CN106759384A - A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove - Google Patents

A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove Download PDF

Info

Publication number
CN106759384A
CN106759384A CN201611211320.7A CN201611211320A CN106759384A CN 106759384 A CN106759384 A CN 106759384A CN 201611211320 A CN201611211320 A CN 201611211320A CN 106759384 A CN106759384 A CN 106759384A
Authority
CN
China
Prior art keywords
base plate
prefabricated
brace
foundation
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611211320.7A
Other languages
Chinese (zh)
Inventor
李景
张宵
任富东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201611211320.7A priority Critical patent/CN106759384A/en
Publication of CN106759384A publication Critical patent/CN106759384A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove, in Earthwork Construction of Deep Foundation, reinforced concrete support is based on horizontal pressure force, the intensity of reinforcing steel bar concrete support, it is not fully exerted as the characteristic that rigidity is big and deformation is small of the concrete of support, it is ensured that the installation security such as basis and surrounding buildingses, road and underground piping;Prefabricated pipeline base plate is placed in kerve, both as pipeline foundation, foundation ditch cross-brace is also served as.Supported using reinforced concrete in Soft Soil Foundation Pit engineering construction, due to its light and flexible, excavator can carry out lifting placement, with digging with putting, segmentation is excavated simultaneously, contributes to the operation simultaneously of many excavators, and shoveling speed is fast, and then shortens the duration of earth excavation.Adjustment prefabricated panel spacing and quantity, control the deformation of Retaining Structures in Excavation Engineering, and reduce the time of base pit dewatering, it is ensured that the safety of surrounding buildingses.

Description

A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove
Technical field
The present invention relates to municipal works drainage pipeline deep foundation pit support, belong to foundation ditch support technology field.
Background technology
In road drainage engineering, along road from east orientation west laying d1800-d2000mm storm sewers.Engineering d1800 rainwater Pipeline start-stop pile No. is K0+563-K0+919.655, and total length 357m, cutting depth reaches 6.58~6.73m.D2000 rain pipes Start-stop pile No. in road is K0+073.034-K0+563, and total length 490m, cutting depth reaches 6.93~7.26m.It is precast reinforced in advance mixed Solidifying soil base plate, by taking d2000 pipelines as an example, prefabricated panel width 3.2m, length 1.5m, thickness 40cm are placed in kerve, are both made It is pipeline foundation, also serves as foundation ditch cross-brace.
The content of the invention
The technical solution adopted by the present invention is a kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove, in deep basal pit In earthwork construction, reinforced concrete support based on horizontal pressure force because reinforced concrete support it is different from bracing members, its deform compared with Method small, that arrangement of reinforcement and support enlarging section are taken in addition, the intensity of reinforcing steel bar concrete support, as the rigidity of the concrete of support The big and small characteristic of deformation is not fully exerted, it is ensured that the installation security such as basis and surrounding buildingses, road and underground piping.Will be pre- Tubing giving sufficient strength base plate is placed in kerve, both as pipeline foundation, also serves as foundation ditch cross-brace.
Supported using reinforced concrete in Soft Soil Foundation Pit engineering construction, due to its light and flexible, excavator can be carried out Lifting is laid, and with digging with putting, is segmented and is excavated simultaneously, contributes to the operation simultaneously of many excavators, and shoveling speed is fast, and then shortening is dug The duration of the earthwork.
At the same time prefabricated panel spacing and quantity can be adjusted according to soil property situation, controls the deformation of Retaining Structures in Excavation Engineering, And reduce the time of base pit dewatering, it is ensured that the safety of surrounding buildingses.
Brief description of the drawings
Fig. 1 is organigram of the present invention.
Fig. 2 is organigram of the present invention two.
Specific embodiment
As shown in Figure 1-2, the present invention can effectively control foundation pit deformation and shorten the duration.Concrete operations are as follows:
S1, pipeline base plate are prefabricated, and prefabricated panel is designed into line label.
S2, steel sheet pile is beaten, be connected using seaming between stake and stake, be arranged by the suitable mode of a fourth one.
S3, excavation of foundation pit, excavation should follow " longitudinal divisionses, it is vertical layered, with support with dig, stretching top jail, strengthen monitoring " Principle.Fluting soil is had bad luck outer to reduce tube seat lateral pressure to tube seat 20m.
S4, prefabricated panel is laid, prefabricated panel interval 1m lays, and lays one piece i.e. one piece of measurement, uses excavator Elevation to base plate is adjusted.
Connected between S5, base plate, reinforced mesh is made in advance.After prefabricated panel leveling in place, reinforced mesh is carried out immediately Install.
S6, subsequent construction, front prefabricated panel are laid after finishing and forming the scope of operation, and Pipe installing is carried out immediately.Pipeline After installing a construction section, assuring and backfilling construction for pipeline is carried out immediately, then carry out steel sheet pile pile pulling and inspection shaft is applied Work.
Embodiment
Prefabricated reinforced concrete base plate in advance, by taking d2000 pipelines as an example, prefabricated panel width 3.2m, length 1.5m, thickness 40cm, is placed in kerve, both as pipeline foundation, also serves as foundation ditch cross-brace.
S1, pipeline base plate are prefabricated, and prefabricated panel design grade is C40, every piece of width 3.2m, length 1.5m.
S2, steel sheet pile is beaten, steel sheet pile selects I40C I-steel, length 12m, and seaming is connected between stake and stake, and a fourth one is suitable Arrangement.
S3, excavation of foundation pit, excavation should follow " longitudinal divisionses, it is vertical layered, with support with dig, stretching top jail, strengthen monitoring " Principle.Fluting soil is had bad luck outer to reduce tube seat lateral pressure to tube seat 20m.
4S, prefabricated panel are laid, and prefabricated panel interval 1m lays, and one piece i.e. one piece of measurement is laid, with excavator to base plate Elevation is adjusted.
Connected between S5, base plate, reinforced mesh, reinforced mesh length 1m, 3.2 meters of width are made in advance.Prefabricated panel is in place After leveling, the installation of reinforced mesh is carried out immediately.
S6, subsequent construction, front prefabricated panel are laid after finishing and forming the scope of operation, and Pipe installing is carried out immediately.Pipeline After installing a construction section, assuring and backfilling construction for pipeline is carried out immediately, then carry out steel sheet pile pile pulling and inspection shaft is applied Work.

Claims (2)

1. a kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove, it is characterised in that:In Earthwork Construction of Deep Foundation, steel Reinforced concrete is supported based on horizontal pressure force, because reinforced concrete support is different from bracing members, its deformation is smaller, and arrangement of reinforcement is taken in addition With the method for support enlarging section, the intensity of reinforcing steel bar concrete support, as the spy that rigidity is big and deformation is small of the concrete of support Property be not fully exerted, it is ensured that basis and the installation security such as surrounding buildingses, road and underground piping;Prefabricated pipeline base plate is laid In in kerve, both as pipeline foundation, foundation ditch cross-brace is also served as.
2. the method that a kind of use prefabricated pipeline base plate according to claim 1 does Brace in Deep Footing Groove, it is characterised in that:Tool Gymnastics is made as follows:
S1, pipeline base plate are prefabricated, and prefabricated panel is designed into line label;
S2, steel sheet pile is beaten, be connected using seaming between stake and stake, be arranged by the suitable mode of a fourth one;
S3, excavation of foundation pit, excavation should follow " longitudinal divisionses, it is vertical layered, with support with dig, stretching top jail, strengthen monitoring " original Then;Fluting soil is had bad luck outer to reduce tube seat lateral pressure to tube seat 20m;
S4, prefabricated panel is laid, prefabricated panel interval 1m lays, and one piece i.e. one piece of measurement is laid, with excavator the bottom of to The elevation of plate is adjusted;
Connected between S5, base plate, reinforced mesh is made in advance;After prefabricated panel leveling in place, the installation of reinforced mesh is carried out immediately;
S6, subsequent construction, front prefabricated panel are laid after finishing and forming the scope of operation, and Pipe installing is carried out immediately;Pipe installing After a complete construction section, assuring and backfilling construction for pipeline is carried out immediately, then carry out steel sheet pile pile pulling and check well construction.
CN201611211320.7A 2016-12-24 2016-12-24 A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove Pending CN106759384A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611211320.7A CN106759384A (en) 2016-12-24 2016-12-24 A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611211320.7A CN106759384A (en) 2016-12-24 2016-12-24 A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove

Publications (1)

Publication Number Publication Date
CN106759384A true CN106759384A (en) 2017-05-31

Family

ID=58919902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611211320.7A Pending CN106759384A (en) 2016-12-24 2016-12-24 A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove

Country Status (1)

Country Link
CN (1) CN106759384A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326929A (en) * 2017-08-07 2017-11-07 中国十七冶集团有限公司 A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting
CN108412016A (en) * 2018-03-15 2018-08-17 中建五局土木工程有限公司 Underground tube body assures construction method
CN110512642A (en) * 2019-08-30 2019-11-29 中国二十二冶集团有限公司 Soft clay area drainage pipeline concrete pack punching block board construction method
CN110735434A (en) * 2019-10-16 2020-01-31 中国建筑一局(集团)有限公司 Construction method for replacing traditional inner support by underground force transmission belt in long and narrow deep foundation pits
CN111021507A (en) * 2019-11-21 2020-04-17 江苏永联精筑建设集团有限公司 Construction process of concrete rainwater pipe joint
CN111794343A (en) * 2020-05-29 2020-10-20 杭州江润科技有限公司 Construction method for connecting pipeline ditch with integrated sewer
CN112064751A (en) * 2020-08-08 2020-12-11 上海静安市政工程有限公司 Deep groove construction method for drainage pipeline
CN112502173A (en) * 2020-10-26 2021-03-16 浙江世润建创科技发展有限公司 Construction method for excavating whole sewer pipeline by high-water-content soft soil precipitation
CN114606932A (en) * 2022-03-11 2022-06-10 东珠生态环保股份有限公司 Soft clay foundation treatment method suitable for municipal road pipeline laying

