CN107480374A - A kind of bridge BIM model creation methods based on CATIA - Google Patents

A kind of bridge BIM model creation methods based on CATIA Download PDF

Info

Publication number
CN107480374A
CN107480374A CN201710691509.9A CN201710691509A CN107480374A CN 107480374 A CN107480374 A CN 107480374A CN 201710691509 A CN201710691509 A CN 201710691509A CN 107480374 A CN107480374 A CN 107480374A
Authority
CN
China
Prior art keywords
level
assembly
catia
bridge
zero component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710691509.9A
Other languages
Chinese (zh)
Other versions
CN107480374B (en
Inventor
刘晓光
潘永杰
赵欣欣
蔡德钩
郭维
魏乾坤
芦永强
贾王育
李超
孙培培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
China State Railway Group Co Ltd
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
China Railway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Railway Engineering Research Institute of CARS, China Railway Corp filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201710691509.9A priority Critical patent/CN107480374B/en
Publication of CN107480374A publication Critical patent/CN107480374A/en
Application granted granted Critical
Publication of CN107480374B publication Critical patent/CN107480374B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Stored Programmes (AREA)

Abstract

The invention discloses a kind of bridge BIM model creation methods based on CATIA, including:Assembly and zero component name and the level division of bridge BIM models are determined, mind map is drawn using Mindjet MindManager, and .csv formatted files are exported with outline form;BOM tables are divided into coding scheme and the encoding list, is edited by EXCEL and arranges the two forms, level division is carried out to bridge BIM models using linear classification method, the title and numbering of assembly and zero component is generated, specifies the attribute information for needing to be loaded into assembly and zero component;By CATIA second development interface, BOM tables are imported, automatically generate structure tree and component file;PRODUCT attributes and the parameter attribute information in PART are automatically generated according to BOM tables;Based on the structure tree and file generated, CATIA geometrical model establishments are carried out.Beneficial effects of the present invention:The loading of non-geometry information and automatically generating for model file can be completed in batches, are realized that geological information creates the separation of work with non-geometry information, can be modeled according to the actual demand of certain moment.

Description

A kind of bridge BIM model creation methods based on CATIA
Technical field
The present invention relates to bridge technology field, in particular to a kind of bridge BIM model creation sides based on CATIA Method.
Background technology
It is conventional that following shortcoming is had based on CATIA progress bridge BIM modeling methods:(1) generally in analysis of two-dimensional CAD Just start the establishment of the progress threedimensional model in CATIA after drawing, easily cause institute's exhibition in the wrong and structure tree of assembly relation Show lack of standardization, the disunity of non-geometry information, or even the problems such as omission of some components be present;(2) letter of two-dimentional drawing reflection Breath is not complete, in the majority with geological information, and the BIM models created accordingly lack non-geometric attribute information, it is impossible to ensure compliance with the spy Determine the demand in stage;(3) general manually to realize associating for non-geometry information and BIM models, the process is excessively cumbersome, Easily there is careless mistake, be unfavorable for the follow-up use of BIM models.
The content of the invention
To solve the above problems, it is an object of the invention to provide a kind of bridge BIM model creation sides based on CATIA Method, the loading of non-geometry information and automatically generating for model file can be completed in batches, realizes geological information and non-geometric letter Breath creates the separation of work, can be modeled according to the actual demand of certain moment.
The invention provides a kind of bridge BIM model creation methods based on CATIA, this method includes:
Step 1, the basic data source of BOM tables is made:
According to bridge construction demand, assembly and zero component name and the level division of bridge BIM models are determined, is used Mindjet MindManager softwares draw mind map, and .csv formatted files are exported in the form of outline, as BOM tables Basic data source;
Step 2, BOM tables are made:
BOM tables are divided into two forms of coding scheme and the encoding list, the two tables are arranged by EXCEL software editings Lattice, level division is carried out to bridge BIM models using linear classification method, generates the title and numbering of assembly and zero component, it is clearly total Into with zero component needed for the attribute information that is loaded into;
Wherein,
The encoding list include level, coding digit, level content, particular content and coding five row, each level it is specific Content includes assembly and zero component name, is encoded to assembly coding corresponding with zero component;
Coding scheme includes several levels, and level title, coding and attribute are included in each level, and level is entitled total Into or zero component name, be encoded to corresponding to assembly or zero component and encode, attribute is the attribute that assembly or zero component correspondingly include Information;
Step 3, CATIA secondary development:
First by the second development interface of CATIA softwares, the BOM tables in steps for importing 2, structure tree and structure are automatically generated Part file;
Then PRODUCT attributes and PART are automatically generated according to BOM tables by secondary development tool in CATIA softwares Interior parameter attribute information, complete information addition.
Step 4, CATIA is modeled:
Based on the structure tree generated and component file, the establishment of CATIA geometrical models is carried out.
Further improved as of the invention, in step 2, the coding in the encoding list is according to mind map in step 1 Level divides relation and assembly and component name determines, level is arranged to 1+N level, and N is positive integer, have in all levels and An only component serial number level, component serial number level are component level.
Further improved as of the invention, in step 2, when making coding scheme form .csv will be exported in step 1 Formatted file is imported in EXCEL softwares as data source and is processed.
Improved as of the invention further, mind map include bridge BIM models assembly and zero component name and Hierarchical relationship.
Improved as of the invention further, assembly is bridge, and zero component includes the structure position of bridge, structure position Partial structurtes, the thin portion structure of partial structurtes.
Beneficial effects of the present invention are:
1st, the modeling method causes BIM modeling work automaticities to be enhanced, and may be implemented in CATIA softwares In assembly structure, automatically generating for model file be automatically imported with attribute information;
2nd, the modeling method is effectively reduced in component code and the mistake in name, and it is soft to take full advantage of EXCEL The data edition ability of part and the secondary development function of CATIA softwares, it is only necessary to which filling in BOM tables content according to flow can complete Cumbersome Data Enter is gone to work;
3rd, information integration is carried out using BOM tables, has unified model based coding and title, ensure that the correct of assembly relation and knot The specification of non-geometry information in paper mulberry, uniformly, reduce the problems such as leakage of component is built, make the distribution of modeling work, model integration with It is clearly bright and clear to join information, it is ensured that the continuity of information;
4th, the step of Part, solid are created directly in CATIA and is renamed is eliminated, and can be specific according to certain The demand in stage (such as design phase, construction stage, O&M stage) creates bridge BIM models;
5th, the expanded type for realizing structure tree with corresponding non-geometry information associates, the application of rock mechanism;
6th, suitable for Forward modeling flow and reverse modeling flow.
Brief description of the drawings
Fig. 1 is a kind of flow signal of bridge BIM model creation methods based on CATIA described in the embodiment of the present invention Figure;
Fig. 2 is the mind map exemplary plot in Fig. 1;
Fig. 3 is the encoding list exemplary plot in Fig. 1;
Fig. 4 is the coding scheme exemplary plot in Fig. 1.
Embodiment
The present invention is described in further detail below by specific embodiment and with reference to accompanying drawing.
As shown in figure 1, a kind of bridge BIM model creation methods based on CATIA of the embodiment of the present invention, this method bag Include:
Step 1, the basic data source of BOM tables is made:
According to bridge construction demand, assembly and zero component name and the level division of bridge BIM models are determined, is used Mindjet MindManager softwares draw mind map, and .csv formatted files are exported in the form of outline, as BOM tables Basic data source.
Mind map includes the assembly and zero component name and hierarchical relationship of bridge BIM models, wherein, assembly is bridge Beam, zero component include the structure position of bridge, the partial structurtes of structure position, the thin portion structure of partial structurtes.
For mind map example as shown in Fig. 2 assembly is bridge, structure position includes superstructure, bearing, damping and flexible Device, substructure and affiliated facility etc., assembly, structure position, partial structurtes and thin portion structure are in hierarchical relationship.Wherein, office Portion's structure include main truss, bridge deck, common bearing and pinner, spherical bearing and pinner, damper, deck expansion installation, pier, Basis, pumping equipment, pavement and railing etc., thin portion structure include montant, brace, top boom, lower boom, top bracing, lower flat Connection, sway bracing, top cap, pier body, pile foundation etc..
Step 2, BOM tables are made:
BOM tables are divided into two forms of coding scheme and the encoding list, the two tables are arranged by EXCEL software editings Lattice, level division is carried out to bridge BIM models using linear classification method, generates the title and numbering of assembly and zero component, it is clearly total Into with zero component needed for the attribute information that is loaded into.
Wherein,
The encoding list include level, coding digit, level content, particular content and coding five row, each level it is specific Content includes assembly and zero component name, is encoded to assembly coding corresponding with zero component.Coding in the encoding list is according to step The level division relation of mind map and assembly and component name determine that level can be arranged to 1+N layer according to demand in rapid 1 Level, N is positive integer, is had in all levels and an only component serial number level, and component serial number level is component level, structure The coding digit of part serial number level does not do hard requirement, can write according to demand.The encoding list example is as shown in figure 3, first It is classified as level title, second is classified as level coding digit, and the 3rd is classified as level content (including assembly, structure position, local knot Structure, thin portion structure etc.), the 4th is classified as particular content (including zero component such as assembly, structure position, partial structurtes, thin portion structure Title), the 5th is classified as coding (coding of corresponding assembly and each zero component), sets 8 levels altogether, wherein, level 7 is arranged to Component serial number level.
Coding scheme includes several levels, and level title, coding and attribute are included in each level, and level is entitled total Into or zero component name, be encoded to corresponding to assembly or zero component and encode, attribute is the attribute that assembly or zero component correspondingly include Information.When making coding scheme form, imported .csv formatted files are exported in step 1 as data source in EXCEL softwares It is processed.Coding scheme example is as shown in figure 4, include the list of 1+N level composition, in each level, first row Zero component name of level 1 is classified as the coding of level 1, second, the 3rd is classified as corresponding zero structure attribute.
Step 3, CATIA secondary development:
First by the second development interface of CATIA softwares, the BOM tables in steps for importing 2, structure tree and structure are automatically generated Part file;
PRODUCT attributes and PART are automatically generated according to BOM tables by secondary development tool in CATIA softwares afterwards Interior parameter attribute information, complete information addition.
Step 4, CATIA is modeled:
Based on the structure tree generated and component file, the establishment of CATIA geometrical models is carried out.
The content that BOM tables planted agent embodies in the present invention includes:(1) project level division (2) level coding (3) hierarchical relationship The attribute that method of bisector framework (4) assembly and zero component numbering (5) assembly and each assembly of zero component name (6) and zero component are included Information (IFD and drawing number in such as Fig. 4).The purpose that BOM tables make is to separate the geological information of model with non-geometry information, Data combing, whole level division informations in a manner of method of bisector in clear and definite project model, generation are carried out by EXCEL softwares Assembly and zero component name and numbering, while confirm the attribute information being loaded into needed for all units.This process ensure that level Division relation is accurate and meets demand, and due to have cured assembly and zero component name and numbering generating mode, it can be ensured that numbering With naming form unique and not repeating.The attribute information carried using EXCEL software finishing units, can be avoided in modeling process In repeat, reduce modeling work amount, effective raising efficiency.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (5)

  1. A kind of 1. bridge BIM model creation methods based on CATIA, it is characterised in that this method includes:
    Step 1, the basic data source of BOM tables is made:
    According to bridge construction demand, assembly and zero component name and the level division of bridge BIM models are determined, using Mindjet MindManager softwares draw mind map, and .csv formatted files, the basic number as BOM tables are exported in the form of outline According to source;
    Step 2, BOM tables are made:
    BOM tables are divided into two forms of coding scheme and the encoding list, the two forms are arranged by EXCEL software editings, adopted Level division is carried out to bridge BIM models with linear classification method, assembly is generated by the CONCATENATE functions in EXCEL softwares With the title and numbering of zero component, the attribute information being loaded into needed for assembly and zero component is specified;Wherein,
    The encoding list includes level, coding digit, level content, particular content and the row of coding five, the particular content of each level Including assembly and zero component name, assembly coding corresponding with zero component is encoded to;
    Coding scheme includes several levels, includes level title, coding and attribute in each level, the entitled assembly of level or Zero component name, it is encoded to corresponding to assembly or zero component and encodes, attribute is the attribute information that assembly or zero component correspondingly include;
    Step 3, CATIA secondary development:
    First by the second development interface of CATIA softwares, the BOM tables in steps for importing 2, structure tree and component text are automatically generated Part presss from both sides;
    PRODUCT attributes and PART are automatically generated according to BOM tables again by secondary development tool in CATIA softwares afterwards Interior parameter attribute information, complete information addition;
    Step 4, CATIA is modeled:
    Based on the structure tree generated and component file, the establishment of CATIA geometrical models is carried out.
  2. 2. bridge BIM model creation methods according to claim 1, it is characterised in that in step 2, in the encoding list Coding divides relation and assembly according to the level of mind map in step 1 and component name determines, level is arranged to 1+N layer Level, N is positive integer, has in all levels and an only component serial number level, component serial number level are component level.
  3. 3. bridge BIM model creation methods according to claim 1, it is characterised in that in step 2, making coding body When being form, will in step 1 export .csv formatted files as data source importing EXCEL softwares in be processed.
  4. 4. bridge BIM model creation methods according to claim 1, it is characterised in that mind map includes bridge BIM The assembly of model and zero component name and hierarchical relationship.
  5. 5. bridge BIM model creation methods according to claim 4, it is characterised in that assembly is bridge, and zero component includes The structure position of bridge, the partial structurtes of structure position, the thin portion structure of partial structurtes.
CN201710691509.9A 2017-08-14 2017-08-14 Bridge BIM model creation method based on CATIA Active CN107480374B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710691509.9A CN107480374B (en) 2017-08-14 2017-08-14 Bridge BIM model creation method based on CATIA

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710691509.9A CN107480374B (en) 2017-08-14 2017-08-14 Bridge BIM model creation method based on CATIA

Publications (2)

Publication Number Publication Date
CN107480374A true CN107480374A (en) 2017-12-15
CN107480374B CN107480374B (en) 2020-06-02

Family

ID=60599318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710691509.9A Active CN107480374B (en) 2017-08-14 2017-08-14 Bridge BIM model creation method based on CATIA

Country Status (1)

Country Link
CN (1) CN107480374B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108595766A (en) * 2018-03-27 2018-09-28 上海市城市建设设计研究总院(集团)有限公司 Beam lattice system bridge structure modeling method based on CATIA softwares
CN109033654A (en) * 2018-08-02 2018-12-18 南京东南建筑机电抗震研究院有限公司 A kind of science of bridge building component classification and coding method based on IFD
CN109086522A (en) * 2018-08-02 2018-12-25 南京东南建筑机电抗震研究院有限公司 The structural level modeling method towards Bridge Management & Maintenance process based on INVENTOR
CN109558688A (en) * 2018-12-07 2019-04-02 广联达科技股份有限公司 A kind of data creation method and device of Building Information Model BIM
CN109682303A (en) * 2019-01-31 2019-04-26 中铁四局集团第二工程有限公司 BIM technology-based curve PC track beam precise three-dimensional detection method
CN109902943A (en) * 2019-02-02 2019-06-18 宁波吉利汽车研究开发有限公司 Coding method, device and production executive system
CN110008534A (en) * 2019-03-18 2019-07-12 中交第二航务工程勘察设计院有限公司 A kind of model system level division methods and device based on BIM
CN110059121A (en) * 2019-03-12 2019-07-26 广州明珞汽车装备有限公司 A kind of method, system, device and the storage medium of quick export bill of materials
CN110347976A (en) * 2019-05-22 2019-10-18 广州明珞汽车装备有限公司 Method, system, device and the storage medium of quick equipment leading out data model
CN110502819A (en) * 2019-08-14 2019-11-26 上海市城市建设设计研究总院(集团)有限公司 The computer-implemented method of concrete-bridge strip member outer closure stirrup
CN110516381A (en) * 2019-08-30 2019-11-29 无锡金尚汽车技术开发有限公司 CATIA element term quickly changes method and device
CN111080209A (en) * 2019-12-27 2020-04-28 苏州浪潮智能科技有限公司 BOM verification method, system, device and storage medium
CN111581700A (en) * 2020-05-06 2020-08-25 中国电建集团成都勘测设计研究院有限公司 Method for adding BIM attribute and outputting BIM attribute table based on CATIA model
CN112818429A (en) * 2021-01-19 2021-05-18 中国建筑第八工程局有限公司 BIM model lightweight method based on digital-analog separation
CN113505413A (en) * 2021-06-04 2021-10-15 中国交通信息科技集团有限公司 BIM model multi-scene automatic coding method
CN113642067A (en) * 2021-07-02 2021-11-12 机械工业第九设计研究院有限公司 Method for classified coding of building component information model in automobile engineering industry
CN115168978A (en) * 2022-09-05 2022-10-11 中铁第五勘察设计院集团有限公司 Bridge building information model data construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101329664A (en) * 2007-06-19 2008-12-24 神讯电脑(昆山)有限公司 Method for conversing material inventory list
CN102073768A (en) * 2011-01-13 2011-05-25 中国水电顾问集团成都勘测设计研究院 Automatic arch dam pouring block plotting device and plotting method
CN104573163A (en) * 2013-10-29 2015-04-29 广州汽车集团股份有限公司 Automobile suspension parameterization design method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101329664A (en) * 2007-06-19 2008-12-24 神讯电脑(昆山)有限公司 Method for conversing material inventory list
CN102073768A (en) * 2011-01-13 2011-05-25 中国水电顾问集团成都勘测设计研究院 Automatic arch dam pouring block plotting device and plotting method
CN104573163A (en) * 2013-10-29 2015-04-29 广州汽车集团股份有限公司 Automobile suspension parameterization design method

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108595766A (en) * 2018-03-27 2018-09-28 上海市城市建设设计研究总院(集团)有限公司 Beam lattice system bridge structure modeling method based on CATIA softwares
CN108595766B (en) * 2018-03-27 2021-10-19 上海市城市建设设计研究总院(集团)有限公司 Beam lattice bridge structure modeling method based on CATIA software
CN109033654A (en) * 2018-08-02 2018-12-18 南京东南建筑机电抗震研究院有限公司 A kind of science of bridge building component classification and coding method based on IFD
CN109086522A (en) * 2018-08-02 2018-12-25 南京东南建筑机电抗震研究院有限公司 The structural level modeling method towards Bridge Management & Maintenance process based on INVENTOR
CN109086522B (en) * 2018-08-02 2023-05-16 南京东南建筑机电抗震研究院有限公司 Structure hierarchy modeling method for bridge management and maintenance process based on INVENTOR
CN109558688A (en) * 2018-12-07 2019-04-02 广联达科技股份有限公司 A kind of data creation method and device of Building Information Model BIM
CN109682303A (en) * 2019-01-31 2019-04-26 中铁四局集团第二工程有限公司 BIM technology-based curve PC track beam precise three-dimensional detection method
CN109902943B (en) * 2019-02-02 2021-03-19 宁波吉利汽车研究开发有限公司 Encoding method, device and production execution system
CN109902943A (en) * 2019-02-02 2019-06-18 宁波吉利汽车研究开发有限公司 Coding method, device and production executive system
CN110059121A (en) * 2019-03-12 2019-07-26 广州明珞汽车装备有限公司 A kind of method, system, device and the storage medium of quick export bill of materials
CN110008534A (en) * 2019-03-18 2019-07-12 中交第二航务工程勘察设计院有限公司 A kind of model system level division methods and device based on BIM
CN110008534B (en) * 2019-03-18 2023-12-15 中交第二航务工程勘察设计院有限公司 BIM-based model system hierarchical division method and device
CN110347976A (en) * 2019-05-22 2019-10-18 广州明珞汽车装备有限公司 Method, system, device and the storage medium of quick equipment leading out data model
CN110347976B (en) * 2019-05-22 2023-10-17 广州明珞汽车装备有限公司 Method, system, apparatus and storage medium for fast exporting device data model
CN110502819A (en) * 2019-08-14 2019-11-26 上海市城市建设设计研究总院(集团)有限公司 The computer-implemented method of concrete-bridge strip member outer closure stirrup
CN110516381A (en) * 2019-08-30 2019-11-29 无锡金尚汽车技术开发有限公司 CATIA element term quickly changes method and device
CN110516381B (en) * 2019-08-30 2023-02-17 无锡金尚汽车技术开发有限公司 CATIA element name rapid changing method and device
CN111080209B (en) * 2019-12-27 2022-06-14 苏州浪潮智能科技有限公司 BOM verification method, system, device and storage medium
CN111080209A (en) * 2019-12-27 2020-04-28 苏州浪潮智能科技有限公司 BOM verification method, system, device and storage medium
CN111581700A (en) * 2020-05-06 2020-08-25 中国电建集团成都勘测设计研究院有限公司 Method for adding BIM attribute and outputting BIM attribute table based on CATIA model
CN112818429A (en) * 2021-01-19 2021-05-18 中国建筑第八工程局有限公司 BIM model lightweight method based on digital-analog separation
CN113505413A (en) * 2021-06-04 2021-10-15 中国交通信息科技集团有限公司 BIM model multi-scene automatic coding method
CN113505413B (en) * 2021-06-04 2024-02-09 中国交通信息科技集团有限公司 BIM model multi-scene automatic coding method
CN113642067A (en) * 2021-07-02 2021-11-12 机械工业第九设计研究院有限公司 Method for classified coding of building component information model in automobile engineering industry
CN115168978A (en) * 2022-09-05 2022-10-11 中铁第五勘察设计院集团有限公司 Bridge building information model data construction method

Also Published As

Publication number Publication date
CN107480374B (en) 2020-06-02

Similar Documents

Publication Publication Date Title
CN107480374A (en) A kind of bridge BIM model creation methods based on CATIA
CN110222445B (en) BIM and design information based integration, collaborative design and delivery method and system
CN107103158B (en) Method for realizing rapid modeling dynamic modification of high-speed railway bridge by utilizing DYNAMOO
Moeys The soil texture wizard: R functions for plotting, classifying, transforming and exploring soil texture data
Douglas Experiments to locate ridges and channels to create a new type of digital elevation model
CN104657510B (en) A kind of method and device that steel truss arched bridge rapid modeling is realized using BIM
CN107045526A (en) A kind of pattern recognition method of electronics architectural working drawing
CN110069818A (en) A kind of railway engineering component parameter method based on Ilogic
CN111506949A (en) BIM-based visualization method for road soft foundation treatment construction progress
CN103077282A (en) Rapid modeling method for high-speed railway scene based on basic-element combination and multilevel semantic constraint
CN104573915A (en) Method and device for constructing high-speed train product structure tree
CN109086495A (en) The method that BIM goes out hard-cover construction drawing
CN107423455A (en) A kind of highway method for automatic modeling and system
CN107330192A (en) It is a kind of that amount of calculation method is set based on the non-fragment orbit BIM up to rope V6 systems
CN109408906A (en) The method of engineering quantity expression and statistics based on BIM model
CN102760160A (en) System for downsizing multi-scale geographic map in spatial information database
CN110046426A (en) A method of detail GIS surface model is automatically extracted from BIM physical model
KR101184981B1 (en) Evaluation method for biotop area of building
CN106202708A (en) A kind of method that the CAD topography that prospecting mapping draws quickly is put in storage
CN110363848A (en) A kind of method for visualizing and device of the pore network model based on digital cores
CN110197013B (en) Riverbed bedrock surface modeling method based on Morphing
CN117171862B (en) Bridge engineering land investigation drilling point position checking method and equipment
CN105045958A (en) Implementation system and method of GPS (Global Positioning System) elevation fitting on the basis of BP (Back Propagation) neural network
CN112948947A (en) BIM-based gravity dam structure design compliance inspection method
CN110688443B (en) Annotation method based on map annotation model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant