CN107380034A - A kind of engineering transportation special dump truck container - Google Patents

A kind of engineering transportation special dump truck container Download PDF

Info

Publication number
CN107380034A
CN107380034A CN201610324629.0A CN201610324629A CN107380034A CN 107380034 A CN107380034 A CN 107380034A CN 201610324629 A CN201610324629 A CN 201610324629A CN 107380034 A CN107380034 A CN 107380034A
Authority
CN
China
Prior art keywords
plate
dump truck
foreboard
supporting seat
truck container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610324629.0A
Other languages
Chinese (zh)
Inventor
马李斌
龙云朗
周新红
李阳
杨清华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Lifan Junma Vehicles Co Ltd
Original Assignee
Yunnan Lifan Junma Vehicles Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Lifan Junma Vehicles Co Ltd filed Critical Yunnan Lifan Junma Vehicles Co Ltd
Priority to CN201610324629.0A priority Critical patent/CN107380034A/en
Publication of CN107380034A publication Critical patent/CN107380034A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P1/00Vehicles predominantly for transporting loads and modified to facilitate loading, consolidating the load, or unloading
    • B60P1/04Vehicles predominantly for transporting loads and modified to facilitate loading, consolidating the load, or unloading with a tipping movement of load-transporting element
    • B60P1/28Tipping body constructions
    • B60P1/283Elements of tipping devices
    • B60P1/286Loading buckets

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Body Structure For Vehicles (AREA)

Abstract

A kind of engineering transportation special dump truck container, it is related to engineering transportation technical field;It is formed by the weldering of foreboard assembly, bottom plate frame assembly and bottom plate group;This huge stone transports special dump truck container due to not having left side plate, right side plate and back door, very convenient huge stone loads, it is simple in construction, cheap, can preferably be applied to the special dump truck that the transport of huge stone is carried out on the accommodation road of building site.

