CN209636858U - A kind of short underpass structure of newly-built basement and existing subway station - Google Patents

A kind of short underpass structure of newly-built basement and existing subway station Download PDF

Info

Publication number
CN209636858U
CN209636858U CN201920103285.XU CN201920103285U CN209636858U CN 209636858 U CN209636858 U CN 209636858U CN 201920103285 U CN201920103285 U CN 201920103285U CN 209636858 U CN209636858 U CN 209636858U
Authority
CN
China
Prior art keywords
short
underpass
horizontal beam
structure according
collar tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920103285.XU
Other languages
Chinese (zh)
Inventor
王长录
王剑非
李振雄
许艳苗
何毅
吴勇
彭云
姚继红
李文艳
沈雁波
刘轩
周麟
王晓燕
雷春燕
桂跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Third Construction Co Ltd
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction Investment Third Construction Co Ltd
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Third Construction Co Ltd, Yunnan Construction and Investment Holding Group Co Ltd filed Critical Yunnan Construction Investment Third Construction Co Ltd
Priority to CN201920103285.XU priority Critical patent/CN209636858U/en
Application granted granted Critical
Publication of CN209636858U publication Critical patent/CN209636858U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of short underpass structure that newly-built basement is connect with existing subway station, the structure includes several horizontal beams and two collar tie beams, horizontal beam extends along underpass excavation direction and is uniformly distributed in the upside and the left and right sides of excavated section, and collar tie beam is located on the section at horizontal beam both ends.The utility model solves newly-built basement and existing subway station connectivity problem, construction method belongs to subsurface excavation method, it avoids the possible traffic jam of open-cut, earth volume huge and the series of problems such as noise is big, more secure working face is provided for engineering construction, effectively enhance the stability in tunnel.

Description

A kind of short underpass structure of newly-built basement and existing subway station
Technical field
The utility model belongs to construction technology in geotechnical engineering field, and it is logical to be related to the short underground connected between two underground structures A kind of road structure, and in particular to the short underpass connectivity structure between newly-built basement and existing subway station.
Background technique
Develop people to utilizing more and more, social development with causing city overhead on city space with society Between heavy congestion, people in order to improve this crowded space, constantly build high buildings and large mansions while also sufficiently city The underground space uses.Generally high-rise and super high rise building can all build underground structure such as underground parking, underground Commercial street, underground supermarket etc., have also built subway in city in order to alleviate the traffic problems of congestion, and subway will also tend to and week The underground structure on side is closely linked.But subway and the building on periphery are not often to build together, it is mostly built At underground structure construction when often the connection with subway is not taken into account, in order to be built with periphery when subway station is built It builds object underground and generates connection, generally require to connect with periphery underground structure by underpass.
However, often surrounding enviroment are complicated, and such as doing cut and cover tunneling tunnel can break when being built in city and building subterranean tunnel Bad earth's surface traffic brings great congestion to urban transportation, does shallow mining method tunnel its stability of strict control again, to applying Work brings great challenge.Therefore, by pre-grouting reinforcing must be done around tunneling, consolidating surrounding soil in advance in advance It is significant in Tunnel Engineering construction.
Utility model content
In order to overcome the shortage of prior art, the utility model provides a kind of newly-built basement and applies with what existing subway station was connected to Work technology, the construction of connection underpass is difficult between two underground structures to solve in Practical Project construction, and when constructing tunnel exists Very big security risk the problem of and its stability problem, keep engineering practice of construction more secure etc..
The utility model realizes that the technical solution of above-mentioned purpose is as follows:
A kind of short underpass structure of newly-built basement and existing subway station, which is characterized in that the structure includes several Horizontal beam and two collar tie beams, the horizontal beam along underpass excavate direction extends and be uniformly distributed in the upside of excavated section with The left and right sides, the collar tie beam are located on the section at horizontal beam both ends.
Further, the horizontal beam is connected with collar tie beam, and horizontal beam is vertical with collar tie beam cross section.
Horizontal beam cross section is circle, and horizontal beam diameter is 150-300mm, and the center of horizontal beam is not away from being preferably greater than its diameter 2.0 times.
Further, the length of the short underpass structure is not more than 15 meters.
Further, the ring beam reinforcing steel bar should meet existing national standards " Code for design of concrete structures " GB 50010 Constructional reinforcement requirement to beam.
Further, the horizontal beam is mainly made of injected hole, fashioned iron and the slurries of solidification, and the fashioned iron is inserted into slip casting Then Kong Zhong injects slurries in injected hole.
The fashioned iron is selected from H profile steel or channel steel, and fashioned iron is arranged along injected hole central axes.
Preferably, injected hole 150-300mm, preferably 200mm are protruded in the fashioned iron both ends, and connect with collar tie beam.
It is highly preferred that being disposed on fashioned iron to middle bracket, the quantity and specification of the centering bracket are according to injected hole Length and size determine.
Further, the section of the short underpass is box, round or ellipse.
The construction method of the short underpass structure of the newly-built basement and existing subway station of the utility model specifically:
1) drilling of the injected hole of underpass and horizontal beam is determined first between existing subway station and newly-built basement Position;
2) drilling machine installation is in place, carries out the drilling construction of single injected hole;
3) fashioned iron is inserted into injected hole;
4) Grouting Pipe is arranged in and is formed by progress slip casting operation in injected hole, and plug-hole forms horizontal beam;
And 4) 5) step 2), 3) is repeated, until setting horizontal beam number is completed in construction;
6) after grout curing in all injected holes, the construction of collar tie beam is carried out according to code requirement;
7) underpass is excavated according to code requirement after collar tie beam reaches requirement of strength design, until excavating to the ground of setting Layer strengthening length.
In the utility model, to prevent string hole, the 2) into the 4) step, the method for taking the job-hopping construction of one hole of interval, After drilling construction and the slip casting operation of completing first slip casting duct, the position for being spaced a duct carries out repeating construction and work Industry, until completing slip casting duct drilling construction and the slip casting operation of all settings.
The utility model, the drilling construction include that the upside that section is moved towards along engineering excavation and the left and right sides carry out The directional drilling and scarfing cinder parallel with design tunnel forms the construction method in duct.
The 3) fashioned iron described in step be selected from H profile steel or channel steel.
Wherein, the 4) slip casting operation specific method described in step be: slurries observation is reserved at the top of injected hole entrance end Hole, carry out slip casting using grouting pump: one end low from injected hole is toward high one end slip casting, until in the slurries peep hole of entrance end Until flowing out denseer slurries, the injected hole for two sides of first constructing, to intermediate direction propelling construction.
Further, the slip casting operation can be handled for single fluid grouting or two fluid grouting.
Further, the slip casting operation is once grouting or multiple slip casting.
In the utility model, the construction method of the collar tie beam is processing assembling reinforcement first, then installation template, to mould After plate is installed, casting concrete, form removal when concrete strength reaches 2.5Mpa, last curing concrete, coagulation Soil maintenance covers sprinkling maintenance using plastic cloth or geotextiles, keeps wet.
It connect and asks with existing subway station the beneficial effects of the utility model are: the utility model solves newly-built basement Topic, solves the problems such as cut and cover tunneling is to earth's surface bring traffic jam and noise, provides for engineering construction more secure Working face can provide the working face that staff is safer in Practical Project construction by the application, effectively enhance tunnel Stability.
Detailed description of the invention
Fig. 1 is box schematic diagram of underground passage structure.
Fig. 2 is the A-A' sectional view of Fig. 1;
Fig. 3 is horizontal beam drawing;
In figure, the ground 1-;2- underpass;3- horizontal beam;4- collar tie beam;The existing subway station of 5-;6- creates basement;7- type Steel;8- slurries;9- centering bracket.
Specific embodiment
The structure of the utility model is further detailed with reference to the accompanying drawing, these attached drawings are the utility model Preferred specific embodiment, be not limitations of the present invention.
The short underpass structure of a kind of newly-built basement and existing subway station as shown in Figs. 1-2, if the structure includes Solid carbon dioxide flat-topped ridge 3 and two collar tie beams 4, horizontal beam 3 along underpass 2 excavate direction extends and be uniformly distributed on the upside of excavated section with The left and right sides, collar tie beam 4 are located on the section at 3 both ends of horizontal beam, and horizontal beam 3 is connected with collar tie beam 4, horizontal beam 3 with The cross section of collar tie beam 4 is vertical.
Horizontal beam drawing as shown in Figure 3, horizontal beam 3 are mainly made of the slurries 8 of injected hole, fashioned iron 7 and solidification, type Steel 7 is inserted into injected hole, and slurries 8 are then injected in injected hole, and fashioned iron 7 is arranged along injected hole central axes.The diameter of horizontal beam 3 For 150mm, the center of horizontal beam 3 is away from for 300mm;Fashioned iron 7 is H profile steel, fashioned iron specification are as follows: 100*100*6*8, Unit Weight are Duct 200mm is protruded at 17.2kg/m, area of section 21.9mm2,7 both ends of fashioned iron;4 width of collar tie beam is 300mm, is highly 200mm。
Applying to the newly-built basement of the utility model and the short underpass structure of existing subway station with reference to the accompanying drawing Work method is specifically described, construction method are as follows:
1) underpass 2 and injected hole bore position are determined first between existing subway station 5 and newly-built basement 6;
2) drilling machine installation is in place, carries out the drilling construction of single injected hole;
3) fashioned iron 7 is inserted into injected hole;
4) Grouting Pipe is arranged in and is formed by progress slip casting operation in injected hole, and plug-hole forms horizontal beam;
And 4) 5) step 2), 3) is repeated, until the quantity of setting horizontal beam 3 is completed in construction;
6) after the solidification of all injected hole slurries 8, the construction of collar tie beam 4 is carried out according to code requirement;
7) underpass 2 is excavated according to code requirement after collar tie beam 4 reaches requirement of strength design, until excavating to setting Stratum consolidation length.
The utility model can also have other a variety of specific embodiments, without departing substantially from the spirit of the present invention and its essence In the case of, those skilled in the art can make various corresponding changes and modifications, but these phases according to the utility model The change and modification answered all should belong to the protection scope of the utility model claims.

Claims (10)

1. the short underpass structure of a kind of newly-built basement and existing subway station, which is characterized in that if the structure includes solid carbon dioxide Flat-topped ridge and two collar tie beams, the horizontal beam extend along underpass excavation direction and are uniformly distributed in the upside and a left side of excavated section Right two sides, the collar tie beam are located on the section at horizontal beam both ends.
2. short underpass structure according to claim 1, which is characterized in that the horizontal beam is connected with collar tie beam It connects, horizontal beam is vertical with collar tie beam cross section.
3. short underpass structure according to claim 1 or 2, which is characterized in that the horizontal beam cross section is circle Shape, horizontal beam diameter are 150-300mm, and the center of horizontal beam is away from 2.0 times no more than its diameter.
4. short underpass structure according to claim 1, which is characterized in that the underpass structure length is not more than 15 meters.
5. short underpass structure according to claim 1, which is characterized in that the horizontal beam is mainly by injected hole, type Steel and slurries composition.
6. short underpass structure according to claim 5, which is characterized in that in the fashioned iron insertion injected hole, then Slurries are injected in injected hole.
7. short underpass structure according to claim 5 or 6, which is characterized in that protrude injected hole in the fashioned iron both ends 150-300mm, and connect with collar tie beam.
8. short underpass structure according to claim 5 or 6, which is characterized in that be disposed on fashioned iron to middle bracket.
9. short underpass structure according to claim 1, which is characterized in that the section of the short underpass is case Type, round or ellipse.
10. short underpass structure according to claim 5, which is characterized in that the fashioned iron is selected from H profile steel or slot Steel.
CN201920103285.XU 2019-01-22 2019-01-22 A kind of short underpass structure of newly-built basement and existing subway station Expired - Fee Related CN209636858U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920103285.XU CN209636858U (en) 2019-01-22 2019-01-22 A kind of short underpass structure of newly-built basement and existing subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920103285.XU CN209636858U (en) 2019-01-22 2019-01-22 A kind of short underpass structure of newly-built basement and existing subway station

Publications (1)

Publication Number Publication Date
CN209636858U true CN209636858U (en) 2019-11-15

Family

ID=68478702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920103285.XU Expired - Fee Related CN209636858U (en) 2019-01-22 2019-01-22 A kind of short underpass structure of newly-built basement and existing subway station

Country Status (1)

Country Link
CN (1) CN209636858U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518722A (en) * 2019-01-22 2019-03-26 云南省建设投资控股集团有限公司 The short underpass structure and its construction method of newly-built basement and existing subway station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518722A (en) * 2019-01-22 2019-03-26 云南省建设投资控股集团有限公司 The short underpass structure and its construction method of newly-built basement and existing subway station

Similar Documents

Publication Publication Date Title
CN108060908B (en) Long-distance horizontal directional drilling and grouting reinforcement process for water-rich sand layer under building group
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN103835729B (en) Deep distance roadway surrounding rock pre grouting from the surface reinforcement process
CN103758123B (en) The construction method of manually digging hole filling pile retaining wall lining
CN205977229U (en) Arcading tunnel non - flushes entrance to a cave structure suitable for bias voltage condition
CN109723443B (en) Tunnel construction method
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN110107310A (en) A kind of construction method at tunnel slope hole
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN106968690A (en) The method for tunnel construction for soil property of caving in
CN107725056A (en) One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN109518722A (en) The short underpass structure and its construction method of newly-built basement and existing subway station
CN103993885A (en) Construction method for underground excavation tunnel side-direction hole opening supporting system
CN103321235A (en) Composite soil nailing wall slope support method
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN110259490A (en) A kind of Underground Subway Station construction method
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN104863183B (en) Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction
CN104481555A (en) Method of grouting and drilling construction by passing through weak surrounding rock
CN108756897B (en) A kind of construction method of breaking surrounding rock people's air defense tunnel cross point
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN204851266U (en) Secretly dig shaft structure directly over station
CN209636858U (en) A kind of short underpass structure of newly-built basement and existing subway station
CN101994314A (en) Longhole rectangular terraced antiskid pile jump-preventing excavating construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191115