CN107435541A - A kind of new TBM and its construction method for possessing pipe roof construction ability - Google Patents

A kind of new TBM and its construction method for possessing pipe roof construction ability Download PDF

Info

Publication number
CN107435541A
CN107435541A CN201710838531.1A CN201710838531A CN107435541A CN 107435541 A CN107435541 A CN 107435541A CN 201710838531 A CN201710838531 A CN 201710838531A CN 107435541 A CN107435541 A CN 107435541A
Authority
CN
China
Prior art keywords
tbm
rig
pipe
oil cylinder
drilling rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710838531.1A
Other languages
Chinese (zh)
Other versions
CN107435541B (en
Inventor
刘晓恒
贺飞
赵振威
宁向可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201710838531.1A priority Critical patent/CN107435541B/en
Publication of CN107435541A publication Critical patent/CN107435541A/en
Application granted granted Critical
Publication of CN107435541B publication Critical patent/CN107435541B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Abstract

The present invention proposes a kind of new TBM and its construction method for possessing pipe roof construction ability, and technical problems to be solved are that TBM methods are constructed and pipe shed support method is respectively in use, work progress is complicated, and low construction efficiency, construction speed are slow.The present invention includes TBM, pipe shed drilling rig and circular orbit, and described pipe shed drilling rig is arranged on rig support base, and rig support base bottom is provided with pitching oil cylinder and passage oil cylinder;Described circular orbit is socketed on TBM main girder, rig support base is connected using the present invention of above-mentioned technical proposal by the way that TBM and pipe shed drilling rig are combined by pitching oil cylinder and passage oil cylinder with circular orbit, it can prevent from, using crushed zones of the TBM in constructing tunnel, loose band, the inbreak of soil layer band or emerging in large numbers for substantial amounts of underground water, influenceing construction speed.