Description

A kind of engineering transportation special dump truck container
Technical field
The present invention relates to technical field of transportation, and in particular to a kind of engineering transportation special dump truck container.
Background technology
Container of dump truck is typically made up of bottom plate, foreboard, left side plate, right side plate and back door, but to meet the transport needs of the huge stone on the accommodation road of building site, and left side plate, right side plate and the back door of traditional container of dump truck turn into the obstacle that huge stone loads.
The content of the invention
In view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of engineering transportation special dump truck container.
To achieve the above object, the technical solution adopted by the present invention is:A kind of engineering transportation special dump truck container, it is formed by connecting by foreboard assembly, bottom plate frame assembly and bottom plate;Foreboard assembly is made up of shrouding, reinforcement vertical beam, middle web beam, side web beam, top dust excluding plate, left side dust excluding plate, right side dust excluding plate, lifting hydraulic jack installation reinforcing plate and hoisting plate under front column, foreboard, front column top closing plate, front column;Foreboard is placed in front side in front column, it is sequentially connected on rear side of foreboard and strengthens vertical beam, middle web beam and side web beam, front column top connects front column top closing plate, shrouding under front column bottom connection front column, foreboard and reinforcement vertical beam top connection top dust excluding plate, top dust excluding plate both sides are connected to dust excluding plate, the upper position connection hoisting plate on rear side of foreboard, foreboard back lower centre position connection lifting hydraulic jack installation reinforcing plate;Bottom plate frame assembly is made up of web beam, turning supporting seat support plate, turning supporting seat reinforcing plate and rear cornerite among two intermediate longitudinal girders, front beam, intermediate transverse girder, overhanging crossbeam, side longeron, rear cross beam, preceding reinforcement carling, turning supporting seat position;Intermediate transverse girder is placed between two intermediate longitudinal girders and firmly connected, the corresponding position of intermediate transverse girder, overhanging crossbeam is connected between to the both sides of longeron respectively, overhanging crossbeam both sides connect side longeron respectively, intermediate longitudinal girder front end connects front beam, intermediate longitudinal girder and two side longeron rear ends connection rear cross beam, strengthen carling before being connected between the overhanging crossbeam of front beam and both sides, web beam among turning supporting seat position is connected between longeron, the both sides connection turning supporting seat support plate of two intermediate longitudinal girders, turning supporting seat reinforcing plate is connected on turning supporting seat support plate, and connected respectively with the outside of two intermediate longitudinal girders, rear cross beam is left, right both ends and both sides longeron rear end is respectively connected with rear cornerite.
Further, described front column, strengthen vertical beam, middle web beam, side web beam, front beam, intermediate transverse girder, rear cross beam, preceding reinforcement carling, web beam among turning supporting seat position, be rectangle flute profile.
Further, described foreboard middle and lower part is provided with bolt mounting holes, and its mounting hole is used to install lifting hydraulic jack.
Further, described top dust excluding plate is right-angle side.
Further, described left and right side dust excluding plate is trapezoidal that its angle is right angle.
Further, described hoisting plate is rectangle, and is provided with circular hole, lifts foreboard assembly during for group weldering container.
Further, described intermediate longitudinal girder is zigzag.
Further, with being trapezoidal flute profile, its inside and outside end top is concordantly connected described overhanging crossbeam with the top of intermediate longitudinal girder and side longeron.
Further, described side longeron is rectangle flute profile, and the angle on its one side is right angle, and the angle of another side is more than 90 ° to match with overhanging crossbeam profile.
Further, described turning supporting seat support plate, turning supporting seat reinforcing plate are rectangle flute profile, concordant with intermediate longitudinal girder top at its inner top 1/2 to connect.
Further, described rear cornerite is right angle.
After said structure, beneficial effects of the present invention are:Its very convenient huge stone loads, and simple in construction, cheap, can preferably be applied to the special dump truck that the transport of huge stone is carried out on the accommodation road of building site.
Brief description of the drawings
Fig. 1 is the left view of the present invention;
Fig. 2 is the front view of the present invention;
Fig. 3 is the rearview of the middle foreboard assembly of the present invention;
Fig. 4 is the top view of the middle foreboard assembly of the present invention;
Fig. 5 is the left view of the middle foreboard assembly of the present invention;
Fig. 6 is Fig. 3 of present invention A-A sectional views;
Fig. 7 is Fig. 3 of present invention B-B sectional views;
Fig. 8 is the top view of the bottom plate frame assembly of the present invention;
Fig. 9 is the left view of the bottom plate frame assembly of the present invention;
Figure 10 is the front view of the bottom plate frame assembly of the present invention;
Figure 11 is the rearview of the bottom plate frame assembly of the present invention;
Figure 12 is Fig. 8 of present invention A-A sectional views;
Figure 13 is Fig. 8 of present invention B-B sectional views;
Figure 14 is Fig. 8 of present invention C-C sectional views;
Figure 15 is Fig. 8 of present invention D-D sectional views;
Figure 16 is the left view of the bottom plate of the present invention;
Figure 17 is the top view of the bottom plate of the present invention.
1st, foreboard assembly;2nd, bottom plate frame assembly;3rd, bottom plate;101st, top dust excluding plate;102nd, front column top closing plate;103rd, hoisting plate;104th, front column;105th, foreboard;106th, side web beam;107th, vertical beam is strengthened;108th, middle web beam;109th, hydraulic jack installation reinforcing plate is lifted;110th, shrouding under front column;111st, left side dust excluding plate;112nd, right side dust excluding plate;201st, front beam;202nd, preceding reinforcement carling;203rd, overhanging crossbeam;204th, intermediate transverse girder;205th, intermediate longitudinal girder;206th, side longeron;207th, turning supporting seat support plate;208th, turning supporting seat reinforcing plate;209th, web beam among turning supporting seat position;210th, rear cross beam;211st, rear cornerite.
Embodiment
Embodiment
Referring to shown in Fig. 1-Fig. 2, the technical scheme that the present embodiment uses is:A kind of engineering transportation special dump truck container, formed by 3 groups of foreboard assembly 1, bottom plate frame assembly 2 and bottom plate welderings;A kind of this huge stone transports special dump truck container due to not having left side plate, right side plate and back door, very convenient huge stone loads, and it is simple in construction, it is cheap, it can preferably be applied to the special dump truck that the transport of huge stone is carried out on the accommodation road of building site.
Referring to shown in Fig. 3-Fig. 7, the technical scheme that the present embodiment uses is:Foreboard assembly is strengthened 112, lifting hydraulic jack installation reinforcing plates 109 of the left side dust excluding plate 111, one of dust excluding plate 101, one right side dust excluding plate and two pieces hoisting plate 103 at the top of the middle side web beam 106, one of web beam 108, six of vertical beam 107, three by shrouding 110, two pieces under 104, foreboards 105 of two pieces front column, two pieces front column top closing plate 102, two pieces front column and formed;Front column 104 with steel plate cutting it is rectangular after be bent into flute profile, the rectangular rear left and right both sides bending backward of steel plate cutting of foreboard 105, processed in the middle and lower part of foreboard 105 12 bolt mounting holes be used for install lifting hydraulic jack;Front column top closing plate 102 is rectangular with steel plate cutting, shrouding 110 is rectangular with steel plate cutting under front column, strengthen vertical beam 107 with steel plate cutting it is rectangular after be bent into flute profile, middle web beam 108 with steel plate cutting it is rectangular after be bent into flute profile, side web beam 106 with steel plate cutting it is rectangular after be bent into flute profile, top dust excluding plate 101 is bent into right-angle side with the rectangular rear front of steel plate cutting, rear bending is at a right angle in echelon with steel plate cutting for left side dust excluding plate 111, right side dust excluding plate 112 and left side dust excluding plate 111 are symmetrical, it is rectangular with steel plate cutting to lift hydraulic jack installation reinforcing plate 109, and process 12 bolt mounting holes and be used to lifting hydraulic jack be installed;Hoisting plate 103 is rectangular with steel plate cutting, and processes a circular hole and be used to lift foreboard assembly during group weldering container;When it organizes weldering foreboard assembly, foreboard 105 is placed in front side in two pieces front column 104, make its top margin concordant with the top of two pieces front column 104, and firmly connect, strengthen vertical beam 107 in the rear side connection two pieces of foreboard 105, three middle web beams 108 and six side web beams 106, a front column top closing plate 102 is connected respectively on the top of two pieces front column 104, connect shrouding 110 under a front column respectively in the bottom of two pieces front column 104, strengthen the top of vertical beam 107 in foreboard 105 and two pieces and connect a top dust excluding plate 101, the dust excluding plate 111 on the left of the connection of the left side of top dust excluding plate 101, the dust excluding plate 112 on the right side of the connection of the right of top dust excluding plate 101;In the upper position connection two pieces hoisting plate 103 of the rear side of foreboard 105, a lifting hydraulic jack installation reinforcing plate 109 is connected in the lower middle position of the rear side of foreboard 105.
