CN107355249A - The natural ventilation system and method for traffic tunnel, subway or underground construction tunnel - Google Patents

The natural ventilation system and method for traffic tunnel, subway or underground construction tunnel Download PDF

Info

Publication number
CN107355249A
CN107355249A CN201710799096.6A CN201710799096A CN107355249A CN 107355249 A CN107355249 A CN 107355249A CN 201710799096 A CN201710799096 A CN 201710799096A CN 107355249 A CN107355249 A CN 107355249A
Authority
CN
China
Prior art keywords
tunnel
underground construction
subway
traffic
blowdown stack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710799096.6A
Other languages
Chinese (zh)
Inventor
耿业津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710799096.6A priority Critical patent/CN107355249A/en
Publication of CN107355249A publication Critical patent/CN107355249A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/18Gravity flow ventilation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/003Ventilation of traffic tunnels

Abstract

A kind of traffic tunnel, the natural ventilation system of subway or underground construction tunnel, the natural ventilation system formed including the more than one blowdown stack by being arranged on the outside of traffic tunnel or underground construction tunnel and main ventilation intake line, described main ventilation intake line is longitudinally lifted on by fixed support on traffic tunnel or the vault on underground construction tunnel top, described blowdown stack is arranged on the outside of traffic tunnel or underground construction tunnel by chimney base, and it is higher than traffic tunnel, subway or underground construction tunnel top, dust clean-up port and chimney base are provided with the bottom of described blowdown stack, dust clean-up port is also provided with the bottom of described main ventilation intake line.It is an advantage of the invention that:Dust waste gas can be more effectively excluded, significantly improves ventilation effect, reduces noise pollution, safety coefficient is improved, energy-conserving and environment-protective, reduces operation cost.

