CN107401389B - A method of steel ball under injection erosion processing well - Google Patents

A method of steel ball under injection erosion processing well Download PDF

Info

Publication number
CN107401389B
CN107401389B CN201710651452.XA CN201710651452A CN107401389B CN 107401389 B CN107401389 B CN 107401389B CN 201710651452 A CN201710651452 A CN 201710651452A CN 107401389 B CN107401389 B CN 107401389B
Authority
CN
China
Prior art keywords
steel ball
injection
coiled tubing
erosion
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710651452.XA
Other languages
Chinese (zh)
Other versions
CN107401389A (en
Inventor
席仲琛
杨红斌
陈雄
费节高
马小龙
徐迎新
李绪宜
张清龙
曹欣
谢涛
吴简
景志明
陈文博
韩静静
杨博丽
姚兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201710651452.XA priority Critical patent/CN107401389B/en
Publication of CN107401389A publication Critical patent/CN107401389A/en
Application granted granted Critical
Publication of CN107401389B publication Critical patent/CN107401389B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B31/00Fishing for or freeing objects in boreholes or wells
    • E21B31/03Freeing by flushing

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides a kind of methods of steel ball under injection erosion processing well, using abradant jet mode, erosion is sprayed downwards along pit shaft axis meets the steel ball of card and the contact position of steel ball and ball seat, expand latus rectum in ball seat by erosion or reduces steel ball internal diameter, to release constraint of the ball seat to steel ball, make it that can voluntarily return to ground under the lifting of liquid in well, this method can increase substantially operating efficiency and process safety is horizontal.

Description

A method of steel ball under injection erosion processing well
Technical field
The invention belongs to exploration of oil and gas field and development technique field, and in particular to a kind of to spray steel ball under erosion processing well Method is suitable for meeting each sized solid steel ball of card and other metal material medicine balls under processing well.
Background technique
Steel ball is a kind of common downhole tool attachment in oil-gas field development field, and major function is to open upper layer to go out liquid logical Lower layer's feed pathway is closed in road.In operation process, since the heating of the squeezing action of long-time highly pressurised liquid, formation temperature is made With, cooling effect of entry well fluid etc., steel ball is stuck on ball seat, i.e., cannot along pipe downlink, can not in well liquid support Uplink in lower edge pipe is lifted until returning out ground.
The existing mainly method by meeting steel-fastening ball under two kinds of processing wells:
First is that brill mill is carried out to steel ball by tripping in continuous tubing drill grinds tool pipe string in oil pipe or in casing, until by steel Ball, which thoroughly bores to remove or bore, is milled to steel ball not by ball seat constraint (ball seat only limits steel ball and continues traveling downwardly);
Second is that annular space energy is increased by annular space lift mode, thus increase the upper top power for meeting steel-fastening ball lower part, on Top steel ball promotes its unfreezing.
But the first processing method has its limitation, bores mill steel ball and bouncing of drilling tool easily occurs, bore mill for a long time to no effect etc. often See unusual service condition;The effect of second of processing method depends on the factors such as tubing and casing bearing capacity, strata pressure, effect often compared with Difference.
Summary of the invention
The purpose of the present invention is overcoming above-mentioned technical problem of the existing technology, provide a kind of convenient for Field Force's grasp With met under the injection erosion processing well of operation card, cannot voluntarily on the construction method of steel ball returned.
Technical solution provided by the invention is as follows:
A method of steel ball under injection erosion processing well, comprising the following steps:
Step 1: checking and coiled tubing and injection erosion tool are connected composition injection erosion tool string from top to bottom, Enter well later;
Step 2: sending downwards coiled tubing until visiting and arrive steel ball, records steel ball depth, preliminary to detect steel ball position, Then coiled tubing is above mentioned to visiting to the above 2-3m in steel ball position, direct flushing, is washed till inlet and outlet water colour unanimously and returning fluid Termination of pumping after middle no solid impurity particle, and record tubing string suspending weight and pump pressure;
Step 3: turn on pump recycles and transfers coiled tubing, determines steel ball position;
When turn on pump recycles and transfers coiled tubing and contradict the lower end surface for spraying erosion tool to steel ball, steel ball position Determination need to meet following three conditions simultaneously:
1) pump pressure at this time is greater than the pump pressure that records in step 2, and with continuing to send brills, pump pressure rise at least 2MPa;2) The lower end surface depth for spraying erosion tool is consistent with the steel ball depth that step 2 records;3) tubing string suspending weight is remembered less than step 2 The tubing string suspending weight of record, and differ and be less than 0.5t;
Step 4: after determining steel ball position, continuing to be sent into coiled tubing, until bit pressure of the load on steel ball is 2-3t;
Step 5: the injection liquid of pump note at least one coiled tubing internal volume, adjusting pump note discharge capacity makes to reach steel ball surface Fluid velocity is not less than 150m/s, and ground pump pressure is less than the 60% of coiled tubing internal pressure strength;
Step 6: the mulling liquid of pump at least 2 times coiled tubing internal volumes of note, adjusting pump note discharge capacity makes to reach steel ball surface Fluid velocity is not less than 150m/s, carries out injection erosion, after mulling liquid pump is infused, replaces at least one coiled tubing internal volume Injection liquid, the pump that discharge capacity is less than mulling liquid infuses discharge capacity, injection all replaced with sand to annular space, then replace with injection liquid clearly Water carries out direct flushing, and well-flushing fluid volume is no less than 2 times of hole volume, wait be washed till inlet and outlet water colour unanimously and in returning fluid Without solid impurity particle;
Step 7: termination of pumping acts injection erosion tool string.
The injection erosion tool includes sequentially connected 1 axial nozzle and multiple oblique nozzles from bottom to up, described Open Side Down for axial nozzle, and multiple oblique nozzle openings are obliquely.
The coiled tubing internal volume is the volume of well head or less the injection above coiled tubing of erosion tool.
The injection liquid is formulated by tackifier and clear water, and the mass percentage concentration of tackifier is greater than 3.5%, sprays liquid Viscosity is not less than 30mPa.s.
The mulling liquid is the mixture for spraying liquid and quartz sand, and the injection liquid is formulated by tackifier and clear water, The mass percentage concentration of tackifier is greater than 3.5%, and injection fluid viscosity is not less than 30mPa.s, and the quartz sand concentration is not more than 170 kg/m3
The quartz sand is 40-100 mesh.
The tackifier are powdery hydroxypropyl guar.
The beneficial effects of the present invention are:
The method of steel ball under this injection erosion processing well provided by the invention, using abradant jet mode, along pit shaft axis Line sprays downwards erosion and meets the steel ball of card and the contact position of steel ball and ball seat, expands latus rectum in ball seat by erosion or reduces steel ball Internal diameter makes it that can voluntarily return to ground under the lifting of liquid in well to release constraint of the ball seat to steel ball, and this method can be big Amplitude improves operating efficiency and process safety is horizontal.
