CN107013219A - Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel - Google Patents

Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel Download PDF

Info

Publication number
CN107013219A
CN107013219A CN201610057115.3A CN201610057115A CN107013219A CN 107013219 A CN107013219 A CN 107013219A CN 201610057115 A CN201610057115 A CN 201610057115A CN 107013219 A CN107013219 A CN 107013219A
Authority
CN
China
Prior art keywords
shed
advanced support
pipe
tunnel
pipe advanced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610057115.3A
Other languages
Chinese (zh)
Inventor
徐韬
周建军
朱世友
贺维国
花书军
郑旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201610057115.3A priority Critical patent/CN107013219A/en
Publication of CN107013219A publication Critical patent/CN107013219A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield

Abstract

The invention belongs to the method that Shed-pipe Advanced Support above shield tunnel technical field, more particularly to a kind of shield tunnel isolates boulder group, it is characterised in that follow the steps below:(1)Shield is shut down, and Shed-pipe Advanced Support hole is applied along above tunnel excavation contour line by cutterhead opening;(2)Using rapid hardening high pressure concrete into the Shed-pipe Advanced Support hole rotary jet grouting, until the Shed-pipe Advanced Support hole stream slurry after, stop mud jacking;(3)Described in repeat step(1)、(2)Until each 30 °~90 ° of tunnel center both sides, scope is all finished;(4)Top boulder group is isolated into the pipe of concrete canopy of 60 °~180 ° scopes with center in tunnel upper formation;(5)The tunnel construction sections of boulder group above shield driving, safety.The present invention is for boulder group above shield tunnel, by pre-grouting one pipe canopy of formation, solves boulder group in the soil body of shield tunnel top and sink or subsidence problems, shield is passed through the boulder group of tunnel upper.