Description

The natural ventilation system and method for traffic tunnel, subway or underground construction tunnel
Technical field
The invention belongs to tunnel and the aeration technology field in underground construction tunnel, more particularly to a kind of traffic tunnel, subway Or the natural ventilation system and method in underground construction tunnel.
Background technology
Existing tunnel and subway etc. are all whether to lean on air blower and air exhauster to solve in construction or in operation Certainly ventilating problem, all it was tunnel internal to be aerated using forced exhaust mode, it is necessary to be set in tunnel multiple big in the past Type ventilating fan.That is, Large Copacity ventilating fan is set at certain intervals in tunnel top, by interim exhaust mode, by tunnel The foul atmosphere and dust in portion etc. are discharged to the outside.
Ventilating fan needs to be horizontally disposed with along tunnel direction in tunnel top center, it is ensured that the discharge directions of ventilating fan are consistent. But the method for setting multiple large-scale ventilating fans to be discharged to the outside the air of tunnel internal and dust in tunnel top, Even if multiple ventilating fans start simultaneously, tunnel internal air can not be also discharged to the outside sometimes.
If traffic tunnel(Operation tunnel)Or underground construction length of tunnel is longer, even if ventilating fan is to tunnel internal air It is exhausted, inner air can only also move limited distance, and just warp-wise tunnel is overall before next ventilating fan is reached Diffusion, causes next ventilating fan can not receive the inner air that a ventilating fan is brought, discharges it to outside, this Sample, ventilating fan can only substantially be such that inner air is circulated on the periphery in the setting field of ventilating fan, cause it is stuffy, together When the longer blower fan of distance power it is bigger, the quantity of unit is more, and China is the big country in individual more mountain areas, length, the quantity in tunnel All it is No. 1 in the world, more than 3000 meters of delimitation is super long tunnel only by taking vcehicular tunnel as an example, and China just builds before the end of the year 2012 Into at 441,1984.8 kilometers of cumulative length, 1000-3000 rice long tunnels are 3304.4 kilometers of cumulative lengths at 1944, railway Tunnel ten thousand metres(10 kilometers)More than for super long tunnel, China just has 70 many places , Sui expanding economy will also be unlimited Increase, the subway in city is also more and more, increasingly longer, capital expenditure is greatly increased around ventilation problem, leads in operation Wind expense is also high, by taking the freeway tunnel of mud mountain as an example, 10 kilometers of long tunnels, and 6000 square metres of Ventilator Room, blower fan Power total amount is 6400 watt thousand, in order to meet the requirement of air quantity, has beaten 4 ventilation inclined shafts again, wherein a most long inclined shaft is exactly 1500 meters, it is exactly 9,340,000 yuan to be often only the ventilation electricity charge, in order to ensure that ventilation uninterruptedly also standby in hole will be more than power of fan Generator, thus present tunnel ventilation mode not only increase pressure and difficulty of construction to construction investment and return enterprise operation In add cost, reduce benefit, the year ventilation of every kilometer of mud mountain tunnel takes more than 100 ten thousand yuan.
In addition, existing tunnel piercing and other underground jobs generally press wind and exhausting using machinery strength, run into perhaps More problems, for example, it is big apart from remote resistance, blasting fume, dust, row is not gone out, cause anoxic blasting fume poisoning etc., this series of problems Serious hinders construction and operation, and substantial amounts of equipment and substantial amounts of oil, electric energy have been put into order to solve existing ventilation problem Consumption, though so also fail to it is thorough solve the problems, such as, the disaster such as blasting fume poisoning, anoxic, gas, dust explosion happens occasionally, Various countries fail to break new road in face of this world's common point problem, simply the nothing in the quantity of equipment, on power, in automation The input of limit, result are only to see that the unrestricted increase problem of input cannot but solve at all, grow operating cost one and grow again, thing Therefore constantly occur, it is that thinkable method of ventilation is all done under reality, but it is ineffective, people, which generally both know about, is The air drag of the Nature gives the difficulty come with road ventilation strip, and the resistance without going to consider the Nature could change into ventilation Power, adopt the key point how flowing resistance being converted into, useful power is the present invention.
The content of the invention
It is good it is an object of the invention to provide a kind of ventilation effect, reduction noise pollution, raising safety coefficient, energy-conserving and environment-protective, The natural ventilation system in the traffic tunnel of operation cost, subway or underground construction tunnel is reduced, by the way of environmental protection naturally, energy The tunnel and the system and method for underground construction tunnel gravity-flow ventilation that flue gas in tunnel and dust are persistently discharged,
A kind of traffic tunnel of the present invention, the natural ventilation system in subway or underground construction tunnel, it is characterised in that:Including one More than be connected by the blowdown stack that is arranged on the outside of traffic tunnel, subway or underground construction tunnel and with blowdown stack be used for By waste gas and dust caused by traffic tunnel and underground construction tunnel suck and be fed through blowdown stack with control valve The natural ventilation system of main ventilation intake line composition, described main ventilation intake line are longitudinally lifted on friendship by fixed support On the vault in logical tunnel or underground construction tunnel top, described blowdown stack is arranged at traffic tunnel or ground by chimney base On the outside of lower construction tunnel, and it is higher than traffic tunnel or underground construction tunnel top, powder is provided with the bottom of described blowdown stack Dirt clean-up port and chimney base, dust clean-up port is also provided with the bottom of described main ventilation intake line 5.
Described natural ventilation system is " L " type natural ventilation system, by a blowdown stack and with blowdown stack one end One straight pipe type main ventilation intake line of connection is formed.
Natural ventilation system is " T " type natural ventilation system, is connected by a blowdown stack and with blowdown stack bottom Two straight tube main ventilation intake lines are formed.
Described natural ventilation system by two or more than two blowdown stacks and be connected with blowdown stack one end two Individual or more than two bending shape main ventilation intake lines are formed.
Branch vent road is uniformly provided with described main ventilation intake line.
It is described when setting " L " type natural ventilation system respectively at the both ends of traffic tunnel, subway or underground construction tunnel Two main ventilation main pipelines be extended down in traffic tunnel or underground construction tunnel, and the suction inlet of two main ventilation main pipelines is in tunnel Spacing after road insertion is more than 100 meters.
When using T-shape natural ventilation system in the middle part of traffic tunnel, at the top of traffic tunnel middle part Excavating shaft, blowdown stack upper end through and out vertical shaft outside, lower end is connected with the main ventilation intake line of both sides respectively.
A kind of traffic tunnel of natural ventilation system using traffic tunnel, subway or underground construction tunnel of the present invention Method of ventilation, it is characterised in that:
(1)Set the diameter of blowdown stack and height and main ventilation intake line straight according to the length of traffic tunnel or subway Footpath and length;
(2)In traffic tunnel or subway one end, " L " type natural ventilation system is set, blowdown stack and main ventilation intake line is close Connection is closed, in the presence of traffic tunnel internal-external temperature difference, pressure difference, the suction inlet of main ventilation intake line makes in the presence of negative pressure Cigarette, dirt and hot gas rise automatically, are inhaled into main ventilation intake line, are discharged by blowdown stack, fresh air is automatic from hole Hot-air in into traffic tunnel with vehicle discharge is combined, and generation convection current, hot gas makes the pollution air very first time from row upper Put chimney discharge.
A kind of underground construction tunnel of natural ventilation system using traffic tunnel, subway or underground construction tunnel of the present invention The method of ventilation in road, it is characterised in that:
(1)Set the diameter of blowdown stack and height and main ventilation intake line straight according to the length of traffic tunnel or subway Footpath and length;
(2)One T-shape natural ventilation system is set in the interposition of traffic tunnel or subway, opened at the top of tunnel middle part Dig vertical shaft, blowdown stack upper end through and out vertical shaft outside, lower end is connected with the main ventilation intake line of both sides respectively, is handing over In the presence of logical tunnel internal-external temperature difference, pressure difference, cigarette, dirt and hot gas rise automatically, two masters connected respectively with blowdown stack Divulge information after the suction inlet suction of intake line, then discharged by blowdown stack, fresh air enters from two holes and vehicle discharge Hot-air combines, and produces convection current, the pollution air very first time is discharged from blowdown stack.
A kind of underground construction tunnel of natural ventilation system using traffic tunnel, subway or underground construction tunnel of the present invention The method of ventilation in road, it is characterised in that:Underground construction tunnel one end set " L " type natural ventilation system, by blowdown stack with The closed connection of main ventilation intake line, main ventilation supervisor's mouth suction inlet are synchronously extend into underground construction tunnel with driving action, All the time at the top of operation field, made by the suction function of suction inlet in underground construction tunnel in gas suction ventilation supervisor, Discharged by blowdown stack.
It is an advantage of the invention that:The present invention has played the effect of smokestack, promoted as a result of above-mentioned natural ventilation system Suction inlet into main ventilation intake line forms pressure differential with hole, convection phenomena and chimney effect is combined, hole can Continue to be circulated to tunnel internal supply fresh air, build comfortable use environment.The main ventilation of the setting of tunnel internal Intake line will be combined from the cold air that tunnel enters with the hot-air that vehicle is discharged, and is produced convection current, is made pollution hot-air first Time discharges from chimney, realizes the Natural Circulation of tunnel internal air.
The present invention is different from the technology in the past using ventilating fan, will not produce noise, will not also produce heat, and do not have Power consumption, economic loss can be reduced, energy-conserving and environment-protective, reduces operation cost, improves Business Economic Benefit.
Brief description of the drawings
Fig. 1 is the natural ventilation system structural representation in traffic tunnel of the invention, subway or underground construction tunnel.
Fig. 2 is the underground construction tunnel of the natural ventilation system in traffic tunnel of the invention, subway or underground construction tunnel Both ends setting structure schematic diagram.
Fig. 3 is arranged on traffic tunnel for the natural ventilation system in the traffic tunnel of the present invention, subway or underground construction tunnel The structural representation of road middle part.
Fig. 4 is the traffic tunnel of the present invention, another implementation of the segmented natural ventilation system of subway or underground construction tunnel The structural representation of example.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, the natural ventilation system in a kind of traffic tunnel of the invention, subway or underground construction tunnel, It is characterized in that:Including the more than one blowdown stack 1 by being arranged on the outside of traffic tunnel or underground construction tunnel and with row Put being used for by waste gas caused by traffic tunnel, subway or underground construction tunnel and dust sucks and the row of being fed through of the connection of chimney 1 Put the natural ventilation system that the main ventilation intake line 5 with control valve of chimney forms, described main ventilation intake line 5 It is lifted on by the longitudinal direction of fixed support 6 on traffic tunnel or the vault on underground construction tunnel top, described blowdown stack 1 passes through Chimney base 3 is arranged on the outside of traffic tunnel, subway or underground construction tunnel, and is higher than traffic tunnel or underground construction tunnel top Portion, dust clean-up port 2 and chimney base 3 are provided with the bottom of described blowdown stack, in described main ventilation intake line 5 Bottom is also provided with dust clean-up port 4, and 9 be traffic tunnel or underground construction tunnel in figure, and the present invention is gone back in main ventilation intake line 5 Provided with control valve 7.
Natural ventilation system of the present invention is " L " type natural ventilation system, by a blowdown stack 1 and with discharging cigarette One straight pipe type main ventilation intake line 5 of the one end of chimney 1 connection is formed.
The present invention works as sets " L " type natural ventilation system at the both ends of traffic tunnel, subway or underground construction tunnel respectively When, described two main ventilation main pipelines 5 are extended down in traffic tunnel or underground construction tunnel, and two main ventilation main pipelines 5 Spacing of the suction inlet after tunnel holing through is more than 100 meters.In order to avoid main ventilation main pipeline 5 while the wind of pump drainage wind regime side, are caused Make the reduction of opposite side ventilation effect.
The height of blowdown stack 1 determines the size of pressure differential, can be in the thickness of blowdown stack according to the demand of exhaust air rate It is adjusted on height, the thickness of main ventilation intake line 5 selects according to exhaust air rate size.
Blowdown stack 1 preferably selects stainless sheet steel to make, and so long intensity of service life is good, reduces maintenance cost, chimney Several layers of bracing wires should be also suitably reinforced, avoid wind from losing.
Chimney base 3 is carried out with cement, firm basis, solid and reliable, solid durable.Main ventilation intake line 5 is using resistance Fire steel band reinforced polyethylene spiral ripple pipe(PE is managed)Pressure-resistant, crashworthiness, impact resistance tool elasticity are hardly damaged, and are loseing sunlight conditions In lower more than the 50 years life-span, in addition to ventilation condition needs are met, safety and feed channel can also be done in contingencies such as landslides. Blowdown stack bottom and the bottom of main ventilation intake line 5 will reserve dust clean-up port, and older laying dust is convenient to clean, dust cleaning Mouth will design closing door simultaneously, to ensure that blowdown stack, main ventilation intake line 5 and the positive confinement of dust clean-up port 4 are not leaked It can guarantee that ventilation effect is good.