It will be described in further details below.
Specific embodiment
Embodiment 1:
Present embodiments provide a kind of method for spraying steel ball under erosion processing well, comprising the following steps:
Step 1: checking and coiled tubing and injection erosion tool are connected composition injection erosion tool string from top to bottom, Enter well later;
Step 2: sending downwards coiled tubing until visiting and arrive steel ball, records steel ball depth, preliminary to detect steel ball position, Then coiled tubing is above mentioned to visiting to the above 2-3m in steel ball position, direct flushing, is washed till inlet and outlet water colour unanimously and returning fluid Termination of pumping after middle no solid impurity particle, and record tubing string suspending weight and pump pressure;
Step 3: turn on pump recycles and transfers coiled tubing, determines steel ball position;
When turn on pump recycles and transfers coiled tubing and contradict the lower end surface for spraying erosion tool to steel ball, steel ball position Determination need to meet following three conditions simultaneously:
1) pump pressure at this time is greater than the pump pressure that records in step 2, and with continuing to send brills, pump pressure rise at least 2MPa;2) The lower end surface depth for spraying erosion tool is consistent with the steel ball depth that step 2 records;3) tubing string suspending weight is remembered less than step 2 The tubing string suspending weight of record, and differ and be less than 0.5t;
Step 4: after determining steel ball position, continuing to be sent into coiled tubing, until bit pressure of the load on steel ball is 2-3t;
Step 5: the injection liquid of pump note at least one coiled tubing internal volume, adjusting pump note discharge capacity makes to reach steel ball surface Fluid velocity is not less than 150m/s, and ground pump pressure is less than the 60% of coiled tubing internal pressure strength;
Step 6: the mulling liquid of pump at least 2 times coiled tubing internal volumes of note, adjusting pump note discharge capacity makes to reach steel ball surface Fluid velocity is not less than 150m/s, carries out injection erosion, after mulling liquid pump is infused, replaces at least one coiled tubing internal volume Injection liquid, the pump that discharge capacity is less than mulling liquid infuses discharge capacity, injection all replaced with sand to annular space, then replace with injection liquid clearly Water carries out direct flushing, and well-flushing fluid volume is no less than 2 times of hole volume, wait be washed till inlet and outlet water colour unanimously and in returning fluid Without solid impurity particle;
Step 7: termination of pumping acts injection erosion tool string.
The present invention uses abradant jet mode, sprays erosion because a variety of causes is by the steel ball being stuck in ball seat, enriches well The processing method of lower steel ball, improves treatment effeciency.
Embodiment 2:
On the basis of embodiment 1, the present embodiment carries out injection erosion processing steel ball to a bite horizontal well of Changqing oilfields Operation.
The well carries out pressure break using diameter 73.02mm oil pipe+Pyatyi hydrajet tool, and diameter 44mm steel ball can not after pressure Discharge ground is returned, judges that pressing crack construction process mesohigh squeezes steel ball and is stuck on ball seat, using the coiled tubing of outer diameter 38.01mm The injection erosion tool connected with outer diameter enters well processing chance steel-fastening ball.
After fastening means and test passes, lower coiled tubing, spy steel ball position is 3850.0m, mentions 2m, above with 100L/min Discharge capacity carry out direct flushing, when returning fluid's continuous-stable, is pumped 35MPa.After well-flushing is qualified, the tool depth is tested in termination of pumping It is 11.2t that place's coiled tubing, which above mentions suspending weight,.With the discharge capacity of 100L/min in Beng Zhu tripping in coiled tubing, when depth of setting is When 3850.05m, pump pressure rises to 40MPa, and suspending weight falls to 10.9t, so that it is determined that steel ball depth is 3850.0m.Steel ball pressurization 2t。
With injection liquid (guanidine glue) 6m of the discharge capacity direct circulation pump note viscosity 35mPa.s of 200L/min3;Liquid to be gone out is continuously steady After fixed, start to add 40-70 mesh quartz sand, 170 kg/m of sand concentration3;Pump note 12 m of mulling liquid3Afterwards, stop adding sand;Continue pump note spray Penetrate 6 m of liquid3;Injection liquid is changed to clear water, pump note 30 m of clear water3, the quartz sand of ground metering returns output and the basic phase of additional amount When termination of pumping;Act coiled tubing.
Verifying learns that steel ball position has moved down afterwards.
In the present embodiment, the injection erosion tool is oblique including sequentially connected 1 from bottom to up axial nozzle and 8 To nozzle, Open Side Down for the axial direction nozzle, and multiple oblique nozzle openings are obliquely.
Wherein, coiled tubing internal volume is the volume of well head or less the injection above coiled tubing of erosion tool;Spraying liquid is Guanidine glue is formulated by powdery hydroxypropyl guar tackifier and clear water, and the mass percentage concentration of tackifier is greater than 3.5%, injection Fluid viscosity is 35mPa.s.
Mulling liquid is the mixture for spraying liquid and quartz sand, and the injection liquid is by powdery hydroxypropyl guar tackifier and clear water It is formulated, injection fluid viscosity is 35mPa.s, and quartz sand concentration is 170 kg/m3
The part that the present embodiment does not specifically describe belongs to the common knowledge and well-known technique of the art, herein not Another one is described in detail.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all It is within being all belonged to the scope of protection of the present invention with the same or similar design of the present invention.