Description

A kind of new TBM and its construction method for possessing pipe roof construction ability
Technical field
The present invention relates to a kind of rock tunnel(ling) machine(TBM), and in particular to a kind of new TBM for possessing pipe roof construction ability and Its construction method.
Background technology
The excavation in tunnel, including:Railway, highway, subterranean railway, the penstock of reservoir, pit passage etc., to meet to be connected The construction means for connecing the connection in point-to-point transmission space and taking, its digging mode can be made rational according to the rock texture of excavation Arrangement and method for construction, including TBM methods and Guan Peng(Or pipe curtain)Advance support drilling excavating load etc., traditional TBM methods apply bottom when constructing Layer be:Rock stratum with certain self-stability, traditional pipe canopy(Or pipe curtain)Advance support creeps into excavating load(Abbreviation pipe shed support Method)Stratum of applying during construction is:There are crushed zone, ravel area, easy inbreak or water burst band in non-steadiness rock-soil layer or rock stratum Or soil layer etc., but it is complex in non-steadiness rock-soil layer excavation, and be often likely to encounter in general constructing tunnel, if Scheme choice is not right, it will influences the progress of construction.
During tunnel excavation, it is difficult to distributed point or the region of non-steadiness rock-soil layer be predicted, so opening in routine In excavation construction, when such as being constructed using TBM methods, to consider standby technique or using appropriate process, go to handle the ground of non-steadiness Interval, and most advanced, most preferable and economic and reliable technique is at present when handling the ground interval of non-steadiness:Abbreviation pipe canopy branch Defend the doctrine.TBM methods are constructed and pipe shed support method is used alternatingly so that work progress is complicated, and low construction efficiency, construction speed are slow.
The content of the invention
The technical problem to be solved in the present invention be the construction of TBM methods and pipe shed support method respectively in use, work progress is complicated, Low construction efficiency, construction speed are slow, there is provided a kind of new TBM and its construction method for possessing pipe roof construction ability.
In order to solve the above technical problems, the present invention uses following technical proposals:It is a kind of to possess the new of pipe roof construction ability TBM, including TBM, pipe shed drilling rig and circular orbit, described pipe shed drilling rig are arranged on rig support base, under rig support base Portion is provided with pitching oil cylinder and passage oil cylinder;Described circular orbit is socketed on TBM main girder, and rig support base passes through pitching Oil cylinder and passage oil cylinder are connected with circular orbit.
Described circular orbit is provided with rack, is engaged with rack and is provided with gear, and gear is provided with support bar, support bar one End is connected by pitching oil cylinder with rig support base, the connection of the other end and rig support seat hinge;Described pipe shed drilling rig bottom It is connected by passage oil cylinder with rig support base.
The opposite side of the support bar both ends rig support base is respectively equipped with a pair of road wheels, and each pair road wheel clamps respectively In the inner side and outer side of circular orbit.
The width of the support bar is more than the width of circular orbit.
Described pipe shed drilling rig is slidably connected with rig support base.
A kind of construction method for the new TBM for possessing pipe roof construction ability, comprises the following steps:1. during tunnel excavation, Driving region is treated using TBM cutterhead and excavated in rock stratum with self-stability;2. met during TBM tunnelings are used To non-steadiness rock-soil layer region when, non-steadiness rock-soil layer is drilled using pipe shed drilling rig and uses pipe shed support; 3. continue to excavate pipe shed support area using TBM after the completion of pipe shed support.
Step passes through Hydraulic Power Transmission System band when 2. described use pipe shed drilling rig drills to non-steadiness rock-soil layer Moving gear rotates along circular orbit, and gear drives pipe shed drilling rig to rotate by support bar, and pitching is controlled by Hydraulic Power Transmission System Oil cylinder it is flexible, realize the regulation of pipe shed drilling rig angle up or down, pass through Hydraulic Power Transmission System and control stretching for passage oil cylinder Contracting, pipe shed drilling rig are slided on rig support base, realize moving forward and backward for pipe shed drilling rig.
Described pipe shed drilling rig rotates along circular orbit, is drilled and is used in 360 ° of circumference ranges in region to be tunneled Pipe shed support.
Pipe shed drilling rig is applied on TBM by the present invention, the ability for making TBM possess pipe roof construction, so that TBM can be non- Tunneled in steadiness soil layer or rock stratum.When TBM is tunneled in stable rock stratum, it is not necessary to pipe canopy operation is carried out, by biography The TBM methods of system are constructed;When unstable soil layer or rock stratum will be suffered from using TBM methods construction front or with broken When broken band stratum, ravel area stratum, using pipe shed drilling rig to carrying out reinforcement operation in TBM " region to be tunneled " circumference range, So, after TBM drivings arrive the region, it becomes possible to normal through.The present invention can be prevented by the way that TBM and pipe shed drilling rig are combined Only using crushed zones of the TBM in constructing tunnel, loose band, the inbreak of soil layer band or emerging in large numbers for substantial amounts of underground water, influence to apply Work progress.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is Fig. 1 partial enlargement structural representation;
Fig. 3 is Fig. 1 C-C cross section structure diagrams.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not paid Embodiment, belong to the scope of protection of the invention.
As shown in Figure 1 to Figure 3, a kind of new TBM for possessing pipe roof construction ability, including TBM1, pipe shed drilling rig 2 and annular Track 4, described pipe shed drilling rig 2 are arranged on rig support base 7, and the bottom of rig support base 7 is provided with pitching oil cylinder 5 and passage oil Cylinder 6;Described circular orbit 4 is socketed on TBM1 main girder 11, and rig support base 7 passes through pitching oil cylinder 5 and passage oil cylinder 6 It is connected with circular orbit 4.Pipe shed drilling rig 2 realizes 360 ° of rotations along circular orbit, realizes the brill on region 8 periphery to be tunneled to tunnel Hole.
Described circular orbit 4 is provided with rack 41, is engaged with rack 41 and is provided with gear 42, and gear 42 is provided with support bar 43, the one end of support bar 43 is connected by pitching oil cylinder 5 with rig support base 7, the other end and rig support base 7 are articulated and connected;Institute The bottom of pipe shed drilling rig 2 stated is connected by passage oil cylinder 6 with rig support base 7.Support bar 43 be fixed on gear 42 and with The rotation of gear is moved along circular orbit;Gear 42 is rotated by the output shaft of dynamical system such as motor, and then passes through support bar 43 drive pipe shed drilling rigs 2 run into when being moved on circular orbit along rack 41 using present invention progress tunnel excavation and treat tunneling region When domain 8 is distributed point or the region of non-steadiness rock-soil layer, is drilled by pipe shed drilling rig 2 and use the supporting of pipe canopy 9, treat driving Region 8 produces very big crown support effects, and the slurries of adjacent apertures interpenetrate connection in pressure injection, form day The pipe booth structure of curtain formula, into protection formula separation layer, the crushed zone of tunnel roof in supporting, loose band, it is not easy inbreak or anti- Only a large amount of of underground water pour into.Its adjacent hole structure, just as deep hole mini pile, but mutually cutting connection, respectively in water Square it is laid out to vertical direction.Tunnel excavation is now carried out, can be apart from former pipe canopy due to forming the support buttress of canopy of the heavens formula The peripheral extent that about 300 to 500 millimeters of eyelet lower end, excavated forward with TBM.
The opposite side of the both ends rig support base 7 of support bar 43 is respectively equipped with a pair of road wheels, each pair road wheel difference It is clamped in the inner side and outer side of circular orbit 4.The setting of road wheel prevents support bar 43 from driving rig support base 7 to depart from circular rails Road 4, position-limiting action is played to support bar 43.
The width of the support bar 43 is more than the width of circular orbit 4.The both ends protrusion circular orbit 4 of support bar 43, bows It is flexible to face upward oil cylinder 5, realizes the regulation of the angle up or down of pipe shed drilling rig 2.Pipe shed drilling rig 2 is real along 4360 ° of rotations of circular orbit 360 ° of pipe shed support in existing tunnel.
Described pipe shed drilling rig 2 is slidably connected with rig support base 7.Passage oil cylinder 6 is flexible, and pipe shed drilling rig 2 is in rig branch Slided on support seat 7, realize moving forward and backward for pipe shed drilling rig 2.
A kind of construction method for the new TBM for possessing pipe roof construction ability, comprises the following steps:1. during tunnel excavation, Driving region 8 is treated using TBM1 cutterhead 12 and excavated in rock stratum with self-stability;2. when using TBM1 tunnelings When the region of non-steadiness rock-soil layer is run into journey, non-steadiness rock-soil layer is drilled using pipe shed drilling rig 2 and uses pipe The supporting of canopy 9;3. continue to excavate pipe shed support area using TBM1 after the completion of the supporting of pipe canopy 9.In non-steadiness rock-soil layer or There are crushed zone, ravel area in rock stratum, traditional pipe canopy or pipe curtain advance support creep into pipe canopy supporting arch of the excavating load in canopy of the heavens formula After wall is formed, dug using manually or mechanically shovel, bore and dig or bore the different excavation scheme such as quick-fried;The present invention is by by TBM and Guan Peng Rig is combined, accelerating construction progress so that has crushed zone, ravel area, easy inbreak in non-steadiness rock-soil layer or rock stratum Or the construction speed of water burst band or soil layer etc. is 5-8 times of traditional pipe canopy or pipe curtain advance support drilling excavating load speed.
Step passes through Hydraulic Power Transmission System when 2. described use pipe shed drilling rig 2 drills to non-steadiness rock-soil layer Band moving gear 42 rotates along circular orbit 4, and gear 42 drives pipe shed drilling rig 2 to rotate by support bar 43, passes through hydraulic drive system System control pitching oil cylinder 5 it is flexible, realize the regulation of the angle up or down of pipe shed drilling rig 2, controlled by Hydraulic Power Transmission System Passage oil cylinder 6 is stretched, and pipe shed drilling rig 2 is slided on rig support base 7, realizes moving forward and backward for pipe shed drilling rig 2.
Pipe shed drilling rig 2 rotates along circular orbit 4, is drilled in 360 ° of circumference ranges in region to be tunneled and uses pipe canopy Supporting.

Claims (8)

  1. A kind of 1. new TBM for possessing pipe roof construction ability, it is characterised in that:Including TBM(1), pipe shed drilling rig(2)And circular rails Road(4), described pipe shed drilling rig(2)It is arranged on rig support base(7)On, rig support base(7)Bottom is provided with pitching oil cylinder(5) And passage oil cylinder(6);Described circular orbit(4)It is socketed in TBM(1)Main girder(11)On, rig support base(7)By bowing Face upward oil cylinder(5)And passage oil cylinder(6)With circular orbit(4)It is connected.
  2. 2. the new TBM according to claim 1 for possessing pipe roof construction ability, it is characterised in that:Described circular orbit (4)It is provided with rack(41), with rack(41)Engagement is provided with gear(42), gear(42)It is provided with support bar(43), support bar (43)One end passes through pitching oil cylinder(5)With rig support base(7)Connection, the other end and rig support base(7)It is articulated and connected;It is described Pipe shed drilling rig(2)Bottom passes through passage oil cylinder(6)With rig support base(7)Connection.
  3. 3. the new TBM according to claim 2 for possessing pipe roof construction ability, it is characterised in that:The support bar(43) Both ends rig support base(7)Opposite side be respectively equipped with a pair of road wheels, each pair road wheel is clamped in circular orbit respectively(4)'s Inner side and outer side.
  4. 4. the new TBM according to claim 2 for possessing pipe roof construction ability, it is characterised in that:The support bar(43) Width be more than circular orbit(4)Width.
  5. 5. the new TBM according to claim 1 for possessing pipe roof construction ability, it is characterised in that:Described pipe shed drilling rig (2)With rig support base(7)It is slidably connected.
  6. 6. the construction method of the new TBM for possessing pipe roof construction ability according to claim any one of 1-5, its feature exist In:Comprise the following steps:1. during tunnel excavation, TBM is used in the rock stratum with self-stability(1)Cutterhead(12)Treat tunneling region Domain(8)Excavated;2. when using TBM(1)When the region of non-steadiness rock-soil layer is run into during tunneling, using pipe canopy Rig(2)Non- steadiness rock-soil layer is drilled and uses pipe canopy(9)Supporting;3. pipe canopy(9)Continue to use after the completion of supporting TBM(1)Pipe shed support area is excavated.
  7. 7. the construction method of the new TBM according to claim 6 for possessing pipe roof construction ability, it is characterised in that:Step 2. described use pipe shed drilling rig(2)When being drilled to non-steadiness rock-soil layer, pass through Hydraulic Power Transmission System band moving gear (42)Along circular orbit(4)Rotate, gear(42)Pass through support bar(43)Drive pipe shed drilling rig(2)Rotate, pass through hydraulic drive System controls pitching oil cylinder(5)It is flexible, realize pipe shed drilling rig(2)The regulation of angle up or down, pass through hydraulic drive system System control passage oil cylinder(6)Flexible, pipe shed drilling rig(2)In rig support base(7)Upper slip, realizes pipe shed drilling rig(2)Before Enter and retreat.
  8. 8. the construction method of the new TBM according to claim 7 for possessing pipe roof construction ability, it is characterised in that:It is described Pipe shed drilling rig(2)Along circular orbit(4)Rotate, in region to be tunneled(8)Drilled in 360 ° of circumference ranges and using pipe Canopy supporting.
CN201710838531.1A 2017-09-18 2017-09-18 TBM with pipe shed construction capability and construction method thereof Active CN107435541B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710838531.1A CN107435541B (en) 2017-09-18 2017-09-18 TBM with pipe shed construction capability and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710838531.1A CN107435541B (en) 2017-09-18 2017-09-18 TBM with pipe shed construction capability and construction method thereof

Publications (2)

Publication Number Publication Date
CN107435541A true CN107435541A (en) 2017-12-05
CN107435541B CN107435541B (en) 2023-04-25

Family

ID=60461703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710838531.1A Active CN107435541B (en) 2017-09-18 2017-09-18 TBM with pipe shed construction capability and construction method thereof

Country Status (1)

Country Link
CN (1) CN107435541B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335901A (en) * 2020-04-09 2020-06-26 中铁十八局集团有限公司 Construction method for auxiliary small-diameter open TBM tunneling of pipe shed at unfavorable geological tunnel section
CN111502699A (en) * 2020-04-24 2020-08-07 济南市市政工程设计研究院(集团)有限责任公司 Flexible leading pipe canopy suitable for mine method weak soil tunnel
CN112392496A (en) * 2020-10-20 2021-02-23 中铁隧道局集团有限公司 Method for drilling tunnel face by using TBM pipe shed drilling machine
CN114198027A (en) * 2021-12-02 2022-03-18 中铁十九局集团第一工程有限公司 Movable advanced drilling and grouting integrated machine suitable for TBM
CN116771357A (en) * 2022-04-11 2023-09-19 高波 High-speed electromagnetic emission auxiliary rock breaking tunnel boring machine and construction method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006241969A (en) * 2005-02-03 2006-09-14 Jfe Engineering Kk Shield machine, rotary joint, and method of operating shield machine
CN101070758A (en) * 2006-05-10 2007-11-14 三一重型装备有限公司 Digging-drilling integrated digging-drilling machine
CN102383805A (en) * 2011-10-19 2012-03-21 中铁隧道装备制造有限公司 Mixed TBM (Tunnel Boring Machine) with multiple-boring mode and tunnel supporting mode
CN102926762A (en) * 2012-11-22 2013-02-13 中铁隧道装备制造有限公司 Anti-explosion TBM (tunnel boring machine)
CN203187733U (en) * 2013-04-19 2013-09-11 浙江瑞金铜铝型材有限公司 Feeding device of aluminum profile aging furnace
CN203808852U (en) * 2014-03-25 2014-09-03 杭州海聚动力科技有限公司 Detachable leading drilling machine applicable to shield tunneling machine
CN104196547A (en) * 2014-09-05 2014-12-10 中船重工(青岛)轨道交通装备有限公司 Integrated supporting system and tunnel boring machine with same
CN104265314A (en) * 2014-09-30 2015-01-07 中铁工程装备集团有限公司 Multi-degree-of-freedom switching device for advance drilling machine of shield heading machine
CN104476026A (en) * 2014-11-14 2015-04-01 柳州市安龙机械设备有限公司 Rotary welding holder
CN105730954A (en) * 2016-03-29 2016-07-06 浙江厚达智能科技股份有限公司 Stacking RGV
CN107013219A (en) * 2016-01-28 2017-08-04 中铁隧道勘测设计院有限公司 Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel
CN207131408U (en) * 2017-09-18 2018-03-23 中铁工程装备集团有限公司 A kind of new TBM for possessing pipe roof construction ability

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006241969A (en) * 2005-02-03 2006-09-14 Jfe Engineering Kk Shield machine, rotary joint, and method of operating shield machine
CN101070758A (en) * 2006-05-10 2007-11-14 三一重型装备有限公司 Digging-drilling integrated digging-drilling machine
CN102383805A (en) * 2011-10-19 2012-03-21 中铁隧道装备制造有限公司 Mixed TBM (Tunnel Boring Machine) with multiple-boring mode and tunnel supporting mode
CN102926762A (en) * 2012-11-22 2013-02-13 中铁隧道装备制造有限公司 Anti-explosion TBM (tunnel boring machine)
CN203187733U (en) * 2013-04-19 2013-09-11 浙江瑞金铜铝型材有限公司 Feeding device of aluminum profile aging furnace
CN203808852U (en) * 2014-03-25 2014-09-03 杭州海聚动力科技有限公司 Detachable leading drilling machine applicable to shield tunneling machine
CN104196547A (en) * 2014-09-05 2014-12-10 中船重工(青岛)轨道交通装备有限公司 Integrated supporting system and tunnel boring machine with same
CN104265314A (en) * 2014-09-30 2015-01-07 中铁工程装备集团有限公司 Multi-degree-of-freedom switching device for advance drilling machine of shield heading machine
CN104476026A (en) * 2014-11-14 2015-04-01 柳州市安龙机械设备有限公司 Rotary welding holder
CN107013219A (en) * 2016-01-28 2017-08-04 中铁隧道勘测设计院有限公司 Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel
CN105730954A (en) * 2016-03-29 2016-07-06 浙江厚达智能科技股份有限公司 Stacking RGV
CN207131408U (en) * 2017-09-18 2018-03-23 中铁工程装备集团有限公司 A kind of new TBM for possessing pipe roof construction ability

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335901A (en) * 2020-04-09 2020-06-26 中铁十八局集团有限公司 Construction method for auxiliary small-diameter open TBM tunneling of pipe shed at unfavorable geological tunnel section
CN111502699A (en) * 2020-04-24 2020-08-07 济南市市政工程设计研究院(集团)有限责任公司 Flexible leading pipe canopy suitable for mine method weak soil tunnel
CN112392496A (en) * 2020-10-20 2021-02-23 中铁隧道局集团有限公司 Method for drilling tunnel face by using TBM pipe shed drilling machine
CN114198027A (en) * 2021-12-02 2022-03-18 中铁十九局集团第一工程有限公司 Movable advanced drilling and grouting integrated machine suitable for TBM
CN116771357A (en) * 2022-04-11 2023-09-19 高波 High-speed electromagnetic emission auxiliary rock breaking tunnel boring machine and construction method thereof

Also Published As

Publication number Publication date
CN107435541B (en) 2023-04-25

Similar Documents

Publication Publication Date Title
CN107435541A (en) A kind of new TBM and its construction method for possessing pipe roof construction ability
CN104196538B (en) A kind of combined type Double shield TBM
KR100209103B1 (en) Excavator for forming underground continuous wall
CN104653187B (en) Water-rich sand layer geology large cross-section tunnel excavation method
CN109296378B (en) Down-the-hole drill matched breaking hammer tunneling and excavating construction method
CN105201518B (en) Disassembling method is received in a kind of major diameter slurry balance shield hole
CN207377565U (en) Constructing metro tunnel structure containing complicated geological and without shield launching place
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN106088149A (en) A kind of mechanization rapid constructing method of precast splice type underground gallery
WO2019015362A1 (en) Shallow seam water conservation mining method and application thereof
CN107218048A (en) The shape of a hoof development machine promoted by crawler belt
CN104747202A (en) Multi-cutter head combined type cutting system for rectangular pipe pushing machine
CN107503755A (en) A kind of construction method for exempting from button arch flat-top cavern-pile method construction subway station
CN107939415A (en) Stay the micro- two step constructions method of Core Soil in the soft plastic clay tunnel of Shallow-buried Large-span
CN207131408U (en) A kind of new TBM for possessing pipe roof construction ability
CN210564541U (en) Quick heading machine
CN206844193U (en) Bore support integral type pile hole forming device
CN205876331U (en) A dig native device for no -dig tunnel machine
CN107676098A (en) A kind of construction method for exempting from button arch flat-top post hole method construction subway station
CN112709579A (en) Quick-forming development machine for river and canal
CN206942770U (en) A kind of shape of a hoof development machine promoted by crawler belt
CN104847373A (en) Gravel clay stratum shield departure and reception construction process
CN204532359U (en) The multi-cutter-disk combined type cutting system of rectangular pipe jacking machine
CN213869711U (en) Construction is with doing pore-forming rig in narrow and small space
CN110454183A (en) A kind of shoveling tool and its shoveling method for bored tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant