CN107366298A - A kind of conversion method for supporting for being used to reinforce blower foundation connection - Google Patents

A kind of conversion method for supporting for being used to reinforce blower foundation connection Download PDF

Info

Publication number
CN107366298A
CN107366298A CN201710650040.4A CN201710650040A CN107366298A CN 107366298 A CN107366298 A CN 107366298A CN 201710650040 A CN201710650040 A CN 201710650040A CN 107366298 A CN107366298 A CN 107366298A
Authority
CN
China
Prior art keywords
foundation ring
concrete
foundation
slit region
conversion support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710650040.4A
Other languages
Chinese (zh)
Other versions
CN107366298B (en
Inventor
冯又全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Fengchang Civil Engineering Technology Co Ltd
Original Assignee
Shanghai Fengchang Civil Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Fengchang Civil Engineering Technology Co Ltd filed Critical Shanghai Fengchang Civil Engineering Technology Co Ltd
Priority to CN201710650040.4A priority Critical patent/CN107366298B/en
Publication of CN107366298A publication Critical patent/CN107366298A/en
Application granted granted Critical
Publication of CN107366298B publication Critical patent/CN107366298B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

The present invention provides a kind of conversion method for supporting for being used to reinforce blower foundation connection, when setting conversion support is connected to basis available for the reinforcing for being completed the item base ring Joint failure that puts into operation, the both sides for being located at concrete stub inside points in foundation ring first drill through some grout holes, the grout hole is led to foundation ring slit region;Then foundation ring slit region and grout hole is made to be stuffed entirely with full high-strength grouting material the pressure grouting of foundation ring slit region by grout hole;Then several vertical drillings are arranged on the outside of foundation ring, vertical foot of hole is drilled into foundation ring;Then the arrangement conversion support in vertical drilling, and the gap between vertical drilling and conversion support of constructing is in the milk;Finally, the top surface in concrete stub arranges vertical bar planting and increases concrete.

