CN107386964A - A kind of advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up - Google Patents

A kind of advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up Download PDF

Info

Publication number
CN107386964A
CN107386964A CN201710693228.7A CN201710693228A CN107386964A CN 107386964 A CN107386964 A CN 107386964A CN 201710693228 A CN201710693228 A CN 201710693228A CN 107386964 A CN107386964 A CN 107386964A
Authority
CN
China
Prior art keywords
steel sleeve
grade
drilling
forming hole
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710693228.7A
Other languages
Chinese (zh)
Inventor
赵治平
王小平
胡国伟
褚晓晖
胡锦宝
刘志如
唐维东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chenglan railway limited liability company
Original Assignee
Three Bridge And Tunnel Engineering Co Ltd Group
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Three Bridge And Tunnel Engineering Co Ltd Group, China Railway No 3 Engineering Group Co Ltd filed Critical Three Bridge And Tunnel Engineering Co Ltd Group
Priority to CN201710693228.7A priority Critical patent/CN107386964A/en
Publication of CN107386964A publication Critical patent/CN107386964A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up, belong to Bored Pile Foundation drilling construction technical field, can solve the problems, such as Bored Pile Foundation through it is deep alluvial body mollisol and high artesian complex environment drilling it is difficult, comprise the following steps:Drill machine with casing telephone-moving aligns;Rotating down pressing, which is crept into, is connected with I grade of steel sleeve of cutting shoe, and with taking slag equipment to take slag, drilling and forming hole, and rotating down pressing drilling is connected with II grade of steel sleeve of cutting shoe, and with taking slag equipment to take slag, drilling and forming hole is until stake bottom.Present invention process is simple and environmentally-friendly, efficient, easy to operate.

