CN107326929A - A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting - Google Patents

A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting Download PDF

Info

Publication number
CN107326929A
CN107326929A CN201710665238.XA CN201710665238A CN107326929A CN 107326929 A CN107326929 A CN 107326929A CN 201710665238 A CN201710665238 A CN 201710665238A CN 107326929 A CN107326929 A CN 107326929A
Authority
CN
China
Prior art keywords
earth
groove
steel sheet
sheet pile
larsen steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710665238.XA
Other languages
Chinese (zh)
Inventor
张峰
卢成成
卢广平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710665238.XA priority Critical patent/CN107326929A/en
Publication of CN107326929A publication Critical patent/CN107326929A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting, comprise the following steps:A. first:Excavating sideline is released, Larsen steel sheet pile is set;B. upper strata earth excavation:Treat after the completion of step A, excavate upper strata cubic metre of earth;C. groove is excavated:After the completion for the treatment of step B, it is determined that the position of purlin is enclosed, and digging groove;D. install and enclose purlin:Treat after the completion of step C, installed in groove and enclose purlin;E. groove backfilling of earthwork:Treat after the completion of step D, backfill groove;F. lower floor's earth excavation:Treat after the completion of step E, excavate lower floor cubic metre of earth.

Description

A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting
Technical field
The present invention relates to construction engineering technical field, Duo Cang undergrounds integrate pipeclay under specially a kind of Larsen steel sheet pile supporting The method that side is excavated.
Background technology
Many storehouse underground pipe gallery earth excavations are unearthed greatly under Larsen steel sheet pile supporting condition, Larsen steel plate under prior art Earth excavation is inefficient under stake supporting condition, and blockage one by one is separated into due to enclosing purlin by the continuous earthwork, irrational Earthwork digging method efficiency bottom is designed, plant equipment input is higher.
The content of the invention
The technical problem to be solved in the present invention is to overcome existing defect there is provided many storehouses under a kind of Larsen steel sheet pile supporting The method of lower integrated pipe earth excavation, by the way that rationally using purlin is enclosed, piecemeal is excavated, and is both improved excavation effect and is thrown while reducing equipment Enter, the problem of effectively can solving in background technology.
To achieve the above object, the present invention provides following technical scheme:Duo Cang undergrounds are comprehensive under a kind of Larsen steel sheet pile supporting The method for closing pipe earth excavation, it is characterised in that comprise the following steps:
A. first:Excavating sideline is released, Larsen steel sheet pile is set;
B. upper strata earth excavation:Treat after the completion of step A, excavate upper strata cubic metre of earth;
C. groove is excavated:After the completion for the treatment of step B, it is determined that the position of purlin is enclosed, and digging groove;
D. install and enclose purlin:Treat after the completion of step C, installed in groove and enclose purlin;
E. groove backfilling of earthwork:Treat after the completion of step D, backfill groove;
F. lower floor's earth excavation:Treat after the completion of step E, excavate lower floor cubic metre of earth.
It is fixed using GPS measurements according to coordinate points during the step A operation as a preferred technical solution of the present invention Position, and by setting gray line to release excavating sideline on the ground;Larsen steel sheet pile is continuously set along excavating sideline.
As a preferred technical solution of the present invention, during the step B operation, upper strata cubic metre of earth is carried out using excavator Excavate, excavate upper strata cubic metre of earth until ground elevation differs 1.5~2.0m with piping lane design top mark height.
As a preferred technical solution of the present invention, during the step C operation, determined to enclose purlin according to design of its support drawing Position, and field lofting;And groove is excavated according to field lofting.
As a preferred technical solution of the present invention, during the D step operations, installed in groove, weld and enclose purlin, and Ensure groove and enclose the space of purlin for 200~300mm.
As a preferred technical solution of the present invention, during the E step operations, groove is backfilled to enclosing purlin top using original soil Face;
As a preferred technical solution of the present invention, during F-step operation, using enclosing the earthwork block that purlin is separated out, The interior side cubic metre of earth from builder's road farther out of first spoil square, then excavates the side cubic metre of earth nearer from builder's road;Until Complete the excavation of all lower floors cubic metre of earth.
Compared with prior art, the beneficial effects of the invention are as follows:By the way that rationally using purlin is enclosed, piecemeal is excavated, both improved out Dig effect and reduce equipment investment simultaneously, constructed using Larsen steel sheet pile enclosure, it is engaged between steel sheet pile, it can also also serve as only Water.
Brief description of the drawings
Fig. 1 is the plan of the present invention;
Fig. 2 is the sectional drawing of the present invention;
Fig. 3 is the groove of the present invention and the node sectional drawing for enclosing purlin.
In figure:1st, purlin is enclosed;2nd, Larsen steel sheet pile;3rd, the side cubic metre of earth from builder's road farther out;4th, it is nearer from builder's road Side cubic metre of earth;5th, groove.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Embodiment one
Fig. 1~Fig. 3 is referred to, the present invention provides a kind of technical scheme:Duo Cang undergrounds are comprehensive under a kind of Larsen steel sheet pile supporting The method for closing pipe earth excavation, it is characterised in that comprise the following steps:
A. first:Excavating sideline is released, Larsen steel sheet pile 2 is set;GPS measurement and positionings are used according to coordinate points, and are passed through Gray line is set to release excavating sideline on the ground;Larsen steel sheet pile 2 is continuously set along excavating sideline;
B. upper strata earth excavation:Treat after the completion of step A, excavate upper strata cubic metre of earth;Upper strata cubic metre of earth is opened using excavator Dig, excavate upper strata cubic metre of earth until ground elevation differs 1.5m with piping lane design top mark height;
C. groove 5 is excavated:After the completion for the treatment of step B, it is determined that the position of purlin 1 is enclosed, and digging groove 5;According to design of its support drawing It is determined that the position of purlin 1 is enclosed, and field lofting;And groove 5 is excavated according to field lofting;
D. install and enclose purlin 1:Treat after the completion of step C, installed in groove 5 and enclose purlin 1;Installed in groove 5, purlin 1 is enclosed in welding, And ensure groove 5 and enclose the space of purlin 1 for 200mm;
E. the backfilling of earthwork of groove 5:Treat after the completion of step D, backfill groove 5;Groove 5 is backfilled to enclosing the top surface of purlin 1 using original soil;
F. lower floor's earth excavation:Treat after the completion of step E, excavate lower floor cubic metre of earth;Using the earthwork block that purlin 1 is separated out is enclosed, first The interior side cubic metre of earth 3 from builder's road farther out of spoil square, then excavates the side cubic metre of earth 4 nearer from builder's road;Until Complete the excavation of all lower floors cubic metre of earth.
Embodiment two
Fig. 1~Fig. 3 is referred to, the present invention provides a kind of technical scheme:Duo Cang undergrounds are comprehensive under a kind of Larsen steel sheet pile supporting The method for closing pipe earth excavation, it is characterised in that comprise the following steps:
A. first:Excavating sideline is released, Larsen steel sheet pile 2 is set;GPS measurement and positionings are used according to coordinate points, and are passed through Gray line is set to release excavating sideline on the ground;Larsen steel sheet pile 2 is continuously set along excavating sideline;
B. upper strata earth excavation:Treat after the completion of step A, excavate upper strata cubic metre of earth;Upper strata cubic metre of earth is opened using excavator Dig, excavate upper strata cubic metre of earth until ground elevation differs 2m with piping lane design top mark height;
C. groove 5 is excavated:After the completion for the treatment of step B, it is determined that the position of purlin 1 is enclosed, and digging groove 5;According to design of its support drawing It is determined that the position of purlin 1 is enclosed, and field lofting;And groove 5 is excavated according to field lofting;
D. install and enclose purlin 1:Treat after the completion of step C, installed in groove 5 and enclose purlin 1;Installed in groove 5, purlin 1 is enclosed in welding, And ensure groove 5 and enclose the space of purlin 1 for 300mm;
E. the backfilling of earthwork of groove 5:Treat after the completion of step D, backfill groove 5;Groove 5 is backfilled to enclosing the top surface of purlin 1 using original soil;
F. lower floor's earth excavation:Treat after the completion of step E, excavate lower floor cubic metre of earth;Using the earthwork block that purlin 1 is separated out is enclosed, first The interior side cubic metre of earth 3 from builder's road farther out of spoil square, then excavates the side cubic metre of earth 4 nearer from builder's road;Until Complete the excavation of all lower floors cubic metre of earth.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting, it is characterised in that including following step Suddenly:
A. first:Excavating sideline is released, Larsen steel sheet pile is set;
B. upper strata earth excavation:Treat after the completion of step A, excavate upper strata cubic metre of earth;
C. groove is excavated:After the completion for the treatment of step B, it is determined that the position of purlin is enclosed, and digging groove;
D. install and enclose purlin:Treat after the completion of step C, installed in groove and enclose purlin;
E. groove backfilling of earthwork:Treat after the completion of step D, backfill groove;
F. lower floor's earth excavation:Treat after the completion of step E, excavate lower floor cubic metre of earth.
2. according to claim 1 under a kind of Larsen steel sheet pile supporting Duo Cang undergrounds integrated pipe earth excavation method, it is special Levy and be:During the step A operation, GPS measurement and positionings are used according to coordinate points, and by setting gray line to release out on the ground Dig sideline;Larsen steel sheet pile is continuously set along excavating sideline.
3. according to claim 1 under a kind of Larsen steel sheet pile supporting Duo Cang undergrounds integrated pipe earth excavation method, it is special Levy and be:During the step B operation, upper strata cubic metre of earth is excavated using excavator, upper strata cubic metre of earth is excavated until ground elevation 1.5~2.0m is differed with piping lane design top mark height.
4. according to claim 1 under a kind of Larsen steel sheet pile supporting Duo Cang undergrounds integrated pipe earth excavation method, it is special Levy and be:During the step C operation, determined to enclose purlin position, and field lofting according to design of its support drawing;And according to field lofting Excavate groove.
5. according to claim 1 under a kind of Larsen steel sheet pile supporting Duo Cang undergrounds integrated pipe earth excavation method, it is special Levy and be:During the D step operations, installed in groove, weld and enclose purlin, and ensure groove and enclose the space of purlin for 200~ 300mm。
6. according to claim 2 under a kind of Larsen steel sheet pile supporting Duo Cang undergrounds integrated pipe earth excavation method, it is special Levy and be:During the E step operations, groove is backfilled to enclosing purlin top surface using original soil.
7. Duo Cang undergrounds integrated pipe earth excavation under a kind of Larsen steel sheet pile supporting according to any one of claim 1~6 Method construction method, comprise the following steps:During F-step operation, using enclosing the earthwork block that purlin is separated out, first spoil The interior side cubic metre of earth from builder's road farther out of square, then excavates the side cubic metre of earth nearer from builder's road;Until completing all The excavation of lower floor cubic metre of earth.
CN201710665238.XA 2017-08-07 2017-08-07 A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting Pending CN107326929A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710665238.XA CN107326929A (en) 2017-08-07 2017-08-07 A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710665238.XA CN107326929A (en) 2017-08-07 2017-08-07 A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting

Publications (1)

Publication Number Publication Date
CN107326929A true CN107326929A (en) 2017-11-07

Family

ID=60226210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710665238.XA Pending CN107326929A (en) 2017-08-07 2017-08-07 A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting

Country Status (1)

Country Link
CN (1) CN107326929A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287299A (en) * 2020-02-26 2020-06-16 深圳市宏大建设集团有限公司 Sewage pipe pit excavation backfill process and pipe pit excavation supporting structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060106159A (en) * 2005-04-06 2006-10-12 대원이엔시 주식회사 The engineering-works structure using composite pile and steel sheet pile, and it's construction method
CN201962684U (en) * 2011-02-09 2011-09-07 云南建工水利水电建设有限公司 Internal support wale reinforcing device
CN104929133A (en) * 2015-06-09 2015-09-23 沈阳市政集团有限公司 Deep foundation pit Larsen steel sheet pile bottom sloping support construction method
CN106759473A (en) * 2016-11-11 2017-05-31 中国建筑第八工程局有限公司 The constructing structure and its construction method of underground pipe gallery and road
CN106759384A (en) * 2016-12-24 2017-05-31 中铁十八局集团有限公司 A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060106159A (en) * 2005-04-06 2006-10-12 대원이엔시 주식회사 The engineering-works structure using composite pile and steel sheet pile, and it's construction method
CN201962684U (en) * 2011-02-09 2011-09-07 云南建工水利水电建设有限公司 Internal support wale reinforcing device
CN104929133A (en) * 2015-06-09 2015-09-23 沈阳市政集团有限公司 Deep foundation pit Larsen steel sheet pile bottom sloping support construction method
CN106759473A (en) * 2016-11-11 2017-05-31 中国建筑第八工程局有限公司 The constructing structure and its construction method of underground pipe gallery and road
CN106759384A (en) * 2016-12-24 2017-05-31 中铁十八局集团有限公司 A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梅君: "《浅谈拉森板桩支护设计及施工实践》", 《市政技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287299A (en) * 2020-02-26 2020-06-16 深圳市宏大建设集团有限公司 Sewage pipe pit excavation backfill process and pipe pit excavation supporting structure

Similar Documents

Publication Publication Date Title
CN108442382B (en) In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method
CN102691300B (en) Construction method of foundation pit earthwork
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN107100171A (en) A kind of foundation ditch construction method
CN203174616U (en) Clay foundation rain falling and water saving system
CN104110038A (en) Construction method for large-area pit support structure in deep-sludge type soft soil area
CN107090851B (en) The inverted side-wall construction method of downtown area open cut groove
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN105544576A (en) Foundation ditch dewatering and drainage excavation structure and application method
CN101634375B (en) Construction device and method for underground pipeline installation
CN108385701A (en) Road Protection of Expansive Soil structure and its construction method
CN106498957B (en) Steel sheet pile cofferdam construction platform and integral construction method
CN102828517A (en) Hierarchical control construction method of foundation pit excavation at entrance and exit of station
CN203808088U (en) Gabion gully detention structure for top of hydropower station slag yard
CN110080169A (en) A kind of construction method reclaimed fields from the sea utilized based on basement
CN109469042B (en) Anti-seepage storage yard field karst cave processing structure
CN104895079A (en) Reverse construction method for piling steel sheet piles
CN208934002U (en) A kind of barrier wall structure
CN107326896A (en) One kind combination steel construction support pile and construction method
CN109113092A (en) Construction method is protected in underground large-diameter pipeline original position water flowing
CN108330963A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN107326929A (en) A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting
CN106869165A (en) City integrated prefabricated piping lane open cut formula is from construction of prevention work method and self-propelled laydown machine
CN106522572A (en) Construction method for constructing large-space underground channel in limited space of historical protection building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171107

RJ01 Rejection of invention patent application after publication