CN107304622A - A kind of integrated special putty construction technology of moistureproof anti-soil - Google Patents
A kind of integrated special putty construction technology of moistureproof anti-soil Download PDFInfo
- Publication number
- CN107304622A CN107304622A CN201610257364.7A CN201610257364A CN107304622A CN 107304622 A CN107304622 A CN 107304622A CN 201610257364 A CN201610257364 A CN 201610257364A CN 107304622 A CN107304622 A CN 107304622A
- Authority
- CN
- China
- Prior art keywords
- putty
- parts
- levelling
- construction
- moistureproof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09D—COATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
- C09D5/00—Coating compositions, e.g. paints, varnishes or lacquers, characterised by their physical nature or the effects produced; Filling pastes
- C09D5/34—Filling pastes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
- E04F13/04—Bases for plaster
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Organic Chemistry (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
- Paints Or Removers (AREA)
Abstract
The invention discloses a kind of integrated putty of moistureproof anti-soil and its construction technology, comprise the following steps technique;The processing of S01 metopes, S02 spray moistureproof alkali resistant back cover liquid, S03 negative and positive angle positioning molding, S04 ash cakes are selected, S05 masonry plinth courses are levelling, S06 first pass putty is levelling, second time putty of S07 is levelling, S08 surface layer putty is levelling, S09 surface layers putty is polished, the construction of S10 special fabric of pants.Through the putty layer after this construction technology, not only laying depth uniform outer surface is smooth, and no matter how long all without occur it is blocking come off the problem of.
Description
Technical field
It is a kind of integrated putty of moistureproof anti-soil specifically the present invention relates to putty construction process field
And its construction technology.
Background technology
Putty (fillering) is a kind of decoration type material of smooth surface of wall, is a kind of thick slurry coating material, is to apply
Essential a kind of product before feed powder brush.Painting is imposed on priming paint or directly applied and imposes on object, to remove
Rugged defect on coated article surface.Using a small amount of paint base, auxiliary agent, mass filler and appropriate coloring
Pigment is formulated, and pigment used is mainly iron oxide red, carbon black, chrome yellow etc..Filler be mainly calcium bicarbonate,
Talcum powder etc..Part, which can be filled up, the working surface of depression, can also be struck off in all surfaces, is typically the bottom of at
After enamelled coating is parched, primer coat surface is applied over.It is required that tack is good, do not crack in baking process.
The technical problem that presently, there are is:The thickness of wall body that traditional putty construction process is painted is uneven,
It is rough, it is that the length of time one blocking can come off the problem of most serious.
The content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide a kind of integrated putty construction of moistureproof anti-soil
Technique, can not only make it that putty laying depth uniform outer surface is smooth, and no matter how long all without appearance
It is blocking the problem of come off.
To reach above-mentioned purpose, present invention is as follows:
A kind of integrated special putty construction technology of moistureproof anti-soil, comprises the following steps:
The processing of S01 metopes:Degree of plainness for wall surface and perpendicularity are handled within 2 centimetres, to concrete wall top surface splicing seams
Polished;
The moistureproof alkali resistant back cover liquid of S02 sprayings:Inside and outside backfill area peripheral edge block wall and indoor high fill metope
Moistureproof alkali resistant back cover liquid is sprayed below 1 meter of side;
S03 negative and positive angle positioning molding:All negative and positive angles are using shaping negative and positive angle bead molding construction;
S04 ash cakes are selected:Build the premise of metope perpendicularity required in S01 steps are met and flatness by laying bricks or stones
Under ash cake is done with wall highest point, ash cake spacing is no more than 2 meters;
S05 masonry plinth courses are levelling:It is levelling to the progress of masonry plinth course, make the flatness of masonry plinth course and hang down
Straight degree is no more than 1 centimetre, increases damp proof quarantine measures;
S06 first pass putty is levelling:It is levelling to block wall, meet that basic unit is levelling to be no more than 1 centimetre, to base
The levelling metope basic unit more than 1 centimetre of layer carries out local leveling;
Second time putty of S07 is levelling:Second time leveling putty construction, order are proceeded by after the completion of base treatment
Should be and from top to bottom construct, construction point be surface scraper joint without sharp trace, surface is smooth, it is desirable to
Flatness, degree control are within 5 millimeters, and instrument should be double-handle scraper or copy chi, to local not up to standard
Carry out repairing treatment;
S08 surface layer putty is levelling:It is levelling to wall top surface progress surface layer putty after after leveling putty completion, operation
Order from top to bottom, constructed by whole face, it is impossible to joint and scratch occurs, finished product answer surface it is fine and smooth, seamless,
Color and luster is consistent;
S09 surface layers putty is polished:After the completion of surface layer putty is levelling, abutment joint is substantially scraped in 48~72 hours
Trace, joint carry out grinding process;
S10 special fabric of pants are constructed:Finished product face is checked, after confirmation is qualified, special fabric of pants construction is proceeded by, this
All application airless sprayer is carried out procedure, and spraying order should be according to uninterrupted spray from top to bottom from left to right
The order of painting, shower nozzle should keep 45~55 cm distances at the uniform velocity to move with wall, meet finished product and fallen without stream.
What is reached has the technical effect that:Due to distinguishing in this technique wall basic unit, basic unit's putty and surface layer putty
Levelling construction, and levelling craft precision requirement height are carried out, hence in so that degree of adhesion is more between putty layer and the wall base
Height, the requirement in the operation of levelling technique to operating procedure and instrument in addition, so as to overcome greasy at present
The blocking technical barrier come off after sublayer long-time.Simultaneously by backfill area peripheral edge block wall and interior
Spraying moistureproof alkali resistant back cover liquid in less than 1 meter of outside can improve the moisture resistance of putty layer in high fill metope,
Further prevent putty layer from coming off.
It is preferred that, in the step S05 layings glass fiber reticular cloth, the width of glass fiber reticular cloth is 30 centimetres.
It is preferred that, in the step S10 special fabric of pants construction, shower nozzle should keep 50 cm distances even with wall
Speed is mobile.
Further, in the levelling technique, the levelling anticracking grout used is by weight comprising following components:
300 parts of P042.5 ordinary portland cements, 50~100 parts of gypsum, 600~650 parts of middle sand, HPMC10 celluloses
2 parts of ether, 2 parts of BNE-118 polyvinyl alcohol, 12 parts of latex powder, 1~2 part of PP fibers, grey wood-fibred 0~
3 parts.
It is preferred that, the PP fibers are PP fiber 6mm or PP fibers 9mm.
Further, basic unit's putty includes following components by weight:650 parts of dicalcium powder, white cement
300 parts, 50 parts of sierozem power, 4 parts of HPMC10 cellulose ethers, 2 parts of BNE-118 polyvinyl alcohol, latex powder
10 parts.
Basic unit's putty includes following components by weight:750 parts of dicalcium powder, 250 parts of sierozem power, HPMC10
5 parts of cellulose ether, 4 parts of BNE-118 polyvinyl alcohol, 0.5 part of starch ether.
The present invention remarkable result be:The putty layer come out by the construction technology in the present invention not only lays thickness
The problem of spending uniform outer surface smooth, and no matter how long come off all without appearance is blocking.
Embodiment
The embodiment and operation principle to the present invention are described in further detail below.
A kind of integrated special putty construction technology of moistureproof anti-soil, comprises the following steps:
The processing of S01 metopes:Degree of plainness for wall surface and perpendicularity are handled within 2 centimetres, to concrete wall top surface splicing seams
Polished.Require that degree of plainness for wall surface and perpendicularity are handled within 2 centimetres in this technological operation, its numerical value
It is the smaller the better.
The moistureproof alkali resistant back cover liquid of S02 sprayings:Inside and outside backfill area peripheral edge block wall and indoor high fill metope
Moistureproof alkali resistant back cover liquid is sprayed below 1 meter of side.The moistureproof alkali resistant back cover liquid of spraying is required in actual mechanical process
Spraying is uniform.
