CN107386660A - 基于bim技术的装配式混凝土结构施工中塔吊系统 - Google Patents

基于bim技术的装配式混凝土结构施工中塔吊系统 Download PDF

Info

Publication number
CN107386660A
CN107386660A CN201710650597.8A CN201710650597A CN107386660A CN 107386660 A CN107386660 A CN 107386660A CN 201710650597 A CN201710650597 A CN 201710650597A CN 107386660 A CN107386660 A CN 107386660A
Authority
CN
China
Prior art keywords
tower crane
bim
components
prefabricated components
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710650597.8A
Other languages
English (en)
Inventor
王胜强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710650597.8A priority Critical patent/CN107386660A/zh
Publication of CN107386660A publication Critical patent/CN107386660A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

本发明公开了基于BIM技术的装配式混凝土结构施工中塔吊系统,包括在数据库中建立每个预制构件的基本信息、统计各预制构件的单重,确定PC构件的分段方案,自动形成各构件的数据库并添加到BIM平台;将建立的预制构件的BIM信息写入到各自预制构件上的RFID芯片中;根据施工BIM模型,确定待吊PC构件的安装位置与现场塔吊位置关系,并自动根据构件编号将上述空间关系添加到数据库;根据各构件重量、塔吊起重半径和塔吊经济性参数,通过内置算法自动优选出当前方案下的最佳塔吊型号;BIM信息写入到PC构件中运至施工现场,施工总包方扫描出厂构件的RFID芯片,获取构件信息,通过云平台查看预制构件的具体信息、图纸、发货验收表,将发货验收表更新入数据库中。

