CN107327118A - A kind of house floor heating heat supply kitchen and toilet waterproof construction method - Google Patents

A kind of house floor heating heat supply kitchen and toilet waterproof construction method Download PDF

Info

Publication number
CN107327118A
CN107327118A CN201710568874.0A CN201710568874A CN107327118A CN 107327118 A CN107327118 A CN 107327118A CN 201710568874 A CN201710568874 A CN 201710568874A CN 107327118 A CN107327118 A CN 107327118A
Authority
CN
China
Prior art keywords
dam
seepage
waterproof construction
floor heating
gram
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710568874.0A
Other languages
Chinese (zh)
Inventor
郭春未
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710568874.0A priority Critical patent/CN107327118A/en
Publication of CN107327118A publication Critical patent/CN107327118A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/10Macromolecular compounds obtained otherwise than by reactions only involving carbon-to-carbon unsaturated bonds
    • C04B26/14Polyepoxides
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00241Physical properties of the materials not provided for elsewhere in C04B2111/00
    • C04B2111/00293Materials impermeable to liquids
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00482Coating or impregnation materials
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/20Resistance against chemical, physical or biological attack
    • C04B2111/27Water resistance, i.e. waterproof or water-repellent materials
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/04Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire

Abstract

The invention discloses a kind of house floor heating heat supply kitchen and toilet waterproof construction method, including key position processing, basal plane cleaning, epoxy glue, rigid waterproofing are applied, flexible water, edge sealing is checked, builds sand dam, closed-water test, sectional repair, empty sand dam, apply epoxy glue and cast gram seepage dam.A kind of waterproof construction method of house floor heating heat supply proposed by the present invention, in gram seepage integral rigidity waterproof layer of fixation leak source progress specially treated, then necessary wet trade of constructing, effectively overcomes the hidden danger of seepage.

