CN107401389A CN201710651452.XA CN201710651452A CN107401389A CN 107401389 A CN107401389 A CN 107401389A CN 201710651452 A CN201710651452 A CN 201710651452A CN 107401389 A CN107401389 A CN 107401389A
Authority
CN
China
Prior art keywords
steel ball
injection
erosion
coiled tubing
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710651452.XA
Other languages
Chinese (zh)
Other versions
CN107401389B (en
Inventor
席仲琛
杨红斌
陈雄
费节高
马小龙
徐迎新
李绪宜
张清龙
曹欣
谢涛
吴简
景志明
陈文博
韩静静
杨博丽
姚兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201710651452.XA priority Critical patent/CN107401389B/en
Publication of CN107401389A publication Critical patent/CN107401389A/en
Application granted granted Critical
Publication of CN107401389B publication Critical patent/CN107401389B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B31/00Fishing for or freeing objects in boreholes or wells
    • E21B31/03Freeing by flushing

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention provides a kind of method for spraying steel ball under erosion processing well, using abradant jet mode, erosion is sprayed downwards along pit shaft axis meets the steel ball blocked and the contact position of steel ball and ball seat, latus rectum in ball seat is expanded by erosion or reduces steel ball internal diameter, so as to release constraint of the ball seat to steel ball, it is set voluntarily to return to ground under the lifting of liquid in well, this method can increase substantially operating efficiency and process safety is horizontal.

Description

A kind of method for spraying steel ball under erosion processing well
Technical field
The invention belongs to exploration of oil and gas field and development technique field, and in particular to a kind of to spray steel ball under erosion processing well Method, it is suitable for meeting each sized solid steel ball of card and other metal material medicine balls under processing well.
Background technology
Steel ball is a kind of conventional downhole tool annex in oil-gas field development field, and its major function is to open upper strata and go out liquid to lead to Road, closing lower floor feed pathway.In operation process, because the heating of the squeezing action of long-time highly pressurised liquid, formation temperature is made Cooling effect with, entry well fluid etc., steel ball is stuck on ball seat, i.e., can not be descending along pipe, can not in well liquid support Lift up in lower edge pipe until returning out ground.
The existing mainly method by meeting steel-fastening ball under two kinds of processing wells:
First, by tripping in continuous tubing drill grinds tool pipe string in oil pipe or in sleeve pipe, brill mill is carried out to steel ball, until steel ball is thorough Subdrilling, which is removed or bored, to be milled to steel ball and is not constrained by ball seat(Ball seat only limits steel ball and continued traveling downwardly);
Second, by annular space lift mode, increase annular space energy, so as to increase the upper top power for meeting steel-fastening ball bottom, upper top steel Ball promotes its unfreezing.
But the first processing method has its limitation, bore mill steel ball and bouncing of drilling tool easily occur, bore mill for a long time to no effect etc. often See unusual service condition;The effect of second of processing method depends on the factor such as tubing and casing bearing capacity, strata pressure, effect often compared with Difference.
The content of the invention
The purpose of the present invention is to overcome above-mentioned technical problem existing for prior art, there is provided one kind is easy to Field Force to grasp With met under the injection erosion processing well of operation card, can not voluntarily on the construction method of steel ball returned.
Technical scheme provided by the invention is as follows:
A kind of method for spraying steel ball under erosion processing well, comprises the following steps:
Step 1:Check and coiled tubing and injection erosion instrument are connected into composition injection erosion tool string from top to bottom, afterwards Enter well;
Step 2:Coiled tubing is sent downwards and arrives steel ball until visiting, and records steel ball depth, it is preliminary to detect steel ball position, then Above carry coiled tubing and arrive steel ball position above 2-3m to visiting, direct flushing is washed till inlet and outlet water colour unanimously and nothing in returning fluid Termination of pumping after solid impurity particle, and record tubing string suspending weight and pump pressure;
Step 3:Turn on pump circulates and transfers coiled tubing, determines steel ball position;
When turn on pump circulate and transfer coiled tubing cause spray erosion instrument lower surface contradict arrive steel ball when, steel ball position determination Following three conditions need to be met simultaneously:
1)Pump pressure now is more than the pump pressure that records in step 2, and with continuing to give brills, pump pressure rise at least 2MPa;2)Injection The lower surface depth of erosion instrument is consistent with the steel ball depth that step 2 records;3)Tubing string suspending weight is less than step 2 record Tubing string suspending weight, and difference is less than 0.5t;
Step 4:After determining steel ball position, continue to be sent into coiled tubing, until the pressure of the drill being carried on steel ball is 2-3t;
Step 5:The injection liquid of infusion at least one coiled tubing internal volume, regulation infusion discharge capacity make the fluid of arrival steel ball surface Speed is not less than 150m/s, and 60% of ground pump pressure less than coiled tubing internal pressure strength;
Step 6:The mulling liquid of at least 2 times coiled tubing internal volumes of infusion, regulation infusion discharge capacity make the fluid of arrival steel ball surface Speed is not less than 150m/s, carries out injection erosion, after mulling liquid pump is noted, replaces the spray of at least one coiled tubing internal volume Liquid is penetrated, discharge capacity is less than the infusion discharge capacity of mulling liquid, then injection liquid is replaced with clear water and entered by injection with sand all for annular space Row direct flushing, well-flushing fluid volume are no less than 2 times of hole volume, wait to be washed till inlet and outlet water colour unanimously and in returning fluid without solid Body impurity particle;
Step 7:Termination of pumping, rise to spray erosion tool string.
The injection erosion instrument includes 1 axial nozzle being sequentially connected from bottom to up and multiple oblique nozzles, described Open Side Down for axial nozzle, and multiple oblique nozzle openings are obliquely.
The coiled tubing internal volume is the volume that erosion instrument above coiled tubing is sprayed below well head.
The injection liquid is formulated by tackifier and clear water, and the mass percentage concentration of tackifier is more than 3.5%, sprays liquid Viscosity is not less than 30mPa.s.
The mulling liquid is injection liquid and the mixture of quartz sand, and the injection liquid is formulated by tackifier and clear water, The mass percentage concentration of tackifier is more than 3.5%, and injection fluid viscosity is not less than 30mPa.s, and the quartz sand concentration is not more than 170 kg/m3
The quartz sand is 40-100 mesh.
The tackifier are powdery hydroxypropyl guar.
The beneficial effects of the invention are as follows:
The method of steel ball under this injection erosion processing well provided by the invention, using abradant jet mode, along pit shaft axis to Steel ball and the contact position of steel ball and ball seat of card are met in lower injection erosion, are expanded latus rectum in ball seat by erosion or are reduced in steel ball Footpath, so as to release constraint of the ball seat to steel ball, it is set voluntarily to return to ground under the lifting of liquid in well, this method can be significantly Degree improves operating efficiency and process safety is horizontal.
It will be described in further details below.
Embodiment
Embodiment 1:
A kind of method for spraying steel ball under erosion processing well is present embodiments provided, is comprised the following steps:
Step 1:Check and coiled tubing and injection erosion instrument are connected into composition injection erosion tool string from top to bottom, afterwards Enter well;
Step 2:Coiled tubing is sent downwards and arrives steel ball until visiting, and records steel ball depth, it is preliminary to detect steel ball position, then Above carry coiled tubing and arrive steel ball position above 2-3m to visiting, direct flushing is washed till inlet and outlet water colour unanimously and nothing in returning fluid Termination of pumping after solid impurity particle, and record tubing string suspending weight and pump pressure;
Step 3:Turn on pump circulates and transfers coiled tubing, determines steel ball position;
When turn on pump circulate and transfer coiled tubing cause spray erosion instrument lower surface contradict arrive steel ball when, steel ball position determination Following three conditions need to be met simultaneously:
1)Pump pressure now is more than the pump pressure that records in step 2, and with continuing to give brills, pump pressure rise at least 2MPa;2)Injection The lower surface depth of erosion instrument is consistent with the steel ball depth that step 2 records;3)Tubing string suspending weight is less than step 2 record Tubing string suspending weight, and difference is less than 0.5t;
Step 4:After determining steel ball position, continue to be sent into coiled tubing, until the pressure of the drill being carried on steel ball is 2-3t;
Step 5:The injection liquid of infusion at least one coiled tubing internal volume, regulation infusion discharge capacity make the fluid of arrival steel ball surface Speed is not less than 150m/s, and 60% of ground pump pressure less than coiled tubing internal pressure strength;
Step 6:The mulling liquid of at least 2 times coiled tubing internal volumes of infusion, regulation infusion discharge capacity make the fluid of arrival steel ball surface Speed is not less than 150m/s, carries out injection erosion, after mulling liquid pump is noted, replaces the spray of at least one coiled tubing internal volume Liquid is penetrated, discharge capacity is less than the infusion discharge capacity of mulling liquid, then injection liquid is replaced with clear water and entered by injection with sand all for annular space Row direct flushing, well-flushing fluid volume are no less than 2 times of hole volume, wait to be washed till inlet and outlet water colour unanimously and in returning fluid without solid Body impurity particle;
Step 7:Termination of pumping, rise to spray erosion tool string.
The present invention uses abradant jet mode, and injection erosion enriches well because a variety of causes is by the steel ball being stuck in ball seat The processing method of lower steel ball, improves treatment effeciency.
Embodiment 2:
On the basis of embodiment 1, the present embodiment carries out spraying erosion processing steel ball operation to a bite horizontal well of Changqing oilfields.
The well carries out pressure break using diameter 73.02mm oil pipes+Pyatyi hydrajet tool, and diameter 44mm steel balls can not after pressure Discharge ground is returned, judges that pressing crack construction process mesohigh extruding steel ball is stuck on ball seat, using external diameter 38.01mm coiled tubing The injection erosion instrument connected with external diameter enters well processing and meets steel-fastening ball.
After fastening means and test passes, lower coiled tubing, it is 3850.0m to visit steel ball position, 2m is above carried, with 100L/min Discharge capacity carry out direct flushing, be pumped 35MPa during returning fluid's continuous-stable.After well-flushing is qualified, termination of pumping, the tool depth is tested It is 11.2t that place's coiled tubing, which above carries suspending weight,.With 100L/min discharge capacity in infusion tripping in coiled tubing, when depth of setting is During 3850.05m, pump pressure rises to 40MPa, and suspending weight drops to 10.9t, so that it is determined that steel ball depth is 3850.0m.Steel ball pressurizes 2t。
With 200L/min discharge capacity direct circulation infusion viscosity 35mPa.s injection liquid(Guanidine glue)6m3;Liquid to be gone out is continuously steady After fixed, start to add 40-70 mesh quartz sands, the kg/m of sand concentration 1703;The m of infusion mulling liquid 123Afterwards, stop adding sand;Continue infusion spray Penetrate the m of liquid 63;Injection liquid is changed to clear water, the m of infusion clear water 303, the quartz sand of ground metering returns output and the basic phase of addition When termination of pumping;Act coiled tubing.
Checking learns that steel ball position has moved down afterwards.
In the present embodiment, the injection erosion instrument includes 1 axial nozzle being sequentially connected from bottom to up and 8 oblique To nozzle, Open Side Down for the axial nozzle, and multiple oblique nozzle openings are obliquely.
Wherein, coiled tubing internal volume is the volume that erosion instrument above coiled tubing is sprayed below well head;Spraying liquid is Guanidine glue, it is formulated by powdery hydroxypropyl guar tackifier and clear water, the mass percentage concentration of tackifier is more than 3.5%, injection Fluid viscosity is 35mPa.s.
Mulling liquid is injection liquid and the mixture of quartz sand, and the injection liquid is by powdery hydroxypropyl guar tackifier and clear water It is formulated, injection fluid viscosity is 35mPa.s, and quartz sand concentration is 170 kg/m3
The present embodiment belongs to the common knowledge and known technology of the art without the part specifically described, herein not Another one describes in detail.
It is exemplified as above be only to the present invention for example, do not form the limitation to protection scope of the present invention, it is all It is to be belonged to the same or analogous design of the present invention within protection scope of the present invention.

Claims (7)

  1. A kind of 1. method for spraying steel ball under erosion processing well, it is characterised in that comprise the following steps:
    Step 1:Check and coiled tubing and injection erosion instrument are connected into composition injection erosion tool string from top to bottom, afterwards Enter well;
    Step 2:Coiled tubing is sent downwards and arrives steel ball until visiting, and records steel ball depth, it is preliminary to detect steel ball position, then Above carry coiled tubing and arrive steel ball position above 2-3m to visiting, direct flushing is washed till inlet and outlet water colour unanimously and nothing in returning fluid Termination of pumping after solid impurity particle, and record tubing string suspending weight and pump pressure;
    Step 3:Turn on pump circulates and transfers coiled tubing, determines steel ball position;
    When turn on pump circulate and transfer coiled tubing cause spray erosion instrument lower surface contradict arrive steel ball when, steel ball position determination Following three conditions need to be met simultaneously:
    1)Pump pressure now is more than the pump pressure that records in step 2, and with continuing to give brills, pump pressure rise at least 2MPa;2)Injection The lower surface depth of erosion instrument is consistent with the steel ball depth that step 2 records;3)Tubing string suspending weight is less than step 2 record Tubing string suspending weight, and difference is less than 0.5t;
    Step 4:After determining steel ball position, continue to be sent into coiled tubing, until the pressure of the drill being carried on steel ball is 2-3t;
    Step 5:The injection liquid of infusion at least one coiled tubing internal volume, regulation infusion discharge capacity make the fluid of arrival steel ball surface Speed is not less than 150m/s, and 60% of ground pump pressure less than coiled tubing internal pressure strength;
    Step 6:The mulling liquid of at least 2 times coiled tubing internal volumes of infusion, regulation infusion discharge capacity make the fluid of arrival steel ball surface Speed is not less than 150m/s, carries out injection erosion, after mulling liquid pump is noted, replaces the spray of at least one coiled tubing internal volume Liquid is penetrated, discharge capacity is less than the infusion discharge capacity of mulling liquid, then injection liquid is replaced with clear water and entered by injection with sand all for annular space Row direct flushing, well-flushing fluid volume are no less than 2 times of hole volume, wait to be washed till inlet and outlet water colour unanimously and in returning fluid without solid Body impurity particle;
    Step 7:Termination of pumping, rise to spray erosion tool string.
  2. A kind of 2. method for spraying steel ball under erosion processing well according to claim 1, it is characterised in that:The injection punching Erosion instrument includes 1 axial nozzle being sequentially connected from bottom to up and multiple oblique nozzles, and Open Side Down for the axial nozzle, more Individual oblique nozzle opening is obliquely.
  3. A kind of 3. method for spraying steel ball under erosion processing well according to claim 1, it is characterised in that:The continuous oil Pipe internal volume is the volume that erosion instrument above coiled tubing is sprayed below well head.
  4. A kind of 4. method for spraying steel ball under erosion processing well according to claim 1, it is characterised in that:The injection liquid It is formulated by tackifier and clear water, the mass percentage concentration of tackifier is more than 3.5%, and injection fluid viscosity is not less than 30mPa.s.
  5. A kind of 5. method for spraying steel ball under erosion processing well according to claim 1, it is characterised in that:The mulling liquid For injection liquid and the mixture of quartz sand, the injection liquid is formulated by tackifier and clear water, and the quality percentage of tackifier is dense Degree is more than 3.5%, and injection fluid viscosity is not less than 30mPa.s, and the quartz sand concentration is not more than 170 kg/m3
  6. A kind of 6. method for spraying steel ball under erosion processing well according to claim 5, it is characterised in that:The quartz sand For 40-100 mesh.
  7. 7. the method for steel ball under a kind of injection erosion processing well according to claim 4 or 5, it is characterised in that:The increasing Stick is powdery hydroxypropyl guar.
CN201710651452.XA 2017-08-02 2017-08-02 A method of steel ball under injection erosion processing well Active CN107401389B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710651452.XA CN107401389B (en) 2017-08-02 2017-08-02 A method of steel ball under injection erosion processing well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710651452.XA CN107401389B (en) 2017-08-02 2017-08-02 A method of steel ball under injection erosion processing well

Publications (2)

Publication Number Publication Date
CN107401389A true CN107401389A (en) 2017-11-28
CN107401389B CN107401389B (en) 2019-06-18

Family

ID=60401885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710651452.XA Active CN107401389B (en) 2017-08-02 2017-08-02 A method of steel ball under injection erosion processing well

Country Status (1)

Country Link
CN (1) CN107401389B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704879A (en) * 2012-05-15 2012-10-03 中国石油大学(华东) Abrasive jet processing tool for downhole accidents
CN204571889U (en) * 2015-04-27 2015-08-19 中国海洋石油总公司 A kind of rotating fluid plug-removing device
US20150337634A1 (en) * 2014-05-21 2015-11-26 Proserv Uk Limited Cutting tool
CN105804679A (en) * 2016-02-06 2016-07-27 高伟时 Horizontal well shaft processing process tubing string device for realizing continuous circulation by ordinary oil pipe
CN105952407A (en) * 2016-06-03 2016-09-21 中国石油天然气股份有限公司 Drilling tool stuck releasing method and stuck releasing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704879A (en) * 2012-05-15 2012-10-03 中国石油大学(华东) Abrasive jet processing tool for downhole accidents
US20150337634A1 (en) * 2014-05-21 2015-11-26 Proserv Uk Limited Cutting tool
CN204571889U (en) * 2015-04-27 2015-08-19 中国海洋石油总公司 A kind of rotating fluid plug-removing device
CN105804679A (en) * 2016-02-06 2016-07-27 高伟时 Horizontal well shaft processing process tubing string device for realizing continuous circulation by ordinary oil pipe
CN105952407A (en) * 2016-06-03 2016-09-21 中国石油天然气股份有限公司 Drilling tool stuck releasing method and stuck releasing device

Also Published As

Publication number Publication date
CN107401389B (en) 2019-06-18

Similar Documents

Publication Publication Date Title
CN108979569A (en) A kind of method of three layers of de-plugging of fixed tubular column
CN201802376U (en) Open hole well completion hydraulic sand blasting immovable pipe string staged fracturing pipe string
CN102168545B (en) Coiled tubing supercritical CO2 jet fracturing method
CN104790916A (en) Method for removing gas well accumulated liquid by means of oil jacket pressure balancing method
CN103089206B (en) The system and method for improving the fluid-withdrawal rate of gas well
CN104179485B (en) Cementation and fracture technique string
CN101446187B (en) Twin packer hydro-jet fracturing technology
CN102777138A (en) Method combining coiled tubing with supercritical CO2 for jet-flow sand washing plugging removal
CN105625993B (en) Hot dry rock multi-cycle heating system and its production method
CN104533288A (en) Drilling and completion and production increasing method for shale gas reservoir of multilateral fishbone horizontal well
CN101457640A (en) Abradant jet downhole perforation, kerf multiple fracturing method and device
CN201095977Y (en) Gas lift pipe column for hot washing protective oil layer and no-killing operation
CN105443099A (en) Method for upward movement fracturing of horizontal well of naked eye prefabricated tubing completion
CN104533354B (en) Plug type sand control method for slim hole sidetracked well
CN107882535B (en) Process method for developing heat energy of hot dry rock by adopting horizontal well
CN103321622A (en) Sand draining and oil extracting method in manner of integrating injection and extraction for thermal producing well and device thereof
CN102071919A (en) Oil-gas well fiber assisted water control fracturing method
CN105507865A (en) Re-fracturing method for oil, gas and water wells
CN102767333A (en) Particle impact drilling simulation experiment method and device thereof
CN103835678B (en) Horizontal well inner-pipe-free drilling-plug-free grading cementing well completion method
CN106050198B (en) Comprehensive drainage gas production system for low-pressure low-yield well
CN105257256B (en) Underground gas production tubing string and gas production method
CN107461184A (en) Heat-extraction system and process are returned in a kind of shale gas horizontal well crack de-plugging
CN201041023Y (en) Gas-liquid mixed injection method liquid level-lowering induced spraying construction device
CN109899017A (en) Drilling and grinding underbalanced cement plug operation construction method for coiled tubing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201028

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: 710018 Changqing building, 1203 Changqing Changqing Garden area, Shaanxi, Xi'an Province

Patentee before: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.