Description

基于BIM技术的装配式混凝土结构施工中塔吊系统
技术领域
本发明涉及建筑工程技术领域,具体为基于BIM技术的装配式混凝土结构施工中塔吊系统。
背景技术
随着装配式混凝土结构大面积应用,预制装配式建筑建造过程中,对构建吊装进行系统化高效化管理至关重要。通过BIM技术在施工总承包方和预制构件厂间及时有效的信息传递影响着施工质量、效率。在装配式混凝土结构施工高速增长的背景下,构件安装需按照一定的顺序。
另外,现阶段预制构件的构件体量大,对于施工吊装机械的选型提出更高要求。然而,现阶段的预制构件工程技术管理方式仍依靠经验参数,其准确度不高、对技术管理经验要求高已无法满足建筑工业信息化参数化智能化要求。
发明内容
本发明要解决的技术问题是克服现有的缺陷,提供基于BIM技术的装配式混凝土结构施工中塔吊系统,以解决大体量的PC构件分段方案过于依赖经验,缺乏精细化科学化优化改进措施,加强供应链的信息互通,安装吊运过程中的自选和识别,同时进行远程可视化实时监控,实现技术管理科学化,可以有效解决背景技术中的问题。
为实现上述目的,本发明提供如下技术方案:基于BIM技术的装配式混凝土结构施工中塔吊系统,包括以下步骤:
a.在数据库中建立每个预制构件的基本信息、统计各预制构件的单重,确定PC构件的分段方案,自动形成各构件的数据库并添加到BIM平台;
b.将建立的预制构件的BIM信息写入到各自预制构件上的RFID芯片中;
c.根据施工BIM模型,确定待吊PC构件的安装位置与现场塔吊空间位置关系,并自动根据构件编号将上述空间关系添加到构件数据库;
d.BIM云平台根据各构件重量、塔吊起重半径和塔吊经济性参数,通过内置算法自动优选出当前方案下的最佳塔吊型号;
e.BIM信息写入到PC构件中运至施工现场,施工总包方初次扫描出厂构件的RFID芯片,获取构件信息,通过云平台对应查看预制构件的具体信息、图纸、发货验收表,将发货验收表更新入数据库中。
进一步的,预制构件吊装时,塔吊吊钩扫描预制构件上的RFID芯片,获取云端信息,由云端反馈参数控制塔吊工作来吊运构件至预定位置。
进一步的,现场安装工扫描预制构件上的RFID芯片,获取预制构件安装信息及安装操作要点指导施工。
进一步的,预制构件安装完成后,施工总包方扫描RFID芯片,获取预制构件的基本信息,通过终端基本信息从云端数据库查看具体信息并反馈收货验收表至云端更新数据库。
与现有技术相比,本发明的有益效果是:
本发明以BIM技术实现工程塔吊机械参数的实时化和数据化动态管理。结合市场价格,通过数据库管理,提高技术人员机械转型和PC构件分段方案的精度,提高工作效率。实现了BIM云端监控,塔吊无人驾驶与PC构件吊运安装全过程监控。将现场施工形象实时地在BIM模型中反映。
附图说明
图1为本发明的流程图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
实施例一
请参阅图1,本发明提供一种技术方案:基于BIM技术的装配式混凝土结构施工中塔吊系统,包括以下步骤:
a.在数据库中建立每个预制构件的基本信息、统计各预制构件的单重,确定PC构件的分段方案,自动形成各构件的数据库并添加到BIM平台;
b.将建立的预制构件的BIM信息写入到各自预制构件上的RFID芯片中;
c.根据施工BIM模型,确定待吊PC构件的安装位置与现场塔吊空间位置关系,并自动根据构件编号将上述空间关系添加到构件数据库;
d.BIM云平台根据各构件重量、塔吊起重半径和塔吊经济性参数,通过内置算法自动优选出当前方案下的最佳塔吊型号;
e.BIM信息写入到PC构件中运至施工现场,施工总包方初次扫描出厂构件的RFID芯片,获取构件信息,通过云平台对应查看预制构件的具体信息、图纸、发货验收表,将发货验收表更新入数据库中。
预制构件吊装时,塔吊吊钩扫描预制构件上的RFID芯片,获取云端信息,由云端反馈参数控制塔吊工作来吊运构件至预定位置。
现场安装工扫描预制构件上的RFID芯片,获取预制构件安装信息及安装操作要点指导施工。
预制构件安装完成后,施工总包方扫描RFID芯片,获取预制构件的基本信息,通过终端基本信息从云端数据库查看具体信息并反馈收货验收表至云端更新数据库。
实施例二
请参阅图1,本发明提供一种技术方案:
第一步:建立整个工程的BIM模型,根据模型初步确定PC构件的分段方案,统计单构件自重,形成预制构件数据库并上传云端;
第二步:根据施工现场的BIM模型,确定吊装PC构件位置与现场塔吊的空间位置关系,并自动根据构件编号将上述空间关系添加到构件数据库;
第三步:从BIM云平台根据各构件重量、塔吊起重半径和塔吊经济性参数,通过内置算法自动优选出当前方案下的最佳塔吊型号;
第四步:将建立的预制构件的BIM信息写入到各自预制构件上的RFID芯片中,PC构件运至施工现场,扫描出厂构件的RFID芯片,获取构件信息,通过云平台对应查看预制构件的具体信息、图纸、发货验收表,将发货验收表更新入数据库中;预制构件吊装时,塔吊吊钩扫描预制构件上的RFID芯片,获取云端信息,由云端反馈参数控制塔吊工作来吊运构件至预定位置;现场安装工扫描预制构件上的RFID芯片,获取预制构件安装信息及安装操作要点指导施工;预制构件安装完成后,施工总包方扫描RFID芯片,获取预制构件的基本信息,通过终端基本信息从云端数据库查看具体信息并反馈收货验收表至云端更新数据库。
在操作时:本发明以BIM技术对整个施工过程监控,从装配式混凝土结构施工中塔吊优化选型,到塔吊无人驾驶与PC构件吊运安装全过程监控。将现场施工形象实时地在BIM模型中反映。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。

Claims (4)

1.基于BIM技术的装配式混凝土结构施工中塔吊系统,其特征在于,包括以下步骤:
a.在数据库中建立每个预制构件的基本信息、统计各预制构件的单重,确定PC构件的分段方案,自动形成各构件的数据库并添加到BIM平台;
b.将建立的预制构件的BIM信息写入到各自预制构件上的RFID芯片中;
c.根据施工BIM模型,确定待吊PC构件的安装位置与现场塔吊空间位置关系,并自动根据构件编号将上述空间关系添加到构件数据库;
d.BIM云平台根据各构件重量、塔吊起重半径和塔吊经济性参数,通过内置算法自动优选出当前方案下的最佳塔吊型号;
e.BIM信息写入到PC构件中运至施工现场,施工总包方初次扫描出厂构件的RFID芯片,获取构件信息,通过云平台对应查看预制构件的具体信息、图纸、发货验收表,将发货验收表更新入数据库中。
2.根据权利要求1所述基于BIM技术的装配式混凝土结构施工中塔吊系统,其特征在于:预制构件吊装时,塔吊吊钩扫描预制构件上的RFID芯片,获取云端信息,由云端反馈参数控制塔吊工作来吊运构件至预定位置。
3.根据权利要求2所述基于BIM技术的装配式混凝土结构施工中塔吊系统,其特征在于:现场安装工扫描预制构件上的RFID芯片,获取预制构件安装信息及安装操作要点指导施工。
4.根据权利要求1~3任一项所述所述基于BIM技术的装配式混凝土结构施工中塔吊系统,其特征在于:预制构件安装完成后,施工总包方扫描RFID芯片,获取预制构件的基本信息,通过终端基本信息从云端数据库查看具体信息并反馈收货验收表至云端更新数据库。
CN201710650597.8A 2017-08-02 2017-08-02 基于bim技术的装配式混凝土结构施工中塔吊系统 Pending CN107386660A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710650597.8A CN107386660A (zh) 2017-08-02 2017-08-02 基于bim技术的装配式混凝土结构施工中塔吊系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710650597.8A CN107386660A (zh) 2017-08-02 2017-08-02 基于bim技术的装配式混凝土结构施工中塔吊系统

