipped with jack, and reaction frame is equipped with above jack, and reaction frame is anchored on the ground beam of building.
2. a kind of device of removing obstacles stake according to claim 1, it is characterised in that: selected Pile feeder selects 2m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821044928.XU CN208415254U (en) | 2018-07-03 | 2018-07-03 | A kind of device of removing obstacles stake |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821044928.XU CN208415254U (en) | 2018-07-03 | 2018-07-03 | A kind of device of removing obstacles stake |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208415254U true CN208415254U (en) | 2019-01-22 |
Family
ID=65108196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821044928.XU Expired - Fee Related CN208415254U (en) | 2018-07-03 | 2018-07-03 | A kind of device of removing obstacles stake |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208415254U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797590A (en) * | 2018-07-03 | 2018-11-13 | 南京工业大学 | A kind of device and operating method of removing obstacles stake |
-
2018
- 2018-07-03 CN CN201821044928.XU patent/CN208415254U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797590A (en) * | 2018-07-03 | 2018-11-13 | 南京工业大学 | A kind of device and operating method of removing obstacles stake |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107313431B (en) | Close on not contour foundation pit method for synchronously constructing | |
CN203768912U (en) | Double-row prestressing high-strength concrete rectangular pile foundation pit supporting structure | |
CN205530247U (en) | Prebored hole bag slip casting stock structure | |
CN103981898A (en) | Integral open-excavation node top-down underground engineering construction method | |
CN103938634B (en) | A kind of deep foundation pit supporting structure and construction method | |
CN104234082A (en) | Jump-layer reversed construction method for deep foundation pit | |
CN103104102B (en) | Construction method for underground storey-addition reconstruction | |
CN105089670A (en) | Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel | |
CN105421491A (en) | Construction method for middle wall dismantling and two-side structure connecting | |
CN207092107U (en) | A kind of anti-subsidence structure using diaphram wall | |
CN201972155U (en) | Topdown-construction-method foundation pit supporting structure of steel plate pile | |
CN208415254U (en) | A kind of device of removing obstacles stake | |
CN204282399U (en) | A kind of subway space enclosing structure | |
CN110159296A (en) | A kind of structural system and its construction method of the deformation of control Shield-bored tunnels | |
CN204212177U (en) | A kind of double doing in the hole of stand column pile cheats diaphragm wall structure | |
CN204097889U (en) | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement | |
CN105821887A (en) | Installing method for stand column pile constructed in pebble bed | |
CN103669422B (en) | Waterproof construction method of pile head of anchor rod static pressure pile | |
CN108252307A (en) | A kind of foundation pit construction method for underground tunnel upper | |
CN108797590A (en) | A kind of device and operating method of removing obstacles stake | |
CN204875495U (en) | No abutment body seat formula abutment | |
CN208734343U (en) | A kind of station tunnel excavation structure with interim middle spacer post support | |
CN207143746U (en) | Support beam template system under concrete support trestle plate | |
CN205934994U (en) | Retaining pile combines guan liang's underground structure's anti structure of floating | |
CN205917709U (en) | Integral type well dotted arranges house steward vacuum system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190122 Termination date: 20190703 |