CN107366298A - A kind of conversion method for supporting for being used to reinforce blower foundation connection - Google Patents
A kind of conversion method for supporting for being used to reinforce blower foundation connection Download PDFInfo
- Publication number
- CN107366298A CN107366298A CN201710650040.4A CN201710650040A CN107366298A CN 107366298 A CN107366298 A CN 107366298A CN 201710650040 A CN201710650040 A CN 201710650040A CN 107366298 A CN107366298 A CN 107366298A
- Authority
- CN
- China
- Prior art keywords
- foundation ring
- concrete
- foundation
- slit region
- conversion support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000006243 chemical reaction Methods 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims abstract description 11
- 239000004567 concrete Substances 0.000 claims abstract description 43
- 239000011440 grout Substances 0.000 claims abstract description 19
- 238000005553 drilling Methods 0.000 claims abstract description 15
- 239000000463 material Substances 0.000 claims abstract description 6
- 239000008267 milk Substances 0.000 claims abstract 2
- 210000004080 milk Anatomy 0.000 claims abstract 2
- 235000013336 milk Nutrition 0.000 claims abstract 2
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims description 2
- 238000003780 insertion Methods 0.000 claims 1
- 230000037431 insertion Effects 0.000 claims 1
- 230000003014 reinforcing effect Effects 0.000 abstract description 6
- 230000035882 stress Effects 0.000 description 6
- 238000010276 construction Methods 0.000 description 3
- 230000002929 anti-fatigue Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000009429 distress Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Foundations (AREA)
Abstract
The present invention provides a kind of conversion method for supporting for being used to reinforce blower foundation connection, when setting conversion support is connected to basis available for the reinforcing for being completed the item base ring Joint failure that puts into operation, the both sides for being located at concrete stub inside points in foundation ring first drill through some grout holes, the grout hole is led to foundation ring slit region;Then foundation ring slit region and grout hole is made to be stuffed entirely with full high-strength grouting material the pressure grouting of foundation ring slit region by grout hole;Then several vertical drillings are arranged on the outside of foundation ring, vertical foot of hole is drilled into foundation ring;Then the arrangement conversion support in vertical drilling, and the gap between vertical drilling and conversion support of constructing is in the milk;Finally, the top surface in concrete stub arranges vertical bar planting and increases concrete.
Description
Technical field
The invention belongs to generation power foundation of wind power technical field of structures, and in particular to one kind is used to reinforce blower foundation connection
Conversion method for supporting.
Background technology
At present, single tube is wind power generation stepped is connected with bottom reinforcement bars concrete foundation frequently with pre- in reinforced concrete foundation
Bury foundation ring, top tower is connected realization with foundation ring by flange.However, because foundation ring length of embedment is shallow, and be non-pre-
Stress structure, top tower is connected using foundation ring and base foundation has following defect:The basic existing reinforcing bar of ring region has again
Foundation ring is strengthened, and region below only has reinforcing bar, because strength and stiffness mutation causes because caused by concrete hardening contraction and stress
Crack is concentrated between foundation ring and bottom plate, fracture width increase;Foundation ring isolates inside and outside concrete, due to steel and concrete
Two kinds of material property differences, thermal coefficient of expansion is different, deformation can not be coordinated, and temperature action, load work, frost heave action etc. make basis
The gap of ring and concrete is continuously increased, and deteriorates both anchorage effects;Under blower fan reciprocating fatigue load action, foundation ring connection
Region distress in concrete, gap are continuously increased development, and then foundation ring vibrated, rocked in base concrete, produce to mixed
Coagulate the percussion of soil.
The project problems that cause to have put into operation of stress defect existing for the connection of basis gradually break out, and have a strong impact on the fortune of blower fan
Row quality and safe for operation.
The content of the invention
It is an object of the invention to provide a kind of conversion method for supporting for being used to reinforce blower foundation connection, can be used for
Build up the reinforcing for the item base ring Joint failure that puts into operation.