S03 negative and positive angle positioning molding:All negative and positive angles are using shaping negative and positive angle bead molding construction.
S04 ash cakes are selected:Build the premise of metope perpendicularity required in S01 steps are met and flatness by laying bricks or stones
Under ash cake is done with wall highest point, ash cake spacing is no more than 2 meters.Ash cake spacing is less than normal preferably in theory, but
It is to select 1.5 meters in the present embodiment in order to consider speed of application and technical requirements ash cake spacing.
S05 masonry plinth courses are levelling:It is levelling to the progress of masonry plinth course, make the flatness of masonry plinth course and hang down
Straight degree is no more than 1 centimetre, increases damp proof quarantine measures.
S06 first pass putty is levelling:It is levelling to block wall, meet that basic unit is levelling to be no more than 1 centimetre, to base
The levelling metope basic unit more than 1 centimetre of layer carries out local leveling.
Second time putty of S07 is levelling:Second time leveling putty construction, order are proceeded by after the completion of base treatment
Should be and from top to bottom construct, construction point be surface scraper joint without sharp trace, surface is smooth, it is desirable to
Flatness, degree control are within 5 millimeters, and instrument should be double-handle scraper or copy chi, to local not up to standard
Carry out repairing treatment.
S08 surface layer putty is levelling:It is levelling to wall top surface progress surface layer putty after after leveling putty completion, operation
Order from top to bottom, constructed by whole face, it is impossible to joint and scratch occurs, finished product answer surface it is fine and smooth, seamless,
Color and luster is consistent.
S09 surface layers putty is polished:After the completion of surface layer putty is levelling, abutment joint is substantially scraped in 48~72 hours
Trace, joint carry out grinding process.
S10 special fabric of pants are constructed:Finished product face is checked, after confirmation is qualified, special fabric of pants construction is proceeded by, this
All application airless sprayer is carried out procedure, and spraying order should be according to uninterrupted spray from top to bottom from left to right
The order of painting, shower nozzle should keep 45~55 cm distances at the uniform velocity to move with wall, meet finished product and fallen without stream.
In the step S10 special fabric of pants construction, shower nozzle should keep 50 cm distances at the uniform velocity to move with wall.
In the levelling technique, the levelling anticracking grout used is by weight comprising following components:PO42.5 is general
300 parts of silicon cement, 50~100 parts of gypsum, 600~650 parts of middle sand, 2 parts of HPMC10 cellulose ethers,
2 parts of BNE-118 polyvinyl alcohol, 12 parts of latex powder, 1~2 part of PP fibers, grey 0~3 part of wood-fibred.
Wherein, PP fibers are PP fiber 6mm or PP fibers 9mm.
Basic unit's putty includes following components by weight:650 parts of dicalcium powder, 300 parts of white cement, ash
50 parts of calcium powder, 4 parts of HPMC10 cellulose ethers, 2 parts of BNE-118 polyvinyl alcohol, 10 parts of latex powder.
Basic unit's putty includes following components by weight:750 parts of dicalcium powder, 250 parts of sierozem power, HPMC10
5 parts of cellulose ether, 4 parts of BNE-118 polyvinyl alcohol, 0.5 part of starch ether.
The above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to preferred embodiment pair
The present invention is described in detail, it will be understood by those within the art that, can be to technology of the invention
Scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should contain
Cover among scope of the presently claimed invention.