Description

A kind of conversion method for supporting for being used to reinforce blower foundation connection
Technical field
The invention belongs to generation power foundation of wind power technical field of structures, and in particular to one kind is used to reinforce blower foundation connection Conversion method for supporting.
Background technology
At present, single tube is wind power generation stepped is connected with bottom reinforcement bars concrete foundation frequently with pre- in reinforced concrete foundation Bury foundation ring, top tower is connected realization with foundation ring by flange.However, because foundation ring length of embedment is shallow, and be non-pre- Stress structure, top tower is connected using foundation ring and base foundation has following defect:The basic existing reinforcing bar of ring region has again Foundation ring is strengthened, and region below only has reinforcing bar, because strength and stiffness mutation causes because caused by concrete hardening contraction and stress Crack is concentrated between foundation ring and bottom plate, fracture width increase;Foundation ring isolates inside and outside concrete, due to steel and concrete Two kinds of material property differences, thermal coefficient of expansion is different, deformation can not be coordinated, and temperature action, load work, frost heave action etc. make basis The gap of ring and concrete is continuously increased, and deteriorates both anchorage effects;Under blower fan reciprocating fatigue load action, foundation ring connection Region distress in concrete, gap are continuously increased development, and then foundation ring vibrated, rocked in base concrete, produce to mixed Coagulate the percussion of soil.
The project problems that cause to have put into operation of stress defect existing for the connection of basis gradually break out, and have a strong impact on the fortune of blower fan Row quality and safe for operation.
The content of the invention
It is an object of the invention to provide a kind of conversion method for supporting for being used to reinforce blower foundation connection, can be used for Build up the reinforcing for the item base ring Joint failure that puts into operation.
A kind of conversion method for supporting for being used to reinforce blower foundation connection proposed by the present invention, the conversion method for supporting lead to The realization of conversion support component is crossed, the conversion support component is by foundation ring 1, concrete stub 2, foundation ring slit region 3 and conversion The composition of support 4, the foundation ring 1 insert concrete stub 2, basic circumferential weld are provided between the foundation ring 1 and concrete stub 2 Gap area 3;When connecting setting conversion support 4 to basis, comprise the following steps that:
(1)The both sides for being located at the inside points of concrete stub 2 in foundation ring 1 drill through some grout holes 5, lead to the grout hole 5 Foundation ring slit region 3;
(2)By grout hole 5 to the pressure grouting of foundation ring slit region 3, foundation ring slit region 3 and grout hole 5 is set to be stuffed entirely with completely High-strength grouting material;
(3)Several vertical drillings 6 of arrangement in the outside of foundation ring 1, vertical 6 bottoms that drill are drilled into foundation ring 1;Then vertically boring Arrangement conversion support 4 in hole 6, and the gap grouting 7 between vertical drilling 6 and conversion support 4 of constructing;4 lower ends of conversion support top Tight foundation ring 1, the major part of foundation ring 1 is forced through conversion support 4 and be transferred to the top Elevated section concrete 9 of stub 2, reduce The stress concentration of the bottom of foundation ring 1, improve the bearing capacity and anti-fatigue performance of concrete;
(4)Vertical bar planting 8 is arranged in the top surface of concrete stub 2 and increases concrete 9.
In the present invention, the conversion support 4 is made up of steel member 10 and the end plate 11 being welded at the top of steel member, end plate 11 Expose the certain altitude of concrete stub 2, be anchored in and increase in concrete 9.
The beneficial effects of the present invention are:
1. a kind of conversion method for supporting for being used to reinforce blower foundation connection proposed by the present invention, simple in construction, reasonable stress can For being completed the reinforcing for the item base ring Joint failure that puts into operation.
2. conversion support is set, foundation ring is largely forced through conversion support and be transferred to Elevated section at the top of stub Concrete, reduce the stress concentration of foundation ring bottom, improve the bearing capacity and anti-fatigue performance of concrete.
3. the present invention is used to be completed the reinforcing for the item base ring Joint failure that puts into operation, thickeies ring beam with reference to top and arrange Apply, the buried depth of foundation ring can be increased, improve binding effect of the concrete to foundation ring, and do not destroy original structure.
4. simple operation of the present invention, easy for construction.
Brief description of the drawings
Fig. 1 connects front view for basis of the present invention.
Fig. 2 is the front view that the present invention applies.
Fig. 3 is the top view that the present invention applies.
Label in figure:Ring based on 1,2 be ring slit region based on concrete stub, 3,4 be to change support, 5 as grouting Hole, 6 for vertical drilling, 7 be gap grouting, 8 be vertical bar planting, 9 for increase concrete, 10 be steel member, 11 be end plate.
Embodiment
The present invention is further illustrated below by embodiment combination accompanying drawing.
Embodiment 1:
As shown in figure 1, during basic Joint failure, between foundation ring 1 and concrete stub 2, foundation ring gap area 3 is produced.
When the present invention is applied to reinforce blower foundation connection, it is located at the two of the inside points of concrete stub 2 in foundation ring 1 first Sidetracking takes some grout holes 5, the grout hole 5 is led to foundation ring slit region 3;Then by grout hole 5 to foundation ring gap The pressure grouting of area 3, foundation ring slit region 3 and grout hole 5 is set to be stuffed entirely with full high-strength grouting material;Then the cloth on the outside of foundation ring Several vertical drillings 6 are put, vertical 6 bottoms that drill are drilled into foundation ring 1;Then the arrangement conversion support 4 in vertical drilling 6, and Gap grouting 7 between the vertical drilling 6 of construction and conversion support 4;Finally, vertical bar planting 8 is arranged in the top surface of concrete stub 2 And increase concrete 9.The conversion support 4 is made up of steel member 10 and the end plate 11 being welded at the top of round steel, and end plate 11 exposes The certain altitude of concrete stub 2, is anchored in and increases in concrete 9.
Implementation steps are as follows:
(1)1 liang of sidetracking grout hole 5 of foundation ring, injection pressure water or pressure-air cleaning and dry-basis ring 1 in both sides grout hole 5 The foundation ring gap area 3 of both sides;
(2)With slip casing by pressure material along grout hole 5, foundation ring gap area 3 is filled;
(3)Several vertical drillings 6 are arranged on the outside of foundation ring, vertical 6 bottoms that drill are drilled into foundation ring 1;
(4)The arrangement conversion support 4 in vertical drilling 6, and the gap grouting 7 between vertical drilling 6 and conversion support 4 of constructing;
(5)Vertical bar planting 8 is arranged in the top surface of concrete stub 2 and increases concrete 9.

Claims (2)

1. a kind of conversion method for supporting for being used to reinforce blower foundation connection, it is characterised in that the conversion method for supporting is by turning Support component realization is changed, the conversion support component is by foundation ring (1), concrete stub (2), foundation ring slit region (3) and turns Change support (4) composition, foundation ring (1) the insertion concrete stub (2), between the foundation ring (1) and concrete stub (2) Provided with foundation ring slit region (3);When connecting setting conversion support (4) to basis, comprise the following steps that:
(1)The both sides for being located at concrete stub (2) inside points in foundation ring (1) drill through some grout holes (5), make the grout hole (5) foundation ring slit region (3) is led to;
(2)By grout hole (5) to foundation ring slit region (3) pressure grouting, make foundation ring slit region (3) and grout hole (5) complete The full high-strength grouting material of portion's filling;
(3)Several vertical drillings (6) of arrangement on the outside of foundation ring (1), vertical (6) bottom that drills are drilled into foundation ring (1);Then In vertically arrangement conversion support (4) in drilling (6), and the gap constructed between vertical drilling (6) and conversion support (4) is in the milk (7);Conversion support (4) lower end holds out against foundation ring (1), foundation ring (1) is largely forced through conversion support (4) and is transferred to post Elevated section concrete (9) at the top of pier (2), reduce the stress concentration of foundation ring (1) bottom, improve the bearing capacity of concrete and resist Fatigue behaviour;
(4)Vertical bar planting (8) is arranged in the top surface of concrete stub (2) and increases concrete (9).
A kind of 2. conversion method for supporting for being used to reinforce blower foundation connection according to claim 1, it is characterised in that institute State conversion support (4) to be made up of steel member (10) and the end plate (11) being welded at the top of steel member, end plate (11) exposes concrete Stub (2) certain altitude, is anchored in and increases in concrete (9).
CN201710650040.4A 2017-08-02 2017-08-02 A kind of conversion method for supporting connected for reinforcing blower foundation Expired - Fee Related CN107366298B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710650040.4A CN107366298B (en) 2017-08-02 2017-08-02 A kind of conversion method for supporting connected for reinforcing blower foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710650040.4A CN107366298B (en) 2017-08-02 2017-08-02 A kind of conversion method for supporting connected for reinforcing blower foundation

Publications (2)

Publication Number Publication Date
CN107366298A true CN107366298A (en) 2017-11-21
CN107366298B CN107366298B (en) 2019-04-12

Family

ID=60309317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710650040.4A Expired - Fee Related CN107366298B (en) 2017-08-02 2017-08-02 A kind of conversion method for supporting connected for reinforcing blower foundation

Country Status (1)

Country Link
CN (1) CN107366298B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241777A (en) * 2019-04-18 2019-09-17 天津津港基础设施养护运营工程管理有限公司 The repairing and reinforcement structure of one plants case cylinder breakwater
CN110629784A (en) * 2019-09-25 2019-12-31 江苏筑岩建设有限公司 Fan foundation prestressed concrete additional strengthening
CN110644525A (en) * 2019-10-22 2020-01-03 中联建设集团股份有限公司 Secondary protection ring structure of foundation of wind driven generator with prestressed anchor bolts
CN110700334A (en) * 2019-09-25 2020-01-17 江苏筑岩建设有限公司 Rapid repairing method for fan foundation
CN113026796A (en) * 2021-03-17 2021-06-25 上海久坚加固科技股份有限公司 Foundation reinforcing structure and method for foundation of wind power generation tower