A kind of conversion method for supporting for being used to reinforce blower foundation connection proposed by the present invention, the conversion method for supporting lead to
The realization of conversion support component is crossed, the conversion support component is by foundation ring 1, concrete stub 2, foundation ring slit region 3 and conversion
The composition of support 4, the foundation ring 1 insert concrete stub 2, basic circumferential weld are provided between the foundation ring 1 and concrete stub 2
Gap area 3;When connecting setting conversion support 4 to basis, comprise the following steps that:
(1)The both sides for being located at the inside points of concrete stub 2 in foundation ring 1 drill through some grout holes 5, lead to the grout hole 5
Foundation ring slit region 3;
(2)By grout hole 5 to the pressure grouting of foundation ring slit region 3, foundation ring slit region 3 and grout hole 5 is set to be stuffed entirely with completely
High-strength grouting material;
(3)Several vertical drillings 6 of arrangement in the outside of foundation ring 1, vertical 6 bottoms that drill are drilled into foundation ring 1;Then vertically boring
Arrangement conversion support 4 in hole 6, and the gap grouting 7 between vertical drilling 6 and conversion support 4 of constructing;4 lower ends of conversion support top
Tight foundation ring 1, the major part of foundation ring 1 is forced through conversion support 4 and be transferred to the top Elevated section concrete 9 of stub 2, reduce
The stress concentration of the bottom of foundation ring 1, improve the bearing capacity and anti-fatigue performance of concrete;
(4)Vertical bar planting 8 is arranged in the top surface of concrete stub 2 and increases concrete 9.
In the present invention, the conversion support 4 is made up of steel member 10 and the end plate 11 being welded at the top of steel member, end plate 11
Expose the certain altitude of concrete stub 2, be anchored in and increase in concrete 9.
The beneficial effects of the present invention are:
1. a kind of conversion method for supporting for being used to reinforce blower foundation connection proposed by the present invention, simple in construction, reasonable stress can
For being completed the reinforcing for the item base ring Joint failure that puts into operation.
2. conversion support is set, foundation ring is largely forced through conversion support and be transferred to Elevated section at the top of stub
Concrete, reduce the stress concentration of foundation ring bottom, improve the bearing capacity and anti-fatigue performance of concrete.
3. the present invention is used to be completed the reinforcing for the item base ring Joint failure that puts into operation, thickeies ring beam with reference to top and arrange
Apply, the buried depth of foundation ring can be increased, improve binding effect of the concrete to foundation ring, and do not destroy original structure.
4. simple operation of the present invention, easy for construction.
Brief description of the drawings
Fig. 1 connects front view for basis of the present invention.
Fig. 2 is the front view that the present invention applies.
Fig. 3 is the top view that the present invention applies.
Label in figure:Ring based on 1,2 be ring slit region based on concrete stub, 3,4 be to change support, 5 as grouting
Hole, 6 for vertical drilling, 7 be gap grouting, 8 be vertical bar planting, 9 for increase concrete, 10 be steel member, 11 be end plate.
Embodiment
The present invention is further illustrated below by embodiment combination accompanying drawing.
Embodiment 1:
As shown in figure 1, during basic Joint failure, between foundation ring 1 and concrete stub 2, foundation ring gap area 3 is produced.
When the present invention is applied to reinforce blower foundation connection, it is located at the two of the inside points of concrete stub 2 in foundation ring 1 first
Sidetracking takes some grout holes 5, the grout hole 5 is led to foundation ring slit region 3;Then by grout hole 5 to foundation ring gap
The pressure grouting of area 3, foundation ring slit region 3 and grout hole 5 is set to be stuffed entirely with full high-strength grouting material;Then the cloth on the outside of foundation ring
Several vertical drillings 6 are put, vertical 6 bottoms that drill are drilled into foundation ring 1;Then the arrangement conversion support 4 in vertical drilling 6, and
Gap grouting 7 between the vertical drilling 6 of construction and conversion support 4;Finally, vertical bar planting 8 is arranged in the top surface of concrete stub 2
And increase concrete 9.The conversion support 4 is made up of steel member 10 and the end plate 11 being welded at the top of round steel, and end plate 11 exposes
The certain altitude of concrete stub 2, is anchored in and increases in concrete 9.
Implementation steps are as follows:
(1)1 liang of sidetracking grout hole 5 of foundation ring, injection pressure water or pressure-air cleaning and dry-basis ring 1 in both sides grout hole 5
The foundation ring gap area 3 of both sides;
(2)With slip casing by pressure material along grout hole 5, foundation ring gap area 3 is filled;
(3)Several vertical drillings 6 are arranged on the outside of foundation ring, vertical 6 bottoms that drill are drilled into foundation ring 1;
(4)The arrangement conversion support 4 in vertical drilling 6, and the gap grouting 7 between vertical drilling 6 and conversion support 4 of constructing;
(5)Vertical bar planting 8 is arranged in the top surface of concrete stub 2 and increases concrete 9.
Claims (2)
1. a kind of conversion method for supporting for being used to reinforce blower foundation connection, it is characterised in that the conversion method for supporting is by turning
Support component realization is changed, the conversion support component is by foundation ring (1), concrete stub (2), foundation ring slit region (3) and turns
Change support (4) composition, foundation ring (1) the insertion concrete stub (2), between the foundation ring (1) and concrete stub (2)
Provided with foundation ring slit region (3);When connecting setting conversion support (4) to basis, comprise the following steps that:
(1)The both sides for being located at concrete stub (2) inside points in foundation ring (1) drill through some grout holes (5), make the grout hole
(5) foundation ring slit region (3) is led to;
(2)By grout hole (5) to foundation ring slit region (3) pressure grouting, make foundation ring slit region (3) and grout hole (5) complete
The full high-strength grouting material of portion's filling;
(3)Several vertical drillings (6) of arrangement on the outside of foundation ring (1), vertical (6) bottom that drills are drilled into foundation ring (1);Then
In vertically arrangement conversion support (4) in drilling (6), and the gap constructed between vertical drilling (6) and conversion support (4) is in the milk
(7);Conversion support (4) lower end holds out against foundation ring (1), foundation ring (1) is largely forced through conversion support (4) and is transferred to post
Elevated section concrete (9) at the top of pier (2), reduce the stress concentration of foundation ring (1) bottom, improve the bearing capacity of concrete and resist
Fatigue behaviour;
(4)Vertical bar planting (8) is arranged in the top surface of concrete stub (2) and increases concrete (9).
A kind of 2. conversion method for supporting for being used to reinforce blower foundation connection according to claim 1, it is characterised in that institute
State conversion support (4) to be made up of steel member (10) and the end plate (11) being welded at the top of steel member, end plate (11) exposes concrete
Stub (2) certain altitude, is anchored in and increases in concrete (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710650040.4A CN107366298B (en) | 2017-08-02 | 2017-08-02 | A kind of conversion method for supporting connected for reinforcing blower foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710650040.4A CN107366298B (en) | 2017-08-02 | 2017-08-02 | A kind of conversion method for supporting connected for reinforcing blower foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107366298A true CN107366298A (en) | 2017-11-21 |
CN107366298B CN107366298B (en) | 2019-04-12 |
Family
ID=60309317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710650040.4A Expired - Fee Related CN107366298B (en) | 2017-08-02 | 2017-08-02 | A kind of conversion method for supporting connected for reinforcing blower foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107366298B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241777A (en) * | 2019-04-18 | 2019-09-17 | 天津津港基础设施养护运营工程管理有限公司 | The repairing and reinforcement structure of one plants case cylinder breakwater |
CN110629784A (en) * | 2019-09-25 | 2019-12-31 | 江苏筑岩建设有限公司 | Fan foundation prestressed concrete additional strengthening |
CN110644525A (en) * | 2019-10-22 | 2020-01-03 | 中联建设集团股份有限公司 | Secondary protection ring structure of foundation of wind driven generator with prestressed anchor bolts |
CN110700334A (en) * | 2019-09-25 | 2020-01-17 | 江苏筑岩建设有限公司 | Rapid repairing method for fan foundation |
CN113026796A (en) * | 2021-03-17 | 2021-06-25 | 上海久坚加固科技股份有限公司 | Foundation reinforcing structure and method for foundation of wind power generation tower |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009035884A (en) * | 2007-07-31 | 2009-02-19 | Tokyo Electric Power Co Inc:The | Lift-up method for steel tower |
CN202500373U (en) * | 2011-12-13 | 2012-10-24 | 河南省电力勘测设计院 | Annular rod column base joint reinforcement mechanism |
CN202787296U (en) * | 2012-03-27 | 2013-03-13 | 辽宁电力勘测设计院 | Foundation structure of anchor pole blower fan |
CN204690778U (en) * | 2015-04-30 | 2015-10-07 | 湖南科技大学 | A kind of foundation ring of wind generating set of stressed good overturn-preventing |
CN105888356A (en) * | 2016-05-11 | 2016-08-24 | 成都市东方电力线路构件厂 | Iron tower with foundation structure reinforced |
CN106193141A (en) * | 2016-07-20 | 2016-12-07 | 天津大学 | A kind of earthquake impaired pier footing method for reinforcing |
-
2017