Claims (6)
1. a kind of integrated special putty construction technology of moistureproof anti-soil, it is characterised in that comprise the following steps:
The processing of S01 metopes:Degree of plainness for wall surface and perpendicularity are handled within 2 centimetres, to concrete wall top surface splicing seams
Polished;
The moistureproof alkali resistant back cover liquid of S02 sprayings:Inside and outside backfill area peripheral edge block wall and indoor high fill metope
Moistureproof alkali resistant back cover liquid is sprayed below 1 meter of side;
S03 negative and positive angle positioning molding:All negative and positive angles are using shaping negative and positive angle bead molding construction;
S04 ash cakes are selected:Build the premise of metope perpendicularity required in S01 steps are met and flatness by laying bricks or stones
Under ash cake is done with wall highest point, ash cake spacing is no more than 2 meters;
S05 masonry plinth courses are levelling:It is levelling to the progress of masonry plinth course, make the flatness of masonry plinth course and hang down
Straight degree is no more than 1 centimetre, increases damp proof quarantine measures;
S06 first pass putty is levelling:It is levelling to block wall, meet that basic unit is levelling to be no more than 1 centimetre, to base
The levelling metope basic unit more than 1 centimetre of layer carries out local leveling;
Second time putty of S07 is levelling:Second time leveling putty construction, order are proceeded by after the completion of base treatment
Should be and from top to bottom construct, construction point be surface scraper joint without sharp trace, surface is smooth, it is desirable to
Flatness, degree control are within 5 millimeters, and instrument should be double-handle scraper or copy chi, to local not up to standard
Carry out repairing treatment;
S08 surface layer putty is levelling:It is levelling to wall top surface progress surface layer putty after after leveling putty completion, operation
Order from top to bottom, constructed by whole face, it is impossible to joint and scratch occurs, finished product answer surface it is fine and smooth, seamless,
Color and luster is consistent;
S09 surface layers putty is polished:After the completion of surface layer putty is levelling, abutment joint is substantially scraped in 48~72 hours
Trace, joint carry out grinding process;
S10 special fabric of pants are constructed:Finished product face is checked, after confirmation is qualified, special fabric of pants construction is proceeded by, this
All application airless sprayer is carried out procedure, and spraying order should be according to uninterrupted spray from top to bottom from left to right
The order of painting, shower nozzle should keep 45~55 cm distances at the uniform velocity to move with wall, meet finished product and fallen without stream.
2. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 1, its feature
It is:In the step S10 special fabric of pants construction, shower nozzle should keep 50 cm distances at the uniform velocity to move with wall.
3. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 1, its feature
It is:In the levelling technique, the levelling anticracking grout used is by weight comprising following components:
300 parts of P042.5 ordinary portland cements, 50~100 parts of gypsum, 600~650 parts of middle sand, HPMC10 are fine
Plain 2 parts of the ether of dimension, 2 parts of BNE-118 polyvinyl alcohol, 12 parts of latex powder, 1~2 part of PP fibers, ash wood are fine
0~3 part of dimension.
4. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 3, its feature
It is:The PP fibers are PP fiber 6mm or PP fibers 9mm.
5. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 1, its feature
It is:Basic unit's putty includes following components by weight:
650 parts of dicalcium powder, 300 parts of white cement, 50 parts of sierozem power, 4 parts of HPMC10 cellulose ethers, BNE-118
2 parts of polyvinyl alcohol, 10 parts of latex powder.
6. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 1, its feature
It is:Basic unit's putty includes following components by weight:
750 parts of dicalcium powder, 250 parts of sierozem power, 5 parts of HPMC10 cellulose ethers, BNE-118 polyvinyl alcohol
4 parts, 0.5 part of starch ether.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610257364.7A CN107304622B (en) | 2016-04-25 | 2016-04-25 | A kind of moisture-proof anti-pollution integration special putty construction technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610257364.7A CN107304622B (en) | 2016-04-25 | 2016-04-25 | A kind of moisture-proof anti-pollution integration special putty construction technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107304622A true CN107304622A (en) | 2017-10-31 |
CN107304622B CN107304622B (en) | 2019-02-01 |
Family
ID=60150754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610257364.7A Expired - Fee Related CN107304622B (en) | 2016-04-25 | 2016-04-25 | A kind of moisture-proof anti-pollution integration special putty construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107304622B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100765437B1 (en) * | 2006-06-02 | 2007-10-09 | (주)포산엔지니어링 | Pretreatment method of wall painting for a building |
CN101195529A (en) * | 2007-12-17 | 2008-06-11 | 重庆大学 | Heat preserving crack resistant mortar for exterior wall |
CN101363269A (en) * | 2008-08-13 | 2009-02-11 | 中建五局第三建设有限公司 | Construction method of anti-plastering putty for concrete structure wall |
CN101832015A (en) * | 2010-03-29 | 2010-09-15 | 陕西建工集团第二建筑工程有限公司 | Construction process for outer wall metal fluorocarbon coating |
CN104120845A (en) * | 2013-04-28 | 2014-10-29 | 杨哲 | Construction method for outer wall inorganic thermal mortar coating decorative finishing |
CN104120847A (en) * | 2014-07-16 | 2014-10-29 | 南通四建集团有限公司 | Construction method for whitewashing-free puttying processing of concrete porous brick wall |
-
2016
- 2016-04-25 CN CN201610257364.7A patent/CN107304622B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100765437B1 (en) * | 2006-06-02 | 2007-10-09 | (주)포산엔지니어링 | Pretreatment method of wall painting for a building |
CN101195529A (en) * | 2007-12-17 | 2008-06-11 | 重庆大学 | Heat preserving crack resistant mortar for exterior wall |
CN101363269A (en) * | 2008-08-13 | 2009-02-11 | 中建五局第三建设有限公司 | Construction method of anti-plastering putty for concrete structure wall |
CN101832015A (en) * | 2010-03-29 | 2010-09-15 | 陕西建工集团第二建筑工程有限公司 | Construction process for outer wall metal fluorocarbon coating |
CN104120845A (en) * | 2013-04-28 | 2014-10-29 | 杨哲 | Construction method for outer wall inorganic thermal mortar coating decorative finishing |
CN104120847A (en) * | 2014-07-16 | 2014-10-29 | 南通四建集团有限公司 | Construction method for whitewashing-free puttying processing of concrete porous brick wall |
Also Published As
Publication number | Publication date |
---|---|
CN107304622B (en) | 2019-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101832015B (en) | Construction process for outer wall metal fluorocarbon coating | |
CN102744190A (en) | Coating method for imitating marble effect | |
CN105298045B (en) | A kind of interior wall diatom ooze coating and its painting method | |
CN104088415A (en) | Construction method for finish concrete surface repair protective agent | |
JP2012106204A (en) | Method for forming patterned surface | |
CN111484780A (en) | Method for manufacturing composite marble-imitated coating based on elastic multicolor paint | |
CN106284890A (en) | A kind of construction method of art colored stone paint | |
CN111364710A (en) | Method for manufacturing composite marble-imitated coating by using multi-color real stone paint | |
CN104453133A (en) | Real stone paint construction technology | |
CN107304622A (en) | A kind of integrated special putty construction technology of moistureproof anti-soil | |
CN103321367A (en) | Construction process for bare concrete and water paint | |
JP2019025881A (en) | Method for producing building material, and building material | |
KR20090131789A (en) | The method for painting work of floor using incombustible material | |
CN110981348A (en) | Precast cement-resin colored concrete slab | |
CN110591532A (en) | Preparation method of stain-resistant high-hardness stone-like paint | |
CN206110545U (en) | Various lining of wall | |
JP5420521B2 (en) | Pattern surface formation method | |
CN104727500B (en) | Art flexible face brick and construction method thereof | |
JP2019013899A (en) | Film formation method | |
CN114273175A (en) | Coating method of imitation brick veneer | |
CN110593529A (en) | Construction process of fluorocarbon paint | |
CN109610833A (en) | Building coating construction technology | |
CN109517423A (en) | A kind of method of novel ultra-white water-proof putty powder and preparation method thereof and the sparkling and crystal-clear white wall decoration carved on paste metope of production | |
CN108824725A (en) | A kind of construction method sprayed at lacquer external corner | |
CN111270820B (en) | Limestone deep seam construction process method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190201 Termination date: 20200425 |