Description

Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel
Technical field
The invention belongs to the method that Shed-pipe Advanced Support above shield tunnel technical field, more particularly to a kind of shield tunnel isolates boulder group.
Background technology
With the development of modern city building and traffic communal facility, the land resource day in city is becoming tight, and city ground transport can not meet traffic requirement.In order to save urban land resource, alleviate urban public transport pressure, the underground space for expanding city is imperative, build the underground transportation facilities such as subway, Urban Underground vcehicular tunnel tool and be of great significance.Shield tunnel construction method refers to use shield machine, the unstability while control excavation face and country rock do not cave in, while carrying out tunnel piercing, slagging tap, and segment assembly forms lining cutting, implements grouting behind shaft or drift lining in machine, the method for not disturbing country rock and building tunnel, it is a kind of Fully-mechanized construction method in shallow mining method.
During China's South China's shield tunnel construction, it is usually present completely decomposed stratum, substantial amounts of boulder is usually contained in completely decomposed stratum, boulder has the characteristics of quality is hard, rock core is complete, intensity is high, some boulders are present in shield tunnel, some exist above shield tunnel some boulders, influence the excavation progress in tunnel.Being present in the boulder group in shield tunnel can be handled during tunnel excavation;The boulder group being present in above shield tunnel is not disposable during tunnel excavation, when the soil layer construction above tunneling is loose, and boulder group, which is easily produced, sink or sinkage, hinders the smooth construction of shield tunnel.Therefore, it is necessary to work out a kind of novel construction method, solve boulder group above shield tunnel and sink or subsidence problems, shield is passed through the boulder group of tunnel upper, ensure the smooth construction of shield tunnel.
The content of the invention
The present invention is directed to above-mentioned technical problem, isolate the method for boulder group there is provided Shed-pipe Advanced Support above a kind of shield tunnel, solve boulder group above shield tunnel to sink or subsidence problems, shield is passed through the boulder group of tunnel upper, ensure the smooth construction of shield tunnel.
The technical solution adopted in the present invention is:
Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel, it is characterised in that follow the steps below:
(1)Shield is shut down, and Shed-pipe Advanced Support hole is applied along above tunnel excavation contour line by cutterhead opening;
(2)Using rapid hardening high pressure concrete into the Shed-pipe Advanced Support hole rotary jet grouting, until the Shed-pipe Advanced Support hole stream slurry after, stop mud jacking;
(3)Described in repeat step(1)、(2)Until each 30 °~90 ° of tunnel center both sides, scope is all finished;
(4)Top boulder group is isolated into the pipe of concrete canopy of 60 °~180 ° scopes with center in tunnel upper formation;
(5)The tunnel construction sections of boulder group above shield driving, safety.
The step(1)In, the outer limb in the Shed-pipe Advanced Support hole does not invade tunnel excavation contour line.
The step(1)In, the hole depth≤10m in the Shed-pipe Advanced Support hole.
The step(1)In, the more excellent hole depth in the Shed-pipe Advanced Support hole is 5~10m, to be preferred more than 1~2m of boulder anterior position.
The step(1)In, a diameter of 80~120mm in the Shed-pipe Advanced Support hole.
The step(1)In, the line of the Shed-pipe Advanced Support hole hole heart is domed, and the hole in adjacent Shed-pipe Advanced Support hole is in the heart away from for 0.5m.
The step(1)In, the drilling sequences in Shed-pipe Advanced Support hole are carried out from high hole position to low hole position.
The step(3)In, each 60 ° of tunnel center both sides are more excellent scope.
The step(4)In, pipe of concrete canopy is formed with center into 120 ° as more excellent scope in tunnel upper.
Beneficial effects of the present invention are:
1st, the present invention is for boulder group above shield tunnel, by pre-grouting one pipe canopy of formation, solves boulder group in the soil body of shield tunnel top and sink or subsidence problems, shield is passed through the boulder group of tunnel upper, ensure the smooth construction of shield tunnel;
2nd, the pipe of concrete canopy formation supporting construction in the present invention, the pipe canopy constructed in advance is isolated into support with the support of front of tunnel heading unconsolidated formation and boulder group, forms the shell-like structure around tunnel profile top, effectively suppresses stratum and loosen and collapse;
3rd, the line of the Shed-pipe Advanced Support hole hole heart is domed, pipe of concrete canopy formation arching, bears great efforts, support strength is high;