Description

A kind of house floor heating heat supply kitchen and toilet waterproof construction method
Technical field
The present invention relates to waterproof construction technology field, more particularly to a kind of house floor heating heat supply kitchen and toilet waterproof construction side Method.
Background technology
Polyurethane is the organic waterproof material of universally acknowledged superior performance, is also that major designing institutees first elect, developer builds Water-repellent paint between the preferred residential kitchen and toilet of business.Between the northern area of China floor heating heat supply residential kitchen and toilet waterproofing design be generally under floor heating and Twice waterproof construction in floor heating, code requirement constructs polyurethane water-proof coating in cement bonded sand that is solid, smooth, clean, drying Starch on screed-coat, because polyurethane is unable to wet trade, moisture organic waterproof extra play and inorganic building are once smothered during waterproof construction With regard to self-assembling formation " two skins " between basal plane, so as to cause " interlayer string water " phenomenon to occur.In this specific environment of civil engineering building site Under be difficult to requirement basal plane and keep drying, it is difficult the technology barrier gone beyond that therefore " two skins ", which turns into polyurethane water-proof to construct,.
Prevented due to be smeared on the tender and lovely weak, waterproof coating of polyurethane water-proof coating between cement mortar protective course, residential kitchen and toilet Water construction is the process of many work posts, a multiple operation cross-operation repeatedly, thus polyurethane water-proof coating be easy to it is damaged by external force And bury hidden leakage defect.Seepage occurs for kitchen and toilet essentially from pipe root, ventilating duct root after house is delivered for use, this problem according to It is so the persistent ailment that waterproofing work is badly in need of solving.
The content of the invention
The technical problem existed based on background technology, the present invention proposes a kind of house floor heating heat supply kitchen and toilet waterproof construction Method, in gram seepage integral rigidity waterproof layer of fixation leak source progress specially treated, then necessary wet trade of constructing, effectively overcomes and oozes The hidden danger of leakage.
A kind of house floor heating heat supply kitchen and toilet waterproof construction method, method and step is as follows:
S1:Key position processing:Steel bar layer is built on fixed leak source, pea gravel concreten is poured in steel bar layer, and Upper surface is levelling, receipts of wiping one's face light, realizes the position for fixing leak source non-leakage;
S2:Basal plane is cleared up:Waterproof construction basal plane thorough cleaning is clean;
S3:Apply epoxy glue:Epoxy glue is applied in the waterproof construction scope of operation;
S4:Rigid waterproofing:The low-lying position in big face first is made up a deficiency with thick gram of seepage slurry, then scratches gram seepage and starches suitable to surface only It is flat;
S5:Flexible water:With epoxy rubber cement paving polyethylene polypropylene fiber waterproof coiled material flexible waterproof layer;
S6:Check edge sealing:Check that patch situation does not allow alice, faces side 200mm and do not allow hollowing, every piece of cloth has been pasted immediately Check, failure does over again at once, with epoxy rubber cement edge sealing;
S7:Build sand dam:In bathroom door oral area position sand dam, height of dam 100mm, dam width 100mm are built along inner mouth;
S8:Closed-water test;
S9:Sectional repair:Repair in water-supply line installation, floor heating work progress by damaged waterproof layer, repairing sand dam, hand over Peastone concrete bed course is poured into a mould by civil engineering;
S10:Empty sand dam:Sand dam is emptied after concrete bed course is solid, bottom exposes concrete structure sheaf, two and exposes doorway facade, By bottom portion of groove and pipeline root to extending out chisel 10-20mm;
S11:Apply epoxy glue:Apply epoxy glue to increase bonding interface in pipeline surface, groove floor, doorway metope Power;
S12:Pour into a mould gram seepage dam:A small amount of gram of seepage fine-stone concrete is added in groove, and is stirred with the unnecessary epoxy glue of bottom land With it is uniform, bottom pipeline is levered up by root with a word screwdriver, emphasis conscientiously consolidates under pipe and bottom corner.In groove both sides shelves Plank control height of dam about 5-10mm higher than room ground, continue pour into a mould and consolidate, it is floating above, operation of building a dam complete.
It is preferred that, the coating layer thickness of rigid waterproofing is 1.0-1.2mm in the S4.
It is preferred that, the grammes per square metre of polyethylene polypropylene fiber waterproof coiled material is >=300g/m in the S52, thickness be 0.8-1.2mm.
It is preferred that, it is 1 that the S7, which builds cement used in sand dam and the mass ratio of middle sand: (6-10).
