CN208472775U - Structure is built along subinverse construction room on a kind of basement - Google Patents

Structure is built along subinverse construction room on a kind of basement Download PDF

Info

Publication number
CN208472775U
CN208472775U CN201820343751.7U CN201820343751U CN208472775U CN 208472775 U CN208472775 U CN 208472775U CN 201820343751 U CN201820343751 U CN 201820343751U CN 208472775 U CN208472775 U CN 208472775U
Authority
CN
China
Prior art keywords
basement
layers
construction
subinverse
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820343751.7U
Other languages
Chinese (zh)
Inventor
张明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201820343751.7U priority Critical patent/CN208472775U/en
Application granted granted Critical
Publication of CN208472775U publication Critical patent/CN208472775U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses structure is built along subinverse construction room on a kind of basement, the super high-rise building for being 300m or more including building height, the super high-rise building contains N layers of basement structure;Braced wall and outer wall of basement (1) are equipped in basement vertical direction, earth excavation and horizontally-supported (2) is equipped in basement horizontal direction, pile foundation (3) are equipped in the following part of-N/2 layers of structure (5) of basement, structural column (4) are equipped in pile foundation (3), basement and upper part part are constituted an entirety by structural column (4).Compared with prior art, the utility model not only has the short slab for overcoming traditional contrary sequence method and just making construction technique, while overcoming the influence for designing the figure time, and is effective to ensure that deep pit monitor, saves the duration, reduce construction cost.

Description

Structure is built along subinverse construction room on a kind of basement
Technical field
The utility model relates to the rooms on a kind of ultra-deep basement N/2 layer along subinverse construction technology to build structure, belong to superelevation Layer is inverse to make technical field.
Background technique
With the continuous development of Building Trade in China, for the land resource for more making full use of city rare, city ultra-deep Super-high buildings are more and more, but often the completion time of project is long for deep super-high buildings, can increase finance and construction cost, simultaneously meeting to project Rental income is caused to lose;The method that tradition accelerates the duration is contrary sequence method, but traditional contrary sequence method technology be confined to 300 meters of height with Under, building of the basement depth within 30 meters, the construction for super high-rise building, or there is very big technical problem.
Utility model content
The purpose of the utility model is to provide one kind, cost is relatively low, construction is quick, suitable subinverse on construction safety basement Construction room builds structure, surpasses the case where 30 meters of building general heights surpass the reverse construction of 300 meters of high buildings in realization basement depth Under, with overcome the deficiencies in the prior art.
The technical solution of the utility model includes:
Structure is built along subinverse construction room on a kind of basement, the super high-rise building for being 300m or more including building height should Super high-rise building contains N layers of basement structure;It is equipped with braced wall and outer wall of basement in basement vertical direction, in basement Horizontal direction is equipped with earth excavation and horizontally-supported, in the following part of-N/2 layer structure of basement equipped with pile foundation, sets in pile foundation There is structural column, basement and upper part part are constituted an entirety by structural column.Wherein, N >=4.
Structure is built according to the room, so that it may which, using the construction method on basement along subinverse, this method is by N layers of underground Room is divided into two kinds of distinct methods and is combined construction, and negative N/2 layers of basement or more basement structure, which uses, just makees construction method, and Negative N/2 layers of basement or less basement structure uses reversed construction method, forms along inverse combined construction technical method, thus It realizes and surpasses a kind of 400 meters of inverse novel technical methods made of basement for surpassing 30 meters of depths.
Compared with prior art, it on ground is interface that existing contrary sequence method, which is from ± 0.000, is made on the ground using positive, and ground It is lower to use inverse work;It is interface that the utility model, which is from negative N/2 layers of basement, and negative N/2 layers of basement or more basement structure is adopted With just making construction method, and negative N/2 layers of basement or less basement structure uses reversed construction method, it, which not only has, overcomes Traditional contrary sequence method and the short slab for just making construction technique, while the influence for designing the figure time is overcome, and be effective to ensure that Deep pit monitor saves the duration, reduces construction cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
It is attached in the figure, it is marked as 1- braced wall and outer wall of basement, 2- earth excavation and horizontally-supported, 3- pile foundation, 4- structure Column, 5--N/2 layers of structure, 6--N/2+1 layers of structure.
Specific embodiment
Below with reference to embodiment, the utility model is described in further detail, but not as any limit to the utility model System.
Embodiment 1:
The utility model be build structure along subinverse construction room on such a basement, including building height be 300m with On super high-rise building, which contains N layers of basement structure;Braced wall and ground are equipped in basement vertical direction Lower room exterior wall 1 is equipped with earth excavation and horizontally-supported 2 in basement horizontal direction, in-N/2 layers of structure 5 of basement with lower part It is arranged with pile foundation 3, structural column 4 is equipped in pile foundation 3, basement and upper part part are constituted an entirety by structural column 4.N≥4.
The first step carries out braced wall and outer wall of basement 1 is constructed, and construction can be first advanced into this way, not by construction building structure Figure does not go out the time effects of figure;- N/2 layers or more earth excavations of second step progress and horizontally-supported 2 construction;Third step carries out pile foundation 3 constructions;4th step carries out structural column 4 and constructs;5th-N/2 layers of step progress 5 Beam-Slab Construction of structure;6th step carries out-N/2 simultaneously + 1 layer of 6 beam slab of structure and the construction of-N/2-1 layers of earth excavation and the sandwich beam plate;7th step carries out-N/2+2 layers of 5 beam of knot simultaneously Plate and the construction ... of-N/2-1 layers of earth excavation and the sandwich beam plate are recycled in this way until superstructure binds and N layers of basement Construction of bottom plates is completed, and is achieved that on ultra-deep basement N/2 layer and is constructed along subinverse.
The specific application example of above only the utility model, there are also other embodiments, all uses for the utility model The technical solution that equivalent substitution or equivalent transformation is formed, all falls within protection scope required by the utility model.

