CN107330192A - It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems - Google Patents

It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems Download PDF

Info

Publication number
CN107330192A
CN107330192A CN201710522145.1A CN201710522145A CN107330192A CN 107330192 A CN107330192 A CN 107330192A CN 201710522145 A CN201710522145 A CN 201710522145A CN 107330192 A CN107330192 A CN 107330192A
Authority
CN
China
Prior art keywords
fragment orbit
rope
systems
model
bim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710522145.1A
Other languages
Chinese (zh)
Inventor
苏林
贺欣
艾山丁
齐春雨
朱天华
陈虹玮
伍卫凡
徐凌雁
寇胜宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
China Railway Design Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp filed Critical China Railway Design Corp
Priority to CN201710522145.1A priority Critical patent/CN107330192A/en
Publication of CN107330192A publication Critical patent/CN107330192A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Amount of calculation method set based on the non-fragment orbit BIM up to rope V6 systems the invention discloses a kind of, it is characterised in that:Comprise the following steps:The calculation amount property set of step 101, non-fragment orbit in expanded definition IFC standards;Step 102, up to the three-dimensional framework that non-fragment orbit model is created in rope V6 systems;Step 103, up in rope V6 systems according to IFC standard development non-fragment orbit engineering templates and associated components;Step 104, instantiation generation non-fragment orbit threedimensional model and the automatic calculation amount attribute value for adding non-fragment orbit in generating process;Step 105, from the project management platform up to rope V6 systems export data file based on non-fragment orbit model;The engineering quantity report form template of step 106, making with computation rule;Step 107, parsing data file and engineering quantity report form template draw non-fragment orbit engineering quantity.This patent is intended to based on non-fragment orbit BIM models realize track engineering calculation amount.

Description

It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems
Technical field
The present invention relates to the construction calculation volume technical field in railway ballastless track design work, more particularly to one kind is based on Non-fragment orbit BIM up to rope V6 systems sets amount of calculation method.
Background technology
In traditional non-fragment orbit design work, calculating non-fragment orbit engineering quantity needs based on design drawing, hand Work calculates and fills in non-fragment orbit engineering quantity form, and calculation amount process is cumbersome and error-prone.After design drawing changes, need Manual entry and modification calculation amount file are wanted, not only labor intensive but also the time had been expended.And for the irregular location of geometrical body as circle is bent The result of calculation that the method for the use estimation envelope value such as concrete quantity, the expansion joint quantity in line and easement curve location is drawn is not It is enough accurate.
The comprehensive workbench for being integrated with multiple application software up to rope V6 systems, its function cover design setting model, Construction Simulation, Calculation Anaysis for Tunnel Structure and Project cooperation management, and IFC data storage standards can be applied.Up to rope V6 systems Data storage by the way of database, it is adaptable to big data quantity, need completely modeling track BIM design.
In non-fragment orbit BIM designs, result of design replaces traditional design drawing with BIM threedimensional models, therefore needs with BIM Non-fragment orbit engineering quantity is drawn based on model.In non-fragment orbit BIM designs, it is impossible to calculated using traditional means without tiny fragments of stone, coal, etc. rail Road engineering quantity, it is necessary to find new technological means and realize construction calculation volume in non-fragment orbit BIM design works.
The content of the invention
The technical problem to be solved in the present invention is:The problems of construction calculation volume in being designed for non-fragment orbit BIM, The present invention proposes a kind of to set amount of calculation method based on the non-fragment orbit BIM up to rope V6 systems, it is intended to using non-fragment orbit BIM models as Realize track engineering calculation amount in basis.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:
It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems, comprise the following steps:
The calculation amount property set of step 101, non-fragment orbit in expanded definition IFC standards;
Step 102, up to the three-dimensional framework that non-fragment orbit model is created in rope V6 systems;
Step 103, up in rope V6 systems according to IFC standard development non-fragment orbit engineering templates and associated components;
Step 104, instantiation generation non-fragment orbit threedimensional model and the automatic calculation for adding non-fragment orbit in generating process Measure attribute value;
Step 105, from the project management platform up to rope V6 systems export data file based on non-fragment orbit model;
The engineering quantity report form template of step 106, making with computation rule;
Step 107, parsing data file and engineering quantity report form template draw non-fragment orbit engineering quantity.
Preferably, the present invention additionally uses following technical scheme:
Further:The step 101 is specially:Expanded definition is used for the attribute for calculating the every engineering quantity of non-fragment orbit, The attribute includes:Different types of rail length, fastener number, track plates number, the consumption of base reinforcing bar and concrete.
Further:The step 102 is specially:Creating with superelevation up in cable system, being first according to design superelevation Rail parietal bone stringing and face, are then respectively created skeleton line, the track plates combined member of rail based on rail parietal bone stringing and face Skeleton coordinate, the skeleton surface frame of base and terminus plane and expansion joint skeleton surface frame and terminus plane.
Further:The step 103 is specially:Classify according to the IFC in IFC standards suitable for railroad track engineering and set up Various track templates and component, the track template and component include rail template, base template, templates for expansion joints and by rail The track plates combined member that guidance tape, fastener, adjustment layer, separation layer, cystosepiment are combined.
Further:The step 104 is specially:For rail template, base template and templates for expansion joints, using up to rope system The above-mentioned rail template of commands calls of system, base template and templates for expansion joints and corresponding skeleton, automatic example are dissolved Three-dimensional rail model, substructure model and expansion joint model;During instantiation template automatically, system calculates related rail automatically Numerical value is simultaneously assigned calculation amount property set by road engineering numerical quantity;It is real by the way of disposably assembling for track plates combined member Exampleization model.
Further:The step 105 is specially:The node of non-fragment orbit Model Structure Tree is selected from project management platform, Export total detail list data file by standard of IFC;Total detail list data file is contained with IFC criteria classifications without the tiny fragments of stone, coal, etc. The basic attribute set and the customized calculation amount property set of extension of model trajectory;Total detail list data file remains selected The set membership and assembling quantity of model below non-fragment orbit model structure tree node.
Further:The step 106 is specially:Last row content of track engineering quantity accounting report is advised to calculate Then, regular main contents are the IFC base attributes and calculation amount attribute of the corresponding calculative track engineering quantity project of description.
Further:The step 106 is specially:The different types of rail length of output is required according to computation rule, buckled Part number, track plates number, base reinforcing bar and concrete amount.
The present invention has the advantages and positive effects of:
By using above-mentioned technical proposal, the non-fragment orbit work based on BIM models is realized in non-fragment orbit BIM designs Journey calculation amount, and its computing capability is better than conventional two-dimensional design, result of calculation will more precisely, and computational efficiency is higher.This method Versatility is good, it is adaptable to various types of non-fragment orbit BIM designs, with obvious application value.The patent is realized Non-fragment orbit engineering quantity is calculated based on BIM models in non-fragment orbit BIM design works, is comprehensive realize without the tiny fragments of stone, coal, etc. Solid foundation has been established in track BIM design works, and suitable for different types of non-fragment orbit, based on the reality up to cable system There is obvious application value in the BIM design works of border.
Brief description of the drawings
Fig. 1 is the flow chart of the preferred embodiment of the present invention;
Embodiment
In order to further understand the content, features and effects of the present invention, hereby enumerating following examples, and coordinate accompanying drawing Describe in detail as follows:
It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems, comprise the following steps:
1. the calculation amount property set of the non-fragment orbit in expanded definition IFC standards
Expanded definition is used for the attribute for calculating the every engineering quantity of non-fragment orbit, such as different types of rail length, fastener Number, track plates number, consumption of base reinforcing bar and concrete etc..
2. in the three-dimensional framework up to establishment non-fragment orbit model in rope V6 systems
Rail parietal bone stringing and face with superelevation are being created up to being first according in cable system to design superelevation, then with rail parietal bone Be respectively created based on stringing and face the skeleton line of rail, the skeleton coordinate of track plates combined member, the skeleton surface frame of base and Terminus plane and the skeleton surface frame and terminus plane at expansion joint.
3. up in rope V6 systems according to IFC standard development non-fragment orbit engineering templates and associated components
Various track templates and component are set up according to the IFC classification in IFC standards suitable for railroad track engineering, is included Rail template, base template, templates for expansion joints and the rail combined by track plates, fastener, adjustment layer, separation layer, cystosepiment Guidance tape combined member.
4. instantiation generation non-fragment orbit threedimensional model and the automatic calculation amount attribute for adding non-fragment orbit in generating process Numerical value
For rail template, base template and templates for expansion joints, the above-mentioned template of commands calls up to cable system is utilized And corresponding skeleton, automatic example dissolves three-dimensional steel rail, base and expansion joint model;In the process of instantiation template automatically In, system calculates related track engineering numerical quantity and assigns calculation amount property set by numerical value automatically;For track plates combined member, adopt Model is instantiated with the mode disposably assembled.
5. export the data file based on non-fragment orbit model from the project management platform up to rope V6 systems
The node of non-fragment orbit Model Structure Tree is selected from project management platform, total detail list by standard of IFC is exported Data file;The data file is contained to be made by oneself with the basic attribute set and extension of the non-fragment orbit model of IFC criteria classifications The calculation amount property set of justice;The father and son that the data file remains the model below selected non-fragment orbit model structure tree node is closed System and assembling quantity.
6. make the track engineering quantity report form template with computation rule
Last row content of track engineering quantity accounting report is computation rule, and regular main contents accordingly need for description The IFC base attributes and calculation amount attribute for the track engineering quantity project to be calculated.
7. parsing data file and engineering quantity report form template draw non-fragment orbit engineering quantity
According to the different types of rail length of computation rule requirement output, fastener number, track plates number, base reinforcing bar And concrete amount etc..
As shown in Figure 1, a kind of step that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems of the present invention Suddenly include:
S1, non-fragment orbit in expanded definition IFC standards calculation amount property set;
S2, up to the three-dimensional framework that non-fragment orbit model is created in rope V6 systems;
S3, up in rope V6 systems according to IFC standard development non-fragment orbit engineering templates and associated components;
S4, instantiation generation non-fragment orbit threedimensional model and the automatic calculation amount attribute for adding non-fragment orbit in generating process Numerical value;
S5, from the project management platform up to rope V6 systems export data file based on non-fragment orbit model;
The track engineering quantity report form template of S6, making with computation rule;
S7, parsing data file and engineering quantity report form template draw non-fragment orbit engineering quantity.Wherein:
1. the calculation amount property set of the non-fragment orbit in expanded definition IFC standards
Use IFC international standards for non-fragment orbit BIM data storage standards, existing IFC standards can not meet non-fragment orbit BIM sets the demand of amount of calculation, therefore expanded definition corresponds to the attribute for being used to calculate the every engineering quantity of non-fragment orbit that IFC classifies Collection, IfcCREQR_RailQuantity property sets need to be defined by such as calculating rail length, and calculating fastener set number needs definition IfcCREQR_TrackFasteningQuantity property sets, concrete and reinforcing bar amount need to determine used in calculating track plates number, track plates Adopted IfcCREQR_TrackSlabQuantity property sets.
2. in the three-dimensional framework up to establishment non-fragment orbit model in rope V6 systems
Three-dimensional framework is main in non-fragment orbit BIM models to be play a part of to determine model space position.Up in cable system It is first according to design rail parietal bone stringing and face of the superelevation establishment with superelevation, is then created respectively based on rail parietal bone stringing and face Build skeleton line, the skeleton coordinate of track plates combined member, the skeleton surface frame of base and terminus plane and the expansion joint of rail Skeleton surface frame and terminus plane.Three-dimensional framework is mainly made up of point, line, surface and the elements of a fix, such as the skeleton line master of rail To be made up of the wire at the top of the connecting line between two one steel rails, rail;The skeleton line of track plates is primarily referred to as being used to determine rail The three-dimensional coordinate of guidance tape locus;The skeleton line of base is mainly the outline surface frame of base and for determining that every piece of base is long The terminus plane of degree.
3. up in rope V6 systems according to IFC standard development non-fragment orbit engineering templates and associated components
It is being the repeatable basic model utilized of parametrization up to engineering template in rope V6 systems and component.Marked according to IFC Various track templates and component are set up in IFC classification in standard suitable for railroad track engineering, include rail template, base mold Plate, templates for expansion joints and the track plates combined member combined by track plates, fastener, adjustment layer, separation layer, cystosepiment.Such as When setting up rail template, IfcCRTrackRail classes and be that parameter and input condition set up rail stage die using rail skeleton are selected Plate.
4. instantiation generation non-fragment orbit threedimensional model and the automatic calculation amount attribute for adding non-fragment orbit in generating process Numerical value
For rail template, base template and templates for expansion joints, the above-mentioned template of commands calls up to cable system is utilized And corresponding skeleton, automatic batch example dissolves three-dimensional steel rail, base and expansion joint model;In the mistake of instantiation template automatically Cheng Zhong, system calculates related track engineering numerical quantity and assigns calculation amount property set by numerical value automatically;For track plates combined member, Model is instantiated by the way of disposably assembling.Addition measures the function of base volume and by measured by such as in base template Numerical value assign the function of corresponding calculation amount attribute, can automatically obtain the number of base volume during batch is instantiated Value.
5. export the data file based on non-fragment orbit model from the project management platform up to rope V6 systems
Plug-in unit is increased to project management platform so that it possesses the function of export data file.Setting up non-fragment orbit model During the hierarchical relationship of non-fragment orbit model is determined according to the form of structure tree.From project management platform selection without tiny fragments of stone, coal, etc. rail The node of road Model Structure Tree, exports total detail list data file by standard of IFC;The data file is contained to be marked with IFC The basic attribute set and the customized calculation amount property set of extension of the non-fragment orbit model of quasi- classification;The data file remains institute The set membership and assembling quantity of the model below non-fragment orbit model structure tree node are selected, it is possible thereby to calculate the structure tree The correlation non-fragment orbit engineering quantity such as rail, fastener, track plates, base under node.
6. make the track engineering quantity report form template with computation rule
The actual demand designed according to non-fragment orbit BIM designs engineering quantity report form template, and the first trip of report form template is table Head, line number and columns are not limited.Every a line in addition to gauge outfit represents specific calculative quantities project, such as different type Rail length, different types of fastener set number, different types of track plates number etc..Track engineering quantity accounting report is most Latter row content is computation rule, and regular main contents are the IFC bases of the corresponding calculative track engineering quantity project of description This attribute and calculation amount attribute, the material composition and the model of model, the model of fastener and track plates of such as rail.
7. parsing data file and engineering quantity report form template draw non-fragment orbit engineering quantity
The total program of exploitation is based on derived data file, according in non-fragment orbit engineering quantity report form template Computation rule requires the different types of rail length of output, fastener number, track plates number, base reinforcing bar and concrete amount Deng thus final to realize based on the non-fragment orbit BIM design construction calculation volumes up to rope V6 systems.
Embodiments of the invention are described in detail above, but the content is only presently preferred embodiments of the present invention, It is not to be regarded as the practical range for limiting the present invention.Any changes and modifications in accordance with the scope of the present application, Within the patent covering scope that the present invention all should still be belonged to.

Claims (8)

1. a kind of set amount of calculation method based on the non-fragment orbit BIM up to rope V6 systems, it is characterised in that:Comprise the following steps:
The calculation amount property set of step 101, non-fragment orbit in expanded definition IFC standards;
Step 102, up to the three-dimensional framework that non-fragment orbit model is created in rope V6 systems;
Step 103, up in rope V6 systems according to IFC standard development non-fragment orbit engineering templates and associated components;
Step 104, instantiation generation non-fragment orbit threedimensional model and the automatic calculation amount category for adding non-fragment orbit in generating process Property numerical value;
Step 105, from the project management platform up to rope V6 systems export data file based on non-fragment orbit model;
The engineering quantity report form template of step 106, making with computation rule;
Step 107, parsing data file and engineering quantity report form template draw non-fragment orbit engineering quantity.
2. according to claim 1 set amount of calculation method based on the non-fragment orbit BIM up to rope V6 systems, it is characterised in that: The step 101 is specially:Expanded definition is used for the attribute for calculating the every engineering quantity of non-fragment orbit, and the attribute includes:No The rail length of same type, fastener number, track plates number, the consumption of base reinforcing bar and concrete.
3. according to claim 1 set amount of calculation method based on the non-fragment orbit BIM up to rope V6 systems, it is characterised in that: The step 102 is specially:Rail parietal bone stringing and face with superelevation are being created up in cable system, being first according to design superelevation, Then skeleton line, skeleton coordinate, the base of track plates combined member of rail are respectively created based on rail parietal bone stringing and face Skeleton surface frame and terminus plane and the skeleton surface frame and terminus plane at expansion joint.
4. according to claim 1 set amount of calculation method based on the non-fragment orbit BIM up to rope V6 systems, it is characterised in that: The step 103 is specially:According in IFC standards suitable for railroad track engineering IFC classification set up various track templates and Component, the track template and component include rail template, base template, templates for expansion joints and by track plates, fastener, adjustment The track plates combined member that layer, separation layer, cystosepiment are combined.
5. according to claim 1 set amount of calculation method based on the non-fragment orbit BIM up to rope V6 systems, it is characterised in that: The step 104 is specially:For rail template, base template and templates for expansion joints, the execution order tune up to cable system is utilized With above-mentioned rail template, base template and templates for expansion joints and corresponding skeleton, automatic example dissolves three-dimensional steel rail model, bottom Seat model and expansion joint model;During instantiation template automatically, system calculates related track engineering numerical quantity simultaneously automatically Calculation amount property set is assigned by numerical value;For track plates combined member, model is instantiated by the way of disposably assembling.
6. according to claim 1 set amount of calculation method based on the non-fragment orbit BIM up to rope V6 systems, it is characterised in that: The step 105 is specially:The node of non-fragment orbit Model Structure Tree is selected from project management platform, is exported using IFC as standard Total detail list data file;Total detail list data file is contained with the basic of the non-fragment orbit model of IFC criteria classifications Property set and the customized calculation amount property set of extension;Total detail list data file remains selected non-fragment orbit model knot The set membership and assembling quantity of model below paper mulberry node.
7. according to claim 1 set amount of calculation method based on the non-fragment orbit BIM up to rope V6 systems, it is characterised in that: The step 106 is specially:Last row content of track engineering quantity accounting report is computation rule, and regular main contents are The IFC base attributes and calculation amount attribute of the corresponding calculative track engineering quantity project of description.
8. according to claim 1 set amount of calculation method based on the non-fragment orbit BIM up to rope V6 systems, it is characterised in that: The step 106 is specially:The different types of rail length, fastener number, track plates of output are required according to computation rule Number, base reinforcing bar and concrete amount.
CN201710522145.1A 2017-06-30 2017-06-30 It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems Pending CN107330192A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710522145.1A CN107330192A (en) 2017-06-30 2017-06-30 It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710522145.1A CN107330192A (en) 2017-06-30 2017-06-30 It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems

Publications (1)

Publication Number Publication Date
CN107330192A true CN107330192A (en) 2017-11-07

Family

ID=60199350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710522145.1A Pending CN107330192A (en) 2017-06-30 2017-06-30 It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems

Country Status (1)

Country Link
CN (1) CN107330192A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107862133A (en) * 2017-11-06 2018-03-30 中国铁路设计集团有限公司 A kind of method of Mass production bridge pier BIM models
CN108090281A (en) * 2017-12-18 2018-05-29 中国铁路设计集团有限公司 A kind of railroad track BIM modeling methods based on up to rope V6 systems
CN108549748A (en) * 2018-03-27 2018-09-18 上海市城市建设设计研究总院(集团)有限公司 The modeling method of surface of concrete structure single line shape reinforcing bar based on CATIA
CN109376391A (en) * 2018-09-20 2019-02-22 中国铁路设计集团有限公司 A kind of tooth block design method based on BIM
CN109408906A (en) * 2018-09-30 2019-03-01 中铁第勘察设计院集团有限公司 The method of engineering quantity expression and statistics based on BIM model
CN110489936A (en) * 2019-09-26 2019-11-22 中国铁路设计集团有限公司 CRTSI type double-block type ballastless track design method on a kind of bridge
CN112464330A (en) * 2020-10-19 2021-03-09 中铁第四勘察设计院集团有限公司 BIM design method of CRTS III plate type ballastless track

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1318434A (en) * 2000-04-20 2001-10-24 王建 Application of cable-track in wall painting and cleaning
US20050132305A1 (en) * 2003-12-12 2005-06-16 Guichard Robert D. Electronic information access systems, methods for creation and related commercial models
CN102864704A (en) * 2012-10-26 2013-01-09 石家庄铁道大学 Device and method for steel rail surface online measurement and laser selective repair
CN105631124A (en) * 2015-12-28 2016-06-01 北京交通大学 Ballastless track damage analysis method performing combined solution based on definite element expansion and fatigue analysis
CN106055820A (en) * 2016-06-07 2016-10-26 铁道第三勘察设计院集团有限公司 CRTS (Slab Ballastless Track) III type track slab machining deviation detection method and informatization method for detection results

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1318434A (en) * 2000-04-20 2001-10-24 王建 Application of cable-track in wall painting and cleaning
US20050132305A1 (en) * 2003-12-12 2005-06-16 Guichard Robert D. Electronic information access systems, methods for creation and related commercial models
CN102864704A (en) * 2012-10-26 2013-01-09 石家庄铁道大学 Device and method for steel rail surface online measurement and laser selective repair
CN105631124A (en) * 2015-12-28 2016-06-01 北京交通大学 Ballastless track damage analysis method performing combined solution based on definite element expansion and fatigue analysis
CN106055820A (en) * 2016-06-07 2016-10-26 铁道第三勘察设计院集团有限公司 CRTS (Slab Ballastless Track) III type track slab machining deviation detection method and informatization method for detection results

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张磊: "大型桥梁工程的BIM设计体验", 《第十七届全国工程设计计算机应用大会论文集》 *
朱天华: "基于达索平台BIM建模工程数量计算方法", 《铁路技术创新》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107862133A (en) * 2017-11-06 2018-03-30 中国铁路设计集团有限公司 A kind of method of Mass production bridge pier BIM models
CN108090281A (en) * 2017-12-18 2018-05-29 中国铁路设计集团有限公司 A kind of railroad track BIM modeling methods based on up to rope V6 systems
CN108549748A (en) * 2018-03-27 2018-09-18 上海市城市建设设计研究总院(集团)有限公司 The modeling method of surface of concrete structure single line shape reinforcing bar based on CATIA
CN108549748B (en) * 2018-03-27 2021-08-27 上海市城市建设设计研究总院(集团)有限公司 CATIA-based modeling method for single linear steel bar on surface of concrete member
CN109376391A (en) * 2018-09-20 2019-02-22 中国铁路设计集团有限公司 A kind of tooth block design method based on BIM
CN109408906A (en) * 2018-09-30 2019-03-01 中铁第勘察设计院集团有限公司 The method of engineering quantity expression and statistics based on BIM model
CN109408906B (en) * 2018-09-30 2023-04-18 中铁第一勘察设计院集团有限公司 BIM model-based engineering quantity expression and statistics method
CN110489936A (en) * 2019-09-26 2019-11-22 中国铁路设计集团有限公司 CRTSI type double-block type ballastless track design method on a kind of bridge
CN112464330A (en) * 2020-10-19 2021-03-09 中铁第四勘察设计院集团有限公司 BIM design method of CRTS III plate type ballastless track

Similar Documents

Publication Publication Date Title
CN107330192A (en) It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems
CN109033671B (en) Revit-based building block filler wall model modeling method capable of calculating engineering quantity
CN107609321A (en) Continuous bridge parametric modeling method based on Revit platforms
CN107480374A (en) A kind of bridge BIM model creation methods based on CATIA
CN109800536A (en) One kind parameterizing tunnel model fast modeling method based on Revit and Dynamo
CN109885966B (en) Chute duct piece conflict and optimal arrangement method based on BIM technology
CN110362887A (en) A kind of fast modeling method based on Revit
Biancardo et al. Procedural modeling-based BIM approach for railway design
CN107045526A (en) A kind of pattern recognition method of electronics architectural working drawing
CN106202723A (en) A kind of BIM subway work method
CN113360583A (en) Construction progress visualization method based on BIM model and monitoring image comparison
CN108595883A (en) Two dimensionization railroad bridge three-dimensional BIM fast modeling methods
CN105608521A (en) Construction engineering quantity calculation method of underground excavation metro stations and running tunnels
CN111814243B (en) Tunnel design drawing and three-dimensional model automatic generation method
CN108090281A (en) A kind of railroad track BIM modeling methods based on up to rope V6 systems
CN109635485A (en) Tunnel Dynamic Construction information model component entity extended method based on IFC standard
CN110263451A (en) Arch rib processing construction method based on BIM
CN112184882A (en) Information processing method and device based on three-dimensional model of railway track
CN106844885A (en) Picture frame title block method for designing based on BIM technology
Ham et al. A study on application of bim (building information modeling) to pre-design in construction project
CN106777779A (en) A kind of railway culvert method for designing based on BIM
CN112348485A (en) BIM-based construction method for building construction project template
CN109376404A (en) Build outer profile model generating method, system, device and readable storage medium storing program for executing
CN111709081A (en) Construction cost control system based on BIM technology
AU2021102904A4 (en) A BIM-Based Optimization Method of Construction Cost and Construction Duration-Cost of Prefabricated Construction Project

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171107