It is preferred that, gram seepage fine-stone concrete in the S12, used gram of seepage: middle sand: the mass ratio of microlith is 1: (2-5): (4-9)。
Skin-type waterproof is called chemical crosslinking, is a kind of identical mutual chemical action of utilization chemical ion keyed and erosion Property, the hole crack in the chemical bond of ionic bond, connection concrete pedestal occurs between cement, the hole in hardenite is reduced Rate, forming one has the structure of " hinge " of toughness.This structure not only increases resistance capacity to deformation, even in stress Lower generation crack, due to concrete structural surface formed it is netted or membranaceous there is toughness or elastic nappe, can be effective Resist and repair the expansion and fracture in crack.
Research finds that all kinds of engineering waterproofing leak sources are fixed, regular.These are fixed leak source and can not either avoided Or it is artificial cause, kitchen and toilet occur seepage and have buried hidden danger after being all delivered for use as residential housing.Between residential kitchen and toilet Fixation leak source be:1st, cross wall wear pipe root;2nd, ventilating duct root;3rd, wall ground inner corner trim.
Compared with prior art, the device have the advantages that being:
1st, based on skin-type waterproof technique, cement mortar screeding layer is not smeared, and these are fixed leak source and are substantially clear to, handle Get up handy;Gram seepage coating is smeared on building body concrete structure sheaf, gram seepage coating and concrete basal plane compatibility are good, muddy So one, overcomes the common fault of " two skins ", has prevented the generation of " interlayer string water " phenomenon.
2nd, the key position fixed leak source as waterproof construction carries out antiseepage drain process, allows pond to realize that " system is certainly anti- Water ";Rigid bottoming waterproofing process overcomes many drawbacks of conventional waterproof, and the twice of key position specially treated and rigid waterproofing are set It is anti-, overcome the hidden danger of seepage.
Embodiment
The present invention is made with reference to specific embodiment further to explain.
Embodiment 1
A kind of house floor heating heat supply kitchen and toilet waterproof construction method, method and step is as follows:
S1:Key position processing:Steel bar layer is built on fixed leak source, pea gravel concreten is poured in steel bar layer, and Upper surface is levelling, receipts of wiping one's face light;
S2:Basal plane is cleared up:Waterproof construction basal plane thorough cleaning is clean;
S3:Apply epoxy glue:Epoxy glue is applied in the waterproof construction scope of operation;
S4:Rigid waterproofing:The low-lying position in big face first is made up a deficiency with thick gram of seepage slurry, then scratches gram seepage and starches suitable to surface only Flat, the coating layer thickness of rigid waterproofing is 1.0mm;
S5:Flexible water:With epoxy rubber cement paving polyethylene polypropylene fiber waterproof coiled material flexible waterproof layer, polyethylene polypropylene waterproof The grammes per square metre of coiled material is 300g/m2, thickness be 0.8mm;
S6:Check edge sealing:Check that patch situation does not allow alice, faces side 200mm and do not allow hollowing, every piece of cloth has been pasted immediately Check, failure does over again at once, with epoxy rubber cement edge sealing;
S7:Build sand dam:Sand dam is built along inner mouth in bathroom door oral area position, height of dam 100mm, dam width 100mm are built used in sand dam Cement and middle sand mass ratio be 1: 6;
S8:Closed-water test, on inspection ne-leakage, seeping phenomenon, and drainage system is unobstructed;
S9:Sectional repair:Repair in water-supply line installation, floor heating work progress by damaged waterproof layer, repairing sand dam, hand over Peastone concrete bed course is poured into a mould by civil engineering;
S10:Empty sand dam:Sand dam is emptied after concrete bed course is solid, bottom exposes concrete structure sheaf, two and exposes doorway facade, By bottom portion of groove and pipeline root to extending out chisel 10mm;
S11:Apply epoxy glue:Apply epoxy glue to increase bonding interface in pipeline surface, groove floor, doorway metope Power;
S12:Pour into a mould gram seepage dam:A small amount of gram of seepage fine-stone concrete is added in groove, and is stirred with the unnecessary epoxy glue of bottom land With uniform, gram seepage fine-stone concrete, used gram of seepage: middle sand: the mass ratio of microlith is 1: 2: 4, with a word screwdriver by bottom pipeline Levered up by root, emphasis conscientiously consolidates under pipe and bottom corner.On groove both sides, boom control height of dam is higher than room ground about 5mm, continuation is poured into a mould and consolidated, floating above, operation of building a dam completion.
Embodiment 2
A kind of house floor heating heat supply kitchen and toilet waterproof construction method, method and step is as follows:
S1:Key position processing:Steel bar layer is built on fixed leak source, pea gravel concreten is poured in steel bar layer, and Upper surface is levelling, receipts of wiping one's face light;
S2:Basal plane is cleared up:Waterproof construction basal plane thorough cleaning is clean;
S3:Apply epoxy glue:Epoxy glue is applied in the waterproof construction scope of operation;
S4:Rigid waterproofing:The low-lying position in big face first is made up a deficiency with thick gram of seepage slurry, then scratches gram seepage and starches suitable to surface only Flat, the coating layer thickness of rigid waterproofing is 1.2mm;
S5:Flexible water:With epoxy rubber cement paving polyethylene polypropylene fiber waterproof coiled material flexible waterproof layer, polyethylene polypropylene waterproof The grammes per square metre of coiled material is 350g/m2, thickness be 1.2mm;
S6:Check edge sealing:Check that patch situation does not allow alice, faces side 200mm and do not allow hollowing, every piece of cloth has been pasted immediately Check, failure does over again at once, with epoxy rubber cement edge sealing;
S7:Build sand dam:Sand dam is built along inner mouth in bathroom door oral area position, height of dam 100mm, dam width 100mm are built used in sand dam Cement and middle sand mass ratio be 1: 10;
S8:Closed-water test, on inspection ne-leakage, seeping phenomenon, and drainage system is unobstructed;
S9:Sectional repair:Repair in water-supply line installation, floor heating work progress by damaged waterproof layer, repairing sand dam, hand over Peastone concrete bed course is poured into a mould by civil engineering;
S10:Empty sand dam:Sand dam is emptied after concrete bed course is solid, bottom exposes concrete structure sheaf, two and exposes doorway facade, By bottom portion of groove and pipeline root to extending out chisel 20mm;
S11:Apply epoxy glue:Apply epoxy glue to increase bonding interface in pipeline surface, groove floor, doorway metope Power;
S12:Pour into a mould gram seepage dam:A small amount of gram of seepage fine-stone concrete is added in groove, and is stirred with the unnecessary epoxy glue of bottom land With uniform, gram seepage fine-stone concrete, used gram of seepage: middle sand: the mass ratio of microlith is 1: 5: 9, with a word screwdriver by bottom pipeline Levered up by root, emphasis conscientiously consolidates under pipe and bottom corner.On groove both sides, boom control height of dam is higher than room ground about 10mm, continuation is poured into a mould and consolidated, floating above, operation of building a dam completion.
Embodiment 3
A kind of house floor heating heat supply kitchen and toilet waterproof construction method, method and step is as follows:
S1:Key position processing:Steel bar layer is built on fixed leak source, pea gravel concreten is poured in steel bar layer, and Upper surface is levelling, receipts of wiping one's face light;
S2:Basal plane is cleared up:Waterproof construction basal plane thorough cleaning is clean;
S3:Apply epoxy glue:Epoxy glue is applied in the waterproof construction scope of operation;
S4:Rigid waterproofing:The low-lying position in big face first is made up a deficiency with thick gram of seepage slurry, then scratches gram seepage and starches suitable to surface only Flat, the coating layer thickness of rigid waterproofing is 1.1mm;
S5:Flexible water:With epoxy rubber cement paving polyethylene polypropylene fiber waterproof coiled material flexible waterproof layer, polyethylene polypropylene waterproof The grammes per square metre of coiled material is 400g/m2, thickness be 1.0mm;
S6:Check edge sealing:Check that patch situation does not allow alice, faces side 200mm and do not allow hollowing, every piece of cloth has been pasted immediately Check, failure does over again at once, with epoxy rubber cement edge sealing;
S7:Build sand dam:Sand dam is built along inner mouth in bathroom door oral area position, height of dam 100mm, dam width 100mm are built used in sand dam Cement and middle sand mass ratio be 1: 8;
S8:Closed-water test, on inspection ne-leakage, seeping phenomenon, and drainage system is unobstructed;
S9:Sectional repair:Repair in water-supply line installation, floor heating work progress by damaged waterproof layer, repairing sand dam, hand over Peastone concrete bed course is poured into a mould by civil engineering;
S10:Empty sand dam:Sand dam is emptied after concrete bed course is solid, bottom exposes concrete structure sheaf, two and exposes doorway facade, By bottom portion of groove and pipeline root to extending out chisel 15mm;
S11:Apply epoxy glue:Apply epoxy glue to increase bonding interface in pipeline surface, groove floor, doorway metope Power;
S12:Pour into a mould gram seepage dam:A small amount of gram of seepage fine-stone concrete is added in groove, and is stirred with the unnecessary epoxy glue of bottom land With uniform, gram seepage fine-stone concrete, used gram of seepage: middle sand: the mass ratio of microlith is 1: 3: 7, with a word screwdriver by bottom pipeline Levered up by root, emphasis conscientiously consolidates under pipe and bottom corner.On groove both sides, boom control height of dam is higher than room ground about 8mm, continuation is poured into a mould and consolidated, floating above, operation of building a dam completion.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (5)

1. a kind of house floor heating heat supply kitchen and toilet waterproof construction method, it is characterised in that method and step is as follows:
S1:Key position processing:Steel bar layer is built on fixed leak source, pea gravel concreten is poured in steel bar layer, and in upper table Face is levelling, receipts of wiping one's face light;
S2:Basal plane is cleared up:Waterproof construction basal plane thorough cleaning is clean;
S3:Apply epoxy glue:Epoxy glue is applied in the waterproof construction scope of operation;
S4:Rigid waterproofing:The low-lying position in big face first is made up a deficiency with thick gram of seepage slurry, then scratches gram seepage and is starched only to surface Shunping County;
S5:Flexible water:With epoxy rubber cement paving polyethylene polypropylene fiber waterproof coiled material flexible waterproof layer;
S6:Check edge sealing:Check that patch situation does not allow alice, faces side 200mm and do not allow hollowing, every piece of cloth has been pasted to be examined immediately Look into, failure does over again at once, with epoxy rubber cement edge sealing;
S7:Build sand dam:In bathroom door oral area position sand dam, height of dam 100mm, dam width 100mm are built along inner mouth;
S8:Closed-water test;
S9:Sectional repair:Repair in water-supply line installation, floor heating work progress by damaged waterproof layer, repairing sand dam, transfer to soil Build cast peastone concrete bed course;
S10:Empty sand dam:Sand dam is emptied after concrete bed course is solid, bottom exposes concrete structure sheaf, two and exposes doorway facade, will be recessed Trench bottom and pipeline root are to extending out chisel 10-20mm;
S11:Apply epoxy glue:Apply epoxy glue to increase interface cohesive force in pipeline surface, groove floor, doorway metope;
S12:Pour into a mould gram seepage dam:A small amount of gram of seepage fine-stone concrete is added in groove, and is mixed with the unnecessary epoxy glue of bottom land It is even, bottom pipeline is levered up by root with a word screwdriver, emphasis conscientiously consolidates under pipe and bottom corner.In groove both sides boom Control height of dam about 5-10mm higher than room ground, continue pour into a mould and consolidate, it is floating above, operation of building a dam complete.
2. a kind of house floor heating heat supply kitchen and toilet waterproof construction method according to claim 1, it is characterised in that the S4 The coating layer thickness of middle rigid waterproofing is 1.0-1.2mm.
3. a kind of house floor heating heat supply kitchen and toilet waterproof construction method according to claim 1, it is characterised in that the S5 The grammes per square metre of middle polyethylene polypropylene fiber waterproof coiled material is >=300g/m2, thickness be 0.8-1.2mm.
4. a kind of house floor heating heat supply kitchen and toilet waterproof construction method according to claim 1, it is characterised in that the S7 The mass ratio for building the cement used in sand dam and middle sand is 1: (6-10).
5. a kind of house floor heating heat supply kitchen and toilet waterproof construction method according to claim 1, it is characterised in that described Gram seepage fine-stone concrete in S12, used gram of seepage: middle sand: the mass ratio of microlith is 1: (2-5): (4-9).
CN201710568874.0A 2017-07-13 2017-07-13 A kind of house floor heating heat supply kitchen and toilet waterproof construction method Pending CN107327118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710568874.0A CN107327118A (en) 2017-07-13 2017-07-13 A kind of house floor heating heat supply kitchen and toilet waterproof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710568874.0A CN107327118A (en) 2017-07-13 2017-07-13 A kind of house floor heating heat supply kitchen and toilet waterproof construction method