Publications (1)

Publication Number Publication Date
CN107386660A true CN107386660A (zh) 2017-11-24

Family

ID=60343174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710650597.8A Pending CN107386660A (zh) 2017-08-02 2017-08-02 基于bim技术的装配式混凝土结构施工中塔吊系统

Country Status (1)

Country Link
CN (1) CN107386660A (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108287933A (zh) * 2017-11-30 2018-07-17 沈阳工业大学 基于bim与虚拟现实技术的装配式建筑智能吊装系统及方法
CN108319741A (zh) * 2017-12-12 2018-07-24 上海建工五建集团有限公司 基于bim的塔吊布置比选方法及系统
CN108564306A (zh) * 2018-05-06 2018-09-21 北京工业大学 基于LoRa技术的预制构件信息采集及吊装方法
CN108616815A (zh) * 2018-05-06 2018-10-02 北京工业大学 一种基于LoRa技术的装配式预制构件定位吊装系统
CN108824817A (zh) * 2018-06-15 2018-11-16 宁波大学 基于可实时感知的构件和bim的装配式建筑自动装配方法
CN109534189A (zh) * 2018-11-14 2019-03-29 中建局集团第建筑有限公司 一种装配式整体框架现浇核心筒结构用起重施工方法
CN110359550A (zh) * 2019-07-26 2019-10-22 彭子茂 基于bim技术的装配式建筑pc构件布置方法
CN110728045A (zh) * 2019-09-30 2020-01-24 同济大学 一种装配式混凝土建筑塔吊逆向选型方法
CN111691685A (zh) * 2020-04-29 2020-09-22 中国一冶集团有限公司 一种装配式建筑用pc构件追踪及吊装指引系统
CN111753353A (zh) * 2020-05-19 2020-10-09 中国一冶集团有限公司 基于bim技术的装配式住宅pc构件吊装模拟系统及方法
CN112069671A (zh) * 2020-08-28 2020-12-11 中冶(上海)钢结构科技有限公司 基于bim模型的钢结构吊装设备选型及布置优化方法
CN112376919A (zh) * 2020-11-02 2021-02-19 上海建工一建集团有限公司 一种装配式建筑数字化自动吊装方法
CN112685821A (zh) * 2020-12-30 2021-04-20 武汉合创炬盛科技有限公司 预制构件吊装辅助系统
CN114876207A (zh) * 2022-04-27 2022-08-09 上海宝冶集团有限公司 狭小空间条件下装配式预制构件智慧安装方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888248A (zh) * 2016-04-27 2016-08-24 河北建筑工程学院 一种基于bim技术指导信息化预制构件的施工方法
CN106348174A (zh) * 2016-10-08 2017-01-25 上海建工五建集团有限公司 基于rfid技术的预制构件定位吊装施工方法及系统
CN106372302A (zh) * 2016-08-31 2017-02-01 浙江精工钢结构集团有限公司 一种基于bim技术的塔吊自动选型和优化系统及方法
CN106485411A (zh) * 2016-10-08 2017-03-08 上海建工五建集团有限公司 基于bim技术的装配式混凝土结构建造管理方法及系统

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888248A (zh) * 2016-04-27 2016-08-24 河北建筑工程学院 一种基于bim技术指导信息化预制构件的施工方法
CN106372302A (zh) * 2016-08-31 2017-02-01 浙江精工钢结构集团有限公司 一种基于bim技术的塔吊自动选型和优化系统及方法
CN106348174A (zh) * 2016-10-08 2017-01-25 上海建工五建集团有限公司 基于rfid技术的预制构件定位吊装施工方法及系统
CN106485411A (zh) * 2016-10-08 2017-03-08 上海建工五建集团有限公司 基于bim技术的装配式混凝土结构建造管理方法及系统

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108287933A (zh) * 2017-11-30 2018-07-17 沈阳工业大学 基于bim与虚拟现实技术的装配式建筑智能吊装系统及方法
CN108287933B (zh) * 2017-11-30 2021-06-22 沈阳工业大学 基于bim与虚拟现实技术的装配式建筑智能吊装系统及方法
CN108319741A (zh) * 2017-12-12 2018-07-24 上海建工五建集团有限公司 基于bim的塔吊布置比选方法及系统
CN108564306A (zh) * 2018-05-06 2018-09-21 北京工业大学 基于LoRa技术的预制构件信息采集及吊装方法
CN108616815A (zh) * 2018-05-06 2018-10-02 北京工业大学 一种基于LoRa技术的装配式预制构件定位吊装系统
CN108824817B (zh) * 2018-06-15 2021-05-04 宁波大学 基于可实时感知的构件和bim的装配式建筑自动装配方法
CN108824817A (zh) * 2018-06-15 2018-11-16 宁波大学 基于可实时感知的构件和bim的装配式建筑自动装配方法
CN109534189A (zh) * 2018-11-14 2019-03-29 中建局集团第建筑有限公司 一种装配式整体框架现浇核心筒结构用起重施工方法
CN110359550A (zh) * 2019-07-26 2019-10-22 彭子茂 基于bim技术的装配式建筑pc构件布置方法
CN110728045A (zh) * 2019-09-30 2020-01-24 同济大学 一种装配式混凝土建筑塔吊逆向选型方法
CN111691685A (zh) * 2020-04-29 2020-09-22 中国一冶集团有限公司 一种装配式建筑用pc构件追踪及吊装指引系统
CN111753353A (zh) * 2020-05-19 2020-10-09 中国一冶集团有限公司 基于bim技术的装配式住宅pc构件吊装模拟系统及方法
CN111753353B (zh) * 2020-05-19 2024-05-17 中国一冶集团有限公司 基于bim技术的装配式住宅pc构件吊装模拟系统及方法
CN112069671A (zh) * 2020-08-28 2020-12-11 中冶(上海)钢结构科技有限公司 基于bim模型的钢结构吊装设备选型及布置优化方法
CN112376919A (zh) * 2020-11-02 2021-02-19 上海建工一建集团有限公司 一种装配式建筑数字化自动吊装方法
CN112685821A (zh) * 2020-12-30 2021-04-20 武汉合创炬盛科技有限公司 预制构件吊装辅助系统
CN114876207A (zh) * 2022-04-27 2022-08-09 上海宝冶集团有限公司 狭小空间条件下装配式预制构件智慧安装方法

Similar Documents

Publication Publication Date Title
CN107386660A (zh) 基于bim技术的装配式混凝土结构施工中塔吊系统
CN110008648B (zh) 一种基于bim模型的智慧工地集成实施方法
CN110909972A (zh) 一种基于bim的钢结构全寿命周期的管理系统及方法
WO2018149087A1 (zh) 一种智能化全自动堆取料机控制装置
CN107958101A (zh) 一种基于bim的装配式建筑信息化管理系统及方法
CN106485411A (zh) 基于bim技术的装配式混凝土结构建造管理方法及系统
CN108108543A (zh) 一种鲁班bim技术的二次结构深化设计应用方法
CN112270482B (zh) 一种超高层建造垂直运输管理方法
CN113240356B (zh) 基于任务树模型的智能塔吊协同控制系统和方法
CN108564306A (zh) 基于LoRa技术的预制构件信息采集及吊装方法
CN104032967B (zh) 预制装配式框架结构构件吊装施工方法
CN109977450A (zh) 装配式建筑的智能化施工方法及其施工系统
CN109019343A (zh) 基于NB-IoT技术的预制墙板信息采集及吊装方法
CN113327045A (zh) 一种梁场智能控制系统
CN105956793A (zh) 基于物联网的钢筋自动化加工配送系统
CN214192204U (zh) 一种预制构件的吊装装置
CN112376919A (zh) 一种装配式建筑数字化自动吊装方法
CN110216788A (zh) 一种桥梁节段预制场的智能化控制方法
CN109626271A (zh) 一种基于bim的异型构件组装用智能胎架系统及其控制方法
CN104992285A (zh) 一种企业预算成本控制系统
CN107368972A (zh) 一种基于bim技术的派工平台及其使用方法
CN110689214A (zh) 一种物资供应智汇管控平台
CN116777678A (zh) 一种基于多源数据的输电线路塔施工进程监控方法
CN105204456A (zh) 基于云网络的多工位自协调智能机器人系统及控制方法
CN118003460A (zh) 基于智慧梁场管理平台的预制混凝土梁施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124