CN107392378A - A kind of tourist attractions tourist flow early warning platform - Google Patents

A kind of tourist attractions tourist flow early warning platform Download PDF

Info

Publication number
CN107392378A
CN107392378A CN201710611522.9A CN201710611522A CN107392378A CN 107392378 A CN107392378 A CN 107392378A CN 201710611522 A CN201710611522 A CN 201710611522A CN 107392378 A CN107392378 A CN 107392378A
Authority
CN
China
Prior art keywords
tourist
visitor
total amount
entrance
moment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710611522.9A
Other languages
Chinese (zh)
Other versions
CN107392378B (en
Inventor
马生全
马晶
郑锦霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Normal University
Original Assignee
Hainan Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Normal University filed Critical Hainan Normal University
Priority to CN201710611522.9A priority Critical patent/CN107392378B/en
Publication of CN107392378A publication Critical patent/CN107392378A/en
Application granted granted Critical
Publication of CN107392378B publication Critical patent/CN107392378B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of tourist attractions tourist flow early warning platform, it is related to sight spot management domain.The tourist attractions tourist flow early warning platform includes:First counter, the second counter, server, the first gate and the second gate;There is M entrance tourist attractions, each entrance is equipped with first counter and first gate, and first counter connects first gate, there is N number of outlet tourist attractions, each outlet is equipped with second counter and second gate, and second counter connects second gate;Wherein, M and N is the natural number more than 1.For the present invention by current time to enter visitor's total amount in tourist attraction, Real-Time Scheduling subsequent time can be into the tourist flow in tourist attraction, so as to avoid the congestion in tourist attraction.

Description

A kind of tourist attractions tourist flow early warning platform
Technical field
The present invention relates to sight spot management domain, more particularly relates to a kind of tourist attractions tourist flow early warning platform.
Background technology
With the economic development and improvement of people's living standards, in period festivals or holidays, people have been unwilling oneself Life track be confined in routine work place or daily life place, but take the various vehicles go to it is domestic outgoing Name tourist attractions tourism, on the one hand, can the open visual field of oneself, increase the knowledge of oneself, on the other hand, pass through change practise Used life track, enlivens body and mind, and energy is saved bit by bit for later work and life.However, due to tourism custom it is identical and Overstaffed situation usually occurs in festivals or holidays effect, each famous tourist attractions, and excessive visitor is crowded to be had in space In the tourist attraction of limit, do not simply fail to normally appreciate scenery, and still suffer from fighting for the pressure of various resources so that visitor is tired It is exhausted to can't bear, do not reach expected tourism effect not only, and physical and mental burden has been aggravated, meanwhile, sight spot administrative department is in face of super When crossing the tourist flow of sight spot ability to bear, and have too many difficulties to cope with, have to run around all the time wears him out.
In the prior art, in order to help visitor to understand the tourist flow of each tourist attractions, generally before festivals or holidays just The tourist flow of former years tourist attractions is circulated a notice of, and in festivals or holidays real-time display sight spot delay tourist information, with police Show that the people for not yet going to sight spot change tourist attractions, avoid the peak time of tourism.However, these means can not be according to enter Enter visitor's total amount in tourist attraction, the tourist flow that Real-Time Scheduling can enter in tourist attraction, so as to cause tourist attraction Interior congestion.
In summary, existing in the prior art can not be according to enter visitor's total amount in tourist attraction, and Real-Time Scheduling can Into the tourist flow in tourist attraction, the problem of so as to cause congestion in tourist attraction.
The content of the invention
The embodiment of the present invention provides a kind of tourist attractions tourist flow early warning platform, to solve in the prior art can not root The visitor's total amount entered according to this in tourist attraction, the tourist flow that Real-Time Scheduling can enter in tourist attraction, so as to cause to travel In scenic spot the problem of congestion.
The embodiment of the present invention provides a kind of tourist attractions tourist flow early warning platform, including:First counter, second count Device, server, the first gate and the second gate;
There is M entrance tourist attractions, and each entrance is equipped with first counter and first gate, and described One counter electrically connects first gate, and there is N number of outlet tourist attractions, and each outlet is equipped with second counter and institute The second gate is stated, and second counter electrically connects second gate;Wherein, M and N is the natural number more than 1;
The server, for every TSRead once the total into visitor of the corresponding entrance of each first counters count Visitor's total amount is left in the corresponding outlet of amount and each second counters count, and according to each entrance enter visitor's total amount and The visitor that visitor's total amount is calculated in current time tourist attraction that leaves each exported is resident total amount, and is stored;For base Special time is calculated in the visitor's total amount that enters into visitor's total amount and last moment each entrance of current time each entrance The tourist flow of each entrance in section;Based on current time each export leave visitor's total amount and last moment each exports Leave visitor's total amount and calculate the tourist flow each exported in special time period;Wherein, the special time period is last moment The time undergone to current time;
Tourist flow of the server based on each entrance in each period of k special time period counts each The tourist flow average and variance of entrance, based on the tourist flow system each exported in each period of k special time period Count out the tourist flow average and variance of each outlet;
The server is resident total amount, the tourist flow according to each entrance according to the visitor in current time tourist attraction Average and variance and the average and variance of the tourist flow each exported, establish following criterion 1, criterion 2 and criterion 3;
Criterion 1:
Wherein, Sum (i) is that the visitor in the i-th moment tourist attraction is resident total amount,Traveled for the i+1 moment Pre-estimation visitor in scenic spot is resident total amount,For the tourist flow average of l-th of entrance, σ [l] is the visitor of l-th of entrance Flow variance,For the optimization factor at l-th of entrance i+1 moment,For q-th outlet tourist flow average, MaxNum is that the maximum visitor in tourist attraction is resident total amount;
Criterion 2:
Wherein,For visitor's growth rate out of the i-th moment to the i+1 moment tourist attraction, MaxPr For visitor's maximum rate of growth out of the i-th moment to the i+1 moment tourist attraction;
Criterion 3:
To postulate, then 1, criterion 2 and criterion 3 carry out comprehensive analysis to the server by utilizing optimum linearity planning principle, draw The optimization factor at each entrance i+1 moment, and the pre- of each entrance i+1 moment is calculated according to the optimization factor Optimal tourist flow is dispatched, and the optimal tourist flow of each pre-scheduling is correspondingly sent to each first gate display screen.
It is preferred that first counter and second counter are led to by way of wireless network with server Letter.
It is preferred that first gate and second gate are communicated by way of wireless network with server.
It is preferred that also including terminal, the terminal is arranged in the visitor management center of the tourist attractions, and the end Hold visitor's maximum rate of growth in the tourist attraction being resident for inputting maximum visitor in total amount and each special time period.
It is preferred that the terminal is additionally operable to show that the visitor in current time tourist attraction is resident total amount.
It is preferred that the terminal is communicated by wired or wireless mode with server.
In the embodiment of the present invention, visitor's total amount and every is entered by the corresponding entrance for gathering each first counters count Visitor's total amount of leaving of the corresponding outlet of individual second counters count calculates each trip gathered in moment tourist attraction in real time The average and variance of the tourist flow of each entrance in visitor resident total amount and special time period, and according to current time trip Visitor in trip scenic spot be resident total amount, each entrance tourist flow average and variance and the tourist flow that each exports it is equal Value and variance establish criterion 1, criterion 2 and criterion 3, and the server by utilizing optimum linearity planning principle is to criterion 1, criterion 2 and standard Then 3 carry out comprehensive analysis, draw the optimization factor of each entrance subsequent time, and according to optimize the factor calculate it is each enter The optimal tourist flow of pre-scheduling of mouth subsequent time, that is, the present invention can enter the trip in tourist attraction by current time Objective total amount, the tourist flow that Real-Time Scheduling subsequent time can enter in tourist attraction, so as to avoid the congestion in tourist attraction, It is resident the change of total amount according to visitor in real time by this way, can dynamic regulation entrance tourist flow so that regulation and control entrance trip The mode of the volume of the flow of passengers is more flexibly and accurate, has reached the purpose of real-time early warning.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of connection diagram of tourist attractions tourist flow early warning platform provided in an embodiment of the present invention.
Description of reference numerals:1st, the first gate;2nd, the second gate;3rd, the first counter;4th, the second counter;5th, service Device;6th, terminal.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
The connection for showing a kind of tourist attractions tourist flow early warning platform provided in an embodiment of the present invention exemplary Fig. 1 Schematic diagram, the tourist attractions tourist flow early warning platform include the first counter 3, the second counter 4, server 5, the first gate 1 and second gate 2.
There is M entrance tourist attractions, and each entrance is equipped with first counter 3 and first gate 1, and first meter Number device 3 electrically connects first gate 1, and there is N number of outlet tourist attractions, each outlet be equipped with second counter 4 and this second Gate 2, and second counter 4 electrically connects second gate 2;Wherein, M and N is the natural number more than 1.
The server 5, for every TSRead once the total into visitor of the corresponding entrance that each first counter 3 counts Visitor's total amount is left in the corresponding outlet of amount and each second counter 4 statistics, and enters visitor's total amount according to each entrance Total amount is resident with the visitor in visitor's total amount calculating current time tourist attraction that leaves of each outlet, and is stored;For When the entrance visitor total amount into visitor's total amount and last moment each entrance based on current time each entrance calculates specific Between in section each entrance tourist flow;Each exported based on leave visitor's total amount and last moment that current time each exports Visitor's total amount of leaving calculate the tourist flow that each exports in special time period;Wherein, the special time period is last moment The time undergone to current time.
Where it is assumed that the visitor's total amount that enters of the corresponding entrance of each first i-th moment of counter statistics is Count_ In [l] [i], i=1 ... n are sampling instant, and l=1 ... M are entry number, respectively represent the 1st entrance, the 2nd entrance and M-th entrance.
In addition, it is assumed that visitor's total amount of leaving of the corresponding outlet of each second i-th moment of counter statistics is Count_ Out [q] [i], i=1 ... n are sampling instant, and q=1 ... N are exit numbers, respectively represent the 1st outlet, the 2nd outlet and N-th exports.
Furthermore the server 5 and according to each entrance is into visitor's total amount and what is each exported leave visitor's total amount meter The visitor calculated in current time tourist attraction is resident total amount, and is stored, including:
The server 5 is resident total amount to the visitor in current time tourist attraction according to equation below (1) and calculate Go out.
Wherein, Count_in [l] [i] enters visitor's total amount for l-th of entrance of the i-th moment, and Count_out [q] [i] is Visitor's total amount is left in the outlet of i-th q-th of moment, and Sum (i) is that the visitor in the i-th moment tourist attraction is resident total amount.
It should be noted that server 5 is each into visitor's total amount and last moment based on current time each entrance Entrance enters visitor's total amount, and the tourist flow of each entrance in special time period is calculated according to equation below (2).
X [l] [i]=Count_in [l] [i]-Count_in [l] [i-1] (2)
Wherein, Count_in [l] [i-1] enters visitor's total amount for i-th -1 l-th of entrance of moment, and x [l] [i] is specific The tourist flow of l-th of entrance in period, wherein, special time period is【I-1, i】Also be the i-th -1 to i-th moment when Between.
It should be noted that server 5 based on current time each export leave visitor's total amount and last moment is each Visitor's total amount of leaving of outlet calculates the tourist flow each exported in special time period, is calculated according to equation below (3) specific The tourist flow each exported in period.
Y [q] [i]=Count_out [q] [i]-Count_out [q] [i-1] (3)
Wherein, Count_out [q] [i-1] leaves visitor's total amount for q-th of the outlet of the i-th -1 moment, and y [q] [i] is spy The tourist flow of q-th of outlet in section of fixing time.
Tourism scape can not can be entered according to the visitor's total amount having been enter into tourist attraction, Real-Time Scheduling by existing in the prior art Tourist flow in area, the problem of so as to cause congestion in tourist attraction, therefore, the embodiment of the present invention passes through according to the trip of having been enter into Visitor's total amount in scenic spot is swum, the tourist flow that Real-Time Scheduling can enter in tourist attraction, avoids the congestion in tourist attraction, That is, subsequent time, i.e. i+1 moment, and it is formula (4) that the pre-estimation visitor in i+1 moment tourist attraction, which is resident total amount, It is shown;
Wherein,Total amount is resident for the pre-estimation visitor in i+1 moment tourist attraction,For i+1 The optimal tourist flow of the pre-scheduling of l-th of entrance in moment tourist attraction,For q in i+1 moment tourist attraction The pre-estimation tourist flow of individual outlet.
Due toIt is outlet, and tourist flow is uncontrollable, the embodiment of the present invention directly passes through q-th of outlet Tourist flow averageEstimationButIt is controllable, therefore, the present invention is by establishing formula (5) regulate and controlThe formula (5) is:
It should be noted that it is based in the present invention by the server in k each period of special time period each The tourist flow of entrance counts the tourist flow average and variance of each entrance, based on each time of k special time period The tourist flow each exported in section counts the tourist flow average and variance of each outlet.
Formula (5) is substituted into formula (4) and can obtain formula (6);
The present invention is that embodiment is made by the principle of linear programmingLess than or equal in maximum tourist attraction most Big visitor is resident the growth rate of total amount and pre-estimation less than or equal to the visitor out of the i-th moment to the i+1 moment tourist attraction most Big growth rate, establish following criterion 1 and criterion 2.
Criterion 1:
Criterion 2:
And in order to prevent the sharp increase of some entrance tourist flow, a certain sight spot in tourist attraction is caused congestion, establish Criterion 3:
Wherein, Sum (i) is that the visitor in the i-th moment tourist attraction is resident total amount,Traveled for the i+1 moment Pre-estimation visitor in scenic spot is resident total amount,For the tourist flow average of l-th of entrance, σ [l] is the visitor of l-th of entrance Flow variance,For the optimization factor at l-th of entrance i+1 moment,For q-th outlet tourist flow average, MaxNum is that the maximum visitor in tourist attraction is resident total amount;For from the i-th moment to the trip of i+1 moment Visitor's growth rate in scenic spot is swum, MaxPr is visitor's maximum rate of growth out of the i-th moment to the i+1 moment tourist attraction.
The server 5 carries out comprehensive analysis using optimum linearity planning principle to criterion 1, criterion 2 and criterion 3, draws every The optimization factor at individual entrance i+1 momentSo as to calculate the presetting of each entrance of i+1 moment by formula (5) Optimal tourist flow is spent, and the optimal tourist flow of each pre-scheduling is correspondingly sent to each display screen of first gate 1.
That is, the optimal visitor of pre-scheduling of real-time display on the display screen of the first gate 1 can be passed through using the method for the present invention Flow controls the tourist flow of each entrance, the visitor in tourist attraction is resident total amount and maintains in rational scope, so as to The congestion in tourist attraction is avoided, and passes through visitor's growth rate in tourist attraction in the period of one end or subsequent time trip Swim the pre-estimation visitor in scenic spot and be resident total amount, and total amount is resident according to specific expected visitor different promptings is provided for visitor Information, more proactive data are provided for visitor.
Alternatively, first counter 3 and second counter 4 are led to by way of wireless network with server 5 Letter;First gate 1 and second gate 2 are communicated by way of wireless network with server 5.
Alternatively, in addition to terminal 6, the terminal 6 are arranged in the visitor management center of the tourist attractions, and the terminal 6 The visitor's maximum rate of growth in tourist attraction being resident for inputting maximum visitor in total amount and every time, and the terminal 6 is also For showing that the visitor in current time tourist attraction is resident total amount.
Wherein, the terminal 6 is communicated by wired or wireless mode with server.
In the embodiment of the present invention, visitor's total amount and every is entered by the corresponding entrance for gathering each first counters count Visitor's total amount of leaving of the corresponding outlet of individual second counters count calculates each trip gathered in moment tourist attraction in real time The average and variance of the tourist flow of each entrance in visitor resident total amount and special time period, and according to current time trip Visitor in trip scenic spot be resident total amount, each entrance tourist flow average and variance and the tourist flow that each exports it is equal Value and variance establish criterion 1, criterion 2 and criterion 3, and the server by utilizing optimum linearity planning principle is to criterion 1, criterion 2 and standard Then 3 carry out comprehensive analysis, draw the optimization factor of each entrance subsequent time, and according to optimize the factor calculate it is each enter The optimal tourist flow of pre-scheduling of mouth subsequent time, that is, the present invention can enter the trip in tourist attraction by current time Objective total amount, the tourist flow that Real-Time Scheduling subsequent time can enter in tourist attraction, so as to avoid the congestion in tourist attraction, It is resident the change of total amount according to visitor in real time by this way, can dynamic regulation entrance tourist flow so that regulation and control entrance trip The mode of the volume of the flow of passengers is more flexibly and accurate, has reached the purpose of real-time early warning.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know basic creation Property concept, then can make other change and modification to these embodiments.So appended claims be intended to be construed to include it is excellent Select embodiment and fall into having altered and changing for the scope of the invention.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (6)

  1. A kind of 1. tourist attractions tourist flow early warning platform, it is characterised in that including:First counter, the second counter, service Device, the first gate and the second gate;
    There is M entrance tourist attractions, and each entrance is equipped with first counter and first gate, and first meter Number devices electrically connect first gate, and there is N number of outlet tourist attractions, and each outlet is equipped with second counter and described the Two gates, and second counter electrically connects second gate;Wherein, M and N is the natural number more than 1;
    The server, for every TSRead once the corresponding entrance of each first counters count enter visitor's total amount with Visitor's total amount is left in the corresponding outlet of each second counters count, and according to each entrance into visitor's total amount and each The visitor that visitor's total amount is calculated in current time tourist attraction that leaves of outlet is resident total amount, and is stored;For based on work as The visitor's total amount that enters into visitor's total amount and last moment each entrance of preceding moment each entrance is calculated in special time period The tourist flow of each entrance;Based on current time each export leave visitor's total amount and what last moment each exported leaves Visitor's total amount calculates the tourist flow each exported in special time period;Wherein, the special time period be last moment to ought The time that the preceding moment is undergone;
    Tourist flow of the server based on each entrance in k special time period each special time period counts each The tourist flow average and variance of entrance, based on the visitor's stream each exported in k special time period each special time period Amount counts the tourist flow average and variance of each outlet;
    The server is resident total amount, according to the equal of the tourist flow of each entrance according to the visitor in current time tourist attraction The average and variance of value and variance and the tourist flow each exported, establish following criterion 1, criterion 2 and criterion 3;
    Criterion 1:
    Wherein, Sum (i) is that the visitor in the i-th moment tourist attraction is resident total amount,For i+1 moment tourist attraction Interior pre-estimation visitor is resident total amount,For the tourist flow average of l-th of entrance, σ [l] is visitor's stream of l-th of entrance Measure variance,For the optimization factor at l-th of entrance i+1 moment,For q-th outlet tourist flow average, MaxNum is that the maximum visitor in tourist attraction is resident total amount;
    Criterion 2:
    Wherein,For visitor's growth rate out of the i-th moment to the i+1 moment tourist attraction, MaxPr be from Visitor's maximum rate of growth in i-th moment to i+1 moment tourist attraction;
    Criterion 3:
    The server by utilizing optimum linearity planning principle to criterion 1, criterion 2 and criterion 3 carry out comprehensive analysis, draw it is each enter The optimization factor at mouth i+1 moment, and the pre-scheduling at each entrance i+1 moment is calculated most according to the optimization factor Good tourist flow, and the optimal tourist flow of each pre-scheduling is correspondingly sent to each first gate display screen.
  2. 2. tourist flow early warning platform in tourist attractions as claimed in claim 1, it is characterised in that first counter and institute The second counter is stated to be communicated with server by way of wireless network.
  3. 3. tourist flow early warning platform in tourist attractions as claimed in claim 1, it is characterised in that first gate and described Second gate is communicated by way of wireless network with server.
  4. 4. tourist flow early warning platform in tourist attractions as claimed in claim 1, it is characterised in that also including terminal, the end End is arranged in the visitor management center of the tourist attractions, and the terminal is used to inputting maximum visitor and is resident total amount and each Visitor's maximum rate of growth in tourist attraction in special time period.
  5. 5. tourist flow early warning platform in tourist attractions as claimed in claim 4, it is characterised in that the terminal is additionally operable to show Visitor in current time tourist attraction is resident total amount.
  6. 6. tourist flow early warning platform in tourist attractions as claimed in claim 5, it is characterised in that the terminal by wired or Wirelessly communicated with server.
CN201710611522.9A 2017-07-25 2017-07-25 Tourist attraction visitor flow early warning platform Active CN107392378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710611522.9A CN107392378B (en) 2017-07-25 2017-07-25 Tourist attraction visitor flow early warning platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710611522.9A CN107392378B (en) 2017-07-25 2017-07-25 Tourist attraction visitor flow early warning platform

Publications (2)

Publication Number Publication Date
CN107392378A true CN107392378A (en) 2017-11-24
CN107392378B CN107392378B (en) 2020-11-06

Family

ID=60336844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710611522.9A Active CN107392378B (en) 2017-07-25 2017-07-25 Tourist attraction visitor flow early warning platform

Country Status (1)

Country Link
CN (1) CN107392378B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108053153A (en) * 2018-02-22 2018-05-18 海南师范大学 A kind of ecotourism environment bearing capacity early warning system
CN112907785A (en) * 2021-01-15 2021-06-04 广东趣买票科技有限公司 Scenic spot number control system and control device based on Internet of things

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105095994A (en) * 2015-07-29 2015-11-25 西南交通大学 Urban rail line passenger flow peak prediction method based on linear programming
US20160343099A1 (en) * 2015-05-22 2016-11-24 International Business Machines Corporation Automated traffic sensor placement planning

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101685299A (en) * 2008-09-26 2010-03-31 上海电机学院 Device for controlling flow in compact district of people stream
CN104573859A (en) * 2014-12-31 2015-04-29 合肥城市云数据中心有限公司 Human traffic prediction method based on Wifi positioning and cloud data processing technology
CN105844742B (en) * 2016-03-20 2018-08-24 立德高科(昆山)数码科技有限责任公司 The method and system that the tourist's quantity for entering scenic spot is controlled based on Quick Response Code
CN105787853A (en) * 2016-04-14 2016-07-20 北京中电万联科技股份有限公司 Public area congestion and stampede emergency early-warning system
CN205722050U (en) * 2016-04-28 2016-11-23 广东赛翼智能科技股份有限公司 A kind of intelligent scenic spot based on cloud computing visitor's quantity supervising device
CN205722300U (en) * 2016-05-06 2016-11-23 牛凯 Volume of the flow of passengers real-time monitoring system in scenic spot, city

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160343099A1 (en) * 2015-05-22 2016-11-24 International Business Machines Corporation Automated traffic sensor placement planning
CN105095994A (en) * 2015-07-29 2015-11-25 西南交通大学 Urban rail line passenger flow peak prediction method based on linear programming

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘柱胜 等: "九寨沟风景区日游客量预测研究", 《旅游科学》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108053153A (en) * 2018-02-22 2018-05-18 海南师范大学 A kind of ecotourism environment bearing capacity early warning system
CN112907785A (en) * 2021-01-15 2021-06-04 广东趣买票科技有限公司 Scenic spot number control system and control device based on Internet of things

Also Published As

Publication number Publication date
CN107392378B (en) 2020-11-06

Similar Documents

Publication Publication Date Title
CN105070037B (en) A kind of public traffic information platform and progress control method that integrated management is reported
Chen et al. Determining intra-urban spatial accessibility disparities in multimodal public transport networks
WO2020083399A1 (en) Coordination trunk line planning method and configuration system based on traffic flow data
CN110278409A (en) A kind of subway shield door passenger flow guidance system based on intensity of passenger flow estimation
CN107392378A (en) A kind of tourist attractions tourist flow early warning platform
CN105488751A (en) Subway station passenger flow micro statistics and scheduling method
CN110941776A (en) Scenic spot guide system based on mobile intelligent terminal
Polus Modeling and measurements of bus service reliability
CN108961804A (en) Method is determined based on the alternative set of public bus network adjustment of multi objective classification intersection
CN108665178A (en) A kind of building staircase passenger flow forecast method in the subway station based on AFC
CN108053153A (en) A kind of ecotourism environment bearing capacity early warning system
CN108984973A (en) A kind of Transmission Line Design teaching simulation method based on VR technology
CN106921982A (en) A kind of method and device of communication abnormality assessment
CN104902240B (en) A kind of closing space congestion monitoring method and system
CN109325664A (en) A kind of data visualization processing method, device, server and medium
CN109615721A (en) Management method based on Intelligent campus
JP4910432B2 (en) Vehicle congestion situation prediction system and method, program
CN109544928A (en) A kind of signalized intersections evaluation method based on entropy assessment
CN116867149B (en) Energy-saving intelligent street lamp management method and system based on Internet of things
CN206179405U (en) Can monitor and show sign of interior number of tourist attraction
CN109544927B (en) A kind of multitiered network collaboration restricted driving method
CN113674452B (en) Wisdom tourist attraction bootstrap system
CN115099685A (en) Urban public transport service level evaluation method based on multi-source data
Dalla Zuanna et al. Sexual behaviour of Italian students
CN111027524B (en) Error correction method for online passenger flow monitoring analysis data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant