CN107435558A - A kind of narrow-bore tunnel excavation construction transport establishment and construction method - Google Patents

A kind of narrow-bore tunnel excavation construction transport establishment and construction method Download PDF

Info

Publication number
CN107435558A
CN107435558A CN201710868402.7A CN201710868402A CN107435558A CN 107435558 A CN107435558 A CN 107435558A CN 201710868402 A CN201710868402 A CN 201710868402A CN 107435558 A CN107435558 A CN 107435558A
Authority
CN
China
Prior art keywords
track
directly
tunnel
arc
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710868402.7A
Other languages
Chinese (zh)
Inventor
阎海平
贺登华
练松涛
马正斌
胡伶勇
郭万福
王存成
邢世孝
刘根英
黄未来
王彦鹏
张瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201710868402.7A priority Critical patent/CN107435558A/en
Publication of CN107435558A publication Critical patent/CN107435558A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61CLOCOMOTIVES; MOTOR RAILCARS
    • B61C3/00Electric locomotives or railcars
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Transportation (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to constructing tunnel field, and in particular to a kind of narrow-bore tunnel excavation construction transport establishment and construction method.A kind of narrow-bore tunnel excavation construction transport establishment, including first directly to track, second directly to track, first arc track, second arc track, first directly to track, second directly to track, first arc track, the relative web of the rail position of second arc track two rails is respectively welded with a undertaking iron plate, connected on the inside of two rails between relative undertaking iron plate by connecting plate, first is directly directly connected with second to track to the close tunnel tunnel face one end of track with the first arc track, first is directly directly connected with second to track to the close tunnel portal one end of track with the second arc track, electric motor-trolley is placed with track.The present invention can transport in the case where ensureing tunnel structure stability condition to the construction material needed for each working procedure in narrow-bore tunnel and construction tool, improve the efficiency of construction of narrow-bore tunnel.

