CN107387097B - 一种小净距隧道扩挖改建过程中中岩墙的处理方法 - Google Patents
一种小净距隧道扩挖改建过程中中岩墙的处理方法 Download PDFInfo
- Publication number
- CN107387097B CN107387097B CN201710655126.6A CN201710655126A CN107387097B CN 107387097 B CN107387097 B CN 107387097B CN 201710655126 A CN201710655126 A CN 201710655126A CN 107387097 B CN107387097 B CN 107387097B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- dike
- prestressing force
- anchor pole
- digging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/01—Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
Abstract
本发明涉及到一种用于小净距隧道扩挖改建中中岩墙的处理方法,属于隧道工程技术领域。本发明提出一种小净距隧道的扩挖改建中中岩墙合理的处理方法,其能够保证扩挖过程中中岩墙的稳定性,从而近一步使小净距隧道在扩挖改建中更加安全稳定。本发明通过一种小净距隧道扩挖改建中中岩墙的处理方法,其能够保证扩挖过程中中岩墙的稳定性,有效的控制了扩挖过程中围岩的变形,使扩挖隧道结构的安全性得到了显著提高。
Description
技术领域
本发明涉及到一种用于小净距隧道扩挖改建中中岩墙的处理方法,属于隧道工程技术领域。
背景技术
随着我国经济的迅速发展,人们对于交通的需求量也不断增加,而对于原有的双向四车道的公路隧道已然不能满足交通运输的需求,对原有隧道的进行扩挖改建不仅可以减少隧道建设的周期,更可以充分利用原有隧道结构的路基及路面,节省人力财力。
由于小净距隧道中岩墙的厚度较小,且在隧道的扩挖改建过程中多次受到扰动,而中岩墙的力学特征对于围岩和支护结构安全稳定有着重要的影响,保证在扩挖过程中中岩墙的稳定性是小净距隧道扩挖改建的关键。
发明内容
本发明要解决的技术问题是提出一种小净距隧道的扩挖改建中中岩墙合理的处理方法,其能够保证扩挖过程中中岩墙的稳定性,从而近一步使小净距隧道在扩挖改建中更加安全稳定。
本发明的技术方案:
一种小净距隧道扩挖改建过程中中岩墙的处理方法,步骤如下:
1)采用预加固方法对隧道围岩松散体和空洞处进行处理,采用水平预应力贯通锚杆对中岩墙进行加固;根据扩挖施工要求布置水平预应力贯通锚杆,并对水平预应力贯通锚杆施加预应力;在扩挖改建过程中,将待扩建的隧道分为四个开挖区域:右导坑上台阶①、左导坑上台阶②、右导坑下台阶③和左导坑下台阶④,原始隧道位于右导坑中;对于开挖断面,首先采用水平预应力贯通锚杆加固上台阶处中岩墙,完成扩挖隧道上台阶的开挖,包括拆除既有隧道支护结构,施工初期支护结构、锁脚锚杆和临时中隔壁支护结构;然后采用水平预应力贯通锚杆加固下台阶处中岩墙,完成扩挖隧道下台阶的开挖,包括拆除既有隧道支护结构,施工初期支护结构、锁脚锚杆和临时中隔壁支护结构;
2)根据扩挖隧道围岩条件,施工扩挖隧道径向锚杆,其中径向锚杆与扩挖隧道外轮廓线垂直均匀布置;在接近中岩墙处,径向锚杆加密处理,从而与步骤1)中水平预应力贯通锚杆共同保证扩挖过程中中岩墙的稳定性。
本发明的有益效果:本发明通过一种小净距隧道扩挖改建中中岩墙的处理方法,其能够保证扩挖过程中中岩墙的稳定性,有效的控制了扩挖过程中围岩的变形,使扩挖隧道结构的安全性得到了显著提高。
附图说明
图1是小净距隧道扩挖立面图。
图2是小净距隧道扩挖平面图。
图中:1既有隧道;2扩挖隧道;3水平预应力贯通锚杆;4径向锚杆;①右导坑上台阶;②左导坑上台阶;③右导坑下台阶;④左导坑下台阶;1a初期支护;1b锁脚锚杆;1c临时中隔壁支护结构;1d二次衬砌;2a初期支护;2b锁脚锚杆;2d二次衬砌;3a初期支护;3b锁脚锚杆;3c临时中隔壁支护结构;3d二次衬砌;4a初期支护;4b锁脚锚杆;4d二次衬砌。
具体实施方式
以下结合技术方案(和附图)详细叙述本发明的具体实施方式。
实施例
以左侧扩挖隧道为例,右侧与之对称
一种小净距隧道扩挖改建中中岩墙的处理方法,包括以下施工步骤:
1)根据扩挖隧道2围岩条件施工扩挖隧道径向锚杆4,其中径向锚杆4与扩挖隧道2外轮廓线垂直均匀布置,且接近中岩墙处水平预应力贯通锚杆3可适当加密处理;
2)对于上台阶处中岩墙采用水平预应力贯通锚杆3加固,主要施工步骤为:钻孔、注浆、安插锚杆和施加预应力;
3)开挖右导坑上台阶①,包括拆除既有隧道1支护结构,施工扩挖隧道右导坑上台阶的初期支护1a(包括网喷混凝土层和钢支撑)、临时中隔壁支护结构1c(包括喷混凝土层和钢支撑)和锁脚锚杆1b;
4)开挖左导坑上台阶②,包括施工左导坑上台阶的初期支护2a(包括网喷混凝土层和钢支撑)、锁脚锚杆2b,可根据施工情况增设上台阶临时仰拱;
5)对于下台阶处中岩墙采用水平预应力贯通锚杆3加固,主要施工步骤为:钻孔、注浆、安插锚杆和施加预应力;
6)开挖右侧导坑下台阶③,包括拆除既有隧道1支护结构,施工右侧导坑下台阶的初期支护结构3a(包括网喷混凝土层和钢支撑)、临时中隔壁支护结构3c(包括喷混凝土层和钢支撑)和锁脚锚杆3b;
7)开挖左侧导坑下台阶④,施工左侧导坑下台阶的初期支护结构4a(包括网喷混凝土层和钢支撑)和锁脚锚杆4b;
8)拆除临时中隔壁支护结构1c、3c,浇筑隧道二次衬砌结构1d、2d、3d、4d。
Claims (1)
1.一种小净距隧道扩挖改建过程中中岩墙的处理方法,其特征在于,步骤如下:
1)采用预加固方法对隧道围岩松散体和空洞处进行处理,采用水平预应力贯通锚杆对中岩墙进行加固;根据扩挖施工要求布置水平预应力贯通锚杆,并对水平预应力贯通锚杆施加预应力;在扩挖改建过程中,将待扩建的隧道分为四个开挖区域:右导坑上台阶①、左导坑上台阶②、右导坑下台阶③和左导坑下台阶④,原始隧道位于右导坑中;对于开挖断面,首先采用水平预应力贯通锚杆加固上台阶处中岩墙,完成扩挖隧道上台阶的开挖,包括拆除既有隧道支护结构,施工初期支护结构、锁脚锚杆和临时中隔壁支护结构;然后采用水平预应力贯通锚杆加固下台阶处中岩墙,完成扩挖隧道下台阶的开挖,包括拆除既有隧道支护结构,施工初期支护结构、锁脚锚杆和临时中隔壁支护结构;
2)根据扩挖隧道围岩条件,施工扩挖隧道径向锚杆,其中径向锚杆与扩挖隧道外轮廓线垂直均匀布置;在接近中岩墙处,径向锚杆加密处理,从而与步骤1)中水平预应力贯通锚杆共同保证扩挖过程中中岩墙的稳定性。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710655126.6A CN107387097B (zh) | 2017-08-03 | 2017-08-03 | 一种小净距隧道扩挖改建过程中中岩墙的处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710655126.6A CN107387097B (zh) | 2017-08-03 | 2017-08-03 | 一种小净距隧道扩挖改建过程中中岩墙的处理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107387097A CN107387097A (zh) | 2017-11-24 |
CN107387097B true CN107387097B (zh) | 2019-03-05 |
Family
ID=60343309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710655126.6A Active CN107387097B (zh) | 2017-08-03 | 2017-08-03 | 一种小净距隧道扩挖改建过程中中岩墙的处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107387097B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109538215B (zh) * | 2018-12-21 | 2021-05-14 | 中铁四局集团有限公司 | 一种隧道扩挖多功能台架及使用该台架的隧道扩挖方法 |
CN110130925A (zh) * | 2019-05-17 | 2019-08-16 | 深圳市综合交通设计研究院有限公司 | 一种小净距城市隧道中岩柱的复合加固方法 |
CN110284900A (zh) * | 2019-06-25 | 2019-09-27 | 深圳市综合交通设计研究院有限公司 | 一种破碎地层超小净距城市隧道支护结构及其跳槽施工工艺 |
CN110397458A (zh) * | 2019-07-03 | 2019-11-01 | 中铁四局集团第五工程有限公司 | 一种适用于塌方隧道扩建的三维加固施工方法 |
CN113356878B (zh) * | 2021-06-11 | 2023-08-08 | 中铁工程设计咨询集团有限公司 | 应力流守恒原理及地下洞室群布置设计方法和装置 |
CN114352291A (zh) * | 2022-01-07 | 2022-04-15 | 贵州路桥集团有限公司 | 近接隧道施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733812B (zh) * | 2012-06-18 | 2015-08-26 | 中铁隧道股份有限公司 | 城市江底分岔段小净距隧道侧壁扩挖的隧道施工方法 |
CN102966360A (zh) * | 2012-11-26 | 2013-03-13 | 中铁四局集团第二工程有限公司 | 小净距隧道中岩墙加固方法 |
CN103114856B (zh) * | 2013-03-05 | 2015-04-01 | 福州市规划设计研究院 | 既有连拱隧道原位拓宽改造的施工方法 |
CN105888674B (zh) * | 2016-05-11 | 2018-12-14 | 中铁十六局集团北京轨道交通工程建设有限公司 | 不同围岩等级下的小净距隧道中夹岩加固方法 |
CN106050240B (zh) * | 2016-05-11 | 2019-05-24 | 上海交通大学 | 山区软弱围岩小净距隧道中夹岩稳定性控制方法 |
-
2017
- 2017-08-03 CN CN201710655126.6A patent/CN107387097B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN107387097A (zh) | 2017-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107387097B (zh) | 一种小净距隧道扩挖改建过程中中岩墙的处理方法 | |
CN107476809B (zh) | 一种绿泥石片岩地层大跨度隧道的大变形控制方法 | |
CN107605489B (zh) | 三线大跨隧道斜井进正洞施工方法 | |
CN107313431B (zh) | 临近不等高基坑同步施工方法 | |
CN106499413B (zh) | 一种浅埋偏压段隧道地层加固施工方法 | |
CN103696784B (zh) | 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法 | |
CN105863650B (zh) | 一种先墙后洞的隧道进洞施工方法 | |
CN102606176B (zh) | 湿陷性黄土隧道施工方法 | |
CN104763433A (zh) | 上软下硬地层大跨地铁车站暗挖施工方法 | |
CN107130613A (zh) | 大跨隧道正穿既有挡墙的支挡结构及其施工方法 | |
CN107965325B (zh) | 一种小净距浅埋隧道初支拱架更换施工方法 | |
CN204059403U (zh) | 一种低路堤既有输气管道隔离保护结构 | |
CN103243665A (zh) | 深挖方路堑拦落石防护方法及装置 | |
CN108952766A (zh) | 隧道穿越喀斯特岩溶地段处治的施工方法 | |
CN203145956U (zh) | 一种防治隧道岩爆结构 | |
CN104532714A (zh) | 一种处理深厚软土岩溶地基的路基结构 | |
CN107059904A (zh) | 一种地下管廊积水井开挖方法 | |
CN105040707A (zh) | 用作地下室外墙的组合密排桩深基坑支护围护结构 | |
CN111706366A (zh) | 一种穿越大型全充填溶洞的隧道衬砌结构及施工方法 | |
CN209195427U (zh) | 穿越半充填性溶洞的明洞加隧底桩筏板结构 | |
CN105484270A (zh) | 一种毗邻深基坑高陡老旧毛石挡土墙加固保护施工方法 | |
CN109826230A (zh) | 一种市政道路管线加固保护结构及其施工方法 | |
CN205605215U (zh) | 一种大断面黄土隧道预切槽法施工结构 | |
CN212642730U (zh) | 一种湿陷性黄土地区隧道穿越人防结构 | |
CN108729468A (zh) | 一种用于岩石地基道路挡墙加高处理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |