CN104153753A - Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging - Google Patents

Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging Download PDF

Info

Publication number
CN104153753A
CN104153753A CN201410423460.5A CN201410423460A CN104153753A CN 104153753 A CN104153753 A CN 104153753A CN 201410423460 A CN201410423460 A CN 201410423460A CN 104153753 A CN104153753 A CN 104153753A
Authority
CN
China
Prior art keywords
packer
pressure
tubing string
oil pipe
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410423460.5A
Other languages
Chinese (zh)
Other versions
CN104153753B (en
Inventor
孙虎
王祖文
隆世明
苏敏文
邓小强
邓继学
李尊团
宁治军
张文
许建伟
王建树
李景彬
安永江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201410423460.5A priority Critical patent/CN104153753B/en
Publication of CN104153753A publication Critical patent/CN104153753A/en
Application granted granted Critical
Publication of CN104153753B publication Critical patent/CN104153753B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention belongs to the technical field of ultra-low permeability reservoir reform, and particularly relates to a horizontal well volume fracturing tubular technological column and method based on conventional oil tube pressure dragging. The horizontal well volume fracturing tubular column and method are used for oil horizontal well volume fracturing technology. A conventional oil tube is adopted for conveying, a packer packs a constructed layer, hydraulic sand blasting perforation is carried out through hydraulic sand blasting, a ground annular preventer and a fracturing tree pressure dragging tubular column are combined to achieve oil and gas horizontal well continuous subsection volume fracturing construction, the problems that in an existing volume fracturing construction technological process, tubular column dragging operation can be carried out by releasing formation pressure, construction time is prolonged, and the constriction cost is increased are solved, construction time is shortened, construction efficiency is improved, and the construction cost is reduced.

Description

Based on conventional oil pipe horizontal well volume fracturing tubing string and the fracturing process dragging with pressure
Technical field
The invention belongs to ultra-low penetration stimulation technology field, for oil well horizontal well volume fracturing technique, be specifically related to a kind of based on conventional oil pipe horizontal well volume fracturing plumber skill post and the fracturing process dragging with pressure.
Background technology
Be accompanied by the further exploitation in oil field, horizontal well volume fracturing process as a kind of efficient reforming mode using the main reforming mode as ultra-low penetration oil reservoir.Volume fracturing technology has the feature of large liquid measure, large discharge capacity, large sand amount, does not reach the requirement of design discharge capacity by infusion in oil pipe, needs in oil pipe and oil jacket annular space injects simultaneously.At present, the construction of some oilfield horizontal well volume fracturings is a large amount of to be adopted " packer packing is every construction layer; hydraulic jet perforation, oil jacket are with note; drag tubing string and realize from bottom to top successively volume fracturing construction ", discharge strata pressure by open flow and just can drag tubing string operation but adopt the method to execute man-hour requirement, extend the engineering time, increase construction cost.
Summary of the invention
The object of the invention is to overcome in existing volume fracturing construction technological process, need to discharge strata pressure by open flow and just can drag tubing string operation, extend the engineering time, increase the problem of construction cost.
For this reason, the invention provides a kind of based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure, comprise oil pipe, on the horizontal segment of oil pipe, being connected with in turn can closing type hydrajet tool, pressure reduction controlled circulation valve, packer and righting-oriented device, and the connected mode between described hydrajet tool, pressure reduction controlled circulation valve, packer and righting-oriented device is screwed connection.
Described hydrajet tool is that mechanical type can be closed waterpower spray gun.
Described packer is mechanical compression type packer.
Described pressure reduction controlled circulation valve comprises top connection, spool and lower contact, and the head of lower contact is sleeved on the afterbody of top connection and fixes by stopping screw;
Spool is positioned at top connection and lower contact inside, and is provided with O RunddichtringO between spool and top connection, lower contact;
The sidewall cross-under of the sidewall of top connection and spool has same shear pin, and the bottom near shear pin on the sidewall of top connection offers through hole.
Described pressure reduction controlled circulation valve is normally close valve.
A fracturing process based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure described above, comprises the steps,
1) under fastening means string, bore:
Fracture well head is installed well head big four, annular preventer from bottom to top successively;
Fastening means string successively, is from bottom to top: righting-oriented device+packer+pressure reduction controlled circulation valve+can close hydrajet tool;
After boring under tool string, the hanger of well head lower flange is connected with oil pipe;
2) set: transfer to design attitude until tool string, set packer, hydrajet tool is opened simultaneously;
3) perforation: inject load fluid in oil pipe, load fluid forms at a high speed and takes sand jet at the nozzle of hydrajet tool, penetrates out sleeve pipe, cementing concrete ring and stratum;
4) pressure break: carry out pressing crack construction to oil pipe and the large discharge capacity injection of oil jacket annular space fracturing fluid;
5) deblocking packer with pressure: after pressing crack construction, close annular preventer, fracture well head and all gates of well head big four, lay down the connecting bolt between fracture well head and annular preventer, by tubing string together with carrying on fracture well head, deblocking packer, closes hydrajet tool;
6) tubing string that drags with pressure: lay down fracture well head, adjust tubing string to next design and construction position;
7) again set: after tubing string is adjusted, fracture well head is connected on tubing string again, then set packer, open hydrajet tool, connect the connecting bolt between fracture well head and annular preventer, open annular preventer;
8) repeat perforation, pressure break: repeating step 3), 4), 5), 6), 7) until all construction locations all pressure break complete.Testing seal about packer failure, pulls out of hole and changes tool string.
After in above-mentioned step 7), packer has set again, to infusion liquid in oil pipe, complete packer is tested to envelope operation by measurement fluid pressure, if testing seal about packer did not lose efficacy, continue next step construction operation, if testing seal about packer lost efficacy, after the replacing tool string that needs to pull out of hole, carry out again construction operation.
In above-mentioned step 3), the nozzle of hydrajet tool forms high speed and takes the opening pressure that the chock pressure difference of sand jet is less than pressure reduction controlled circulation valve.
Beneficial effect of the present invention: of the present invention this based on conventional oil pipe horizontal well volume fracturing plumber skill post and the fracturing process dragging with pressure, adopt conventional tubing transmission, packer packing is every construction layer, carry out hydraulic jet perforation by hydraulic sand blasting, tie surface annular preventer combination fracturing tree belt pressure drags tubing string realization oil, the construction of gas well horizontal well contiguous segmentation volume fracturing, shortening engineering time, raising efficiency of construction, reduction construction cost.
Below with reference to accompanying drawing, the present invention is described in further details.
Brief description of the drawings
Fig. 1 is tubular column structure schematic diagram of the present invention.
Fig. 2 is pressure reduction controlled circulation valve arrangement figure.
Description of reference numerals: 1, fracture well head; 2, annular preventer; 3, well head big four; 4, hydrajet tool; 5, pressure reduction controlled circulation valve; 6, packer; 7, righting-oriented device; 8, oil pipe; 9, oil jacket annular space; 10, top connection; 11, spool; 12, lower contact; 13, stopping screw; 14, shear pin; 15, through hole.
Detailed description of the invention
In order to overcome in existing volume fracturing construction technological process, can drag tubing string operation just need to discharge strata pressure by open flow, extend the engineering time, increase the problem of construction cost.It is a kind of based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure that the present embodiment provides, as shown in Figure 1, comprise oil pipe 8, on the horizontal segment of oil pipe 8, being connected with in turn can closing type hydrajet tool 4, pressure reduction controlled circulation valve 5, packer 6 and righting-oriented device 7, connected mode between described hydrajet tool 4, pressure reduction controlled circulation valve 5, packer 6 and righting-oriented device 7 is screwed connection, hydrajet tool 4 can be closed waterpower spray gun for mechanical type, and packer 6 is mechanical compression type packer.
Can close waterpower spray gun, mechanical compression type packer is applied very extensive in oil field hydraulic jet perforation, here its structure is not particularly limited and is illustrated, routine can be closed waterpower spray gun, mechanical compression type packer and can meet the requirement of this tool string.
The tubular column structure of this structure, will jointly drag with fracture well head 1 when pressing crack construction, and use under the cooperation of annular preventer 2, realize with pressure dragging, avoid open flow to discharge strata pressure and just can drag tubing string operation, saved the time, reduced construction cost.