Claims (2)

1. building structure along subinverse construction room on a kind of basement, it is characterised in that: the superelevation for being 300m or more including building height Layer building, the super high-rise building contain N layers of basement structure;Braced wall and outer wall of basement are equipped in basement vertical direction (1), it is equipped with earth excavation and horizontally-supported (2) in basement horizontal direction, in the following part of-N/2 layers of structure (5) of basement Equipped with pile foundation (3), structural column (4) are equipped in pile foundation (3), basement and upper part part are constituted an entirety by structural column (4).
2. building structure along subinverse construction room on basement according to claim 1, it is characterised in that: N >=4.
CN201820343751.7U 2018-03-14 2018-03-14 Structure is built along subinverse construction room on a kind of basement Expired - Fee Related CN208472775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820343751.7U CN208472775U (en) 2018-03-14 2018-03-14 Structure is built along subinverse construction room on a kind of basement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820343751.7U CN208472775U (en) 2018-03-14 2018-03-14 Structure is built along subinverse construction room on a kind of basement

Publications (1)

Publication Number Publication Date
CN208472775U true CN208472775U (en) 2019-02-05

Family

ID=65206332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820343751.7U Expired - Fee Related CN208472775U (en) 2018-03-14 2018-03-14 Structure is built along subinverse construction room on a kind of basement

Country Status (1)

Country Link
CN (1) CN208472775U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115324106A (en) * 2022-08-19 2022-11-11 中建三局第三建设工程有限责任公司 Construction method for optimizing intermittent stop points of synchronous reverse construction technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115324106A (en) * 2022-08-19 2022-11-11 中建三局第三建设工程有限责任公司 Construction method for optimizing intermittent stop points of synchronous reverse construction technology
CN115324106B (en) * 2022-08-19 2023-08-18 中建三局第三建设工程有限责任公司 Construction method for optimizing intermittent stopping point of synchronous reverse construction technology

Similar Documents

Publication Publication Date Title
CN103422511B (en) A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
CN103422501A (en) Anti-floating anchor structure in sand layer geology and construction method thereof
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN106351331A (en) Multi-floor basement reverse and normal combined construction process
CN101736756B (en) Method for constructing soft soil foundation reverse interlayer
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN208472775U (en) Structure is built along subinverse construction room on a kind of basement
CN203594055U (en) Structure of basement guide wall waterproof concrete horizontal construction joint
CN202416324U (en) Beam and slab structure superposed through top-down beam and down-top slab construction of foundation pit project
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN204645044U (en) A kind of steel strand reclaim support
CN204401557U (en) The vertical bank protection structure of a kind of Novel direct
CN111809729A (en) A dry connection node for prefabricated concrete beams and columns
CN208815560U (en) A kind of structure of Underground Subway Station construction period full station sealing
CN207017169U (en) A kind of high-filled subgrade culvert off-loading structure
CN206308700U (en) A kind of Traffic Engineering Construction slope protection device
CN203145011U (en) Anchor rod structure with anti-floating capacity
CN203603162U (en) Construction elevator load basic system based on foundation pit edge
CN108203994A (en) Along the method for subinverse construction technology on a kind of basement
CN104032732B (en) Cast-type pre-stressed steel plate concrete-pile and construction method thereof and supporting piling wall
CN209323553U (en) A kind of steady type house foundation
CN208267067U (en) A kind of building basement bottom plate catch pit
CN201943094U (en) Building foundation structure based on cement-based penetration-resistant waterproof coating
CN207092105U (en) Foundation pit support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190205

CF01 Termination of patent right due to non-payment of annual fee