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009035884A (en) * 2007-07-31 2009-02-19 Tokyo Electric Power Co Inc:The Lift-up method for steel tower
CN202500373U (en) * 2011-12-13 2012-10-24 河南省电力勘测设计院 Annular rod column base joint reinforcement mechanism
CN202787296U (en) * 2012-03-27 2013-03-13 辽宁电力勘测设计院 Foundation structure of anchor pole blower fan
CN204690778U (en) * 2015-04-30 2015-10-07 湖南科技大学 A kind of foundation ring of wind generating set of stressed good overturn-preventing
CN105888356A (en) * 2016-05-11 2016-08-24 成都市东方电力线路构件厂 Iron tower with foundation structure reinforced
CN106193141A (en) * 2016-07-20 2016-12-07 天津大学 A kind of earthquake impaired pier footing method for reinforcing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009035884A (en) * 2007-07-31 2009-02-19 Tokyo Electric Power Co Inc:The Lift-up method for steel tower
CN202500373U (en) * 2011-12-13 2012-10-24 河南省电力勘测设计院 Annular rod column base joint reinforcement mechanism
CN202787296U (en) * 2012-03-27 2013-03-13 辽宁电力勘测设计院 Foundation structure of anchor pole blower fan
CN204690778U (en) * 2015-04-30 2015-10-07 湖南科技大学 A kind of foundation ring of wind generating set of stressed good overturn-preventing
CN105888356A (en) * 2016-05-11 2016-08-24 成都市东方电力线路构件厂 Iron tower with foundation structure reinforced
CN106193141A (en) * 2016-07-20 2016-12-07 天津大学 A kind of earthquake impaired pier footing method for reinforcing

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241777A (en) * 2019-04-18 2019-09-17 天津津港基础设施养护运营工程管理有限公司 The repairing and reinforcement structure of one plants case cylinder breakwater
CN110629784A (en) * 2019-09-25 2019-12-31 江苏筑岩建设有限公司 Fan foundation prestressed concrete additional strengthening
CN110700334A (en) * 2019-09-25 2020-01-17 江苏筑岩建设有限公司 Rapid repairing method for fan foundation
CN110700334B (en) * 2019-09-25 2021-04-27 江苏筑岩建设有限公司 Rapid repairing method for fan foundation
CN110644525A (en) * 2019-10-22 2020-01-03 中联建设集团股份有限公司 Secondary protection ring structure of foundation of wind driven generator with prestressed anchor bolts
CN113026796A (en) * 2021-03-17 2021-06-25 上海久坚加固科技股份有限公司 Foundation reinforcing structure and method for foundation of wind power generation tower
CN113026796B (en) * 2021-03-17 2023-12-15 上海久坚加固科技股份有限公司 Wind power generation tower foundation ring foundation reinforcing structure and method

Also Published As

Publication number Publication date
CN107366298B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN107366298B (en) A kind of conversion method for supporting connected for reinforcing blower foundation
CN100567659C (en) The base configuration of iron tower
CN106193141B (en) A kind of impaired pier footing method for reinforcing of earthquake
CN206396816U (en) A kind of blower foundation various dimensions ruggedized construction
CN103628473A (en) Composite type combined piles and construction method thereof
CN108547641A (en) The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel
CN108643602A (en) A kind of outsourcing anchor steel ruggedized construction suitable for concrete beam and column node
CN105040726B (en) A kind of method for applying ring orientation prestress is connected to blower foundation ring
CN107100192A (en) A kind of foundation ring of wind generating set local stiffening device and reinforcement means
CN105421445A (en) Construction method for non-prestressed centrifugal high-strength concrete pile planted pile
CN106049563B (en) Earthquake is damaged pier footing reinforcing system
CN205444968U (en) Bar planting anchor structure
CN109578011B (en) Supporting structure in municipal tunnel and construction method thereof
CN104295112A (en) Reinforced concrete column upper-connected concrete filled steel tube column connecting structure and construction method thereof
CN109930624A (en) A kind of embedding petrographic province blower foundation of offshore wind farm and construction method
CN104074183A (en) Drilling and concrete injected root composite pile implanting pile structure and construction method
CN205917713U (en) Truss -like steel pipe slip casting pile foundation
CN104372793A (en) Anti-floating method used for existing basement by adopting pre-stressed anchor cables in jet grouting pile method
CN207277360U (en) A kind of conversion support component for being used to reinforce blower foundation connection
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN106245668A (en) A kind of truss-like pile foundation and construction method thereof
CN207794067U (en) Compound mini pile is perfused in concrete filled steel tube borehole
KR20130103929A (en) Complex pile for improving end bearing capacity of bored precast pile
CN206942196U (en) The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework
CN208472721U (en) A kind of anchor pole constructed in loose media stratum using hand air drill

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412

CF01 Termination of patent right due to non-payment of annual fee