CN107293179B - Tunnel cave rescues integrated rehearsal simulation system and application method - Google Patents

Tunnel cave rescues integrated rehearsal simulation system and application method Download PDF

Info

Publication number
CN107293179B
CN107293179B CN201710711431.2A CN201710711431A CN107293179B CN 107293179 B CN107293179 B CN 107293179B CN 201710711431 A CN201710711431 A CN 201710711431A CN 107293179 B CN107293179 B CN 107293179B
Authority
CN
China
Prior art keywords
rehearsal
rescue
mouth
simulation system
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710711431.2A
Other languages
Chinese (zh)
Other versions
CN107293179A (en
Inventor
刘卫华
文舟
黄达
钟杰
穆树元
魏阳
杜长清
王献泽
王维俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
Original Assignee
China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 2 Engineering Group Co Ltd filed Critical China Railway No 2 Engineering Group Co Ltd
Priority to CN201710711431.2A priority Critical patent/CN107293179B/en
Publication of CN107293179A publication Critical patent/CN107293179A/en
Application granted granted Critical
Publication of CN107293179B publication Critical patent/CN107293179B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/04Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The invention discloses tunnel caves to rescue integrated rehearsal simulation system, including two abutment walls, arc top cover above two abutment walls is set, the side that two abutment walls and arc top cover are formed by channel is hatch frame, the other side is closed by parados, and the parados is equipped with openable and closable gate;The channel middle is stacked with rubble mound, the side view of the rubble mound is triangle, rubble mound front and rear sides are provided with sand pocket, horizontal drill mouth is provided on the rubble mound, the lower section of the horizontal drill mouth is clay region, it is provided with push pipe mouth in the clay region, is provided with large-diameter drill mouth, central drainage pipe and small base tunnel mouth below the clay region.The invention also discloses its application method, the rehearsal including small base tunnel rescue method;Horizontal drill gets through life channel rehearsal;Push bench process rehearsal;The rehearsal of large-diameter drill method;Rescue method rehearsal in center gutter;Any combination rehearsal of the above various methods.