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993019258A1 (en) * 1992-03-19 1993-09-30 Caswick Limited Manholes and inspection chambers
CN101565964A (en) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 Construction method for mounting outdoor embedded high-density polyethylene double-wall corrugated drain pipe
CN203393740U (en) * 2013-08-06 2014-01-15 嘉兴市规划设计研究院有限公司 Integral reinforced concrete foundation structure for assembling drainage pipelines
CN105672450A (en) * 2016-02-16 2016-06-15 上海市城市建设设计研究总院 Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993019258A1 (en) * 1992-03-19 1993-09-30 Caswick Limited Manholes and inspection chambers
CN101565964A (en) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 Construction method for mounting outdoor embedded high-density polyethylene double-wall corrugated drain pipe
CN203393740U (en) * 2013-08-06 2014-01-15 嘉兴市规划设计研究院有限公司 Integral reinforced concrete foundation structure for assembling drainage pipelines
CN105672450A (en) * 2016-02-16 2016-06-15 上海市城市建设设计研究总院 Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王俊等: ""深厚软弱地基上的新型管道基础形式"", 《城市道桥与防洪》 *
黄文胜: ""某道路塌陷原因分析与污水管道修复方案介绍"", 《给水排水》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326929A (en) * 2017-08-07 2017-11-07 中国十七冶集团有限公司 A kind of method of Duo Cang undergrounds integrated pipe earth excavation under Larsen steel sheet pile supporting
CN108412016A (en) * 2018-03-15 2018-08-17 中建五局土木工程有限公司 Underground tube body assures construction method
CN110512642A (en) * 2019-08-30 2019-11-29 中国二十二冶集团有限公司 Soft clay area drainage pipeline concrete pack punching block board construction method
CN110735434A (en) * 2019-10-16 2020-01-31 中国建筑一局(集团)有限公司 Construction method for replacing traditional inner support by underground force transmission belt in long and narrow deep foundation pits
CN111021507A (en) * 2019-11-21 2020-04-17 江苏永联精筑建设集团有限公司 Construction process of concrete rainwater pipe joint
CN111794343A (en) * 2020-05-29 2020-10-20 杭州江润科技有限公司 Construction method for connecting pipeline ditch with integrated sewer
CN111794343B (en) * 2020-05-29 2021-11-19 杭州江润科技有限公司 Construction method for connecting pipeline ditch with integrated sewer
CN112064751A (en) * 2020-08-08 2020-12-11 上海静安市政工程有限公司 Deep groove construction method for drainage pipeline
CN112502173A (en) * 2020-10-26 2021-03-16 浙江世润建创科技发展有限公司 Construction method for excavating whole sewer pipeline by high-water-content soft soil precipitation
CN114606932A (en) * 2022-03-11 2022-06-10 东珠生态环保股份有限公司 Soft clay foundation treatment method suitable for municipal road pipeline laying

Similar Documents

Publication Publication Date Title
CN106759384A (en) A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove
CN108442382B (en) In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method
CN101761083B (en) Underground continuous wall obstacle clearing construction method for traversing ultra-thick obstacle
CN103195158B (en) Municipal drainage pipeline slurry balance pipe-jacking construction method
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN110258582B (en) Inclined support foundation pit supporting structure based on steel pipe pile and Lassen steel plate and construction method
CN107503754A (en) A kind of construction method of VI grade of country rock rich water Shallow tunnel with large cross-section
CN112064751A (en) Deep groove construction method for drainage pipeline
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN101638898B (en) Suspension type construction method of top pipe shaft
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN107700497A (en) A kind of building basement pattern foundation pit supporting structure and earth excavation construction method
CN105926642B (en) A kind of Urban Underground pipe gallery pattern foundation pit supporting structure and underground structure external mold integral structure and construction method
CN106988337B (en) It is a kind of for reducing the reinforcement means of bar shaped shallow foundation house differential settlement
CN111335912B (en) Large-pipe-diameter mechanical pipe jacking construction process for soft soil foundation in collapsible loess area
CN101532586A (en) Underground pipeline installation construction device and method thereof
CN106498951B (en) A kind of shaft excavation construction method
CN112144425B (en) Box culvert drainage ditch pouring method located at high water level and in sandy soil environment
CN106049516A (en) Corrugated steel cofferdam hollow digging pile and manufacturing technique thereof
CN204435321U (en) A kind of steam power station water intaking open channel
CN208023591U (en) A kind of foundation pit supporting construction of steel sheet pile combined deposited pile
CN105672328B (en) Slip casting ductule resists the H profile steel foundation pit support device of earth lateral pressure
CN111042841A (en) Tunnel water-proof and drainage construction process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531