4th, reinforcing basement effect is generated:Grouting serous fluid enters in stratum and crack through Shed-pipe Advanced Support pore pressure, makes scall or rock mass is cementing, consolidation, so as to improve the physico-mechanical properties on stratum, enhance stratum from ability to bear, reached the purpose of reinforcing pipe canopy surrounding formations;
5th, construction safety is ensured:Pipe shed support rigidity is larger, and loose soil layer and boulder collapse on pipe canopy during shield driving, plays buffering and buffer action, it is therefore prevented that boulder extruding shield, card shield even damage cutterhead in tunneling process, have been greatly reduced range of disturbance and surface subsidence.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Fig. 2 is the construction schematic diagram in Shed-pipe Advanced Support hole in the present invention.
Fig. 3 is the structural representation of pipe canopy in the present invention.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings:
In figure, 1- boulders, the 2- waters surface, 3- pipe canopies, 4- shield machines, 5- sections of jurisdiction, 6- tunnel excavation contour lines, 7- Shed-pipe Advanced Supports hole, 8- pipe canopies.
Embodiment 1
As Figure 1-3, Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel, follows the steps below:
(1)Shield is shut down; Shed-pipe Advanced Support hole 7 is applied along the top of tunnel excavation contour line 6 by cutterhead opening; the outer limb in Shed-pipe Advanced Support hole 7 does not invade tunnel excavation contour line 6; hole depth≤the 10m in Shed-pipe Advanced Support hole 7 and more than the anterior position 1m of boulder 1; a diameter of 80mm in Shed-pipe Advanced Support hole 7; the line of the hole heart of Shed-pipe Advanced Support hole 7 is domed, and the hole in adjacent Shed-pipe Advanced Support hole 7 is carried out away from the drilling sequences for 0.5m, Shed-pipe Advanced Support hole 7 from high hole position to low hole position in the heart;
(2)Using rapid hardening high pressure concrete into Shed-pipe Advanced Support hole 7 rotary jet grouting, until Shed-pipe Advanced Support hole 7 stream slurry after, stop mud jacking;
(3)Repeat step(1)、(2)Until tunnel center both sides, each 30 ° of scopes are all finished;
(4)Top boulder group is isolated into the pipe of concrete canopy 8 of 60 ° of scopes with center in tunnel upper formation;
(5)The tunnel construction sections of boulder group above shield driving, safety.
Wherein, step(1)In, it is the smaller the better that the outer limb in Shed-pipe Advanced Support hole 7 does not invade tunnel excavation contour line 6.
Embodiment 2
As Figure 1-3, Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel, follows the steps below:
(1)Shield is shut down; Shed-pipe Advanced Support hole 7 is applied along the top of tunnel excavation contour line 6 by cutterhead opening; the outer limb in Shed-pipe Advanced Support hole 7 does not invade tunnel excavation contour line 6; the hole depth in Shed-pipe Advanced Support hole 7 is 5m and more than the anterior position 1.2m of boulder 1; a diameter of 90mm in Shed-pipe Advanced Support hole 7; the line of the hole heart of Shed-pipe Advanced Support hole 7 is domed, and the hole in adjacent Shed-pipe Advanced Support hole 7 is carried out away from the drilling sequences for 0.5m, Shed-pipe Advanced Support hole 7 from high hole position to low hole position in the heart;
(2)Using rapid hardening high pressure concrete into Shed-pipe Advanced Support hole 7 rotary jet grouting, until Shed-pipe Advanced Support hole stream slurry after, stop mud jacking;
(3)Repeat step(1)、(2)Until tunnel center both sides, each 60 ° of scopes are all finished;
(4)Top boulder group is isolated into the pipe of concrete canopy 8 of 120 ° of scopes with center in tunnel upper formation;
(5)The tunnel construction sections of boulder group above shield driving, safety.
Wherein, step(1)In, it is the smaller the better that the outer limb in Shed-pipe Advanced Support hole does not invade tunnel excavation contour line.
Embodiment 3
As Figure 1-3, Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel, follows the steps below:
(1)Shield is shut down; Shed-pipe Advanced Support hole 7 is applied along the top of tunnel excavation contour line 6 by cutterhead opening; the outer limb in Shed-pipe Advanced Support hole 7 does not invade tunnel excavation contour line 6; the hole depth in Shed-pipe Advanced Support hole 7 is 10m and more than the anterior position 1.5m of boulder 1; a diameter of 100mm in Shed-pipe Advanced Support hole 7; the line of the hole heart of Shed-pipe Advanced Support hole 7 is domed, and the hole in adjacent Shed-pipe Advanced Support hole 7 is carried out away from the drilling sequences for 0.5m, Shed-pipe Advanced Support hole 7 from high hole position to low hole position in the heart;
(2)Using rapid hardening high pressure concrete into Shed-pipe Advanced Support hole 7 rotary jet grouting, until Shed-pipe Advanced Support hole 7 stream slurry after, stop mud jacking;
(3)Repeat step(1)、(2)Until tunnel center both sides, each 60 ° of scopes are all finished;
(4)Top boulder group is isolated into the pipe of concrete canopy 8 of 120 ° of scopes with center in tunnel upper formation;
(5)The tunnel construction sections of boulder group above shield driving, safety.
Wherein, step(1)In, it is the smaller the better that the outer limb in Shed-pipe Advanced Support hole 7 does not invade tunnel excavation contour line 6.
Embodiment 4
As Figure 1-3, Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel, follows the steps below:
(1)Shield is shut down; Shed-pipe Advanced Support hole 7 is applied along the top of tunnel excavation contour line 6 by cutterhead opening; the outer limb in Shed-pipe Advanced Support hole 7 does not invade tunnel excavation contour line 6; the hole depth in Shed-pipe Advanced Support hole 7 is 8m and more than the anterior position 2m of boulder 1; a diameter of 110mm in Shed-pipe Advanced Support hole 7; the line of the hole heart of Shed-pipe Advanced Support hole 7 is domed, and the hole in adjacent Shed-pipe Advanced Support hole 7 is carried out away from the drilling sequences for 0.5m, Shed-pipe Advanced Support hole 7 from high hole position to low hole position in the heart;
(2)Using rapid hardening high pressure concrete into Shed-pipe Advanced Support hole 7 rotary jet grouting, until Shed-pipe Advanced Support hole 7 stream slurry after, stop mud jacking;
(3)Repeat step(1)、(2)Until tunnel center both sides, each 60 ° of scopes are all finished;
(4)Top boulder group is isolated into the pipe of concrete canopy 8 of 120 ° of scopes with center in tunnel upper formation;
(5)The tunnel construction sections of boulder group above shield driving, safety.
Wherein, step(1)In, it is the smaller the better that the outer limb in Shed-pipe Advanced Support hole 7 does not invade tunnel excavation contour line 6.
Embodiment 5
As Figure 1-3, Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel, follows the steps below:
(1)Shield is shut down; Shed-pipe Advanced Support hole 7 is applied along the top of tunnel excavation contour line 6 by cutterhead opening; the outer limb in Shed-pipe Advanced Support hole 7 does not invade tunnel excavation contour line 6; the hole depth in Shed-pipe Advanced Support hole 7 is 10m and more than the anterior position 2m of boulder 1; a diameter of 120mm in Shed-pipe Advanced Support hole 7; the line of the hole heart of Shed-pipe Advanced Support hole 7 is domed, and the hole in adjacent Shed-pipe Advanced Support hole 7 is carried out away from the drilling sequences for 0.5m, Shed-pipe Advanced Support hole 7 from high hole position to low hole position in the heart;
(2)Using rapid hardening high pressure concrete into Shed-pipe Advanced Support hole 7 rotary jet grouting, until Shed-pipe Advanced Support hole 7 stream slurry after, stop mud jacking;
(3)Repeat step(1)、(2)Until tunnel center both sides, each 90 ° of scopes are all finished;
(4)Top boulder group is isolated into the pipe of concrete canopy 8 of 180 ° of scopes with center in tunnel upper formation;
(5)The tunnel construction sections of boulder group above shield driving, safety.
Wherein, step(1)In, it is the smaller the better that the outer limb in Shed-pipe Advanced Support hole 7 does not invade tunnel excavation contour line 6.
The present invention is for boulder group above shield tunnel, by pre-grouting one pipe canopy of formation, solves boulder group in the soil body of shield tunnel top and sink or subsidence problems, shield is passed through the boulder group of tunnel upper, ensure the smooth construction of shield tunnel;Pipe of concrete canopy formation supporting construction, the pipe canopy constructed in advance is isolated into support with the support of front of tunnel heading unconsolidated formation and boulder group, forms the shell-like structure around tunnel profile top, effectively suppresses stratum and loosens and collapse;The line of the Shed-pipe Advanced Support hole hole heart is domed, pipe of concrete canopy formation arching, bears great efforts, support strength is high;Generate reinforcing basement effect:Grouting serous fluid enters in stratum and crack through Shed-pipe Advanced Support pore pressure, makes scall or rock mass is cementing, consolidation, so as to improve the physico-mechanical properties on stratum, enhance stratum from ability to bear, reached the purpose of reinforcing pipe canopy surrounding formations;Ensure construction safety:Pipe shed support rigidity is larger, and loose soil layer and boulder collapse on pipe canopy during shield driving, plays buffering and buffer action, it is therefore prevented that boulder extruding shield, card shield even damage cutterhead in tunneling process, have been greatly reduced range of disturbance and surface subsidence.
5 embodiments to the present invention are described in detail above, but the content is only presently preferred embodiments of the present invention, it is impossible to be considered as the practical range for limiting the present invention.Within any changes and modifications in accordance with the scope of the present application, the patent covering scope that all should still belong to the present invention.