Description

Tunnel cave rescues integrated rehearsal simulation system and application method
Technical field
The present invention relates to a kind of rehearsal simulation system, in particular to a kind of tunnel cave rescue integrated rehearsal simulation system and Application method.
Background technique
Tunnel is the engineering works for being embedded in underground, and the construction in tunnel need to be in underground job, therefore the construction in tunnel is deposited In many uncertain Safety Influence Factors.Wherein, since Tunnel Engineering length is big, complex geologic conditions, the depth of prospecting is not Foot, in addition arrangement and method for construction is unreasonable, process control red line, executes the reasons such as ineffective, process of construction is very risky, collapses in built tunnel " shutdown " phenomenon that is square and causing happens occasionally, and causes great threat to construction personnel's life security.When tunnel cave disaster After generation, position, the number, live distributed intelligence of the personnel that are buried are grasped in time, seems outstanding to reasonable, effective arrangement rescue It is important.
Due to lacking advanced rescue outfit, effective tissue, rescue operations are often that personnel jump on the bandwagon, along with rescuing It helps method also to lack than choosing, causes the waste of a large amount of manpower financial capacity.More seriously, since rescue experience is insufficient, sometimes Rescue it is improper will cause secondary landslide instead, the trapped person rescued will be hopeful originally and thoroughly buried, cause rescue fail.Cause This, needs a kind of place that rescue modes various when can be to tunnel cave are drilled, more by carrying out to various rescue modes It is secondary to repeat to drill, so as to enhance the rescue experience of personnel, and most reasonable rescue mode is selected, guarantees the lives and properties of personnel Safety.
Summary of the invention
Lack rescue experience when it is an object of the invention to overcome the shortcomings of the tunnel cave in the presence of the prior art, mentions Integrated rehearsal simulation system is rescued for a kind of tunnel cave and application method, the rehearsal simulation system can be to various rescue modes Carry out multiplicating rehearsal.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
Tunnel cave rescues integrated rehearsal simulation system, including two abutment walls, and the arc above two abutment walls is arranged in The side that shape top cover, two abutment walls and arc top cover are formed by channel is hatch frame, and the other side is carried out by parados Closing, and the parados is equipped with openable and closable gate, the entrance of trapped person when drilling.The channel middle is stacked with Rubble mound, for the rubble mound to simulate tunnel cave accumulation body, rubble mound can take mound to put at the scene, described The side view of rubble mound is triangle.Rubble mound front and rear sides are provided with sand pocket, and the effect of sand pocket is to remain broken The shape of stone soil accumulation body, while rehearsal working face being provided.
It is provided with horizontal drill mouth on the rubble mound, rescue personnel can be used horizontal drill and bore in level when rehearsal Machine mouth is crept into, and the rehearsal of life channel rehearsal is got through to carry out horizontal drill.
The lower section of the horizontal drill mouth is clay region, is provided with push pipe mouth in the clay region, rescue personnel can Push bench process rehearsal is carried out in push pipe mouth.
Large-diameter drill mouth, central drainage pipe and small base tunnel mouth are provided with below the clay region.Rehearsal personnel can be with The rehearsal that small base tunnel rescues method is carried out by small base tunnel mouth, Big Diameter Hole Drills rescue is drilled by large-diameter drill mouth, in The rehearsal of heart drainpipe utilizes the rescue of drainpipe.
The tunnel cave rescues the design of integrated rehearsal simulation system rationally, and structure is simple, drills the true mould of design in place The situation of tunnel cave is intended, rescue personnel can carry out the rescue rehearsal of a variety of distinct methods, can also rescue for a certain kind The method of helping carries out repeating rehearsal, increases the rescue experience of rescue personnel;Meanwhile the place can carry out the group of a variety of rescue modes White silk is costared, so that rescue mode combination is more rationally scientific;In addition, the place also provides rehearsal for the innovation of rescue mode Space;Tunnel cave rescue integrated rehearsal simulation system also may be repeated use, have at low cost, the spy of strong flexibility Point.
Preferably, the arc top cover is steel truss structure.
Preferably, the arc top cover is safely and effectively connected by ring flange and the abutment wall.
Preferably, two abutment walls are concrete structure, and part partial size is mixed specially in concrete less than 25cm's Rubble, medium stone volume are no more than 20%.
Preferably, also inserted with the steel pipe to simulate tunnel basis in the abutment wall.
Preferably, the parados is brickwork construction.
Preferably, the central drainage pipe is riffled tube structure.
Preferably, the push pipe mouth is steel-tube construction, and welds the supporting structure formed by angle steel and be supported.
Preferably, the small base tunnel mouth is the timber structure that cross section is isosceles trapezoid.
Tunnel cave rescues the application method of integrated rehearsal simulation system, rescues synthesis including any above-mentioned tunnel cave Drill simulation system, application method are as follows:
Method one: carrying out the rehearsal of small base tunnel rescue method, when specifically drilling rescue personnel by the small base tunnel mouth into Row;
Method two: it carries out horizontal drill and gets through life channel rehearsal, rescue personnel uses horizontal drill when specifically drilling It is crept into the horizontal drill mouth;
Method three: carrying out push bench process rehearsal, and rescue personnel is carried out by the push pipe mouth when specifically drilling;
Method four: carrying out the rehearsal of large-diameter drill method, and rescue personnel passes through the large-diameter drill mouth when specifically drilling It carries out;
Method five: center gutter rescue method rehearsal is carried out, rescue personnel is drained by the center when specifically drilling Pipe carries out;
Method six: any combination rehearsal of above-mentioned each method is carried out.
By carrying out rescue rehearsal to various manual methods and mechanical means in rehearsal place, rescue personnel, which can be found that, to be rescued Various problems during helping, and propose the scheme solved, rescue method is constantly improve, so that rescue mode is more reasonable, and The rescue experience that can increase rescue personnel, guarantees the security of the lives and property of personnel.
Compared with prior art, beneficial effects of the present invention:
(1) rationally, structure is simple, and the design for drilling place is true for the design of tunnel cave rescue integrated rehearsal simulation system The situation of tunnel cave is simulated, rescue personnel can carry out the rescue rehearsal of a variety of distinct methods, can also be for a certain kind Rescue mode carries out repeating rehearsal, increases the rescue experience of rescue personnel;Meanwhile the place can carry out a variety of rescue modes Combination rehearsal, so that rescue mode combination is more rationally scientific;In addition, the place also provides rehearsal for the innovation of rescue mode Space;Tunnel cave rescue integrated rehearsal simulation system also may be repeated use, have at low cost, the spy of strong flexibility Point.
(2) by carrying out rescue rehearsal to various manual methods and mechanical means in rehearsal place, rescue personnel can be sent out Various problems in existing rescue operations, and propose the scheme solved, rescue method is constantly improve, so that rescue mode more adduction Reason, and can increase the rescue experience of rescue personnel, guarantee the security of the lives and property of personnel.
Detailed description of the invention:
Fig. 1 is the structural schematic diagram that tunnel cave rescues integrated rehearsal simulation system.
Fig. 2 is the overall structure figure that tunnel cave rescues integrated rehearsal simulation system.
Fig. 3 is the front view that tunnel cave rescues integrated rehearsal simulation system.
Fig. 4 is the rearview that tunnel cave rescues integrated rehearsal simulation system.
Fig. 5 is the central cross-section figure that tunnel cave rescues integrated rehearsal simulation system.
Marked in the figure: 1- parados;The gate 2-;3- arc top cover;4- abutment wall;5- sand pocket;6- rubble mound;The draining of the center 7- Pipe;8- large-diameter drill mouth;The small base tunnel mouth of 9-;10- clay region;11- push pipe mouth;12- horizontal drill mouth.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments The range of invention.
Embodiment 1
As shown in Figs. 1-5, tunnel cave rescues integrated rehearsal simulation system, including two abutment walls 4, described two abutment walls 4 For concrete structure, the rubble that part partial size is less than 25cm is mixed specially in concrete, medium stone volume is no more than 20%, The skeleton of the abutment wall 4 can be using waste steel bar according to simulation tunnel side wall size connection molding, and is inserted into DN65 steel pipe mould Quasi- tunnel basis.The arc top cover 3 of described two 4 tops of abutment wall is set, and the arc top cover 3 is steel truss structure, institute Arc top cover 3 is stated safely and effectively to be connected by ring flange and the abutment wall 4.3 institute of two abutment walls 4 and arc top cover The side in the channel of formation is hatch frame, and the other side is closed by parados 1, and the parados 1 is brickwork construction and described Parados 1 is equipped with openable and closable gate 2, the entrance of trapped person when drilling.The channel middle is stacked with rubble mound 6, the rubble mound 6 can take mound to put at the scene to simulate tunnel cave accumulation body, rubble mound 6, the rubble The side view of mound 6 is triangle.6 front and rear sides of rubble mound are provided with sand pocket 5, and the effect of the sand pocket 5 is dimension The shape of the product body of rubble mound 6 is held, while rehearsal working face being provided.
It is provided with horizontal drill mouth 12 on the rubble mound 6, horizontal drill can be used in water in rescue personnel when rehearsal Horizontal drill machine mouth 12 is crept into, and the rehearsal of life channel rehearsal is got through to carry out horizontal drill.
The lower section of the horizontal drill mouth 12 is clay region 10, is provided with push pipe mouth 11, institute in the clay region 10 Stating push pipe mouth 11 is steel-tube construction, and welds the supporting structure formed by angle steel and be supported, and rescue personnel can be in push pipe mouth 11 Carry out push bench process rehearsal.
Large-diameter drill mouth 8, central drainage pipe 7 and small base tunnel mouth 9 are provided with below the clay region 10.The center Drainpipe 7 is riffled tube structure, and the small base tunnel mouth 9 is the timber structure that cross section is isosceles trapezoid.Rehearsal personnel can pass through Small base tunnel mouth 9 carries out the rehearsal of small base tunnel rescue method, drills Big Diameter Hole Drills rescue by large-diameter drill mouth 8, passes through center The rehearsal of drainpipe 7 utilizes the rescue of drainpipe.
The tunnel cave rescues the design of integrated rehearsal simulation system rationally, and structure is simple, drills the true mould of design in place The situation of tunnel cave is intended, rescue personnel can carry out the rescue rehearsal of a variety of distinct methods, can also rescue for a certain kind The method of helping carries out repeating rehearsal, increases the rescue experience of rescue personnel;Meanwhile the place can carry out the group of a variety of rescue modes White silk is costared, so that rescue mode combination is more rationally scientific;In addition, the place also provides rehearsal for the innovation of rescue mode Space;Tunnel cave rescue integrated rehearsal simulation system also may be repeated use, have at low cost, the spy of strong flexibility Point.
Embodiment 2
Tunnel cave rescues the application method of integrated rehearsal simulation system, rescues synthesis including any above-mentioned tunnel cave Drill simulation system, application method are as follows:
Method one: carrying out the rehearsal of small base tunnel rescue method, when specifically drilling rescue personnel by the small base tunnel mouth 9 into Row;
Method two: it carries out horizontal drill and gets through life channel rehearsal, rescue personnel uses horizontal drill when specifically drilling It is crept into the horizontal drill mouth 12;
Method three: carrying out push bench process rehearsal, and rescue personnel is carried out by the push pipe mouth 11 when specifically drilling;
Method four: carrying out the rehearsal of large-diameter drill method, and rescue personnel passes through the large-diameter drill mouth 8 when specifically drilling It carries out;
Method five: center gutter rescue method rehearsal is carried out, rescue personnel is drained by the center when specifically drilling Pipe 7 carries out;
Method six: any combination rehearsal of above-mentioned each method is carried out.
By carrying out rescue rehearsal to various manual methods and mechanical means in rehearsal place, rescue personnel, which can be found that, to be rescued Various problems during helping, and propose the scheme solved, rescue method is constantly improve, so that rescue mode is more reasonable, and The rescue experience that can increase rescue personnel, guarantees the security of the lives and property of personnel.
Above embodiments are only to illustrate the present invention and not limit the technical scheme described by the invention, although this explanation The present invention has been described in detail referring to above-mentioned each embodiment for book, but the present invention is not limited to above-mentioned specific implementation Mode, therefore any couple of present invention modifies or equivalent replacement;And the technical side of all spirit and scope for not departing from invention Case and its improvement, are intended to be within the scope of the claims of the invention.

Claims (10)

1. tunnel cave rescues integrated rehearsal simulation system, which is characterized in that including two abutment walls (4), setting is described in two Arc top cover (3) above abutment wall (4), two abutment walls (4) and arc top cover (3) are formed by the side in channel as opening Structure, the other side are closed by parados (1), and the parados (1) is equipped with openable and closable gate (2);
The channel middle is stacked with rubble mound (6), and the side view of the rubble mound (6) is triangle, the rubble Mound (6) front and rear sides are provided with sand pocket (5), are provided with horizontal drill mouth (12) on the rubble mound (6), the horizontal brill The lower section of machine mouth (12) is clay region (10), is provided with push pipe mouth (11) in the clay region (10), the clay region (10) lower section is provided with large-diameter drill mouth (8), central drainage pipe (7) and small base tunnel mouth (9).
2. tunnel cave according to claim 1 rescues integrated rehearsal simulation system, which is characterized in that the arc top cover It (3) is steel truss structure.
3. tunnel cave according to claim 2 rescues integrated rehearsal simulation system, which is characterized in that the arc top cover (3) it is attached by ring flange and the abutment wall (4).
4. tunnel cave according to claim 1 rescues integrated rehearsal simulation system, which is characterized in that two abutment walls (4) it is concrete structure, the rubble that part partial size is less than 25cm is mixed specially in concrete, medium stone volume is no more than 20%.
5. tunnel cave according to claim 4 rescues integrated rehearsal simulation system, which is characterized in that the abutment wall (4) In also inserted with the steel pipe to simulate tunnel basis.
6. tunnel cave according to claim 1 rescues integrated rehearsal simulation system, which is characterized in that the parados (1) For brickwork construction.
7. tunnel cave according to claim 1 rescues integrated rehearsal simulation system, which is characterized in that the center draining Managing (7) is riffled tube structure.
8. -7 any tunnel caves rescue integrated rehearsal simulation system according to claim 1, which is characterized in that the top Nozzle (11) is steel-tube construction, and welds the supporting structure formed by angle steel and be supported.
9. -7 any tunnel caves rescue integrated rehearsal simulation system according to claim 1, which is characterized in that described small Base tunnel mouth (9) is the timber structure that cross section is isosceles trapezoid.
10. the application method of tunnel cave rescue integrated rehearsal simulation system, which is characterized in that appoint including such as claim 1-9 Tunnel cave described in one rescues integrated rehearsal simulation system, application method are as follows:
Method one: carrying out the rehearsal of small base tunnel rescue method, when specifically drilling rescue personnel by the small base tunnel mouth (9) into Row;
Method two: it carries out horizontal drill and gets through life channel rehearsal, rescue personnel is using horizontal drill in institute when specifically drilling Horizontal drill mouth (12) is stated to be crept into;
Method three: carrying out push bench process rehearsal, and rescue personnel is carried out by the push pipe mouth (11) when specifically drilling;
Method four: carry out the rehearsal of large-diameter drill method, specifically drill when rescue personnel by the large-diameter drill mouth (8) into Row;
Method five: center gutter rescue method rehearsal is carried out, rescue personnel passes through the central drainage pipe (7) when specifically drilling It carries out;
Method six: any combination rehearsal of above-mentioned each method is carried out.
CN201710711431.2A 2017-08-18 2017-08-18 Tunnel cave rescues integrated rehearsal simulation system and application method Active CN107293179B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710711431.2A CN107293179B (en) 2017-08-18 2017-08-18 Tunnel cave rescues integrated rehearsal simulation system and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710711431.2A CN107293179B (en) 2017-08-18 2017-08-18 Tunnel cave rescues integrated rehearsal simulation system and application method