Referring to shown in Fig. 8-Figure 15, the technical scheme that the present embodiment uses is:By strengthening before 204,16 overhanging crossbeams 203 of the intermediate transverse girder of front beam 201, eight of two pieces intermediate longitudinal girder 205, one, two pieces side longeron 206, rear cross beams 210, a two pieces among 202, turning supporting seat positions of carling, cornerite 211 forms bottom plate frame assembly after web beam 209, two pieces turning supporting seat support plate 207, two pieces turning supporting seat reinforcing plate 208 and two pieces;Front beam 201 with steel plate cutting it is rectangular after be bent into flute profile;Intermediate longitudinal girder 205 with steel plate cutting it is rectangular after be bent into zigzag;Intermediate transverse girder 204 with steel plate cutting it is rectangular after be bent into flute profile;Overhanging crossbeam 203 is bent into unequal section flute profile afterwards in echelon with steel plate cutting, its inner sectional dimension is big, outer end sectional dimension is small, turns into the approximate beam of uniform strength, and its inside and outside end top is cut into a part to be concordantly connected with the top of intermediate longitudinal girder 205 and side longeron 206;Side longeron 206 with steel plate cutting it is rectangular after be bent into flute profile, the angle on its one side is right angle, and the angle of another side is more than 90 ° to match with the overhanging profile of crossbeam 203;Rear cross beam 210 with steel plate cutting it is rectangular after be bent into flute profile;It is preceding reinforcement carling 202 with steel plate cutting it is rectangular after be bent into flute profile;Among turning supporting seat position web beam 209 with steel plate cutting it is rectangular after be bent into flute profile;Turning supporting seat support plate 207 with steel plate cutting it is rectangular after be bent into flute profile, and a part is cut into be concordantly connected with the top of intermediate longitudinal girder 205 in its inner top;Turning supporting seat reinforcing plate 208 with steel plate cutting it is rectangular after be bent into flute profile, and a part is cut into be concordantly connected with the top of intermediate longitudinal girder 205 in its inner top;Cornerite 211 is at a right angle with bending after steel plate cutting afterwards;During group foot framework assembly, 8 intermediate transverse girders 204 are placed between two intermediate longitudinal girders 205 and firmly connected;In the corresponding position of eight intermediate transverse girders 204, eight overhanging crossbeams 203 are connected to the left and right both sides of intermediate longitudinal girder 205 respectively;A side longeron 206 is connected in the left end of eight overhanging crossbeams 203 on the left side;Similarly, on the right the right-hand member of eight overhanging crossbeams 203 connects a side longeron 206;A front beam 201 is connected in the front end of two intermediate longitudinal girder 205;A rear cross beam 210 is connected in two intermediate longitudinal girders 205 and the rear end of both sides longeron 206;Strengthen carling 202 before connecting one between front beam 201 and the first overhanging crossbeam 203 of arranged on left and right sides respectively;Web beam 209 among a turning supporting seat position is connected between the 7th intermediate transverse girder 204 and two intermediate longitudinal girders 205 in the centre position of the 8th intermediate transverse girder 204;Respectively a turning supporting seat support plate 207 is connected in the 7th intermediate transverse girder 204 with the arranged on left and right sides of two intermediate longitudinal girders 205 in the centre position of the 8th intermediate transverse girder 204;A turning supporting seat reinforcing plate 208 is connected on two turning supporting seat support plates 207 respectively, and is connected respectively with the outside of two intermediate longitudinal girder 205;After connecting one at 210 left and right both ends of rear cross beam and the rear end of both sides longeron 206 respectively on cornerite 211.
Referring to shown in Figure 16-Figure 17, the technical scheme that the present embodiment uses is:The use of bottom plate 3 is rectangular with the blanking of certain thickness steel plate elder generation, then cuts a small rectangular indentation in its arranged on left and right sides in front to match with front column profile respectively again.
It is described above, it is merely to illustrate technical scheme and unrestricted, the other modifications or equivalent substitution that those of ordinary skill in the art are made to technical scheme, without departing from the spirit and scope of technical solution of the present invention, all should cover among scope of the presently claimed invention.

Claims (11)

  1. A kind of 1. engineering transportation special dump truck container, it is characterised in that:It is formed by the weldering of foreboard assembly, bottom plate frame assembly and bottom plate group;Foreboard assembly is made up of shrouding, reinforcement vertical beam, middle web beam, side web beam, top dust excluding plate, left side dust excluding plate, right side dust excluding plate, lifting hydraulic jack installation reinforcing plate and hoisting plate under front column, foreboard, front column top closing plate, front column;Foreboard is placed in front side in front column, it is sequentially connected on rear side of foreboard and strengthens vertical beam, middle web beam and side web beam, front column top connects front column top closing plate, shrouding under front column bottom connection front column, foreboard and reinforcement vertical beam top connection top dust excluding plate, top dust excluding plate both sides are connected to dust excluding plate, the upper position connection hoisting plate on rear side of foreboard, foreboard back lower centre position connection lifting hydraulic jack installation reinforcing plate;Bottom plate frame assembly is by two intermediate longitudinal girders,Front beam,Intermediate transverse girder,Overhanging crossbeam,Side longeron,Rear cross beam,Preceding reinforcement carling,Web beam among turning supporting seat position,Turning supporting seat support plate,Turning supporting seat reinforcing plate and rear cornerite composition,Intermediate transverse girder is located between two intermediate longitudinal girders and firmly connected,The corresponding position of intermediate transverse girder,Overhanging crossbeam is connected between to the both sides of longeron respectively,Overhanging crossbeam both sides connect side longeron respectively,Intermediate longitudinal girder front end connects front beam,Intermediate longitudinal girder and two side longeron rear ends connection rear cross beam,Strengthen carling before being connected between the overhanging crossbeam of front beam and both sides,Web beam among turning supporting seat position is connected between longeron,The both sides connection turning supporting seat support plate of two intermediate longitudinal girders,Turning supporting seat reinforcing plate is connected on turning supporting seat support plate,And connected respectively with the outside of two intermediate longitudinal girders,Rear cross beam is left,Right both ends and both sides longeron rear end is respectively connected with rear cornerite.
  2. A kind of 2. engineering transportation special dump truck container according to claim 1, it is characterised in that:Described front column, strengthen vertical beam, middle web beam, side web beam, front beam, intermediate transverse girder, rear cross beam, preceding reinforcement carling, web beam among turning supporting seat position, be rectangle flute profile.
  3. A kind of 3. engineering transportation special dump truck container according to claim 1, it is characterised in that:The rectangular rear left and right both sides bending backward of described foreboard steel plate cutting, bolt mounting holes are provided with foreboard middle and lower part.
  4. A kind of 4. engineering transportation special dump truck container according to claim 1, it is characterised in that:Described top dust excluding plate is bent into right-angle side with the rectangular rear front of steel plate cutting.
  5. A kind of 5. engineering transportation special dump truck container according to claim 1, it is characterised in that:Described left and right side dust excluding plate is trapezoidal, and its angle is right angle.
  6. A kind of 6. engineering transportation special dump truck container according to claim 1, it is characterised in that:Described hoisting plate is rectangle, and is provided with circular hole.
  7. A kind of 7. engineering transportation special dump truck container according to claim 1, it is characterised in that:Described intermediate longitudinal girder is zigzag.
  8. A kind of 8. engineering transportation special dump truck container according to claim 1, it is characterised in that:Described overhanging crossbeam is with being trapezoidal flute profile, and inside and outside end top is concordant with the top of intermediate longitudinal girder and side longeron connects for its.
  9. A kind of 9. engineering transportation special dump truck container according to claim 1, it is characterised in that:Described side longeron is rectangle flute profile, and the angle on its one side is right angle, and the angle of another side is more than 90 ° to match with overhanging crossbeam profile.
  10. A kind of 10. engineering transportation special dump truck container according to claim 1, it is characterised in that:Described turning supporting seat support plate, turning supporting seat reinforcing plate are rectangle flute profile, and inner top part is concordant with intermediate longitudinal girder top connects for its.
  11. A kind of 11. engineering transportation special dump truck container according to claim 1, it is characterised in that:Described rear cornerite is right angle.
CN201610324629.0A 2016-05-17 2016-05-17 A kind of engineering transportation special dump truck container Pending CN107380034A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610324629.0A CN107380034A (en) 2016-05-17 2016-05-17 A kind of engineering transportation special dump truck container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610324629.0A CN107380034A (en) 2016-05-17 2016-05-17 A kind of engineering transportation special dump truck container

Publications (1)

Publication Number Publication Date
CN107380034A true CN107380034A (en) 2017-11-24

Family

ID=60338702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610324629.0A Pending CN107380034A (en) 2016-05-17 2016-05-17 A kind of engineering transportation special dump truck container

Country Status (1)

Country Link
CN (1) CN107380034A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201512008U (en) * 2009-10-01 2010-06-23 成都市高荣华龙实业有限公司 Compartment of dump truck
FR2961140A1 (en) * 2010-06-14 2011-12-16 Vendee Carrosserie Positionable type box for use on frame of commercial vehicle, has two beams, where one beam allows introduction of front and intermediate connection cross-pieces to adjustable position according to desired centre-to-centre distance
CN202174971U (en) * 2011-08-09 2012-03-28 中国第一汽车股份有限公司 Compartment structure of dump truck
CN203293966U (en) * 2013-04-07 2013-11-20 陕西汽车集团有限责任公司 Compartment
CN203460747U (en) * 2013-08-21 2014-03-05 重庆重型汽车集团专用汽车有限责任公司 Heavy-duty flat dump truck
CN205737138U (en) * 2016-05-17 2016-11-30 云南力帆骏马车辆有限公司 A kind of engineering transportation special dump truck container

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201512008U (en) * 2009-10-01 2010-06-23 成都市高荣华龙实业有限公司 Compartment of dump truck
FR2961140A1 (en) * 2010-06-14 2011-12-16 Vendee Carrosserie Positionable type box for use on frame of commercial vehicle, has two beams, where one beam allows introduction of front and intermediate connection cross-pieces to adjustable position according to desired centre-to-centre distance
CN202174971U (en) * 2011-08-09 2012-03-28 中国第一汽车股份有限公司 Compartment structure of dump truck
CN203293966U (en) * 2013-04-07 2013-11-20 陕西汽车集团有限责任公司 Compartment
CN203460747U (en) * 2013-08-21 2014-03-05 重庆重型汽车集团专用汽车有限责任公司 Heavy-duty flat dump truck
CN205737138U (en) * 2016-05-17 2016-11-30 云南力帆骏马车辆有限公司 A kind of engineering transportation special dump truck container

Similar Documents

Publication Publication Date Title
CN103628567B (en) Assembled integral shear wall, floor construction system and construction method
DE202016102275U1 (en) Large volume, covered pallet freight wagon
CN201236030Y (en) Tank type container
CN205737138U (en) A kind of engineering transportation special dump truck container
CN107380034A (en) A kind of engineering transportation special dump truck container
CN103538994B (en) Adjustable intermediate disk body of large double-layer cage and adjusting and moving method thereof
CN109625044A (en) One kind having bad luck component transportation vehicle
CN202400496U (en) Bottom structure of container and container with bottom structure
CN202788002U (en) Assembled overhanging-type feed-receiving platform
CN205737751U (en) A kind of cargo vehicle cargo floor skeleton
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN101446118A (en) Curtain-wall board-shifting support
CN208168313U (en) A kind of operating platform of tool-type elevator
CN209455204U (en) Detachable transportation frame for Pipe rack module
CN206751345U (en) A kind of tunnel duct piece turnover machine
CN207048365U (en) It is a kind of to have enough to meet the need steel member suitable for shear wall external reinforcement at tower crane attachment
CN201343871Y (en) Curtain wall moving plate support
CN103291078B (en) A kind of steel girder erection equipment
CN206032957U (en) Novel improve companion ladder of structure
CN206326583U (en) Integrated precast component deposits pallet
CN206385750U (en) A kind of mixed structure precast stair
CN211643661U (en) Efficient evaporates presses aerated concrete block transport vechicle
KR102255701B1 (en) Transporting cart for table form
CN206634975U (en) Material lifting device for building
CN219214842U (en) Rear dump truck device with lock box device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171124