CN107435388A - Complete prefabricated lightgage steel joist combination wall column collaboration member in shear memory and assembly method - Google Patents
Complete prefabricated lightgage steel joist combination wall column collaboration member in shear memory and assembly method Download PDFInfo
- Publication number
- CN107435388A CN107435388A CN201710522878.5A CN201710522878A CN107435388A CN 107435388 A CN107435388 A CN 107435388A CN 201710522878 A CN201710522878 A CN 201710522878A CN 107435388 A CN107435388 A CN 107435388A
- Authority
- CN
- China
- Prior art keywords
- steel
- joist
- guide rail
- lightgage steel
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 179
- 239000010959 steel Substances 0.000 title claims abstract description 179
- 238000000034 method Methods 0.000 title claims description 12
- 238000010008 shearing Methods 0.000 claims description 19
- 238000009434 installation Methods 0.000 claims description 4
- 210000000988 bone and bone Anatomy 0.000 claims description 2
- 238000006073 displacement reaction Methods 0.000 claims description 2
- 239000002184 metal Substances 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000010079 rubber tapping Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000009417 prefabrication Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000013517 stratification Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/562—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with fillings between the load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/58—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
- E04B2/60—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Claims (9)
- A kind of 1. complete prefabricated lightgage steel joist faced wall-post collaboration member in shear memory, it is characterised in that:Including steel core concrete column (1) First (2) with interior wall, interior wall member (2) includes light steel skeleton (3), intertie (4) and wallboard (5);Light steel skeleton (3) is by C Type lightgage steel joist column (6), U-shaped lightgage steel joist guide rail (7), the stull of putting more energy into (8) laterally set and angularly disposed put more energy into tiltedly Support (9) connects and composes, and the preformed hole (11) of intertie (4) through c-type lightgage steel joist column (6) is arranged in light steel skeleton (3) Inside, wallboard (5) are arranged on light steel skeleton (3) both sides;Two steel core concrete columns (1) are arranged on first (2) both sides of interior wall, interior Assembled position (12) is in order to light steel skeleton (3) and intertie (4) and concrete filled steel tube after wallboard is reserved at wall first (2) both ends in portion's Post (1) is connected, and light steel skeleton (3) is connected by U-shaped false keel (13) with steel core concrete column (1), intertie (4) and steel pipe Concrete column (1) drawknot.
- 2. complete prefabricated lightgage steel joist faced wall according to claim 1-post collaboration member in shear memory, it is characterised in that:It is described Steel core concrete column (1) section length of side is not less than U-shaped lightgage steel joist guide rail (7) web height and light steel skeleton (3) both sides wallboard (5) thickness sum.
- 3. complete prefabricated lightgage steel joist faced wall according to claim 1-post collaboration member in shear memory, it is characterised in that:The C Type lightgage steel joist column (6), U-shaped lightgage steel joist guide rail (7), stull of putting more energy into (8), diagonal brace of putting more energy into (9) and U-shaped false keel (13) Thickness is respectively smaller than equal to 2mm.
- 4. complete prefabricated lightgage steel joist faced wall according to claim 1-post collaboration member in shear memory, it is characterised in that:It is described Intertie (4) is the round steel pipe that end is provided with connecting plate (14), and round steel pipe external diameter is less than or equal to 30mm, and round steel thickness of pipe wall is not small In 4mm.
- 5. complete prefabricated lightgage steel joist faced wall according to claim 1-post collaboration member in shear memory, it is characterised in that:It is described Wallboard (5) is the structural panel of double-deck fissure of displacement arrangement, and each layer sheet metal thickness is not less than 12mm.
- 6. complete prefabricated lightgage steel joist faced wall according to claim 1-post collaboration member in shear memory, it is characterised in that:The U Type lightgage steel joist guide rail (7) prepared screw-bolt hole (15), before wallboard (5) is connected with light steel skeleton (3), by pre-buried shearing bolt (16) The embedded U-shaped lightgage steel joist guide rail (7) of batten (17) and pass through prepared screw-bolt hole (15), shearing bolt (16) and U-shaped light steel are imperial Bone conduction rail (7) is fixed temporarily by nut, after wallboard (5) be connected with light steel skeleton (3) it is integral after, remove for temporarily fixed Nut.
- A kind of 7. levels assembly method of complete prefabricated lightgage steel joist faced wall-post collaboration member in shear memory, it is characterised in that including Following steps:S1:By first node plate (18), section point plate (19) and splicing block (20) by upper and lower layer steel core concrete column (1) It is fixedly connected with the superstructure joist guide rail (22) of connection superstructure joist (21) using bolt;S2:Superstructure joist guide rail (22) and floorboard (23) difference prepared screw-bolt hole, will be arranged at the top of lower interior part wall first (2) Shearing bolt (16) on U-shaped lightgage steel joist guide rail (7) passes through the preformed hole (24) of superstructure joist guide rail (22) lower flange, and leads to It is integral to cross bolt connection;The shearing bolt that will be arranged on the first U-shaped lightgage steel joist guide rail (7) in (2) bottom of upper strata interior wall (16) through the preformed hole (24) of superstructure joist guide rail (22) top flange and the preformed hole (25) of floorboard (23), and bolt is passed through Connect integral;S3:Assembled wallboard (12) after installation.
- 8. the levels assembly method of complete prefabricated lightgage steel joist faced wall according to claim 7-post collaboration member in shear memory, It is characterized in that:In step S1, superstructure joist guide rail (22) is the U-shaped i shaped cross section of Two bors d's oeuveres, splicing block (20) " back-to-back " into To being arranged in superstructure joist guide rail (22) both ends.
- 9. the levels assembly method of complete prefabricated lightgage steel joist faced wall according to claim 7-post collaboration member in shear memory, It is characterized in that:In step S1, first node plate (18), section point plate (19) and splicing block (20) connect upper and lower layer steel pipe The step of concrete column (1) and superstructure joist guide rail (22) is:S1.1:First node plate (18), section point plate (19) are passed through into the split bolt that is embedded in steel core concrete column (1) (26) wall with steel core concrete column (1) is fixedly connected, and then passes through splicing block (20) top and first node plate (18) The first U-shaped lightgage steel joist guide rail in (2) bottom of top flange, floorboard (23) and upper strata interior wall of bolt and superstructure joist guide rail (22) (7) web is fixedly connected;S1.2:By splicing block (20) bottom and section point plate (19) by the lower flange of bolt and superstructure joist guide rail (22) and The web of U-shaped lightgage steel joist guide rail (7) is fixedly connected at the top of lower interior part wall member (2), and splicing block (20) is embedded in superstructure joist In guide rail (22);S1.3:Front and rear relative splicing block (20) sidepiece is fixedly connected by bolt with the web of superstructure joist guide rail (22);S1.4:Splicing block (20) end is passed through into the split bolt (26) and the steel tube concrete that are embedded in steel core concrete column (1) Earth pillar (1) is fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710522878.5A CN107435388B (en) | 2017-06-30 | 2017-06-30 | Complete prefabricated lightgage steel joist faced wall-column collaboration member in shear memory and assembly method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710522878.5A CN107435388B (en) | 2017-06-30 | 2017-06-30 | Complete prefabricated lightgage steel joist faced wall-column collaboration member in shear memory and assembly method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107435388A true CN107435388A (en) | 2017-12-05 |
CN107435388B CN107435388B (en) | 2019-09-03 |
Family
ID=60459570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710522878.5A Active CN107435388B (en) | 2017-06-30 | 2017-06-30 | Complete prefabricated lightgage steel joist faced wall-column collaboration member in shear memory and assembly method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107435388B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643376A (en) * | 2018-06-14 | 2018-10-12 | 天津大学建筑设计研究院 | Concrete-Filled Square Steel Tube coupled column outsourcing composite material fireproof construction |
CN109457860A (en) * | 2018-10-22 | 2019-03-12 | 北京工业大学 | A kind of assembled light gauge cold-formed steel shape combined shock absorption wall |
CN110820955A (en) * | 2019-10-24 | 2020-02-21 | 白圣川 | Flexible assembling unit for precast concrete outer wall |
CN110924571A (en) * | 2019-11-26 | 2020-03-27 | 鞍钢中电建筑科技股份有限公司 | Embedded keel type steel structure wall |
CN111622380A (en) * | 2020-04-27 | 2020-09-04 | 江苏科技大学 | Combined shear wall capable of quickly recovering function after earthquake and wall body composed of combined shear wall |
CN112832414A (en) * | 2020-12-31 | 2021-05-25 | 江苏科技大学 | Cold-formed thin-wall section steel embedded block combined shear wall and installation method |
CN112854538A (en) * | 2021-01-11 | 2021-05-28 | 江苏科技大学 | Block combined wall-column type multi-layer light steel residential structure system and assembly method |
CN115653141A (en) * | 2022-11-15 | 2023-01-31 | 昆明理工大学 | Method for manufacturing wall plate by fixing bamboo splints on surface of cold-bent thin-wall steel skeleton |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104818785A (en) * | 2015-05-05 | 2015-08-05 | 东南大学 | Cold-formed steel combined wall with support and installation method |
CN105888101A (en) * | 2016-04-14 | 2016-08-24 | 北京工业大学 | Modular assembly type T-shaped cold-formed thin-walled steel combined wall and connecting mode thereof |
CN205669281U (en) * | 2016-06-06 | 2016-11-02 | 河北建筑工程学院 | A kind of cast-in-place integral concrete frame wall filled with masonry system |
CN106639054A (en) * | 2016-11-15 | 2017-05-10 | 沈阳建筑大学 | Assembled type steel plate net outer wrapped concrete shear wall structure based on prefabricated steel structure |
CN206279622U (en) * | 2016-11-29 | 2017-06-27 | 山东科技大学 | A kind of connecting node of new H profile steel post and H profile steel beam |
-
2017
- 2017-06-30 CN CN201710522878.5A patent/CN107435388B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104818785A (en) * | 2015-05-05 | 2015-08-05 | 东南大学 | Cold-formed steel combined wall with support and installation method |
CN105888101A (en) * | 2016-04-14 | 2016-08-24 | 北京工业大学 | Modular assembly type T-shaped cold-formed thin-walled steel combined wall and connecting mode thereof |
CN205669281U (en) * | 2016-06-06 | 2016-11-02 | 河北建筑工程学院 | A kind of cast-in-place integral concrete frame wall filled with masonry system |
CN106639054A (en) * | 2016-11-15 | 2017-05-10 | 沈阳建筑大学 | Assembled type steel plate net outer wrapped concrete shear wall structure based on prefabricated steel structure |
CN206279622U (en) * | 2016-11-29 | 2017-06-27 | 山东科技大学 | A kind of connecting node of new H profile steel post and H profile steel beam |
Non-Patent Citations (1)
Title |
---|
李书田等: "《建筑围护材料与施工》", 31 July 2011, 中国物资出版社 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643376A (en) * | 2018-06-14 | 2018-10-12 | 天津大学建筑设计研究院 | Concrete-Filled Square Steel Tube coupled column outsourcing composite material fireproof construction |
CN109457860A (en) * | 2018-10-22 | 2019-03-12 | 北京工业大学 | A kind of assembled light gauge cold-formed steel shape combined shock absorption wall |
CN110820955A (en) * | 2019-10-24 | 2020-02-21 | 白圣川 | Flexible assembling unit for precast concrete outer wall |
CN110924571A (en) * | 2019-11-26 | 2020-03-27 | 鞍钢中电建筑科技股份有限公司 | Embedded keel type steel structure wall |
CN110924571B (en) * | 2019-11-26 | 2020-08-18 | 鞍钢中电建筑科技股份有限公司 | Embedded keel type steel structure wall |
CN111622380A (en) * | 2020-04-27 | 2020-09-04 | 江苏科技大学 | Combined shear wall capable of quickly recovering function after earthquake and wall body composed of combined shear wall |
CN111622380B (en) * | 2020-04-27 | 2022-05-10 | 江苏科技大学 | Combined shear wall capable of quickly recovering function after earthquake and wall body composed of combined shear wall |
CN112832414A (en) * | 2020-12-31 | 2021-05-25 | 江苏科技大学 | Cold-formed thin-wall section steel embedded block combined shear wall and installation method |
CN112854538A (en) * | 2021-01-11 | 2021-05-28 | 江苏科技大学 | Block combined wall-column type multi-layer light steel residential structure system and assembly method |
CN115653141A (en) * | 2022-11-15 | 2023-01-31 | 昆明理工大学 | Method for manufacturing wall plate by fixing bamboo splints on surface of cold-bent thin-wall steel skeleton |
Also Published As
Publication number | Publication date |
---|---|
CN107435388B (en) | 2019-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107435388A (en) | Complete prefabricated lightgage steel joist combination wall column collaboration member in shear memory and assembly method | |
CN106677336A (en) | Connecting joint structure of square concrete filled steel tubular column and I-shaped section steel beam | |
CN106703197B (en) | A kind of large span multilayer anti-seismic frame structure system and its construction method | |
CN103510723B (en) | A kind of prefabricated integral frame structure dwelling house system | |
CN102995756B (en) | Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method | |
CN105040816A (en) | Prefabricated assembly type and hidden-support-equipped superposed plate type reinforced concrete core wall | |
CN208701908U (en) | A kind of column External prestressed Self-resetting bean column node with grating Wasted-energy steel plate | |
CN210887559U (en) | Low multi-storey steel structure residential system | |
CN103276806B (en) | A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces | |
CN102635163A (en) | Assembled monolithic multilayer long-span bidirectional multi-span building with space steel grid box-type structures | |
CN105821961A (en) | T-shaped beam column connecting joint | |
CN112832414A (en) | Cold-formed thin-wall section steel embedded block combined shear wall and installation method | |
CN209941912U (en) | Beam column connecting structure for assembly type frame structure building | |
CN204370562U (en) | A kind of frame structure, frame structure body | |
CN107386446A (en) | A kind of beam-column connection and connection method for faced wall pillar cold formed steel structure | |
CN104988984A (en) | U-shaped steel and concrete combined orthogonal-diagonal spatial grid box type structure and manufacturing method | |
CN206655314U (en) | The board-like assembling building systems of DGC | |
CN110670720A (en) | Connecting structure of prefabricated column and superposed beam and construction method thereof | |
CN212053252U (en) | Square steel pipe column-H-shaped steel beam connecting node for connecting outer sleeve with double channel steel | |
CN204266370U (en) | Prefabricated SRC-S-RC post beam shear wall supports floor assembling system | |
CN210032128U (en) | Dry construction connecting structure of corner post and beam for fabricated frame structure building | |
CN110284594B (en) | Full-bolt connection assembly type floor composite beam steel pipe column frame joint and forming method thereof | |
CN207277607U (en) | A kind of assembled steel support frame Strengthened Masonry Walls load bearing wall | |
CN216042835U (en) | Layer adding device with light wall board for raising frame structure | |
CN109537724A (en) | One kind is unilateral to be bolted reinforcing joint for resisting continuous collapse of beam column and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20171205 Assignee: Center for technology transfer Jiangsu University of Science and Technology Assignor: JIANGSU University OF SCIENCE AND TECHNOLOGY Contract record no.: X2021980006173 Denomination of invention: Fully prefabricated light steel keel composite wall column cooperative shear member and its assembly method Granted publication date: 20190903 License type: Common License Record date: 20210714 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EC01 | Cancellation of recordation of patent licensing contract | ||
EC01 | Cancellation of recordation of patent licensing contract |
Assignee: Center for technology transfer Jiangsu University of Science and Technology Assignor: JIANGSU University OF SCIENCE AND TECHNOLOGY Contract record no.: X2021980006173 Date of cancellation: 20210826 |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231207 Address after: Room 2202, 22 / F, Wantong building, No. 3002, Sungang East Road, Sungang street, Luohu District, Shenzhen City, Guangdong Province Patentee after: Shenzhen dragon totem technology achievement transformation Co.,Ltd. Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee before: Dragon totem Technology (Hefei) Co.,Ltd. Effective date of registration: 20231207 Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee after: Dragon totem Technology (Hefei) Co.,Ltd. Address before: No. 2 Mengxi Road, Zhenjiang City, Jiangsu Province, 212005 Patentee before: JIANGSU University OF SCIENCE AND TECHNOLOGY |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240205 Address after: No. 55 Mopanshan South Road, Wanli District, Nanchang City, Jiangxi Province, 330004 Patentee after: Hu Bangming Country or region after: China Patentee after: Yu Meilin Patentee after: Yu Limin Address before: Room 2202, 22 / F, Wantong building, No. 3002, Sungang East Road, Sungang street, Luohu District, Shenzhen City, Guangdong Province Patentee before: Shenzhen dragon totem technology achievement transformation Co.,Ltd. Country or region before: China |