Publications (2)

Publication Number Publication Date
CN107293179A CN107293179A (en) 2017-10-24
CN107293179B true CN107293179B (en) 2019-11-26

Family

ID=60107068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710711431.2A Active CN107293179B (en) 2017-08-18 2017-08-18 Tunnel cave rescues integrated rehearsal simulation system and application method

Country Status (1)

Country Link
CN (1) CN107293179B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989618A (en) * 2017-11-27 2018-05-04 河南工业大学 A kind of natural arch simulator
CN108198505B (en) * 2018-03-01 2023-10-03 西南交通大学 Shield type TBM tunnel bean gravel construction simulation device
CN112983467B (en) * 2021-04-08 2022-08-30 中国电建集团成都勘测设计研究院有限公司 Treatment method for tunnel gate closing type large collapse

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07158389A (en) * 1993-12-06 1995-06-20 Kajima Corp Working face independence method in collapse bedrock tunnel
CN102393312B (en) * 2011-08-23 2013-09-18 刘元雪 Side slope tunnel coupling simulation test system and application method thereof
CN103000068B (en) * 2012-08-28 2014-11-12 浙江工业大学 Tunnel construction process simulating test method
CN104464477B (en) * 2014-11-18 2017-01-04 西南交通大学 Tunnel teaching experiment model
CN104713987B (en) * 2015-01-25 2017-04-19 北京工业大学 Model test apparatus for stimulating tunnel excavation process
CN204877506U (en) * 2015-08-31 2015-12-16 长安大学 Indoor test device in han qu tunnel
CN105931527A (en) * 2016-07-20 2016-09-07 成都吉平机械有限公司 Tunnel collapse escape experience lifesaving apparatus

Also Published As

Publication number Publication date
CN107293179A (en) 2017-10-24

Similar Documents

Publication Publication Date Title
CN107293179B (en) Tunnel cave rescues integrated rehearsal simulation system and application method
CN101539008B (en) Ground stereoscopic discharge and mining method of coal bed methane
CN107327306B (en) Construction method for excavating superposed tunnels under urban shallow-buried condition
CN104234716B (en) The packed cofferdam method of mining by the way of filling
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN111058458A (en) Construction method and structure based on cutter suction type ground connecting wall local replacement row pile support
RU2182228C2 (en) Method of borehole mining of thick underground formations
CN107642377A (en) Double-deck fire-fighting life-saving tunnel
CN202250169U (en) Self-rescue system for underground culvert pipe
CN204299468U (en) A kind of positioning and guiding system and device of hidden hole drilling boring
CN108035752A (en) Coal road based on roof stability pushes up by force wall supporting anchor rod support method
CN108104814A (en) High iron content underground reservoir is promoted restorative procedure by the artificial of Surface cracking
CN105507872A (en) Hydraulic flushing and presplit blasting combined permeability-increasing extraction system in crossing holes
CN207499898U (en) Double-deck fire-fighting life-saving tunnel
CN106869125B (en) A kind of steel pipe pile construction method
CN205743928U (en) Shallow buried type magnesium iron frame type reinforced concrete combination tunnel wallboard
CN205297636U (en) Anti -reflection drainage system in coal seam in drilling
CN107780418A (en) The rapid constructing method cheated in Deep Foundation Pit
CN104863502A (en) Safe drilling device and method for preventing overflow and blowout in gas-bearing soil layers
CN204782730U (en) Steel brush drill bit rig that circles round
CN202000700U (en) Welding protective room for pipeline under trench in water network region
CN107201906A (en) Slag tap structure and the slag tapping method of a kind of tunnel top base tunnel
CN208834528U (en) Restricted clearance operation actual training device
CN209569015U (en) A kind of antitorque moment device of chute-type matched with sinking method shaft excavation machine
CN205999924U (en) A kind of Metro station excavation blast working safeguard structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: China Railway Second Bureau Construction Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190801

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant before: China Railway Second Bureau Construction Co.,Ltd.

GR01 Patent grant
GR01 Patent grant