CN107304622A - A kind of integrated special putty construction technology of moistureproof anti-soil - Google Patents

A kind of integrated special putty construction technology of moistureproof anti-soil Download PDF

Info

Publication number
CN107304622A
CN107304622A CN201610257364.7A CN201610257364A CN107304622A CN 107304622 A CN107304622 A CN 107304622A CN 201610257364 A CN201610257364 A CN 201610257364A CN 107304622 A CN107304622 A CN 107304622A
Authority
CN
China
Prior art keywords
putty
parts
levelling
construction
moistureproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610257364.7A
Other languages
Chinese (zh)
Other versions
CN107304622B (en
Inventor
李平远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610257364.7A priority Critical patent/CN107304622B/en
Publication of CN107304622A publication Critical patent/CN107304622A/en
Application granted granted Critical
Publication of CN107304622B publication Critical patent/CN107304622B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D5/00Coating compositions, e.g. paints, varnishes or lacquers, characterised by their physical nature or the effects produced; Filling pastes
    • C09D5/34Filling pastes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Organic Chemistry (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)
  • Paints Or Removers (AREA)

Abstract

The invention discloses a kind of integrated putty of moistureproof anti-soil and its construction technology, comprise the following steps technique;The processing of S01 metopes, S02 spray moistureproof alkali resistant back cover liquid, S03 negative and positive angle positioning molding, S04 ash cakes are selected, S05 masonry plinth courses are levelling, S06 first pass putty is levelling, second time putty of S07 is levelling, S08 surface layer putty is levelling, S09 surface layers putty is polished, the construction of S10 special fabric of pants.Through the putty layer after this construction technology, not only laying depth uniform outer surface is smooth, and no matter how long all without occur it is blocking come off the problem of.

Description

A kind of integrated special putty construction technology of moistureproof anti-soil
Technical field
It is a kind of integrated putty of moistureproof anti-soil specifically the present invention relates to putty construction process field And its construction technology.
Background technology
Putty (fillering) is a kind of decoration type material of smooth surface of wall, is a kind of thick slurry coating material, is to apply Essential a kind of product before feed powder brush.Painting is imposed on priming paint or directly applied and imposes on object, to remove Rugged defect on coated article surface.Using a small amount of paint base, auxiliary agent, mass filler and appropriate coloring Pigment is formulated, and pigment used is mainly iron oxide red, carbon black, chrome yellow etc..Filler be mainly calcium bicarbonate, Talcum powder etc..Part, which can be filled up, the working surface of depression, can also be struck off in all surfaces, is typically the bottom of at After enamelled coating is parched, primer coat surface is applied over.It is required that tack is good, do not crack in baking process.
The technical problem that presently, there are is:The thickness of wall body that traditional putty construction process is painted is uneven, It is rough, it is that the length of time one blocking can come off the problem of most serious.
The content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide a kind of integrated putty construction of moistureproof anti-soil Technique, can not only make it that putty laying depth uniform outer surface is smooth, and no matter how long all without appearance It is blocking the problem of come off.
To reach above-mentioned purpose, present invention is as follows:
A kind of integrated special putty construction technology of moistureproof anti-soil, comprises the following steps:
The processing of S01 metopes:Degree of plainness for wall surface and perpendicularity are handled within 2 centimetres, to concrete wall top surface splicing seams Polished;
The moistureproof alkali resistant back cover liquid of S02 sprayings:Inside and outside backfill area peripheral edge block wall and indoor high fill metope Moistureproof alkali resistant back cover liquid is sprayed below 1 meter of side;
S03 negative and positive angle positioning molding:All negative and positive angles are using shaping negative and positive angle bead molding construction;
S04 ash cakes are selected:Build the premise of metope perpendicularity required in S01 steps are met and flatness by laying bricks or stones Under ash cake is done with wall highest point, ash cake spacing is no more than 2 meters;
S05 masonry plinth courses are levelling:It is levelling to the progress of masonry plinth course, make the flatness of masonry plinth course and hang down Straight degree is no more than 1 centimetre, increases damp proof quarantine measures;
S06 first pass putty is levelling:It is levelling to block wall, meet that basic unit is levelling to be no more than 1 centimetre, to base The levelling metope basic unit more than 1 centimetre of layer carries out local leveling;
Second time putty of S07 is levelling:Second time leveling putty construction, order are proceeded by after the completion of base treatment Should be and from top to bottom construct, construction point be surface scraper joint without sharp trace, surface is smooth, it is desirable to Flatness, degree control are within 5 millimeters, and instrument should be double-handle scraper or copy chi, to local not up to standard Carry out repairing treatment;
S08 surface layer putty is levelling:It is levelling to wall top surface progress surface layer putty after after leveling putty completion, operation Order from top to bottom, constructed by whole face, it is impossible to joint and scratch occurs, finished product answer surface it is fine and smooth, seamless, Color and luster is consistent;
S09 surface layers putty is polished:After the completion of surface layer putty is levelling, abutment joint is substantially scraped in 48~72 hours Trace, joint carry out grinding process;
S10 special fabric of pants are constructed:Finished product face is checked, after confirmation is qualified, special fabric of pants construction is proceeded by, this All application airless sprayer is carried out procedure, and spraying order should be according to uninterrupted spray from top to bottom from left to right The order of painting, shower nozzle should keep 45~55 cm distances at the uniform velocity to move with wall, meet finished product and fallen without stream.
What is reached has the technical effect that:Due to distinguishing in this technique wall basic unit, basic unit's putty and surface layer putty Levelling construction, and levelling craft precision requirement height are carried out, hence in so that degree of adhesion is more between putty layer and the wall base Height, the requirement in the operation of levelling technique to operating procedure and instrument in addition, so as to overcome greasy at present The blocking technical barrier come off after sublayer long-time.Simultaneously by backfill area peripheral edge block wall and interior Spraying moistureproof alkali resistant back cover liquid in less than 1 meter of outside can improve the moisture resistance of putty layer in high fill metope, Further prevent putty layer from coming off.
It is preferred that, in the step S05 layings glass fiber reticular cloth, the width of glass fiber reticular cloth is 30 centimetres.
It is preferred that, in the step S10 special fabric of pants construction, shower nozzle should keep 50 cm distances even with wall Speed is mobile.