Description

A kind of advanced water proof of the pile foundation classification full stake of steel sleeve of growing up, supporting drilling and forming hole Method
Technical field
The invention belongs to Bored Pile Foundation drilling construction technical field, and in particular to one kind grow up pile foundation classification steel sleeve it is complete Stake advanced water proof, the method for supporting drilling and forming hole.
Background technology
Complicated geology is changeable at certain earthquake mountain railway Field in Bridge Site Located, and pile foundation collapses through deep lacustrine facies silty clay, earthquake Product block stone soil, fluvial facies circle gravel soil and layer of sand, preservation head exceed 1.0MPa high artesian, and maximum length of pile is more than 140m.Hold Pressure water buried depth is big, pressure is high, Source Of Supply enriches, and the measure such as stifled, precipitation can not overcome the problem that high artesian environment drills;Ground Layer self-stable ability is poor, and under high artesian effect, mud static pressure retaining wall measure can not maintain hole wall stable, can not pore-forming;Pile foundation Through deep mollisol stratum, common steel pile casting construction depth is limited, and scene can not implement;Drill machine with casing is by equipment dynamic, set Tubing matter etc. restricts, it is impossible to the rotary drilling of full pile body, can not smooth pore-forming.
The content of the invention
The present invention drills to solve Bored Pile Foundation through deep alluvial body mollisol and high artesian complex environment A kind of the problem of difficult, there is provided the advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up.
The present invention adopts the following technical scheme that:
A kind of the grow up advanced water proof of the pile foundation classification full stake of steel sleeve, the method for supporting drilling and forming hole, including drill machine with casing, by some I grade of steel sleeve that section steel sleeve is connected with dismountable high-strength bolt using bell socket, adopted by some section steel sleeves With II grade of steel sleeve, cutting shoe being welded to connect and take slag equipment, I grade of steel sleeve and II grade of steel sleeve top respectively with drill machine with casing Connection, bottom connect cutting shoe respectively, and II grade of steel sleeve is stretched into I grade of steel sleeve;Specifically comprise the following steps:
A kind of the grow up advanced water proof of the pile foundation classification full stake of steel sleeve, the method for supporting drilling and forming hole, comprise the following steps:
The first step, construction site is cleared up, makes its smooth, fixing body external support case, crane lifting drill machine with casing telephone-moving contraposition, sleeve pipe Rig is positioned over external supported box;
Second step, the length h of I grade of steel sleeve is determined according to the long h of stake1With wall thickness a1, I grade of steel sleeve top and drill machine with casing are connected Connect, bottom connects cutting shoe with bolt combination by welding, and rotating down pressing creeps into I grade of steel sleeve, in drilling process, using socket joint I grade of steel sleeve of formula interface and dismountable high-strength bolt spreading, under the advanced water proof of I grade of steel sleeve, retaining wall, taken with slag equipment is taken Slag, drilling and forming hole;
3rd step, the length h of II grade of steel sleeve is determined according to the long h of stake2With wall thickness a2, after the completion of I grade of steel sleeve is crept into, II grade Steel sleeve top is connected with drill machine with casing, and bottom connects cutting shoe by welding with bolt combination, and II grade of steel sleeve is stretched into I grade of steel In sleeve pipe, using II grade of steel sleeve of welding manner spreading, and rotating down pressing creeps into II grade of steel sleeve, II grade of steel sleeve in advance every Under water, retaining wall, with taking slag equipment to take slag, drilling and forming hole is until stake bottom.
Perpendicularity during drilling and forming hole is controlled by vertical.
During drilling and forming hole, the interior top of the slag of I grade of steel sleeve and II grade of steel sleeve should remain higher than respective sword respectively Pin.
The length h of the long h and I grade of steel sleeve of stake1With wall thickness a1And the length h of II grade of steel sleeve2With wall thickness a2Between pass It is to be:During h < 60m, h2For 60m, a2For 21mm;During 60m≤h < 70m, h2For 70m, a2For 24mm;During 70m≤h < 90m, h1 For 20m, a1For 40mm, 50m≤h2< 70m, a2For 25mm;During 90m≤h < 110m, h1For 30m, a1For 40mm, 60m≤h2< 80m, a2For 28mm;During 110m≤h < 120m, h1For 40m, a1For 40mm, 70m≤h2< 80m, a2For 30mm;120m≤h < During 130m, h1For 50m, a1For 40mm, 70m≤h2< 80m, a2For 30mm.
Beneficial effects of the present invention are as follows:
1. according to the long rationally classification steel sleeve of stake, suitable sleeve pipe grading gaps, set pipe range are selected according to economic and practical principle The parameters such as degree, casing wall thickness, this method is not restricted substantially by equipment, while effectively reduce engineering cost, improve technology Scope of application etc..
2. by classifying rationally steel sleeve segmental length, reduce and Large-scale Hoisting equipment is relied on.