Claims (7)

1. a kind of method of steel ball under injection erosion processing well, which comprises the following steps:
Step 1: checking and coiled tubing and injection erosion tool are connected composition injection erosion tool string from top to bottom, later Enter well;
Step 2: sending downwards coiled tubing until visiting and arrive steel ball, records steel ball depth, preliminary to detect steel ball position, then Coiled tubing is above mentioned to visiting to the above 2-3m in steel ball position, direct flushing, is washed till inlet and outlet water colour unanimously and nothing in returning fluid Termination of pumping after solid impurity particle, and record tubing string suspending weight and pump pressure;
Step 3: turn on pump recycles and transfers coiled tubing, determines steel ball position;
The determination of steel ball position need to meet following three conditions simultaneously, that is, when turn on pump recycles and transfers coiled tubing injection be rushed When the lower end surface of erosion tool is contradicted to steel ball:
1) pump pressure at this time is greater than the pump pressure that records in step 2, and with continuing to send brills, pump pressure rise at least 2MPa;2) it sprays The lower end surface depth of erosion tool is consistent with the steel ball depth that step 2 records;3) tubing string suspending weight is less than step 2 record Tubing string suspending weight, and differ and be less than 0.5t;
Step 4: after determining steel ball position, continuing to be sent into coiled tubing, until bit pressure of the load on steel ball is 2-3t;
Step 5: the injection liquid of pump note at least one coiled tubing internal volume, adjusting pump note discharge capacity makes the fluid for reaching steel ball surface Speed is not less than 150m/s, and ground pump pressure is less than the 60% of coiled tubing internal pressure strength;
Step 6: the mulling liquid of pump at least 2 times coiled tubing internal volumes of note, adjusting pump note discharge capacity makes the fluid for reaching steel ball surface Speed is not less than 150m/s, carries out injection erosion, after mulling liquid pump is infused, replaces the spray of at least one coiled tubing internal volume Penetrate liquid, the pump that discharge capacity is less than mulling liquid infuses discharge capacity, injection is all replaced with sand to annular space, then will injection liquid replace with clear water into Row direct flushing, well-flushing fluid volume are no less than 2 times of hole volume, wait be washed till inlet and outlet water colour unanimously and in returning fluid without solid Body impurity particle;
Step 7: termination of pumping acts injection erosion tool string.
2. the method for steel ball under a kind of injection erosion processing well according to claim 1, it is characterised in that: the injection punching Erosion tool includes sequentially connected 1 axial nozzle and multiple oblique nozzles from bottom to up, and Open Side Down for the axial direction nozzle, more A oblique nozzle opening is obliquely.
3. the method for steel ball under a kind of injection erosion processing well according to claim 1, it is characterised in that: the continuous oil Pipe internal volume be well head or less with it is more than injection erosion tool between coiled tubing volume.
4. the method for steel ball under a kind of injection erosion processing well according to claim 1, it is characterised in that: the injection liquid It is formulated by tackifier and clear water, the mass percentage concentration of tackifier is greater than 3.5%, and injection fluid viscosity is not less than 30mPa.s.
5. the method for steel ball under a kind of injection erosion processing well according to claim 1, it is characterised in that: the mulling liquid For the mixture for spraying liquid and quartz sand, the injection liquid is formulated by tackifier and clear water, and the quality percentage of tackifier is dense Degree is greater than 3.5%, and injection fluid viscosity is not less than 30mPa.s, and the quartz sand concentration is not more than 170 kg/m3
6. the method for steel ball under a kind of injection erosion processing well according to claim 5, it is characterised in that: the quartz sand For 40-100 mesh.
7. the method for steel ball under a kind of injection erosion processing well according to claim 4 or 5, it is characterised in that: the increasing Stick is powdery hydroxypropyl guar.
CN201710651452.XA 2017-08-02 2017-08-02 A method of steel ball under injection erosion processing well Active CN107401389B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710651452.XA CN107401389B (en) 2017-08-02 2017-08-02 A method of steel ball under injection erosion processing well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710651452.XA CN107401389B (en) 2017-08-02 2017-08-02 A method of steel ball under injection erosion processing well

Publications (2)

Publication Number Publication Date
CN107401389A CN107401389A (en) 2017-11-28
CN107401389B true CN107401389B (en) 2019-06-18

Family

ID=60401885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710651452.XA Active CN107401389B (en) 2017-08-02 2017-08-02 A method of steel ball under injection erosion processing well

Country Status (1)

Country Link
CN (1) CN107401389B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704879A (en) * 2012-05-15 2012-10-03 中国石油大学(华东) Abrasive jet processing tool for downhole accidents
CN204571889U (en) * 2015-04-27 2015-08-19 中国海洋石油总公司 A kind of rotating fluid plug-removing device
CN105804679A (en) * 2016-02-06 2016-07-27 高伟时 Horizontal well shaft processing process tubing string device for realizing continuous circulation by ordinary oil pipe
CN105952407A (en) * 2016-06-03 2016-09-21 中国石油天然气股份有限公司 Drilling tool stuck releasing method and stuck releasing device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201409046D0 (en) * 2014-05-21 2014-07-02 Proserv Uk Ltd Downhole cutting tool

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704879A (en) * 2012-05-15 2012-10-03 中国石油大学(华东) Abrasive jet processing tool for downhole accidents
CN204571889U (en) * 2015-04-27 2015-08-19 中国海洋石油总公司 A kind of rotating fluid plug-removing device
CN105804679A (en) * 2016-02-06 2016-07-27 高伟时 Horizontal well shaft processing process tubing string device for realizing continuous circulation by ordinary oil pipe
CN105952407A (en) * 2016-06-03 2016-09-21 中国石油天然气股份有限公司 Drilling tool stuck releasing method and stuck releasing device

Also Published As

Publication number Publication date
CN107401389A (en) 2017-11-28

Similar Documents

Publication Publication Date Title
CN108979569A (en) A kind of method of three layers of de-plugging of fixed tubular column
CN103790516B (en) A kind of boring method utilizing heating power jet-flow efficient to break rock
CN106382097B (en) A kind of drilling rig and method using liquid nitrogen injection efficient rock-breaking
CN110173246A (en) A kind of water-liquid nitrogen method that alternately heating rate is adopted in tired pressure break hot dry rock raising
CN107882535B (en) Process method for developing heat energy of hot dry rock by adopting horizontal well
CN102168545A (en) Coiled tubing supercritical CO2 jet fracturing method
CN104533354B (en) Plug type sand control method for slim hole sidetracked well
CN106481328A (en) A kind of utilization graininess dry ice builds the hot dry rock method that manually heat is stored up
CN102777138A (en) Method combining coiled tubing with supercritical CO2 for jet-flow sand washing plugging removal
CN102767333A (en) Particle impact drilling simulation experiment method and device thereof
Gensheng et al. Multistage hydraulic jet acid fracturing technique for horizontal wells
CN106050198B (en) Comprehensive drainage gas production system for low-pressure low-yield well
CN103321622A (en) Sand draining and oil extracting method in manner of integrating injection and extraction for thermal producing well and device thereof
CN109138959B (en) Supercritical CO2Energy-gathering fracturing method
CN201095977Y (en) Gas lift pipe column for hot washing protective oil layer and no-killing operation
CN105443099A (en) Method for upward movement fracturing of horizontal well of naked eye prefabricated tubing completion
CN104153753A (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN109723399A (en) A kind of method of oil/gas well liquid nitrogen injection de-plugging anatonosis
CN114508336B (en) Drilling, unfreezing and fracturing integrated device and method for soft coal seam
CN108104749A (en) Sandstone geothermal well gas lift reverse circulation sand-flushing Processes and apparatus
CN112343560A (en) Fracturing and sand prevention combined process method for exploiting low-permeability reservoir natural gas hydrate
CN109899017A (en) Drilling and grinding underbalanced cement plug operation construction method for coiled tubing
CN107401389B (en) A method of steel ball under injection erosion processing well
CN201865597U (en) Laminated fracturing protection device for continuous oil pipe
CN106639997B (en) Device and method for reducing viscosity of heavy oil by injecting agent through high-pressure water jet of continuous oil pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201028

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: 710018 Changqing building, 1203 Changqing Changqing Garden area, Shaanxi, Xi'an Province

Patentee before: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.