Publications (1)

Publication Number Publication Date
CN107327118A true CN107327118A (en) 2017-11-07

Family

ID=60196696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710568874.0A Pending CN107327118A (en) 2017-07-13 2017-07-13 A kind of house floor heating heat supply kitchen and toilet waterproof construction method

Country Status (1)

Country Link
CN (1) CN107327118A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519865A (en) * 2020-04-30 2020-08-11 深圳市维业装饰集团股份有限公司 Waterproof construction method for toilet base layer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003147947A (en) * 2001-11-08 2003-05-21 Kanegafuchi Chem Ind Co Ltd Vibration control heat insulating floor structure of building
CN101792301A (en) * 2010-03-09 2010-08-04 郭春未 Skin-type waterproof coating and construction method
CN102155071A (en) * 2011-03-15 2011-08-17 郭春未 Rigid-soft-rigid compound waterproof process
CN102322131A (en) * 2011-06-28 2012-01-18 郭春未 Obstructing and water retaining method for residential waterproof construction
KR20120002588U (en) * 2010-10-06 2012-04-16 고서연 Heating fiber board fiooring
CN104343189A (en) * 2013-08-07 2015-02-11 吕孟龙 Composite waterproof leaking stoppage method
CN105178452A (en) * 2015-06-29 2015-12-23 广西金雨伞防水装饰有限公司 Full-seal waterproof construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003147947A (en) * 2001-11-08 2003-05-21 Kanegafuchi Chem Ind Co Ltd Vibration control heat insulating floor structure of building
CN101792301A (en) * 2010-03-09 2010-08-04 郭春未 Skin-type waterproof coating and construction method
KR20120002588U (en) * 2010-10-06 2012-04-16 고서연 Heating fiber board fiooring
CN102155071A (en) * 2011-03-15 2011-08-17 郭春未 Rigid-soft-rigid compound waterproof process
CN102322131A (en) * 2011-06-28 2012-01-18 郭春未 Obstructing and water retaining method for residential waterproof construction
CN104343189A (en) * 2013-08-07 2015-02-11 吕孟龙 Composite waterproof leaking stoppage method
CN105178452A (en) * 2015-06-29 2015-12-23 广西金雨伞防水装饰有限公司 Full-seal waterproof construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519865A (en) * 2020-04-30 2020-08-11 深圳市维业装饰集团股份有限公司 Waterproof construction method for toilet base layer

Similar Documents

Publication Publication Date Title
CN104153400B (en) A kind of construction method of soft foundation pouring pile head waterproof
CN207987983U (en) A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip
CN107190844A (en) The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall
CN107190783A (en) A kind of construction method of basement waterproofing structure and its outer wall of basement waterproof construction
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN102776897B (en) Wash apron anti-settling anti-cracking construction method and structure
CN104988955B (en) The anti-row's convolution waterproof system of ultra-deep basement and construction method
CN108867894B (en) Waterproof standard construction process for finely decorated kitchen and toilet
CN108487481A (en) A kind of antiseep assembled water stopping thresholds and its construction method
CN107816138A (en) A kind of construction technology of subsided rest room
CN105201025B (en) Basement waterproofing construction and its construction method
CN110093989A (en) A kind of interior waterproof construction and its construction method
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN108755979A (en) A kind of toilet moistureproof and waterproof processing method
CN108868176A (en) A kind of kitchen and toilet percolating water repairerment system
CN205804633U (en) A kind of basement bottom board waterproof construction
CN110629893B (en) Construction method of toilet waterproof engineering
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN107227823A (en) A kind of foreign-style house waterproof roof-working method
CN104831820B (en) A kind of waterproof system of kitchen structure
CN107327118A (en) A kind of house floor heating heat supply kitchen and toilet waterproof construction method
CN206220272U (en) Ground hot water lays heating toilet doorway sealing damp proof insulation construction
CN101586367B (en) Method for preventing decorative surfaces of ceramic tiles in shower room from leaking water
CN107675811B (en) Bathroom waterproof system and construction method
CN206916791U (en) A kind of basement waterproofing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171107