Further, in the levelling technique, the levelling anticracking grout used is by weight comprising following components: 300 parts of P042.5 ordinary portland cements, 50~100 parts of gypsum, 600~650 parts of middle sand, HPMC10 celluloses 2 parts of ether, 2 parts of BNE-118 polyvinyl alcohol, 12 parts of latex powder, 1~2 part of PP fibers, grey wood-fibred 0~ 3 parts.
It is preferred that, the PP fibers are PP fiber 6mm or PP fibers 9mm.
Further, basic unit's putty includes following components by weight:650 parts of dicalcium powder, white cement 300 parts, 50 parts of sierozem power, 4 parts of HPMC10 cellulose ethers, 2 parts of BNE-118 polyvinyl alcohol, latex powder 10 parts.
Basic unit's putty includes following components by weight:750 parts of dicalcium powder, 250 parts of sierozem power, HPMC10 5 parts of cellulose ether, 4 parts of BNE-118 polyvinyl alcohol, 0.5 part of starch ether.
The present invention remarkable result be:The putty layer come out by the construction technology in the present invention not only lays thickness The problem of spending uniform outer surface smooth, and no matter how long come off all without appearance is blocking.
Embodiment
The embodiment and operation principle to the present invention are described in further detail below.
A kind of integrated special putty construction technology of moistureproof anti-soil, comprises the following steps:
The processing of S01 metopes:Degree of plainness for wall surface and perpendicularity are handled within 2 centimetres, to concrete wall top surface splicing seams Polished.Require that degree of plainness for wall surface and perpendicularity are handled within 2 centimetres in this technological operation, its numerical value It is the smaller the better.
The moistureproof alkali resistant back cover liquid of S02 sprayings:Inside and outside backfill area peripheral edge block wall and indoor high fill metope Moistureproof alkali resistant back cover liquid is sprayed below 1 meter of side.The moistureproof alkali resistant back cover liquid of spraying is required in actual mechanical process Spraying is uniform.
S03 negative and positive angle positioning molding:All negative and positive angles are using shaping negative and positive angle bead molding construction.
S04 ash cakes are selected:Build the premise of metope perpendicularity required in S01 steps are met and flatness by laying bricks or stones Under ash cake is done with wall highest point, ash cake spacing is no more than 2 meters.Ash cake spacing is less than normal preferably in theory, but It is to select 1.5 meters in the present embodiment in order to consider speed of application and technical requirements ash cake spacing.
S05 masonry plinth courses are levelling:It is levelling to the progress of masonry plinth course, make the flatness of masonry plinth course and hang down Straight degree is no more than 1 centimetre, increases damp proof quarantine measures.
S06 first pass putty is levelling:It is levelling to block wall, meet that basic unit is levelling to be no more than 1 centimetre, to base The levelling metope basic unit more than 1 centimetre of layer carries out local leveling.
Second time putty of S07 is levelling:Second time leveling putty construction, order are proceeded by after the completion of base treatment Should be and from top to bottom construct, construction point be surface scraper joint without sharp trace, surface is smooth, it is desirable to Flatness, degree control are within 5 millimeters, and instrument should be double-handle scraper or copy chi, to local not up to standard Carry out repairing treatment.
S08 surface layer putty is levelling:It is levelling to wall top surface progress surface layer putty after after leveling putty completion, operation Order from top to bottom, constructed by whole face, it is impossible to joint and scratch occurs, finished product answer surface it is fine and smooth, seamless, Color and luster is consistent.
S09 surface layers putty is polished:After the completion of surface layer putty is levelling, abutment joint is substantially scraped in 48~72 hours Trace, joint carry out grinding process.
S10 special fabric of pants are constructed:Finished product face is checked, after confirmation is qualified, special fabric of pants construction is proceeded by, this All application airless sprayer is carried out procedure, and spraying order should be according to uninterrupted spray from top to bottom from left to right The order of painting, shower nozzle should keep 45~55 cm distances at the uniform velocity to move with wall, meet finished product and fallen without stream.
In the step S10 special fabric of pants construction, shower nozzle should keep 50 cm distances at the uniform velocity to move with wall.
In the levelling technique, the levelling anticracking grout used is by weight comprising following components:PO42.5 is general 300 parts of silicon cement, 50~100 parts of gypsum, 600~650 parts of middle sand, 2 parts of HPMC10 cellulose ethers, 2 parts of BNE-118 polyvinyl alcohol, 12 parts of latex powder, 1~2 part of PP fibers, grey 0~3 part of wood-fibred.
Wherein, PP fibers are PP fiber 6mm or PP fibers 9mm.
Basic unit's putty includes following components by weight:650 parts of dicalcium powder, 300 parts of white cement, ash 50 parts of calcium powder, 4 parts of HPMC10 cellulose ethers, 2 parts of BNE-118 polyvinyl alcohol, 10 parts of latex powder.
Basic unit's putty includes following components by weight:750 parts of dicalcium powder, 250 parts of sierozem power, HPMC10 5 parts of cellulose ether, 4 parts of BNE-118 polyvinyl alcohol, 0.5 part of starch ether.
The above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to preferred embodiment pair The present invention is described in detail, it will be understood by those within the art that, can be to technology of the invention Scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should contain Cover among scope of the presently claimed invention.

Claims (6)

1. a kind of integrated special putty construction technology of moistureproof anti-soil, it is characterised in that comprise the following steps:
The processing of S01 metopes:Degree of plainness for wall surface and perpendicularity are handled within 2 centimetres, to concrete wall top surface splicing seams Polished;
The moistureproof alkali resistant back cover liquid of S02 sprayings:Inside and outside backfill area peripheral edge block wall and indoor high fill metope Moistureproof alkali resistant back cover liquid is sprayed below 1 meter of side;
S03 negative and positive angle positioning molding:All negative and positive angles are using shaping negative and positive angle bead molding construction;
S04 ash cakes are selected:Build the premise of metope perpendicularity required in S01 steps are met and flatness by laying bricks or stones Under ash cake is done with wall highest point, ash cake spacing is no more than 2 meters;
S05 masonry plinth courses are levelling:It is levelling to the progress of masonry plinth course, make the flatness of masonry plinth course and hang down Straight degree is no more than 1 centimetre, increases damp proof quarantine measures;
S06 first pass putty is levelling:It is levelling to block wall, meet that basic unit is levelling to be no more than 1 centimetre, to base The levelling metope basic unit more than 1 centimetre of layer carries out local leveling;
Second time putty of S07 is levelling:Second time leveling putty construction, order are proceeded by after the completion of base treatment Should be and from top to bottom construct, construction point be surface scraper joint without sharp trace, surface is smooth, it is desirable to Flatness, degree control are within 5 millimeters, and instrument should be double-handle scraper or copy chi, to local not up to standard Carry out repairing treatment;
S08 surface layer putty is levelling:It is levelling to wall top surface progress surface layer putty after after leveling putty completion, operation Order from top to bottom, constructed by whole face, it is impossible to joint and scratch occurs, finished product answer surface it is fine and smooth, seamless, Color and luster is consistent;
S09 surface layers putty is polished:After the completion of surface layer putty is levelling, abutment joint is substantially scraped in 48~72 hours Trace, joint carry out grinding process;
S10 special fabric of pants are constructed:Finished product face is checked, after confirmation is qualified, special fabric of pants construction is proceeded by, this All application airless sprayer is carried out procedure, and spraying order should be according to uninterrupted spray from top to bottom from left to right The order of painting, shower nozzle should keep 45~55 cm distances at the uniform velocity to move with wall, meet finished product and fallen without stream.
2. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 1, its feature It is:In the step S10 special fabric of pants construction, shower nozzle should keep 50 cm distances at the uniform velocity to move with wall.
3. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 1, its feature It is:In the levelling technique, the levelling anticracking grout used is by weight comprising following components:
300 parts of P042.5 ordinary portland cements, 50~100 parts of gypsum, 600~650 parts of middle sand, HPMC10 are fine Plain 2 parts of the ether of dimension, 2 parts of BNE-118 polyvinyl alcohol, 12 parts of latex powder, 1~2 part of PP fibers, ash wood are fine 0~3 part of dimension.
4. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 3, its feature It is:The PP fibers are PP fiber 6mm or PP fibers 9mm.
5. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 1, its feature It is:Basic unit's putty includes following components by weight:
650 parts of dicalcium powder, 300 parts of white cement, 50 parts of sierozem power, 4 parts of HPMC10 cellulose ethers, BNE-118 2 parts of polyvinyl alcohol, 10 parts of latex powder.
6. the integrated special putty construction technology of a kind of moistureproof anti-soil according to claim 1, its feature It is:Basic unit's putty includes following components by weight:
750 parts of dicalcium powder, 250 parts of sierozem power, 5 parts of HPMC10 cellulose ethers, BNE-118 polyvinyl alcohol 4 parts, 0.5 part of starch ether.
CN201610257364.7A 2016-04-25 2016-04-25 A kind of moisture-proof anti-pollution integration special putty construction technology Expired - Fee Related CN107304622B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610257364.7A CN107304622B (en) 2016-04-25 2016-04-25 A kind of moisture-proof anti-pollution integration special putty construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610257364.7A CN107304622B (en) 2016-04-25 2016-04-25 A kind of moisture-proof anti-pollution integration special putty construction technology

Publications (2)

Publication Number Publication Date
CN107304622A true CN107304622A (en) 2017-10-31
CN107304622B CN107304622B (en) 2019-02-01

Family

ID=60150754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610257364.7A Expired - Fee Related CN107304622B (en) 2016-04-25 2016-04-25 A kind of moisture-proof anti-pollution integration special putty construction technology

Country Status (1)

Country Link
CN (1) CN107304622B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100765437B1 (en) * 2006-06-02 2007-10-09 (주)포산엔지니어링 Pretreatment method of wall painting for a building
CN101195529A (en) * 2007-12-17 2008-06-11 重庆大学 Heat preserving crack resistant mortar for exterior wall
CN101363269A (en) * 2008-08-13 2009-02-11 中建五局第三建设有限公司 Construction method of anti-plastering putty for concrete structure wall
CN101832015A (en) * 2010-03-29 2010-09-15 陕西建工集团第二建筑工程有限公司 Construction process for outer wall metal fluorocarbon coating
CN104120845A (en) * 2013-04-28 2014-10-29 杨哲 Construction method for outer wall inorganic thermal mortar coating decorative finishing
CN104120847A (en) * 2014-07-16 2014-10-29 南通四建集团有限公司 Construction method for whitewashing-free puttying processing of concrete porous brick wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100765437B1 (en) * 2006-06-02 2007-10-09 (주)포산엔지니어링 Pretreatment method of wall painting for a building
CN101195529A (en) * 2007-12-17 2008-06-11 重庆大学 Heat preserving crack resistant mortar for exterior wall
CN101363269A (en) * 2008-08-13 2009-02-11 中建五局第三建设有限公司 Construction method of anti-plastering putty for concrete structure wall
CN101832015A (en) * 2010-03-29 2010-09-15 陕西建工集团第二建筑工程有限公司 Construction process for outer wall metal fluorocarbon coating
CN104120845A (en) * 2013-04-28 2014-10-29 杨哲 Construction method for outer wall inorganic thermal mortar coating decorative finishing
CN104120847A (en) * 2014-07-16 2014-10-29 南通四建集团有限公司 Construction method for whitewashing-free puttying processing of concrete porous brick wall

Also Published As

Publication number Publication date
CN107304622B (en) 2019-02-01

Similar Documents

Publication Publication Date Title
CN101832015B (en) Construction process for outer wall metal fluorocarbon coating
CN102744190A (en) Coating method for imitating marble effect
CN105298045B (en) A kind of interior wall diatom ooze coating and its painting method
CN104088415A (en) Construction method for finish concrete surface repair protective agent
JP2012106204A (en) Method for forming patterned surface
CN111484780A (en) Method for manufacturing composite marble-imitated coating based on elastic multicolor paint
CN106284890A (en) A kind of construction method of art colored stone paint
CN111364710A (en) Method for manufacturing composite marble-imitated coating by using multi-color real stone paint
CN104453133A (en) Real stone paint construction technology
CN107304622A (en) A kind of integrated special putty construction technology of moistureproof anti-soil
CN103321367A (en) Construction process for bare concrete and water paint
JP2019025881A (en) Method for producing building material, and building material
KR20090131789A (en) The method for painting work of floor using incombustible material
CN110981348A (en) Precast cement-resin colored concrete slab
CN110591532A (en) Preparation method of stain-resistant high-hardness stone-like paint
CN206110545U (en) Various lining of wall
JP5420521B2 (en) Pattern surface formation method
CN104727500B (en) Art flexible face brick and construction method thereof
JP2019013899A (en) Film formation method
CN114273175A (en) Coating method of imitation brick veneer
CN110593529A (en) Construction process of fluorocarbon paint
CN109610833A (en) Building coating construction technology
CN109517423A (en) A kind of method of novel ultra-white water-proof putty powder and preparation method thereof and the sparkling and crystal-clear white wall decoration carved on paste metope of production
CN108824725A (en) A kind of construction method sprayed at lacquer external corner
CN111270820B (en) Limestone deep seam construction process method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190201

Termination date: 20200425