Claims (9)

1. Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel, it is characterised in that follow the steps below:
(1)Shield is shut down, and Shed-pipe Advanced Support hole is applied along above tunnel excavation contour line by cutterhead opening;
(2)Using rapid hardening high pressure concrete into the Shed-pipe Advanced Support hole rotary jet grouting, until the Shed-pipe Advanced Support hole stream slurry after, stop mud jacking;
(3)Described in repeat step(1)、(2)Until each 30 °~90 ° of tunnel center both sides, scope is all finished;
(4)Tunnel upper formation with center into 60 °~ The pipe of concrete canopy of 180 ° of scopes, isolation top boulder group;
(5)The tunnel construction sections of boulder group above shield driving, safety.
2. Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel according to claim 1, it is characterised in that:The step(1)In, the outer limb in the Shed-pipe Advanced Support hole does not invade tunnel excavation contour line.
3. Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel according to claim 1, it is characterised in that:The step(1)In, the hole depth≤10m in the Shed-pipe Advanced Support hole.
4. Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel according to claim 3, it is characterised in that:The step(1)In, the more excellent hole depth in the Shed-pipe Advanced Support hole is 5~10m, to be preferred more than 1~2m of boulder anterior position.
5. Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel according to claim 1, it is characterised in that:The step(1)In, a diameter of 80~120mm in the Shed-pipe Advanced Support hole.
6. Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel according to claim 1, it is characterised in that:The step(1)In, the line of the Shed-pipe Advanced Support hole hole heart is domed, and the hole in adjacent Shed-pipe Advanced Support hole is in the heart away from for 0.5m.
7. Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel according to claim 1, it is characterised in that:The step(1)In, the drilling sequences in Shed-pipe Advanced Support hole are carried out from high hole position to low hole position.
8. Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel according to claim 1, it is characterised in that:The step(3)In, each 60 ° of tunnel center both sides are more excellent scope.
9. Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel according to claim 1, it is characterised in that:The step(4)In, pipe of concrete canopy is formed with center into 120 ° as more excellent scope in tunnel upper.
CN201610057115.3A 2016-01-28 2016-01-28 Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel Pending CN107013219A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610057115.3A CN107013219A (en) 2016-01-28 2016-01-28 Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610057115.3A CN107013219A (en) 2016-01-28 2016-01-28 Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel

Publications (1)

Publication Number Publication Date
CN107013219A true CN107013219A (en) 2017-08-04

Family

ID=59439464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610057115.3A Pending CN107013219A (en) 2016-01-28 2016-01-28 Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel

Country Status (1)

Country Link
CN (1) CN107013219A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107435541A (en) * 2017-09-18 2017-12-05 中铁工程装备集团有限公司 A kind of new TBM and its construction method for possessing pipe roof construction ability
CN109611103A (en) * 2019-01-30 2019-04-12 中铁十局集团城市轨道工程有限公司 A method of for boulder group consolidation process outstanding on shield section
CN109707388A (en) * 2019-01-07 2019-05-03 中铁十一局集团城市轨道工程有限公司 The method of surface collapse when preventing shield launching from wearing existing shield tunnel down