As shown in figure 3, natural ventilation system of the present invention is " T " type natural ventilation system, by a blowdown stack 1 and two straight tube main ventilation intake lines 5 being connected with the bottom of blowdown stack 1 formed.When in the use of the middle part in tunnel During T-shape natural ventilation system, the excavating shaft 10 at the top of tunnel middle part, the upper end of blowdown stack 1 is through and out vertical shaft Outside 10, lower end is connected with the main ventilation intake line 5 of both sides respectively.Ensure two straight tube main ventilation intake lines 5 of pipe with The position bottom end seal of blowdown stack 1 is connected, and such traffic tunnel both ends ventilation effect is identical, while two main ventilation main pipelines 5 Spacing of the suction inlet after tunnel holing through more than 100 meters.In order to avoid main ventilation main pipeline 5 while the wind of pump drainage wind regime side, Cause the reduction of opposite side ventilation effect.
As shown in figure 4, the present invention described natural ventilation system by two or more than two blowdown stacks 1 and with discharge The one end of chimney 1 connection two or more than two bending shape main ventilation intake lines 5 formed.Solved with segmented method of ventilation Super long tunnel ventilating problem.This such as underground storehouse, factory, office occupancy and mining production is many places while used, and discharges cigarette Chimney 1 and main ventilation intake line 5 are identical with phase draft type, are a difference in that each separate space connects one from main pipeline Branch duct, and be in charge of one valve of installation at each and control is adjusted so that everywhere is attained by perfect ventilation Effect.
As shown in figure 1, a kind of natural ventilation system using traffic tunnel, subway or underground construction tunnel of the present invention The method of ventilation of traffic tunnel is:
(1) set the diameter of blowdown stack 1 and height and main ventilation intake line 5 straight according to the length of traffic tunnel or subway Footpath and length;
(2) the one end of traffic tunnel 9 sets " L " type natural ventilation system, and blowdown stack 1 and main ventilation intake line 5 is closed
Connection, in the presence of the internal-external temperature difference of traffic tunnel 9, pressure difference, the effect of the suction inlet of main ventilation intake line 5 in negative pressure Under cigarette, dirt and hot gas is increased automatically, be inhaled into main ventilation intake line 5, discharged by blowdown stack 1, fresh air is from hole Mouth enters to be combined with the hot-air of vehicle discharge, is produced convection current, the pollution air very first time is discharged from blowdown stack.
As shown in figure 3, a kind of natural ventilation system using traffic tunnel, subway or underground construction tunnel of the present invention The method of ventilation in underground construction tunnel is:
(1) the diameter of blowdown stack and height and main ventilation intake line 5 are set according to the length of traffic tunnel 9 or subway Diameter and length;
(2) the interposition of traffic tunnel 9 or subway sets T-shape natural ventilation system, is pushed up in traffic tunnel middle part
Portion's excavating shaft 10, general height more than 30 meters, the upper end of blowdown stack 1 through and out vertical shaft 10 outside, lower end respectively with The main ventilation intake line 5 of both sides is connected, in the presence of traffic tunnel internal-external temperature difference, pressure difference, cigarette, dirt and hot gas it is automatic on Rise, after the suction inlets of the two main ventilation intake lines 5 connect respectively with blowdown stack sucks, then discharged by blowdown stack, Fresh air enters from two holes to be combined with the hot-air of vehicle discharge, is produced convection current, is made the pollution air very first time from discharge Chimney is discharged.
The present invention can also use and set " L " type gravity-flow ventilation system respectively at the both ends in traffic tunnel or underground construction tunnel System, its method of ventilation are same as above.
As depicted in figs. 1 and 2, a kind of gravity-flow ventilation using traffic tunnel, subway or underground construction tunnel of the invention The method of ventilation in the underground construction tunnel of system, it is characterised in that:In underground construction tunnel one end, " L " type gravity-flow ventilation system is set System, by blowdown stack 1 with main ventilation intake line 5 is closed connects, main ventilation, which is responsible for mouth suction inlet and acted with driving, synchronously to be stretched into Into underground construction tunnel, all the time at the top of operation field, gas in underground construction tunnel is made by the suction function of suction inlet In body suction ventilation supervisor 5, discharged by blowdown stack 1.
As shown in figure 4, when traffic tunnel, the super speciality of subway or underground construction tunnel, when buried depth degree is special deep, do not possess vertical shaft Ventilation condition, while hole is height-limited, can not install major diameter main ventilation intake line 5 and be solved using segmented exhaust method Super long tunnel ventilating problem, described natural ventilation system using two or more than two blowdown stacks 1 and with blowdown stack 1 one The natural ventilation system of two or more than two compositions of bending shape main ventilation intake lines 5 of end connection, to ensure ventilation effect.

Claims (10)

  1. A kind of 1. natural ventilation system of traffic tunnel, subway or underground construction tunnel, it is characterised in that:Including more than one What is be connected by the blowdown stack being arranged on the outside of traffic tunnel or underground construction tunnel and with blowdown stack is used for traffic tunnel And waste gas and dust caused by underground construction tunnel suck and are fed through the suction of the main ventilation with control valve of blowdown stack The natural ventilation system of pipeline composition, described main ventilation intake line are longitudinally lifted on traffic tunnel or ground by fixed support On the vault on lower construction tunnel top, described blowdown stack is arranged at traffic tunnel or underground construction tunnel by chimney base Outside, and it is higher than traffic tunnel, subway or underground construction tunnel top, cleared up in the bottom of described blowdown stack provided with dust Mouth and chimney base, dust clean-up port is also provided with the bottom of described main ventilation intake line 5.
  2. 2. the natural ventilation system of traffic tunnel according to claim 1, subway or underground construction tunnel, its feature exists In:Described natural ventilation system is " L " type natural ventilation system, is connected by a blowdown stack and with blowdown stack one end One straight pipe type main ventilation intake line is formed.
  3. 3. the system of the gravity-flow ventilation of traffic tunnel according to claim 1, subway or underground construction tunnel, its feature exists In:Natural ventilation system is " T " type natural ventilation system, by a blowdown stack and be connected with blowdown stack both ends two Straight tube main ventilation intake line is formed.
  4. 4. the natural ventilation system of traffic tunnel according to claim 1, subway or underground construction tunnel, its feature exists In:Described natural ventilation system is by two or more than two blowdown stacks and be connected with blowdown stack one end two or two Above bending shape main ventilation intake line is formed.
  5. 5. the natural ventilation system of traffic tunnel according to claim 1, subway or underground construction tunnel, its feature exists In:Branch vent road is uniformly provided with described main ventilation intake line.
  6. 6. the natural ventilation system of traffic tunnel according to claim 2, subway or underground construction tunnel, its feature exists In:When setting " L " type natural ventilation system respectively at the both ends of traffic tunnel, subway or underground construction tunnel, described two Individual main ventilation main pipeline is extended down in traffic tunnel or underground construction tunnel, and the suction inlet of two main ventilation main pipelines passes through in tunnel Spacing after logical is more than 100 meters.
  7. 7. the natural ventilation system of traffic tunnel according to claim 3, subway or underground construction tunnel, its feature exists In:When using T-shape natural ventilation system in the middle part of traffic tunnel or subway, at the top of traffic tunnel middle part Excavating shaft, blowdown stack upper end through and out vertical shaft outside, lower end is connected with the main ventilation intake line of both sides respectively.
  8. 8. a kind of method of ventilation of the traffic tunnel of natural ventilation system using traffic tunnel, subway or underground construction tunnel, It is characterized in that:
    (1) set the diameter of blowdown stack and height and main ventilation intake line straight according to the length of traffic tunnel or subway Footpath and length;
    (2) " L " type natural ventilation system is set in traffic tunnel or subway one end, blowdown stack and main ventilation intake line is close Connection is closed, in the presence of traffic tunnel internal-external temperature difference, pressure difference, the suction inlet of main ventilation intake line makes in the presence of negative pressure Cigarette, dirt and hot gas rise automatically, are inhaled into main ventilation intake line, are discharged by blowdown stack, and fresh air enters from hole Combined with the hot-air of vehicle discharge, produce convection current, pollution air is discharged from blowdown stack.
  9. A kind of 9. ventilation side in the underground construction tunnel of natural ventilation system using traffic tunnel, subway or underground construction tunnel Method, it is characterised in that:
    (1) set the diameter of blowdown stack and height and main ventilation intake line straight according to the length of traffic tunnel or subway Footpath and length;
    (2) T-shape natural ventilation system is set in the interposition of traffic tunnel or subway, excavated at the top of tunnel middle part perpendicular Well, blowdown stack upper end through and out vertical shaft outside, lower end is connected with the main ventilation intake line of both sides respectively, in traffic tunnel In the presence of road internal-external temperature difference, pressure difference, cigarette, dirt and hot gas rise automatically, two main ventilations connected respectively with blowdown stack After the suction inlet suction of intake line, then discharged by blowdown stack, fresh air enters empty with the heat of vehicle discharge from two holes Depressed conjunction, convection current is produced, pollution air is discharged from blowdown stack.
  10. A kind of 10. ventilation in the underground construction tunnel of natural ventilation system using traffic tunnel, subway or underground construction tunnel Method, it is characterised in that:" L " type natural ventilation system is set in underground construction tunnel one end, blowdown stack and main ventilation are inhaled Enter pipeline closed connection, main ventilation supervisor's mouth suction inlet synchronously extend into underground construction tunnel with driving action, made all the time The top at industry scene, made by the suction function of suction inlet in underground construction tunnel in gas suction ventilation supervisor, pass through discharge Chimney is discharged.
CN201710799096.6A 2017-09-07 2017-09-07 The natural ventilation system and method for traffic tunnel, subway or underground construction tunnel Withdrawn CN107355249A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710799096.6A CN107355249A (en) 2017-09-07 2017-09-07 The natural ventilation system and method for traffic tunnel, subway or underground construction tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710799096.6A CN107355249A (en) 2017-09-07 2017-09-07 The natural ventilation system and method for traffic tunnel, subway or underground construction tunnel

Publications (1)

Publication Number Publication Date
CN107355249A true CN107355249A (en) 2017-11-17

Family

ID=60291303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710799096.6A Withdrawn CN107355249A (en) 2017-09-07 2017-09-07 The natural ventilation system and method for traffic tunnel, subway or underground construction tunnel

Country Status (1)

Country Link
CN (1) CN107355249A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185485A (en) * 2019-07-08 2019-08-30 中国电建集团成都勘测设计研究院有限公司 Heat pressing type Tunnel Ventilation System for High aititude High-geotemperature long tunnel
CN111764948A (en) * 2020-07-28 2020-10-13 重庆交通大学 Highway tunnel crowd disaster prevention system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007315143A (en) * 2006-05-29 2007-12-06 Kinki Regional Development Bureau Ministry Of Land Infrastructure & Transport Ventilation control method of road tunnel of vertical shaft intensive exhaust ventilation system
CN102482943A (en) * 2009-09-11 2012-05-30 李学守 Tunnel air-exchange device using a natural air-exchange method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007315143A (en) * 2006-05-29 2007-12-06 Kinki Regional Development Bureau Ministry Of Land Infrastructure & Transport Ventilation control method of road tunnel of vertical shaft intensive exhaust ventilation system
CN102482943A (en) * 2009-09-11 2012-05-30 李学守 Tunnel air-exchange device using a natural air-exchange method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185485A (en) * 2019-07-08 2019-08-30 中国电建集团成都勘测设计研究院有限公司 Heat pressing type Tunnel Ventilation System for High aititude High-geotemperature long tunnel
CN110185485B (en) * 2019-07-08 2023-12-05 中国电建集团成都勘测设计研究院有限公司 Hot-pressing type tunnel ventilation system for high-altitude high-ground-temperature long tunnel
CN111764948A (en) * 2020-07-28 2020-10-13 重庆交通大学 Highway tunnel crowd disaster prevention system

Similar Documents

Publication Publication Date Title
CN100595420C (en) Pressure regulating and distributing chamber ventilation construction method inside tunnel assist drift heading hole
CN104405430A (en) Ventilation system and ventilation method for single-cavern large-section extra-long tunnel construction
CN104314600B (en) Article three, the construction ventilation method of Parallel Tunnel
CN104746531B (en) A kind of stainless steel composite pipe gallery
CN108561169B (en) Combined ventilation design method for urban underground interchange tunnel
CN108301859A (en) A kind of Large Underground water seal cave depot group push-pull type construction ventilation method and its system
CN107355249A (en) The natural ventilation system and method for traffic tunnel, subway or underground construction tunnel
CN106593508A (en) Plateau high-gas extra long separating type tunnel construction ventilation method
CN208998272U (en) A kind of ventilation systems in underground car parks system
CN205858397U (en) Inclined shaft and positive hole ventilating system in constructing tunnel
CN112065486A (en) Ventilation method for long and large tunnel construction
WO2021196707A1 (en) Staged ventilation method based on construction of complex cavern group
CN205823681U (en) A kind of constructing tunnel blower fan
CN211008711U (en) Novel water sump capable of achieving independent ventilation in underground coal mine
CN204126663U (en) A kind of single hole big cross section Extra Long Tunnel Construction ventilation system
CN210798980U (en) Air exhaust purification type tunnel structure
CN107939435A (en) A kind of coal road dash system
CN209212274U (en) A kind of ventilation of underground mine tunnelling and dust removal integrated plant
CN210163939U (en) Air discharge and intake system for pressure flow sewage pipeline in comprehensive pipe gallery
CN207278289U (en) The ventilating system of city tunnel
CN111706381A (en) Air duct ventilation structure of extra-long single-head ventilation tunnel and ventilation method thereof
CN104676814A (en) Large underground cave depot construction network ventilation method
CN102121391A (en) Construction method for ventilation in construction of small-radius spiral tunnel
CN206831754U (en) A kind of tunnel VMC
CN104533500B (en) Underground coal mine natural ventilation system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171117

WW01 Invention patent application withdrawn after publication