Pressure reduction controlled circulation valve 5 is normally close valve, as shown in Figure 2, comprises top connection 10, spool 11 and lower contact 12, and the head of lower contact 12 is sleeved on the afterbody of top connection 10 fixing by stopping screw 13; Spool 11 is positioned at top connection 10 and lower contact 12 inside, and is provided with O RunddichtringO between spool 11 and top connection 10, lower contact 12; The sidewall cross-under of the sidewall of top connection 10 and spool 11 has same shear pin 14, and the bottom near shear pin 14 on the sidewall of top connection 10 offers through hole 15.
For pressure reduction controlled circulation valve 5, being mainly used in packer 6 in work progress lost efficacy, to such an extent as to spray gun uses when cannot normally opening abrasive perforating, conventional time, it is normally off, when tubing string internal pressure is during higher than tubing string external pressure, with reference to Fig. 2, internal high pressure produces downward hydraulic action to spool 11, this hydraulic action is cut off shear pin 14, spool 11 moves down, now the inside and outside liquid of tubing string can be linked up by top connection 10 through hole 15 above, and then can realize the inside and outside circulation of tubing string, and safety pulls out of hole and changes drilling tool.
A fracturing process based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure described above, comprises the steps,
1) under fastening means string, bore:
Fracture well head 1 is installed well head big four 3, annular preventer 2 from bottom to top successively;
Fastening means string successively, is from bottom to top: righting-oriented device 7+ packer 6+ pressure reduction controlled circulation valve 5+ can close hydrajet tool 4;
After boring under tool string, the hanger of well head lower flange is connected with oil pipe.
2) set: transfer to design attitude until tool string, by put-on and delegated tubing string, packer 6 is selected mechanical compression type packer here, the slips anchoring of mechanical compression type packer is on internal surface of sleeve pipe, apply the packing element of certain the pressure of the drill compression packer 6, set packer 6, packer 6 tubing string in setting is subject to axial compressive force, hydrajet tool 4(selects mechanical type can close waterpower spray gun here) compress in the effect of this axial compressive force, open nozzle fluid hole, the inside and outside nozzle by hydrajet tool of tubing string is communicated with;
3) perforation: to the interior infusion load fluid of oil pipe 8, load fluid stream forms at a high speed and takes sand jet at the nozzle of spray gun, penetrates out sleeve pipe, cementing concrete ring and stratum.When hydraulic jet perforation, the chock pressure difference that liquid stream produces while flowing through nozzle is less than the opening pressure of pressure reduction controlled circulation valve 5, now pressure reduction circulating valve 5 fluid closed conditions;
4) pressure break: after perforation finishes, to the interior infusion liquid of oil pipe 8, force stratum crack initiation, after the crack initiation of stratum, carry out pressing crack construction with the large discharge capacity injection of oil jacket annular space 9 fracturing fluid in oil pipe 8;
5) deblocking packer with pressure: after pressing crack construction, close annular preventer 2, fracture well head 1 and all gates of well head big four 3, lay down the connecting bolt between fracture well head 1 and annular preventer 2, by tubing string together with carrying on fracture well head 1, deblocking packer 6, closes hydrajet tool 4; Now as follows with the well control state of oil jacket annular space in oil pipe: annular preventer 2 Seal Oil cover annular spaces 9, and can realize 9 movable sealings of oil jacket annular space.Derrick traveling system is together with carrying on tubing string in well, now due to fracture well head 1 connected pipes 8, fluid course in oil pipe 8 is by the gate combined closing of fracture well head 2, now the stream of the liquid in tubing string can not flow out, in the time that fracture well head 1 is carried on tubing string in together with well, the tubing string axial compressive force that packer 6 applies in the time setting disappears, simultaneously spray gun again cuts out under the effect of self back-moving spring, close oil, cover liquid stream interface channel, now the liquid in oil jacket annular space 9 can not enter oil pipe 8 inside.In the time above carrying to certain altitude (being greater than the deblocking height of packer 6), packer 6 deblockings, transfer the flange face of well head to annular preventer 2, now can open the gate of fracture well head 1, if lost returns liquid in oil pipe, illustrate that down-hole mechanical can close spray gun and close.Now can unload well head, with pressure dragging moved tubing string operation.
Because conventional oil pipe is rising, tubing string has the action of transferring when lower brills, the unlatching compressive force that machinery can closing type spray gun is much larger than the frictional force of mechanical compression type packer and casing wall, and in moving tubing string, waterpower spray gun can not be opened.
6) tubing string that drags with pressure: do not have at the moment well control risk with oil jacket annular space 9 in oil pipe 8, now can carry out the tubing string operation that drags with pressure, adjust tubing string to next design and construction position;
7) again set: after tubing string is adjusted, well mouth oil pipe 8 is connected to fracture well head 1(fracture well head 1 all closing gates again), by put-on and delegated tubing string set packer 6, packer 6 machinery in setting can be opened by closing type spray gun, connect the connecting bolt of fracture well head and annular preventer, open annular preventer 2;
8) repeat perforation, pressure break: repeating step 3), 4), 5), 6), 7) until all construction locations all pressure break complete.Testing seal about packer failure, pulls out of hole and changes tool string.
After in above-mentioned step 7), packer 6 has set again, to the interior infusion liquid of oil pipe 8, complete packer 6 is tested to envelope operation by measurement fluid pressure, if testing seal about packer did not lose efficacy, continue next step construction operation, if testing seal about packer lost efficacy, after the replacing tool string that needs to pull out of hole, carry out again construction operation.
In tool string, be connected with pressure reduction controlled circulation valve 5, when mechanical compression type packer slip mechanism lost efficacy, be that tubing string is can not grappling time, now tubing string does not have the strong point to compress tubing string as fulcrum, and then machinery can cannot open by closing type spray gun, tubing string is inside and outside carries out open flow or circulation kill-job in oil pipe without interface channel, and now lift pipe string exists risk.Now in oil pipe, suppress high pressure, starting differential pressure controlled circulation valve 5, open flow in circulate kill-job or tubing string, pulls out of hole and changes drilling tool.
This fracturing string of the present invention and fracturing process, adopt conventional tubing transmission, packer packing is every construction layer, carry out hydraulic jet perforation by hydraulic sand blasting, tie surface annular preventer combination fracturing tree belt pressure drags tubing string realization oil, the construction of gas well horizontal well contiguous segmentation volume fracturing, shortening engineering time, raising efficiency of construction, reduction construction cost.
More than exemplifying is only to illustrate of the present invention, does not form the restriction to protection scope of the present invention, within the every and same or analogous design of the present invention all belongs to protection scope of the present invention.

Claims (8)

1. based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure, comprise oil pipe (8), it is characterized in that: on the horizontal segment of oil pipe (8), being connected with in turn can closing type hydrajet tool (4), pressure reduction controlled circulation valve (5), packer (6) and righting-oriented device (7), and the connected mode between described hydrajet tool (4), pressure reduction controlled circulation valve (5), packer (6) and righting-oriented device (7) is screwed connection.
2. as claimed in claim 1 based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure, it is characterized in that: described hydrajet tool (4) can be closed waterpower spray gun for mechanical type.
3. as claimed in claim 1 based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure, it is characterized in that: described packer (6) is mechanical compression type packer.
4. as claimed in claim 1 based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure, it is characterized in that: described pressure reduction controlled circulation valve (5) comprises top connection (10), spool (11) and lower contact (12), the head of lower contact (12) is sleeved on the afterbody of top connection (10) fixing by stopping screw (13);
Spool (11) is positioned at top connection (10) and lower contact (12) inside, and spool (11) and top connection (10), lower contact are provided with O RunddichtringO between (12);
The sidewall cross-under of the sidewall of top connection (10) and spool (11) has same shear pin (14), and the bottom near shear pin (14) on the sidewall of top connection (10) offers through hole (15).
5. as claimed in claim 4 based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure, it is characterized in that: described pressure reduction controlled circulation valve (5) is normally close valve.
6. the fracturing process based on the conventional oil pipe horizontal well volume fracturing tubing string dragging with pressure as described in any one claim in claim 1 ~ 5, is characterized in that: comprises the steps,
1) under fastening means string, bore:
Fracture well head (1) is installed well head big four (3), annular preventer (2) from bottom to top successively;
Fastening means string successively, is from bottom to top: righting-oriented device (7)+packer (6)+pressure reduction controlled circulation valve (5)+can close hydrajet tool (4);
After boring under tool string, the hanger of well head lower flange is connected with oil pipe.
2) set: set packer (6), in packer setting, hydrajet tool (4) is opened under the compression force of tubing string;
3) perforation: inject load fluid in oil pipe (8), load fluid forms at a high speed and takes sand jet at the nozzle of hydrajet tool (4), penetrates out sleeve pipe, cementing concrete ring and stratum;
4) pressure break: carry out pressing crack construction to oil pipe (8) and the large discharge capacity injection of oil jacket annular space (9) fracturing fluid;
5) deblocking packer with pressure: after pressing crack construction, close annular preventer (2), fracture well head (1) and all gates of well head big four (3), lay down the connecting bolt between fracture well head (1) and annular preventer (2), by tubing string together with carrying on fracture well head (1), deblocking packer (6), closes hydrajet tool (4);
6) tubing string that drags with pressure: lay down fracture well head (1), adjust tubing string to next design and construction position;
7) again set: after tubing string is adjusted, fracture well head (1) is connected on tubing string again, then set packer (6), hydrajet tool (4) opened, connect the connecting bolt between fracture well head (1) and annular preventer (2), open annular preventer (2);
8) repeat perforation, pressure break: repeating step 3), 4), 5), 6), 7) until all construction locations all pressure break complete; Testing seal about packer failure, pulls out of hole and changes tool string.
7. fracturing process as claimed in claim 4, it is characterized in that: after packer in described step 7) (6) has set again, to the interior infusion liquid of oil pipe (8), complete packer (6) is tested to envelope operation by measurement fluid pressure, if testing seal about packer did not lose efficacy, continue next step construction operation, if testing seal about packer lost efficacy, after the replacing tool string that needs to pull out of hole, carry out again construction operation.
8. fracturing process as claimed in claim 4, is characterized in that: the nozzle of hydrajet tool in described step 3) (4) forms high speed and takes the opening pressure that the chock pressure difference of sand jet is less than pressure reduction controlled circulation valve (5).
CN201410423460.5A 2014-08-26 2014-08-26 Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging Active CN104153753B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410423460.5A CN104153753B (en) 2014-08-26 2014-08-26 Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410423460.5A CN104153753B (en) 2014-08-26 2014-08-26 Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging

Publications (2)

Publication Number Publication Date
CN104153753A true CN104153753A (en) 2014-11-19
CN104153753B CN104153753B (en) 2017-04-19

Family

ID=51879364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410423460.5A Active CN104153753B (en) 2014-08-26 2014-08-26 Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging

Country Status (1)

Country Link
CN (1) CN104153753B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104564001A (en) * 2014-12-03 2015-04-29 中国石油化工股份有限公司 Horizontal well multi-cluster fracturing method and multi-cluster perforating and fracturing pipe column for implementing method
CN105178934A (en) * 2015-09-24 2015-12-23 中国石油天然气股份有限公司 Horizontal well throttling-free straddle type double-seal single-clamp fracturing process
CN105525902A (en) * 2016-01-21 2016-04-27 中国石油化工股份有限公司 Horizontal well up-going fracturing method for screen pipe suspension well completion
CN106014370A (en) * 2016-07-13 2016-10-12 北京龙恒业石油工程技术有限公司 Oil-pipe under-pressure dragging fracturing device and technology
CN106529074A (en) * 2016-11-28 2017-03-22 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Hydraulic sandblasting fixed-point perforation mechanical parameter calculation model and application method
US9683424B2 (en) 2015-02-06 2017-06-20 Comitt Well Solutions Us Holding Inc. Apparatus for injecting a fluid into a geological formation
CN111305787A (en) * 2018-12-11 2020-06-19 中国石油化工股份有限公司 Well completion method for carbonate reservoir ultra-deep horizontal well
CN111456691A (en) * 2020-05-27 2020-07-28 中国石油天然气集团有限公司 Method and device for single-section double-cluster continuous oil pipe bottom seal dragging fracturing
CN113530512A (en) * 2020-04-22 2021-10-22 中国石油天然气股份有限公司 Fracturing string and fracturing method
CN116146126A (en) * 2021-11-19 2023-05-23 中国石油天然气股份有限公司 Double-seal single-clamping-belt-pressure continuous-dragging horizontal well volume repeated fracturing transformation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691493A (en) * 2012-06-05 2012-09-26 中国石油化工股份有限公司 Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method
CN202628046U (en) * 2012-06-05 2012-12-26 中国石油化工股份有限公司 Sectional sand blasting perforation sleeve fracturing string of continuous oil tube
CN103470239A (en) * 2013-08-20 2013-12-25 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Pressurized-dragging continuous fracturing process
CN103470242A (en) * 2013-09-14 2013-12-25 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Oilfield horizontal well volume fracturing method
US20140102708A1 (en) * 2012-03-08 2014-04-17 Petrowell Limited Selective Fracturing System
CN103982159A (en) * 2014-06-04 2014-08-13 安东石油技术(集团)有限公司 Reverse circulation valve with ball capable of being thrown
CN204082115U (en) * 2014-08-26 2015-01-07 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140102708A1 (en) * 2012-03-08 2014-04-17 Petrowell Limited Selective Fracturing System
CN102691493A (en) * 2012-06-05 2012-09-26 中国石油化工股份有限公司 Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method
CN202628046U (en) * 2012-06-05 2012-12-26 中国石油化工股份有限公司 Sectional sand blasting perforation sleeve fracturing string of continuous oil tube
CN103470239A (en) * 2013-08-20 2013-12-25 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Pressurized-dragging continuous fracturing process
CN103470242A (en) * 2013-09-14 2013-12-25 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Oilfield horizontal well volume fracturing method
CN103982159A (en) * 2014-06-04 2014-08-13 安东石油技术(集团)有限公司 Reverse circulation valve with ball capable of being thrown
CN204082115U (en) * 2014-08-26 2015-01-07 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104564001A (en) * 2014-12-03 2015-04-29 中国石油化工股份有限公司 Horizontal well multi-cluster fracturing method and multi-cluster perforating and fracturing pipe column for implementing method
US9683424B2 (en) 2015-02-06 2017-06-20 Comitt Well Solutions Us Holding Inc. Apparatus for injecting a fluid into a geological formation
CN105178934A (en) * 2015-09-24 2015-12-23 中国石油天然气股份有限公司 Horizontal well throttling-free straddle type double-seal single-clamp fracturing process
CN105525902A (en) * 2016-01-21 2016-04-27 中国石油化工股份有限公司 Horizontal well up-going fracturing method for screen pipe suspension well completion
CN105525902B (en) * 2016-01-21 2019-01-22 中国石油化工股份有限公司 Fracturing process is returned on a kind of complete well water horizontal well of suspension screen casing
CN106014370A (en) * 2016-07-13 2016-10-12 北京龙恒业石油工程技术有限公司 Oil-pipe under-pressure dragging fracturing device and technology
CN106529074A (en) * 2016-11-28 2017-03-22 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Hydraulic sandblasting fixed-point perforation mechanical parameter calculation model and application method
CN106529074B (en) * 2016-11-28 2019-09-24 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of hydraulic sand blasting fixed point perforation mechanics parameter computation model and application method
CN111305787A (en) * 2018-12-11 2020-06-19 中国石油化工股份有限公司 Well completion method for carbonate reservoir ultra-deep horizontal well
CN113530512A (en) * 2020-04-22 2021-10-22 中国石油天然气股份有限公司 Fracturing string and fracturing method
CN111456691A (en) * 2020-05-27 2020-07-28 中国石油天然气集团有限公司 Method and device for single-section double-cluster continuous oil pipe bottom seal dragging fracturing
CN116146126A (en) * 2021-11-19 2023-05-23 中国石油天然气股份有限公司 Double-seal single-clamping-belt-pressure continuous-dragging horizontal well volume repeated fracturing transformation method
CN116146126B (en) * 2021-11-19 2024-05-24 中国石油天然气股份有限公司 Double-seal single-clamping-belt-pressure continuous-dragging horizontal well volume repeated fracturing transformation method

Also Published As

Publication number Publication date
CN104153753B (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN104153753A (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
US11060376B2 (en) System for stimulating a well
GB2527935B (en) Wellbore annular safety valve and method
CN104695927B (en) Coiled tubing and production tubing combined string fracturing and well completion integrated method
CN103470242B (en) A kind of oilfield horizontal well volume fracturing method
US8469089B2 (en) Process and apparatus to improve reliability of pinpoint stimulation operations
US8327930B2 (en) Equipment for remote launching of cementing plugs
US20140102723A1 (en) Telescoping latching mechanism for casing cementing plug
CN109736737B (en) Method for snubbing tripping of reservoir gas drilling well
CN101775977B (en) Dual-tube injection well safety production string
CN104196492B (en) A kind of dragging down-hole plugging valve with pressure
US9422786B2 (en) Hybrid-tieback seal assembly
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN106522918A (en) Test operation tubular column capable of realizing direct-push kill well and stratum test method thereof
CN104563872B (en) Blockage resisting self-filling-type float collar
CN204082115U (en) Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure
CN102797448B (en) Retreating sectional type hydraulic cracking method
CN104481488A (en) Vertical well coiled tubing sand filling and pressure dividing ring pressure control method
RU2732891C1 (en) Method for multi-stage hydraulic fracturing in well with horizontal termination
US9822607B2 (en) Control line damper for valves
CN110617057A (en) Full-pipe type underground testing pipe column and testing method thereof
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending
RU2626108C2 (en) Method of well casing by tail pipe with bottomhole screen
CN115704298A (en) Underground pulse hydraulic fracturing combined tool and fracturing process method
EP3087246B1 (en) Method for running conduit in extended reach wellbores

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211020

Address after: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: 710018 room 1207, Changqing building, Changqing Xing Long Yuan District, Xi'an, Shaanxi

Patentee before: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING COMPANY LIMITED CHANGQING DOWNHOLE TECHNOLOGY Co.

TR01 Transfer of patent right