Description

A kind of narrow-bore tunnel excavation construction transport establishment and construction method
Technical field
The present invention relates to constructing tunnel field, and in particular to a kind of narrow-bore tunnel excavation construction with transport establishment and Construction method.
Background technology
Nowadays, highway, railway develop rapidly, and wherein Tunnel Engineering is composition important in highway, railway construction Part, tunnel excavation are carried out respectively by multiple processes, mainly include tunnel tunnel face explosion, cubic metre of earth and stone transport, steel arch-shelf Erection, linked network, spray anchor, preliminary bracing, secondary lining, etc. multiple processes, be required in above-mentioned each working procedure to tunnel slap Substantial amounts of instrument, material etc. are transported in sub- face direction, are generally transported for the larger constructing tunnel of section by Transport Machinery It is defeated, but for relatively small bore tunnel, Transport Machinery is carried out in limited tunnel space to construction material, instrument Transport will be relatively difficult, and bulk transport machinery can affect to tunnel internal structural stability, cause tunnel The problems such as unstability, the personal safety of workmen is had a strong impact on, and hinder the progress of constructing tunnel each operation.
The content of the invention
The technical problems to be solved by the invention are to be directed to above-mentioned the deficiencies in the prior art, there is provided a kind of narrow-bore tunnel Excavation construction conveying arrangement and construction method, there is simple in construction, strong applicability, safe and reliable, low cost, can effectively solve The problem of transport difficult, cost are high during narrow-bore tunnel excavation construction, security performance is low.
To achieve these goals, technical scheme provided by the invention is:
A kind of narrow-bore tunnel excavation construction transport establishment, including first directly to track, second directly to track, the first arc Shape track, the second arc track, first is respectively directly directly to track, the first arc track, the second arc track to track, second It is made up of two rail being parallel to each other, first directly to track, second directly to track, the first arc track, the second arc track The relative web of the rail position of two rails is respectively welded with a undertaking iron plate, passes through connecting plate between the relative undertaking iron plate in two rails inner side Connection, first is directly directly connected with second to track to the close tunnel tunnel face one end of track with the first arc track, first directly to Track is directly connected with second to the close tunnel portal one end of track with the second arc track, and electric motor-trolley is placed with track.
Specifically, described first directly directly leads to track, second to one end of the close face of track with the first arc track Cross connecting cleat connection.
Preferably, the both ends of the connecting cleat are bolted on first directly to track, second directly to track, first On the rail of arc track.
Specifically, described first is directly directly provided with a coagulation to track and second at the close tunnel both ends abutment wall of track Soil padding, the concrete cushion are higher than tunnel bottom surface.
Present invention also offers a kind of construction method of narrow-bore tunnel excavation construction conveying arrangement, by detail below Step is constructed:
A, measurement is reconnoitred before tunnel excavation
Before excavation, excavated section profile is measured, confirms specific excavation scope, is provided specifically for next step laying conveying track Data;
B, tunnel excavation
Suitable excavation method is selected according to measurement data, carries out tunnel excavation, after the completion of excavation, carries out section survey immediately Amount, after confirming that section meets design, preliminary bracing is carried out, concrete cushion, concrete are laid at abutment wall in tunnel bottom The width of bed course determines that thickness is to be higher by tunnel bottom surface 5cm by tunnel cross-section width;
C, conveying track laying, use
It is directly directly directly straight with second to track to track, first to track and second that conveying track installs first first when installing Laid to parallel track, first is directly directly controlled to track and second to the parallel spacing of track by tunnel excavation section, the It is directly always one group per 2m to track length to track and second, increases by first directly to track with to the continuous excavation in tunnel Directly directly directly the first arc is provided with second at the close tunnel tunnel face of track to track and second to the group number of track, first Track, first is directly directly provided with the second arc track to track and second at the close tunnel portal of track, and first directly to track The first arc track and the second arc track are directly connected by connecting cleat to track with second, track is formed one The entirety of circulation, when tunnel tunnel face is pushed ahead, it is only necessary to the first arc track is removed and as face is past Preceding movement, be directly directly continuing with whole device to track groups number to track and second by increase by first, first directly to Track and second is used when by electric motor-trolley come to constructing tunnel directly to multiple electric motor-trolleys are placed with track Material and instrument transported;
D, track structure is removed after the completion of constructing tunnel
After the completion of constructing tunnel, tunnel internal track structure is removed in order, should be since one end when dismounting Remove, should be segmented progress in demolishing process, the track after dismounting be transported by electric motor-trolley, finally electric track Car is removed from track.
Compared with prior art, beneficial effects of the present invention are:
The present invention is simple in construction, easy to operate, low cost, strong applicability, can be under conditions of security is ensured to small disconnected Construction material and construction tool needed for each working procedure in face tunnel are transported, and improve constructing tunnel efficiency.
Brief description of the drawings
Fig. 1 is tunnel internal sectional view of the present invention
Fig. 2 be in Fig. 1 A-A to sectional view
Fig. 3 is the connection diagram of connecting cleat.
Parts title in accompanying drawing is:
1st, first directly to track, and 2, second directly to track, the 3, first arc track, the 4, second arc track, and 5, connecting plate, 6th, tunnel side wall, 7, face, 8, earth and stone digging, 9, tunnel portal, 10, accept iron plate, 11, concrete cushion, 12, spiral shell Bolt, 13, connecting cleat, 14, electric motor-trolley.
Embodiment
As shown in figure 1, a kind of narrow-bore tunnel excavation construction transport establishment, including first directly to track 1, second directly to Track 2, the first arc track 3, the second arc track 4, first directly to track 1, second directly to track 2, the first arc track 3, Second arc track 4 is made up of two rail being parallel to each other respectively, and first directly to track 1, second directly to track 2, first The relative web of the rail position of arc track 3, the two rails of the second arc track 4 is respectively welded with a undertaking iron plate 10, two rails inner side phase To undertaking iron plate 10 between connected by connecting plate 5, first directly to track 1 and second directly to track 2 close to tunnel tunnel face 7 One end is connected with the first arc track 3, and first directly to track 1 and second directly to track 2 close to the one end of tunnel portal 9 and the second arc Shape track 4 is connected, and electric motor-trolley 14 is placed with track.
Described first directly directly passes through company to track 2 to track 1, second close to one end of face 7 and the first arc track 3 Fishplate 13 connects.
The both ends of the connecting cleat 13 are bolted on first directly to track 1, second directly to track 2, the first arc On the rail of shape track 3.
Described first is directly directly provided with a concrete cushion to track 2 to track 1 and second at tunnel both ends abutment wall 6 11, the concrete cushion 11 is higher than tunnel bottom surface.
A kind of construction method of narrow-bore tunnel excavation construction conveying arrangement, is applied by step in detail below Work:
A, measurement is reconnoitred before tunnel excavation
Before excavation, excavated section profile is measured, confirms specific excavation scope, is provided specifically for next step laying conveying track Data;
B, tunnel excavation
Suitable excavation method is selected according to measurement data, carries out tunnel excavation, after the completion of excavation, carries out section survey immediately Amount, after confirming that section meets design, preliminary bracing is carried out, concrete cushion 11, coagulation are laid at abutment wall in tunnel bottom The width of soil padding 11 determines that thickness is to be higher by tunnel bottom surface 5cm by tunnel cross-section width;
C, conveying track laying, use
Conveying track installs first directly to track 1 and second directly to track 2 first when installing, first directly to track 1 and the Two directly to the parallel laid of track 2, first directly to track 1 and second directly to track 2 parallel spacing by tunnel excavation section come Control, first is directly directly one group per 2m to the length of track 2 to track 1 and second, increases by the with to the continuous excavation in tunnel Always to track 1 and second directly to the group number of track 2, first directly to track 1 and second directly to track 2 close to tunnel tunnel face 7 Place is provided with the first arc track 3, and first is directly directly provided with the second arc to track 2 to track 1 and second at tunnel portal 9 Shape track 4, first is directly directly connected the first arc track 3 and the second arc to track 2 with second to track 1 by connecting cleat 13 Track 4, track is thus set to form the entirety of a circulation, when tunnel tunnel face 7 is pushed ahead, it is only necessary to first Arc track 3 is removed and as face 7 is moved along, by increase by first directly to track 1 and second directly to 2 groups of numbers of track come Whole device is continuing with, first directly to track 1 and second directly to multiple electric motor-trolleys 14 are placed with track 2, is led to Used material and instrument transport when crossing electric motor-trolley 14 come to constructing tunnel;
D, track structure is removed after the completion of constructing tunnel
After the completion of constructing tunnel, tunnel internal track structure is removed in order, should be since one end when dismounting Remove, should be segmented progress in demolishing process, the track after dismounting be transported by electric motor-trolley 14, finally electronic rail Road car 14 is removed from track.
The method is particularly suitable for use in narrow-bore tunnel excavation, and narrow-bore tunnel section is relatively small, and engineer machinery operation is empty Between it is small, enable construction material that tunnel excavation is used with instrument by quick and stable by track structure and electric motor-trolley 14 Be transported at tunnel tunnel face 7, improve operating efficiency, on tunnel internal structural stability influence it is smaller, have it is very big Economic value.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should be included in the scope of the protection.

Claims (5)

1. a kind of narrow-bore tunnel excavation construction transport establishment, it is characterised in that including first directly to track (1), second straight To track (2), the first arc track (3), the second arc track (4), first directly to track (1), second directly to track (2), One arc track (3), the second arc track (4) are made up of two rail being parallel to each other respectively, first directly to track (1), Second is directly respectively welded with one to the relative web of the rail position of track (2), the first arc track (3), the second arc track (4) two rails Iron plate (10) is accepted, is connected between the relative undertaking iron plate (10) in two rails inner side by connecting plate (5), first directly to track (1) directly it is connected with second to track (2) close to tunnel tunnel face (7) one end with the first arc track (3), first directly to track (1) directly it is connected, is placed with track electronic with the second arc track (4) close to tunnel portal (9) one end to track (2) with second Railcar (14).
2. a kind of narrow-bore tunnel excavation construction transport establishment according to claim 1, it is characterised in that described first is straight Directly pass through connecting cleat (13) with the first arc track (3) close to one end of face (7) to track (2) to track (1), second Connection.
A kind of 3. narrow-bore tunnel excavation construction transport establishment according to claim 2, it is characterised in that the connection clip The both ends of plate (13) are bolted on first directly to track (1), second directly to track (2), the steel of the first arc track (3) On rail.
4. a kind of narrow-bore tunnel excavation construction transport establishment according to claim 1, it is characterised in that described first is straight Tunnel both ends abutment wall (6) place is directly provided with a concrete cushion (11) to track (2) with second to track (1), it is described mixed Solidifying soil padding (11) is higher than tunnel bottom surface.
5. a kind of construction method of narrow-bore tunnel excavation construction conveying arrangement, it is characterised in that pass through step in detail below To be constructed:
A, measurement is reconnoitred before tunnel excavation
Before excavation, excavated section profile is measured, confirms specific excavation scope, specific number is provided for next step laying conveying track According to;
B, tunnel excavation
Suitable excavation method is selected according to measurement data, carries out tunnel excavation, after the completion of excavation, carries out section survey immediately, After confirming that section meets design, preliminary bracing is carried out, concrete cushion (11), concrete are laid at abutment wall in tunnel bottom The width of bed course (11) determines that thickness is to be higher by tunnel bottom surface 5cm by tunnel cross-section width;
C, conveying track laying, use
Conveying track installs first directly to track (1) and second directly to track (2) first when installing, first directly to track (1) and Second is directly directly directly opened to track (1) and second to track (2) parallel laid, first to the parallel spacing of track (2) by tunnel Section is dug to control, first is directly directly one group per 2m to track (2) length to track (1) and second, with to the continuous of tunnel Excavate to increase by first directly to track (1) and second directly to the group number of track (2), first directly to track (1) and second directly to rail Road (2) is provided with the first arc track (3) close to tunnel tunnel face (7) place, and first directly to track (1) and second directly to track (2) tunnel portal (9) place is provided with the second arc track (4), first is directly directly logical to track (2) with second to track (1) Cross connecting cleat (13) and connect the first arc track (3) and the second arc track (4), thus make one circulation of track formation It is overall, when tunnel tunnel face (7) is pushed ahead, it is only necessary to the first arc track (3) is removed and with face (7) It is moved along, number is directly directly organized be continuing with whole device to track (2) to track (1) and second by increase by first, First, directly to track (1) and second directly to multiple electric motor-trolleys (14) are placed with track (2), passes through electric motor-trolley (14) Used material and instrument transport when come to constructing tunnel;
D, track structure is removed after the completion of constructing tunnel
After the completion of constructing tunnel, tunnel internal track structure is removed in order, should be removed since one end when dismounting, Progress should be segmented in demolishing process, the track after dismounting is transported by electric motor-trolley (14), finally electric track Car (14) is removed from track.
CN201710868402.7A 2017-09-22 2017-09-22 A kind of narrow-bore tunnel excavation construction transport establishment and construction method Pending CN107435558A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710868402.7A CN107435558A (en) 2017-09-22 2017-09-22 A kind of narrow-bore tunnel excavation construction transport establishment and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710868402.7A CN107435558A (en) 2017-09-22 2017-09-22 A kind of narrow-bore tunnel excavation construction transport establishment and construction method

Publications (1)

Publication Number Publication Date
CN107435558A true CN107435558A (en) 2017-12-05

Family

ID=60462329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710868402.7A Pending CN107435558A (en) 2017-09-22 2017-09-22 A kind of narrow-bore tunnel excavation construction transport establishment and construction method

Country Status (1)