- 2017-08-02 CN CN201710650040.4A patent/CN107366298B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009035884A (en) * | 2007-07-31 | 2009-02-19 | Tokyo Electric Power Co Inc:The | Lift-up method for steel tower |
CN202500373U (en) * | 2011-12-13 | 2012-10-24 | 河南省电力勘测设计院 | Annular rod column base joint reinforcement mechanism |
CN202787296U (en) * | 2012-03-27 | 2013-03-13 | 辽宁电力勘测设计院 | Foundation structure of anchor pole blower fan |
CN204690778U (en) * | 2015-04-30 | 2015-10-07 | 湖南科技大学 | A kind of foundation ring of wind generating set of stressed good overturn-preventing |
CN105888356A (en) * | 2016-05-11 | 2016-08-24 | 成都市东方电力线路构件厂 | Iron tower with foundation structure reinforced |
CN106193141A (en) * | 2016-07-20 | 2016-12-07 | 天津大学 | A kind of earthquake impaired pier footing method for reinforcing |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241777A (en) * | 2019-04-18 | 2019-09-17 | 天津津港基础设施养护运营工程管理有限公司 | The repairing and reinforcement structure of one plants case cylinder breakwater |
CN110629784A (en) * | 2019-09-25 | 2019-12-31 | 江苏筑岩建设有限公司 | Fan foundation prestressed concrete additional strengthening |
CN110700334A (en) * | 2019-09-25 | 2020-01-17 | 江苏筑岩建设有限公司 | Rapid repairing method for fan foundation |
CN110700334B (en) * | 2019-09-25 | 2021-04-27 | 江苏筑岩建设有限公司 | Rapid repairing method for fan foundation |
CN110644525A (en) * | 2019-10-22 | 2020-01-03 | 中联建设集团股份有限公司 | Secondary protection ring structure of foundation of wind driven generator with prestressed anchor bolts |
CN113026796A (en) * | 2021-03-17 | 2021-06-25 | 上海久坚加固科技股份有限公司 | Foundation reinforcing structure and method for foundation of wind power generation tower |
CN113026796B (en) * | 2021-03-17 | 2023-12-15 | 上海久坚加固科技股份有限公司 | Wind power generation tower foundation ring foundation reinforcing structure and method |
Also Published As
Publication number | Publication date |
---|---|
CN107366298B (en) | 2019-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107366298B (en) | A kind of conversion method for supporting connected for reinforcing blower foundation | |
CN100567659C (en) | The base configuration of iron tower | |
CN106193141B (en) | A kind of impaired pier footing method for reinforcing of earthquake | |
CN206396816U (en) | A kind of blower foundation various dimensions ruggedized construction | |
CN103628473A (en) | Composite type combined piles and construction method thereof | |
CN108547641A (en) | The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel | |
CN108643602A (en) | A kind of outsourcing anchor steel ruggedized construction suitable for concrete beam and column node | |
CN105040726B (en) | A kind of method for applying ring orientation prestress is connected to blower foundation ring | |
CN107100192A (en) | A kind of foundation ring of wind generating set local stiffening device and reinforcement means | |
CN105421445A (en) | Construction method for non-prestressed centrifugal high-strength concrete pile planted pile | |
CN106049563B (en) | Earthquake is damaged pier footing reinforcing system | |
CN205444968U (en) | Bar planting anchor structure | |
CN109578011B (en) | Supporting structure in municipal tunnel and construction method thereof | |
CN104295112A (en) | Reinforced concrete column upper-connected concrete filled steel tube column connecting structure and construction method thereof | |
CN109930624A (en) | A kind of embedding petrographic province blower foundation of offshore wind farm and construction method | |
CN104074183A (en) | Drilling and concrete injected root composite pile implanting pile structure and construction method | |
CN205917713U (en) | Truss -like steel pipe slip casting pile foundation | |
CN104372793A (en) | Anti-floating method used for existing basement by adopting pre-stressed anchor cables in jet grouting pile method | |
CN207277360U (en) | A kind of conversion support component for being used to reinforce blower foundation connection | |
CN204174955U (en) | Reinforced concrete post connects steel core concrete column syndeton | |
CN106245668A (en) | A kind of truss-like pile foundation and construction method thereof | |
CN207794067U (en) | Compound mini pile is perfused in concrete filled steel tube borehole | |
KR20130103929A (en) | Complex pile for improving end bearing capacity of bored precast pile | |
CN206942196U (en) | The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework | |
CN208472721U (en) | A kind of anchor pole constructed in loose media stratum using hand air drill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190412 |
|
CF01 | Termination of patent right due to non-payment of annual fee |