3. by guider and vertical control system can simply, conveniently, be precisely controlled steel sleeve rotating down pressing drilling and hang down Straight precision, it is easy to operate, flexible.
4. suitable for being unable to effective precipitation directly in deep alluvial body and the drilling of high artesian environment, it is ensured that complex environment Grow up drilled pile construction quality;It is not required to improve equipment dynamic, steel bushing thickness of pipe wall can be reduced, reduce engineering cost, technique is simple, ring Protect, efficient, easy to operate, considerable benefit.
Brief description of the drawings
Fig. 1 is that drill machine with casing telephone-moving of the present invention aligns schematic diagram;
Fig. 2 is I grade of steel sleeve drilling schematic diagram of the present invention;
Fig. 3 is II grade of steel sleeve of decentralization and II grade of steel sleeve drill drawing in I grade of steel sleeve of the present invention;
Wherein:1- drill machine with casing;2- cranes;3- ground levels;The external supported boxs of 4-;I grade of steel sleeve of 5-;6- bell sockets;7- High-strength bolt;8- takes slag equipment;II grade of steel sleeve of 9-;The top of the slag in 10-;11- cutting shoes.
Embodiment
With reference to accompanying drawing, the present invention will be further described.
A kind of the grow up advanced water proof of the pile foundation classification full stake of steel sleeve, the method for supporting drilling and forming hole, including drill machine with casing 1, I grade of steel sleeve 5 being connected by some section steel sleeves using bell socket 6 and dismountable high-strength bolt 7, by some sections Steel sleeve uses II grade of steel sleeve 9 being welded to connect, cutting shoe 11 and takes slag equipment 8, I grade of steel sleeve 5 and II grade of top of steel sleeve 9 It is connected respectively with drill machine with casing 1, bottom connects cutting shoe 11 respectively, and II grade of steel sleeve 9 is stretched into I grade of steel sleeve 5.
In work progress, I grade of steel sleeve 5 can reuse, and internode passes through bell socket and detachable high-strength spiral shell Tether and connect, convenient scene assembly and disassembly, improve I grade of recycling rate of waterused of steel sleeve 5, II grade of steel sleeve 9 is along the elongated setting of pile body, as stake Body structure is carried jointly, and internode is not reused, is welded to connect using internode using being welded to connect, can improve strength of joint and Ensure construction quality.The method being classified using sleeve pipe can reduce the frictional resistance of sleeve pipe.
Specifically comprise the following steps:
The first step, construction site is cleared up, makes its smooth, fixing body external support case 4, the telephone-moving of 2 emepalcement casing rig of crane 1 contraposition, Drill machine with casing 1 is positioned on external supported box 4;
Second step, I grade of top of steel sleeve 5 are connected with drill machine with casing 1, and bottom connects cutting shoe 11 with bolt combination by welding, are revolved Turn to push I grade of steel sleeve 5 of drilling, in drilling process, using bell socket 6 and dismountable high-strength bolt 7 spreading, I grade of steel Sleeve pipe 5, under I grade of 5 advanced water proof of steel sleeve, retaining wall, slag, drilling and forming hole are taken with slag equipment 8 is taken;
3rd step, after the completion of I grade of steel sleeve 5 is crept into, II grade of top of steel sleeve 9 is connected with drill machine with casing 1, bottom by welding with Bolt combination connects cutting shoe 11, and II grade of steel sleeve 9 is stretched into I grade of steel sleeve 5, using II grade of steel sleeve 9 of welding manner spreading, And rotating down pressing creeps into II grade of steel sleeve 9, under II grade of 9 advanced water proof of steel sleeve, retaining wall, with taking slag equipment 8 to take slag, creeps into Hole is until stake bottom.
Perpendicularity during drilling and forming hole is controlled by vertical.
During drilling and forming hole, the interior top of the slag 10 of I grade of steel sleeve 5 and II grade of steel sleeve 9 should remain higher than each respectively From cutting shoe 11.Need to combine geology artesian pressure size and stratum takes slag drilling depth to determine that steel sleeve bottom cutting shoe 11 is deep in advance Degree, to suppress stake bottom artesian water and protection steel sleeve bottom cutting shoe 11.
, be according to the long classification length for selecting I, II suitable two-stage steel sleeve of stake, steel bushing thickness of pipe wall in drilling and forming hole And shell clearance, while it is long according to applicable principle increase steel sleeve classification quantity, steel sleeve gradation in units of saving to combine stake Stratum is pierced prior to pile foundation boring, then completes bored pile by several times in steel sleeve;The length of steel sleeve is only to determine single Merogenesis length, section by section spreading.Determine that the top of the slag is higher than the height of steel sleeve bottom cutting shoe in the steel sleeve of stake bottom according to artesian water situation.
Embodiment, construction method of the present invention is used in four line bridges of peace station into blue railway Co., Ltd, has been completed Main body pile foundation engineering, specific implementation situation are as shown in the table:

Claims (4)

  1. A kind of 1. advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up, it is characterised in that:Including set Pipe rig(1), by some section steel sleeves use bell socket(6)With dismountable high-strength bolt(7)I grade of steel bushing of connection Pipe(5), by some section steel sleeves using II grade of steel sleeve being welded to connect(9), cutting shoe(11)With take slag equipment(8), I grade of steel Sleeve pipe(5)With II grade of steel sleeve(9)Top respectively with drill machine with casing(1)Connection, bottom connects cutting shoe respectively(11), II grade of steel bushing Pipe(9)Stretch into I grade of steel sleeve(5)It is interior;Specifically comprise the following steps:
    The first step, construction site is cleared up, makes its smooth, fixing body external support case(4), crane(2)Emepalcement casing rig(1)Telephone-moving Contraposition, drill machine with casing(1)It is positioned over external supported box(4)On;
    Second step, I grade of steel sleeve is determined according to the long h of stake(5)Length h1With wall thickness a1, by I grade of steel sleeve(5)Top and sleeve pipe Rig(1)Connection, bottom connect cutting shoe by welding with bolt combination(11), rotating down pressing I grade of steel sleeve of drilling(5), boring During entering, using bell socket(6)With dismountable high-strength bolt(7)I grade of steel sleeve of spreading(5), in I grade of steel sleeve (5)Under advanced water proof, retaining wall, with taking slag equipment(8)Take slag, drilling and forming hole;
    3rd step, I grade of steel sleeve(5)After the completion of drilling, II grade of steel sleeve is determined according to the long h of stake(9)Length h2With wall thickness a2, By II grade of steel sleeve(9)Top and drill machine with casing(1)Connection, bottom connect cutting shoe by welding with bolt combination(11), by II Level steel sleeve(9)Stretch into I grade of steel sleeve(5)It is interior, using II grade of steel sleeve of welding manner spreading(9), and rotating down pressing drilling II Level steel sleeve(9), in II grade of steel sleeve(9)Under advanced water proof, retaining wall, with taking slag equipment(8)Slag is taken, drilling and forming hole is until stake Bottom.
  2. A kind of 2. advanced water proof of the pile foundation classification full stake of steel sleeve, side of supporting drilling and forming hole of growing up according to claim 1 Method, it is characterised in that:Perpendicularity during drilling and forming hole is controlled by vertical.
  3. A kind of 3. advanced water proof of the pile foundation classification full stake of steel sleeve, side of supporting drilling and forming hole of growing up according to claim 1 Method, it is characterised in that:During drilling and forming hole, I grade of steel sleeve(5)With II grade of steel sleeve(9)The interior top of the slag(10)It should begin respectively Respective cutting shoe is kept above eventually(11).
  4. A kind of 4. advanced water proof of the pile foundation classification full stake of steel sleeve, side of supporting drilling and forming hole of growing up according to claim 1 Method, it is characterised in that:The long h and I grade of steel sleeve of stake(5)Length h1With wall thickness a1And II grade of steel sleeve(9)Length h2And wall Thick a2Between relation be:During h < 60m, h2For 60m, a2For 21mm;During 60m≤h < 70m, h2For 70m, a2For 24mm;70m≤ During h < 90m, h1For 20m, a1For 40mm, 50m≤h2< 70m, a2For 25mm;During 90m≤h < 110m, h1For 30m, a1For 40mm, 60m≤h2< 80m, a2For 28mm;During 110m≤h < 120m, h1For 40m, a1For 40mm, 70m≤h2< 80m, a2For 30mm;During 120m≤h < 130m, h1For 50m, a1For 40mm, 70m≤h2< 80m, a2For 30mm.
CN201710693228.7A 2017-08-14 2017-08-14 A kind of advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up Pending CN107386964A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710693228.7A CN107386964A (en) 2017-08-14 2017-08-14 A kind of advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710693228.7A CN107386964A (en) 2017-08-14 2017-08-14 A kind of advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up

Publications (1)

Publication Number Publication Date
CN107386964A true CN107386964A (en) 2017-11-24

Family

ID=60355958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710693228.7A Pending CN107386964A (en) 2017-08-14 2017-08-14 A kind of advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up

Country Status (1)

Country Link
CN (1) CN107386964A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09105289A (en) * 1995-10-12 1997-04-22 Sumitomo Electric Ind Ltd Drilling blade for all casing construction method
CN103603342A (en) * 2013-11-01 2014-02-26 中冶天工上海十三冶建设有限公司 Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN203846485U (en) * 2014-05-28 2014-09-24 宏润建设集团股份有限公司 Long pile percussion drill hole forming construction device
CN204151788U (en) * 2014-09-10 2015-02-11 浙江绩丰岩土技术股份有限公司 A kind of portable steel bushing pile tube implanter
CN204370414U (en) * 2014-12-22 2015-06-03 中铁十九局集团有限公司 A kind of steel pile casting for cast-in-place concrete pile boring and a kind of drilling equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09105289A (en) * 1995-10-12 1997-04-22 Sumitomo Electric Ind Ltd Drilling blade for all casing construction method
CN103603342A (en) * 2013-11-01 2014-02-26 中冶天工上海十三冶建设有限公司 Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN203846485U (en) * 2014-05-28 2014-09-24 宏润建设集团股份有限公司 Long pile percussion drill hole forming construction device
CN204151788U (en) * 2014-09-10 2015-02-11 浙江绩丰岩土技术股份有限公司 A kind of portable steel bushing pile tube implanter
CN204370414U (en) * 2014-12-22 2015-06-03 中铁十九局集团有限公司 A kind of steel pile casting for cast-in-place concrete pile boring and a kind of drilling equipment

Similar Documents

Publication Publication Date Title
CN105649012B (en) Upper-soft lower-hard ground subway station building enclosure drilled pile construction method
CN105735251B (en) Cutting type full-casing follow-up pile-forming construction method and system of bridge pile foundation rotary drilling rig
CN106120839B (en) A kind of construction technology of off-lying sea blower foundation embedded rock pile
CN105442532B (en) Pile crown expands bored pile construction method
CN204753589U (en) A static pressure stake machine complete machine is planted in reaming
CN104295239A (en) Method for using rotary drilling rig to drill into hard rock stratum
CN110043190B (en) Method for building vertical well large-diameter chamber
CN101586340A (en) Preconditioning process of continuous wall for weak weathering terrane grooving construction
CN107476301A (en) A kind of full casing follow-up step construction method of bridge pile foundation
CN107237323A (en) Major diameter super thick boulder bed forming hole method
CN101694159A (en) Technology for rapidly constructing air shaft under chill condition and process for sinking vertical shaft pit shaft
CN108755659A (en) One kind is drawn for ground-connecting-wall under complicated high-strength geology grabs the quick forming construction method thereof of milling
JP2021165468A (en) Construction method of steel pipe pile
CN203584301U (en) Hole guide equipment
CN104005768B (en) The construction reinforcing method of vertical shaft interlude Unfavorable geology layer
CN107653878A (en) Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction
CN204401612U (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction equipment
CN108071110A (en) Rotary drilling rig Pile method under complex geological condition
CN111577118B (en) Mechanical rapid hole forming construction method for slide-resistant pile
CN105401572A (en) Construction technique for environment-friendly cast-in-situ bored pile provided with wall protecting tube
CN107386964A (en) A kind of advanced water proof of the pile foundation classification full stake of steel sleeve, method of supporting drilling and forming hole of growing up
CN105804079A (en) Tool and method for smashing hard rock in large-diameter pile hole
CN206721875U (en) A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod
CN107476293A (en) A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method
CN110005377B (en) Method for building vertical well bottom chamber

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180801

Address after: 030001 Yingze Avenue, Taiyuan, Shanxi 269

Applicant after: China Railway Third Engineering Co., Ltd.

Applicant after: Three bridge and Tunnel Engineering Co. Ltd. group

Applicant after: Chenglan railway limited liability company

Address before: 030001 Yingze Avenue, Taiyuan, Shanxi 269

Applicant before: China Railway Third Engineering Co., Ltd.

Applicant before: Three bridge and Tunnel Engineering Co. Ltd. group

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124