Country Link
CN (1) CN107435558A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108506022A (en) * 2018-03-02 2018-09-07 辽宁西北供水有限责任公司 A kind of long range jacked piles with small section concrete transportation and lining construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11336500A (en) * 1998-05-25 1999-12-07 Sato Kogyo Co Ltd Constructing method of temporary track for tunneling work, and sleepers for temporary track used therefor
CN1719001A (en) * 2005-05-03 2006-01-11 山东科技大学 Stereo operation fast fragments discharging method in mine drifting
CN101403305A (en) * 2008-09-08 2009-04-08 中铁隧道集团有限公司 Construction method for tunnel continuous mucking, lining and excavation synchronization
CN201934131U (en) * 2010-11-24 2011-08-17 广东华隧建设股份有限公司 Horizontal transportation system for shield tunnel
CN203473770U (en) * 2013-09-06 2014-03-12 兖矿集团有限公司 Foldable conveyor body of belt type conveyor and telescopic belt type conveyor
CN105221162A (en) * 2015-10-30 2016-01-06 中铁隧道集团有限公司 Light section super long tunnel transportation system and transportation resources
CN204960971U (en) * 2015-09-22 2016-01-13 中铁六局集团有限公司 Long rail conveyer of tunnel abrupt slope inclined shaft
CN207229159U (en) * 2017-09-22 2018-04-13 中国水利水电第四工程局有限公司 A kind of narrow-bore tunnel excavation construction transport establishment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11336500A (en) * 1998-05-25 1999-12-07 Sato Kogyo Co Ltd Constructing method of temporary track for tunneling work, and sleepers for temporary track used therefor
CN1719001A (en) * 2005-05-03 2006-01-11 山东科技大学 Stereo operation fast fragments discharging method in mine drifting
CN101403305A (en) * 2008-09-08 2009-04-08 中铁隧道集团有限公司 Construction method for tunnel continuous mucking, lining and excavation synchronization
CN201934131U (en) * 2010-11-24 2011-08-17 广东华隧建设股份有限公司 Horizontal transportation system for shield tunnel
CN203473770U (en) * 2013-09-06 2014-03-12 兖矿集团有限公司 Foldable conveyor body of belt type conveyor and telescopic belt type conveyor
CN204960971U (en) * 2015-09-22 2016-01-13 中铁六局集团有限公司 Long rail conveyer of tunnel abrupt slope inclined shaft
CN105221162A (en) * 2015-10-30 2016-01-06 中铁隧道集团有限公司 Light section super long tunnel transportation system and transportation resources
CN207229159U (en) * 2017-09-22 2018-04-13 中国水利水电第四工程局有限公司 A kind of narrow-bore tunnel excavation construction transport establishment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108506022A (en) * 2018-03-02 2018-09-07 辽宁西北供水有限责任公司 A kind of long range jacked piles with small section concrete transportation and lining construction method

Similar Documents

Publication Publication Date Title
CN106641440B (en) A kind of transverse crossing railway line underground piping jacking construction method
CN106401645B (en) A kind of deep high stress tunnel pressure relief support control method for coordinating based on drilling release
KR101028535B1 (en) Construction method of double tunnel
CN103032073B (en) Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN108678751B (en) Assembly type construction method of shield cutter head manhole by jacking and excavating firstly
CN105350988B (en) Tunnel Base reinforcement means
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN207229159U (en) A kind of narrow-bore tunnel excavation construction transport establishment
CN108708736B (en) Shield cutter head manhole assembly type construction method
CN107435558A (en) A kind of narrow-bore tunnel excavation construction transport establishment and construction method
RU2293810C1 (en) Reinforced concrete sleeper
CN113062750A (en) Construction method of tunnel structure with underground structure uplift pile penetrating downwards
CN109184752A (en) A kind of coal mine supporting construction and its method for protecting support for passing through old kiln goaf
CN107700490A (en) Gunite concrete makes up constructing structure and its construction method in advance between the stratum stake of sand ovum
CN210684351U (en) Railway line reinforcing device for underneath-crossing existing railway construction
CN112727470A (en) Construction reinforcing method for shield tunnel at overlapped section
KR100835597B1 (en) filling method by blasting and groutting
King et al. Crossrail project: machine-driven tunnels on the Elizabeth line, London
JP4113007B2 (en) Widening method of existing tunnel
CN210561510U (en) Railway line protection device
CN110230238B (en) Railway line protection device and protection method
KR20020024912A (en) Method of construct a tunnel
CN209636858U (en) A kind of short underpass structure of newly-built basement and existing subway station
CN102277879B (en) Construction protection method for existing foundation with over crossing railway bridge
KR102014471B1 (en) Tunnel construction method and tunnel supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171205