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0390800A (en) * 1989-09-04 1991-04-16 Taisei Corp Construction method of spiral shield tunnel
CN102518442A (en) * 2011-12-14 2012-06-27 中铁十二局集团第二工程有限公司 Method for processing isolated stone groups in shield excavation karren section
CN102587920A (en) * 2012-03-23 2012-07-18 中交二公局第六工程有限公司 Tunnel entrance bias section construction method
CN103628894A (en) * 2013-10-24 2014-03-12 重庆大学 Water-rich fault fracture zone collapsed roadway repairing method based on angle-variable umbrella-shaped advancing grouting
CN204283211U (en) * 2014-11-29 2015-04-22 中铁十九局集团有限公司 Plenty water weak surrounding rock tunnel advanced support pipe canopy pore-forming system smashed to pieces
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0390800A (en) * 1989-09-04 1991-04-16 Taisei Corp Construction method of spiral shield tunnel
CN102518442A (en) * 2011-12-14 2012-06-27 中铁十二局集团第二工程有限公司 Method for processing isolated stone groups in shield excavation karren section
CN102587920A (en) * 2012-03-23 2012-07-18 中交二公局第六工程有限公司 Tunnel entrance bias section construction method
CN103628894A (en) * 2013-10-24 2014-03-12 重庆大学 Water-rich fault fracture zone collapsed roadway repairing method based on angle-variable umbrella-shaped advancing grouting
CN204283211U (en) * 2014-11-29 2015-04-22 中铁十九局集团有限公司 Plenty water weak surrounding rock tunnel advanced support pipe canopy pore-forming system smashed to pieces
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郑汉森: "松散堆积土覆盖层中隧洞超前管棚的施工", 《东北水利水电》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107435541A (en) * 2017-09-18 2017-12-05 中铁工程装备集团有限公司 A kind of new TBM and its construction method for possessing pipe roof construction ability
CN107435541B (en) * 2017-09-18 2023-04-25 中铁工程装备集团有限公司 TBM with pipe shed construction capability and construction method thereof
CN109707388A (en) * 2019-01-07 2019-05-03 中铁十一局集团城市轨道工程有限公司 The method of surface collapse when preventing shield launching from wearing existing shield tunnel down
CN109707388B (en) * 2019-01-07 2024-02-06 中铁十一局集团城市轨道工程有限公司 Method for preventing ground collapse when shield tunneling machine starts to pass through existing shield tunnel
CN109611103A (en) * 2019-01-30 2019-04-12 中铁十局集团城市轨道工程有限公司 A method of for boulder group consolidation process outstanding on shield section
CN109611103B (en) * 2019-01-30 2024-01-30 中铁十一局集团城市轨道工程有限公司 Method for reinforcing shield section suspended boulder group

Similar Documents

Publication Publication Date Title
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN104863629B (en) A kind of method taking out absciss layer gas and draining slip casting under overlying strata using combined drilling and counterboring
CN102071947B (en) Construction method for soft surrounding rock section of large-span tunnel portal
CN104806251B (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN104806267B (en) The shield end reinforcement system and its construction method of land pebble stratum super-front large pipe shed
CN108756894B (en) Tunnel micro- three step top Core Soil construction
CN105863648B (en) A kind of tunneling is shallow to cover large-section tunnel construction method
CN203961994U (en) Under balancing earth-pressure shielding machine, wear the concealed tunneling structure of having runed shield tunnel
CN106761778A (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN108915736A (en) The water damage control method of digging laneway under the strong weak cementing water-bearing layer of rich water
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN103306713A (en) Networking reinforcement method for cross drilling holes of outburst coal seam
CN206174963U (en) Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN106837357A (en) A kind of no-dig technique pipe-roof method of use curve pipe canopy
CN104033160A (en) Novel support method applicable to shallow-buried subsurface tunnel of soft soil stratum
CN107605509A (en) Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method
CN107013219A (en) Shed-pipe Advanced Support isolates the method for boulder group above a kind of shield tunnel
CN105909262B (en) A kind of bored tunnel driving method
CN102720176B (en) Foundation strengthening treatment method
CN207513614U (en) Shallow tunnel subsurface excavation method advance support structure and combined type advanced tubule
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
AU2016431138B2 (en) Rotary jet-grouting modular rare-earth mining process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190211

Address after: 300000 Tianjin Free Trade Test Zone (Airport Economic Zone) No. 36 West Central Road

Applicant after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: No. 1 Hebei street, Hongqiao District, Tianjin City, Tianjin

Applicant before: Zhongtie Tunnel Survey and Design Inst., Ltd.

TA01 Transfer of patent application right
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170804

WD01 Invention patent application deemed withdrawn after publication