CN107386683B - 一种框架结构楼面超大幅度提载的加固方法及加固结构 - Google Patents
一种框架结构楼面超大幅度提载的加固方法及加固结构 Download PDFInfo
- Publication number
- CN107386683B CN107386683B CN201710802606.0A CN201710802606A CN107386683B CN 107386683 B CN107386683 B CN 107386683B CN 201710802606 A CN201710802606 A CN 201710802606A CN 107386683 B CN107386683 B CN 107386683B
- Authority
- CN
- China
- Prior art keywords
- section steel
- secondary beam
- end surface
- girder
- overlapping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0237—Increasing or restoring the load-bearing capacity of building construction elements of storey floors
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710802606.0A CN107386683B (zh) | 2017-09-07 | 2017-09-07 | 一种框架结构楼面超大幅度提载的加固方法及加固结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710802606.0A CN107386683B (zh) | 2017-09-07 | 2017-09-07 | 一种框架结构楼面超大幅度提载的加固方法及加固结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107386683A CN107386683A (zh) | 2017-11-24 |
CN107386683B true CN107386683B (zh) | 2019-10-25 |
Family
ID=60351508
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710802606.0A Active CN107386683B (zh) | 2017-09-07 | 2017-09-07 | 一种框架结构楼面超大幅度提载的加固方法及加固结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107386683B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252691A (zh) * | 2018-10-19 | 2019-01-22 | 沈阳建筑大学 | 一种加固钢筋混凝土框架楼板结构及加固方法 |
CN111877791A (zh) * | 2020-07-02 | 2020-11-03 | 浙江省建筑设计研究院 | 一种既有混凝土梁的预应力钢梁叠合加固结构 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4770300B2 (ja) * | 2004-07-15 | 2011-09-14 | 三菱樹脂株式会社 | 補強方法 |
CN202645035U (zh) * | 2012-05-04 | 2013-01-02 | 南京盛圆土木工程高科技有限公司 | 一种全预应力复合一体化加固钢筋混凝土结构 |
JP6046932B2 (ja) * | 2012-07-10 | 2016-12-21 | 株式会社竹中工務店 | 有孔梁の補強構造 |
CN102900242A (zh) * | 2012-11-16 | 2013-01-30 | 南京工业大学 | 一种钢桁架部分约束钢筋混凝土梁加固结构 |
CN203834971U (zh) * | 2014-05-12 | 2014-09-17 | 汕头市建筑工程总公司 | 一种型钢梁托架 |
CN204920270U (zh) * | 2015-07-17 | 2015-12-30 | 深圳市深港建筑集团有限公司 | 一种加固梁 |
CN206070746U (zh) * | 2016-09-09 | 2017-04-05 | 京鼎工程建设有限公司 | 一种h型钢梁与h型钢梁单侧固接节点结构 |
-
2017
- 2017-09-07 CN CN201710802606.0A patent/CN107386683B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN107386683A (zh) | 2017-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350454B (zh) | 一种用于钢桁拱桥梁的钢拱肋外包混凝土施工方法 | |
CN108331158A (zh) | 一种预制钢筋混凝土梁柱的现场连接方法 | |
CN109779114B (zh) | 一种整体式叠合板组合梁 | |
CN104264895A (zh) | 一种预应力混凝土f板及框架结构体系 | |
CN103774541B (zh) | 一种多片式组合梁桥上下部整体式结构及其施工方法 | |
CN107386683B (zh) | 一种框架结构楼面超大幅度提载的加固方法及加固结构 | |
CN104060542A (zh) | 组合梁斜拉桥横桥向预应力施加装置及其施加方法 | |
CN205636474U (zh) | 一种装配式牛腿结构 | |
CN107460948A (zh) | 一种后浇上部结构的双层rc板式转换层及施工方法 | |
CN214996175U (zh) | 一种超高层箱型钢梁刚性连接的吊装调整装置 | |
CN105133786B (zh) | 空腹式快速施工组合梁及其建造方法 | |
CN104018521B (zh) | 地铁双柱高架车站型钢混凝土转换结构钢骨及其施工方法 | |
KR20140139272A (ko) | 보 거푸집과 이를 운반 및 지지하는 새들 | |
CN211947993U (zh) | 大跨度现浇桥梁施工用支架 | |
CN108625488A (zh) | 一种可拆卸式钢筋桁架板端支撑节点结构及施工方法 | |
CN111411643A (zh) | 一种支承于地下室顶板的施工电梯基础施工方法 | |
CN210025768U (zh) | 一种用于沉箱模板安装的作业平台系统 | |
CN207538499U (zh) | 用于框架结构楼面超大幅度提载加固的连续过渡段结构 | |
CN203924115U (zh) | 一种地铁双柱高架车站型钢混凝土转换结构钢骨 | |
CN109025281A (zh) | 一种适用于商业体超高超大跨度中庭结构的施工体系及方法 | |
CN205259417U (zh) | 一种新型钢结构住宅楼板与钢梁的连接结构 | |
CN205839606U (zh) | 大跨径空心板梁桥的加固结构 | |
CN208717939U (zh) | 一种高效成型的施工升降机基础结构 | |
WO2020253098A1 (zh) | 一种局部叠合板与组合墙柱连接节点构造 | |
CN208918309U (zh) | 一种适用于商业体超高超大跨度中庭结构的组合支撑体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Bin Inventor after: Sun Shiwei Inventor after: Zheng Wei Inventor after: Jiang Kaichen Inventor after: Gu Weiliang Inventor after: Qian Jing Inventor before: Chen Bin Inventor before: Sun Shiwei Inventor before: Zheng Wei Inventor before: Jiang Kaichen Inventor before: Gu Weiliang Inventor before: Qian Jing |
|
CB03 | Change of inventor or designer information | ||
CP02 | Change in the address of a patent holder |
Address after: No.77, South Tiancheng Road, high speed rail new town, Xiangcheng District, Suzhou, Jiangsu 215100 Patentee after: SUZHOU ZHONGGU BUILDING SCIENCE AND TECHNOLOGY CO., LTD. Address before: Long road east Xiangcheng District bridge in Suzhou city of Jiangsu Province, No. 1 215152 Patentee before: SUZHOU ZHONGGU BUILDING SCIENCE AND TECHNOLOGY CO., LTD. |
|
CP02 | Change in the address of a patent holder |