CN107269087B - The integrated building of high-grade earthquake can be resisted - Google Patents

The integrated building of high-grade earthquake can be resisted Download PDF

Info

Publication number
CN107269087B
CN107269087B CN201710624621.0A CN201710624621A CN107269087B CN 107269087 B CN107269087 B CN 107269087B CN 201710624621 A CN201710624621 A CN 201710624621A CN 107269087 B CN107269087 B CN 107269087B
Authority
CN
China
Prior art keywords
wallboard
steel pipe
floor
building materials
middle layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710624621.0A
Other languages
Chinese (zh)
Other versions
CN107269087A (en
Inventor
周兴和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Xinghe Green Building Materials Group Co., Ltd
Original Assignee
周兴和
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周兴和 filed Critical 周兴和
Priority to CN201710624621.0A priority Critical patent/CN107269087B/en
Publication of CN107269087A publication Critical patent/CN107269087A/en
Application granted granted Critical
Publication of CN107269087B publication Critical patent/CN107269087B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/30Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing magnesium cements or similar cements
    • C04B28/32Magnesium oxychloride cements, e.g. Sorel cement
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00637Uses not provided for elsewhere in C04B2111/00 as glue or binder for uniting building or structural materials

Abstract

The invention discloses the integrated buildings that one kind can resist high-grade earthquake, are related to integrated house field, which includes ground and prefabricated profiled wallboard and floor;It further include steel framework, steel framework includes vertical steel pipe, lateral steel pipe;It is provided with wallboard slot in ground and connects built-in fitting with steel pipe;Wallboard is inserted into wallboard slot, and sticky building materials are filled between wallboard and wallboard groove sidewall;Wallboard and floor pass through sticky building materials and bond;Steel pipe is provided in wallboard by pipe, wallboard top is provided with cast-in-place slot;Vertical steel pipe passes through steel pipe by pipe, and vertical steel pipe is connect with wallboard by the cast-in-place sticky building materials in cast-in-place slot;Vertical steel pipe top is threadedly coupled with loose flange;Vertical steel pipe positioned at bottom connect built-in fitting connection by mounting flange and fastener with steel pipe;The vertical steel pipe of remaining adjacent layer is connected by mounting flange, loose flange with fastener;Lateral steel pipe is set to above roof and both ends are connect with vertical steel pipe.

Description

The integrated building of high-grade earthquake can be resisted
Technical field
The present invention relates to integrated house fields, more particularly to a kind of integrated building that can resist high-grade earthquake.
Background technique
Integrated house also known as industrializes rapid assembling house, the various pieces structure in the house that is mainly characterized by being prefabricated in the factory Part module, the scene of can be realized is assembled into rapidly complete house, to reduce waste of material and labor intensive operation.Integrated house It is a kind of specialized design, standardization, modularization, generalization production are easy to removal, install convenient, convenient transport, storage just Victory, interim or with permanent nature the house that can be repeatedly used and have enough to meet the need.Integrated house is widely used in rural resident's use Room, villa, office, dormitory;Room is used in the large size such as traffic, water conservancy, petroleum, natural gas ground observation, field work construction;City The temporary houses such as office, civilian placement, exhibition;Tourist district's leisure villa, chalet;Earthquake relief work and military field etc. are used Room.
In recent years, the anti-seismic performance in house was increasingly taken seriously, the anti-seismic performance of the raising integrated house occurred at present Mode be mainly change intermodule connection structure to improve bonding strength or connect in house with ground flexible.Above-mentioned side Formula can improve to a certain degree the anti seismic efficiency of integrated house, but be difficult to resist high-grade earthquake;And house is higher, the number of plies compared with When more, anti seismic efficiency is undesirable.
Summary of the invention
The invention solves a technical problem be: a kind of integrated building that can resist high-grade earthquake is provided.
In order to solve the above problem the technical solution adopted is that: can resist high-grade earthquake integrated building include ground and Prefabricated profiled wallboard and floor;It further include steel framework, steel framework includes vertical steel pipe, lateral steel pipe and loose flange, One end of vertical steel pipe is provided with mounting flange;It is provided with wallboard slot in ground and connects built-in fitting with steel pipe;
Wallboard is inserted into wallboard slot, and sticky building materials are filled between wallboard and wallboard groove sidewall;Wallboard and wallboard, floor and floor And wallboard and floor pass through sticky building materials and bond;The thickness of the wallboard on upper layer is less than the thickness of the wallboard of lower layer;It is set in wallboard The steel pipe of short transverse perforation wallboard is equipped with by pipe, wallboard top, which is provided with, passes through the corresponding cast-in-place slot in pipe position with steel pipe; The edge of floor is provided with steel pipe corresponding with cast-in-place groove location and passes through slot;
One vertical steel pipe passes through a steel pipe by pipe, and vertical steel pipe is with wallboard by cast-in-place in the viscosity in cast-in-place slot Building materials connection;Vertical steel pipe top in addition to the vertical steel pipe for being located at top layer is threadedly coupled with loose flange;Positioned at bottom Vertical steel pipe connect built-in fitting connection with steel pipe by mounting flange and fastener;The vertical steel pipe of remaining adjacent layer passes through fixation Flange, loose flange are connected with fastener, and mounting flange, loose flange and fastener, which connect, is respectively positioned on steel pipe by slot;It is horizontal It is set to above roof to steel pipe and both ends is connect with vertical steel pipe, each vertical steel pipe is connected by lateral steel pipe;
The raw material of sticky building materials includes: magnesia 20~25%, magnesium chloride 10%~13%, stabilizer by weight ratio 0.2%~0.5%, adhesive 0.65%~0.85%, thickener 0.35%~0.55%, stalk 30%~35%, glass increasing Strong fiber 5%~6.5%;Surplus is water.
Further, wallboard includes wallboard frame, in wallboard frame through-thickness be disposed with wallboard outer layer, Wallboard middle layer and wallboard la m pass through sticky building materials connection between adjacent layer;Wallboard outer layer include sticky building materials and Through-thickness is successively layered the grid cloth being arranged at intervals in sticky building materials, bamboo reinforcement, cypress item, grid cloth, cypress item, bamboo Muscle, grid cloth;Wallboard la m includes that sticky building materials and through-thickness are successively layered and are arranged at intervals in sticky building materials Grid cloth, cypress item, bamboo reinforcement and grid cloth;Wallboard middle layer includes middle muscle;Middle muscle is arranged along short transverse, and middle muscle will be in wallboard Interbed is divided into wallboard middle layer interconnecting piece and the disconnected portion of wallboard middle layer;Steel pipe is located at wallboard middle layer interconnecting piece by pipe Interior, its complementary space in wallboard middle layer interconnecting piece fills sticky building materials, is provided with multilayer cypress item in sticky building materials;In wallboard The wallboard bracket of hollow structure, the non-company of wallboard middle layer outside sticky building materials filled-in panel bracket are provided in the disconnected portion of interbed Socket part space.
Further, floor includes floor frame, setting there are two floor topping and is located at two buildings in floor frame Floor middle layer between board finish passes through sticky building materials connection between adjacent layer;Floor topping includes sticky building materials and edge Thickness direction is successively layered the grid cloth being arranged at intervals in sticky building materials, cypress item, bamboo reinforcement and grid cloth;Floor middle layer packet Include middle muscle;Middle muscle is arranged in the width direction, and floor middle layer is divided into floor middle layer interconnecting piece and floor middle layer by middle muscle Disconnected portion;Sticky building materials are filled in floor middle layer interconnecting piece, are provided with multilayer cypress item in sticky building materials;Floor middle layer The floor bracket of hollow structure, the disconnected portion of floor middle layer outside sticky building materials filled floor bracket are provided in disconnected portion Space.
Further, wallboard is corresponding with wallboard middle layer interconnecting piece position with the connection position of wallboard;Wallboard with The connection of floor is corresponding with wallboard middle layer interconnecting piece and floor middle layer interconnecting piece position.
Further, the middle muscle of wallboard protrudes into wallboard outer layer.
Further, cypress item is arranged in the width direction in wallboard;Bamboo reinforcement is arranged along short transverse.
Further, the cypress item of the adjacent layer in wallboard middle layer interconnecting piece is perpendicular, floor middle layer interconnecting piece The cypress item of interior adjacent layer is perpendicular.
The beneficial effects of the present invention are: 1, prefabricated panel and steel framework organically combined, wallboard, floor and steel framework Vibration is resisted jointly, and integrated house anti-seismic performance is greatly improved.2, made using the high sticky building materials of intensity after sticky strong and solidification For binding material, and optimize the internal structure of wallboard and floor, greatly improve wallboard and floor self-strength and Bonding strength, to improve the anti-seismic performance of integrated house.3, wallboard and floor are according to whether to be that junction is arranged different Internal structure, so that junction intensity is high, portion other than connected portion is light-weight, to reduce integrated house in the case where guaranteeing high-intensitive The weight in room.4, the connection type of integrated house and ground is optimized, so that integrated house and ground bonding strength are high.5, under And cornice sheathing thickness successively reduces, so that entire integrated house entirety anti-seismic performance is balanced, and reduces lower layer's load-bearing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that can resist the integrated building of high-grade earthquake;
Fig. 2 is wallboard and ground connection schematic diagram;
Fig. 3 is that vertical steel pipe connect built-in fitting connection schematic diagram with steel pipe;
Fig. 4 is two vertical steel pipe connection schematic diagrams;
Fig. 5 is wallboard schematic diagram of internal structure;
Fig. 6 is wallboard thickness sectional view;
Fig. 7 is wallboard outer layer thickness direction cross-sectional view;
Fig. 8 is wallboard la m thickness direction cross-sectional view;
Fig. 9 is floor schematic diagram of internal structure;
Figure 10 is floor carrier structure schematic diagram;
Figure 11 is lateral steel pipe and vertical steel pipe connection schematic diagram;
In the figure, it is marked as wallboard 1, wallboard frame 11, middle muscle 12, wallboard bracket 13, wallboard middle layer interconnecting piece 14, wallboard The disconnected portion 15 of middle layer, wallboard outer layer 16, cypress item 161, grid cloth 162, bamboo reinforcement 163, wallboard la m 17, in wallboard Interbed 18, steel pipe pass through pipe 19, cast-in-place slot 110, floor 2, floor frame 21, floor bracket 22, floor middle layer interconnecting piece 23, the disconnected portion 24 of floor middle layer, steel pipe connect built-in fitting 32, sticky building materials by slot 25, ground 3, wallboard slot 31, steel pipe 4, vertical steel pipe 5, mounting flange 51, lateral steel pipe 6, loose flange 7.
Specific embodiment
The present invention is further described with reference to the accompanying drawings and detailed description.
In order to provide a kind of integrated building that can resist high-grade earthquake, as shown in Figures 1 to 4: can resist high-gradely The integrated building of shake includes ground 3 and prefabricated profiled wallboard 1 and floor 2;It further include steel framework, steel framework includes perpendicular Steel pipe 5, lateral steel pipe 6 and loose flange 7, one end of vertical steel pipe 5 are provided with mounting flange 51;Wall is provided in ground 3 Board slot 31 connects built-in fitting 32 with steel pipe;Wallboard 1 is inserted into wallboard slot 21, and filling viscosity is built between 31 side wall of wallboard 1 and wallboard slot Material 4;Wallboard 1 and wallboard 1, floor 2 and floor 2 and wallboard 1 and floor 2 pass through sticky building materials 4 and bond;The wallboard 1 on upper layer Thickness is less than the thickness of the wallboard 1 of lower layer;The steel pipe that short transverse perforation wallboard 1 is provided in wallboard 1 passes through pipe 19, wallboard 1 Top, which is provided with, passes through the corresponding cast-in-place slot 110 in 19 position of pipe with steel pipe;The edge of floor 2 is provided with and cast-in-place 110 position of slot Corresponding steel pipe passes through slot 25;One vertical steel pipe 5 passes through a steel pipe by pipe 19, and vertical steel pipe 5 passes through cast-in-place with wallboard 1 It is connected in the sticky building materials 4 in cast-in-place slot 110;5 top of vertical steel pipe and mobilization in addition to the vertical steel pipe 5 for being located at top layer Orchid 7 is threadedly coupled;Built-in fitting 32 is connect with steel pipe by mounting flange 51 and fastener positioned at the vertical steel pipe 5 of bottom to connect; The vertical steel pipe 5 of remaining adjacent layer is connected by mounting flange 51, loose flange 7 with fastener, mounting flange 51, loose flange 7 connect with fastener and are respectively positioned on steel pipe by slot 25;Lateral steel pipe 6 is set to above roof and both ends and vertical steel pipe 5 connect It connects, each vertical steel pipe 5 is connected by lateral steel pipe 6;The raw material of sticky building materials 4 include: by weight ratio magnesia 20~ 25%, magnesium chloride 10%~13%, stabilizer 0.2%~0.5%, adhesive 0.65%~0.85%, thickener 0.35%~ 0.55%, stalk 30%~35%, fiberglass reinforcement 5%~6.5%;Surplus is water.
It is disclosed in the patent that sticky building materials 4 were applied before applicant, has been a kind of with certain fluidity, has simultaneously The very high building material of intensity after toughness and solidification.
The integrated building of high-grade earthquake can be resisted builds that steps are as follows: A, modulating sticky building materials 4,1 He of prefabricated panel Ground 3 is arranged in floor 2.B, vertical steel pipe 5 is connect built-in fitting 32 with steel pipe using fastener to connect, is guaranteed vertical after connecting The position degree and verticality of steel pipe 5.C, wallboard 1 is set on vertical steel pipe 5 by steel pipe by pipe 19, then move down wallboard 1 to It is inserted into wallboard slot 31, then with 4 filled-in panel slot 31 of sticky building materials, the sticky building materials 4 of smearing in the junction of wallboard 1 and wallboard 1, from And by wallboard 1 and ground, wallboard 1 is connect with wallboard 1;D, sticky building materials 4 are poured in cast-in-place slot 110, by vertical steel pipe 5 and wall Plate 1 connects;Upper loose flange 7 is connected on 5 top of vertical steel pipe again.E, on 1 top of wallboard sticky building materials 4 are smeared and by floor 2 It covers on wallboard 1, then smears sticky building materials 4 at the angle of cut that wallboard 1 and floor 2 are formed and connect wallboard 1 and floor 2, thus Form the first layer of integrated building;Due to steel pipe by slot 25 there are vertical steel pipe 5, mounting flange 51 and loose flanges 7 simultaneously Floor 2 is not interfered.F, vertical steel pipe 5 is connected on loose flange 7, it is same to guarantee the position degree of vertical steel pipe 5 after connecting and hang down Straight degree.G, upper one layer of wallboard 1 is set on vertical steel pipe 5 by steel pipe by pipe 19, then move down wallboard 1 to next layer Floor 2 contacts, then covers floor 2, and everywhere with the sticky connection of building materials 4, loose flange 7 is loaded on, to form integrated building The second layer.H, it repeats G step and repeatedly forms the integrated building of multilayer.I, it after the last layer completion is built, is connected with lateral steel pipe 6 Vertical steel pipe 5, connection type can be as shown in figure 11, and lateral steel pipe 6 is to intersect, and each junction can be welding;Connection Steel framework is formed after the completion.
For the ease of guarantee vertical steel pipe 5 position degree can suitably increase the diameter of the fastener hole on mounting flange 51 with Just vertical steel pipe 5 is suitably moved.For the ease of guaranteeing the verticality of vertical steel pipe 5, can certain side under mounting flange 51 pad Upper suitable gasket.
The specific structure of wallboard 1 is recommended as follows: wallboard 1 includes wallboard frame 11, in wallboard frame 11 through-thickness according to It is secondary to be provided with wallboard outer layer 16, wallboard middle layer 18 and wallboard la m 17, it is connected between adjacent layer by sticky building materials 4; Wallboard outer layer 16 includes that sticky building materials 4 and through-thickness are successively layered the grid cloth being arranged at intervals in sticky building materials 4 162, bamboo reinforcement 163, cypress item 161, grid cloth 162, cypress item 161, bamboo reinforcement 163, grid cloth 162;Wallboard la m 17 includes Sticky building materials and through-thickness are successively layered the grid cloth 162 being arranged at intervals in sticky building materials 4, cypress item 161, bamboo reinforcement 163 and grid cloth 162;Wallboard middle layer 18 includes middle muscle 12;Middle muscle 12 is arranged along short transverse, and middle muscle 12 is by wallboard middle layer 18 are divided into wallboard middle layer interconnecting piece 14 and the disconnected portion 15 of wallboard middle layer;Steel pipe is located at wallboard middle layer company by pipe 19 In socket part 14, its complementary space in wallboard middle layer interconnecting piece 14 fills sticky building materials 4, is provided with multilayer cypress in sticky building materials 4 Batten 161;The wallboard bracket 13 of hollow structure, sticky 4 filled-in panel support of building materials are provided in the disconnected portion 15 of wallboard middle layer Disconnected 15 space of portion of wallboard middle layer outside frame 13.
The specific structure of floor 2 is recommended as follows: floor includes floor frame 21, and there are two floors for setting in floor frame 21 Surface layer and the floor middle layer between two floor toppings are connected by sticky building materials 4 between adjacent layer;Floor topping packet Include sticky building materials 4 and through-thickness be successively layered the grid cloth 162 being arranged at intervals in sticky building materials 4, cypress item 161, Bamboo reinforcement 163 and grid cloth 162;Floor middle layer includes middle muscle 12;Middle muscle 12 is arranged in the width direction, and middle muscle 12 will be among floor Layer is divided into floor middle layer interconnecting piece 23 and the disconnected portion 24 of floor middle layer;Filling viscosity in floor middle layer interconnecting piece 23 Building materials 4 are provided with multilayer cypress item 161 in sticky building materials 4;The building of hollow structure is provided in the disconnected portion 24 of floor middle layer Board bracket 22, disconnected 24 space of portion of floor middle layer outside sticky 4 filled floor bracket 22 of building materials.
The manufacturing step of wallboard 1 is as follows: A, modulating sticky building materials 4.B, wallboard outer layer 16 is manufactured, specifically: B1, setting Wallboard frame 11 has cast-in-place slot 110 on frame 11, and when wallboard 1 does not have window or door, frame 11 is only frame;Wallboard 1 has When window or door, 11 flash trimming outer frame of frame further includes doorframe or window frame in frame.B2, in frame 11 doorframe or It is laid with one layer of sticky building materials 4 except window frame, is laid with grid cloth 162 on the sticky building materials 4 of this layer, then re-lays one layer of viscosity Building materials 4;B3, it is laid with bamboo reinforcement 163, then re-lays one layer of sticky building materials 4, sticky building materials 4 flow into the gap of bamboo reinforcement 163; B4, it is laid with cypress item 161, then re-lays one layer of sticky building materials 4, sticky building materials 4 flow into the gap of cypress item 161;F, again Then secondary laying grid cloth 162 re-lays one layer of sticky building materials 4;It is laid with cypress item 161 again, then re-lays one layer of viscosity Building materials 4;It is laid with bamboo reinforcement 163 again, then re-lays one layer of sticky building materials 4;Third time is laid with grid cloth 162, then re-lays One layer of sticky building materials 4;B5, wallboard outer layer 16 is formed after the solidification of sticky building materials 4.C, on wallboard outer layer 16 in setting Wallboard bracket 13 is arranged in muscle 12 in the disconnected portion 15 of wallboard middle layer, and disconnected with 4 filled-in panel middle layer of sticky building materials The remaining space in portion 15;Setting passes through pipe 19 through the steel pipe of wallboard frame 11 in wallboard middle layer interconnecting piece 14, then surplus Multilayer viscosity building materials 4 and cypress item 161 are successively laid in complementary space.D, wallboard la m 17 is manufactured, wallboard la m 17 is manufactured Only fewer than wallboard outer layer 16 some layers, manufacturing method are similar with the manufacturing method of wallboard outer layer 16.
The manufacturing step of floor 2 is similar with wallboard 1, and which is not described herein again.
Wallboard middle layer interconnecting piece 14 and floor middle layer interconnecting piece 23 should be according to wallboards 1 and wallboard 1 and floor 2 and wall The link position of plate 1 is arranged;Guarantee that wallboard 1 is corresponding with wallboard middle layer 14 positions of interconnecting piece with the connection position of wallboard 1; Wallboard 1 is corresponding with wallboard middle layer interconnecting piece 14 and floor middle layer 23 positions of interconnecting piece with the connection of floor 2.In this way It ensure that junction has higher intensity.
For the fixed effect of muscle 12 in improving and the bending resistance of wallboard 1 is improved, the middle muscle 12 of wallboard 1 protrudes into wallboard In outer layer 16.Middle muscle 12 can be inserted into wallboard outer layer 16 before sticky building materials 4 solidify.
In order to make 1 all directions of wallboard all have high intensity, in wallboard 1, cypress item 161 is arranged in the width direction;Bamboo reinforcement 163 are arranged along short transverse.The cypress item 161 of adjacent layer in wallboard middle layer interconnecting piece 14 is perpendicular, floor middle layer The cypress item 161 of adjacent layer in interconnecting piece 23 is perpendicular.
Floor bracket 22 can be as shown in figure 8, be that several wooden partitions are arranged inside wooden hollow frame.Wallboard bracket 13 Small volume can be not provided with partition.
Integrated building of the invention, there is good anti seismic efficiency the number of plies is higher.

Claims (5)

1. the integrated building of high-grade earthquake can be resisted, including ground (3) and prefabricated profiled wallboard (1) and floor (2);Its Be characterized in that: including steel framework, steel framework includes vertical steel pipe (5), lateral steel pipe (6) and loose flange (7), vertical steel One end of pipe (5) is provided with mounting flange (51);Wallboard slot (31) is provided in ground (3), and built-in fitting (32) are connected with steel pipe;
Wallboard (1) is inserted into wallboard slot (31), and sticky building materials (4) are filled between wallboard (1) and wallboard slot (31) side wall;Wallboard (1) Pass through sticky building materials (4) with floor (2) and wallboard (1) and floor (2) with wallboard (1), floor (2) to bond;The wallboard on upper layer (1) thickness is less than the thickness of the wallboard (1) of lower layer;The steel pipe that short transverse perforation wallboard (1) is provided in wallboard (1) passes through It manages (19), wallboard (1) top, which is provided with, passes through the corresponding cast-in-place slot (110) in pipe (19) position with steel pipe;The edge of floor (2) is set It is equipped with steel pipe corresponding with cast-in-place slot (110) position and passes through slot (25);
One vertical steel pipe (5) passes through a steel pipe by pipe (19), and vertical steel pipe (5) passes through cast-in-place in cast-in-place with wallboard (1) Sticky building materials (4) connection in slot (110);Vertical steel pipe (5) top and activity in addition to the vertical steel pipe (5) for being located at top layer Flange (7) is threadedly coupled;Vertical steel pipe (5) positioned at bottom connect built-in fitting with steel pipe by mounting flange (51) and fastener (32) it connects;The vertical steel pipe (5) of remaining adjacent layer is connected by mounting flange (51), loose flange (7) with fastener, fixed Flange (51), loose flange (7) are connected with fastener is respectively positioned on steel pipe by slot (25);Lateral steel pipe (6) is set to roof Top and both ends are connect with vertical steel pipe (5), each vertical steel pipe (5) is connected by lateral steel pipe (6);
The raw material of sticky building materials (4) includes: magnesia 20~25%, magnesium chloride 10%~13%, stabilizer by weight ratio 0.2%~0.5%, adhesive 0.65%~0.85%, thickener 0.35%~0.55%, stalk 30%~35%, glass increasing Strong fiber 5%~6.5%;Surplus is water;
Wallboard (1) includes wallboard frame (11), wallboard frame (11) interior through-thickness be disposed with wallboard outer layer (16), Wallboard middle layer (18) and wallboard la m (17) are connected by sticky building materials (4) between adjacent layer;Wallboard outer layer (16) packet It includes sticky building materials (4) and through-thickness and is successively layered grid cloth (162), the bamboo reinforcement being arranged at intervals in sticky building materials (4) (163), cypress item (161), grid cloth (162), cypress item (161), bamboo reinforcement (163), grid cloth (162);Wallboard la m It (17) include that sticky building materials (4) and through-thickness are successively layered the grid cloth being arranged at intervals in sticky building materials (4) (162), cypress item (161), bamboo reinforcement (163) and grid cloth (162);Wallboard middle layer (18) includes middle muscle (12);Middle muscle (12) It is arranged along short transverse, wallboard middle layer (18) is divided into wallboard middle layer interconnecting piece (14) and wallboard middle layer by middle muscle (12) Disconnected portion (15);Steel pipe is located in wallboard middle layer interconnecting piece (14) by managing (19), in wallboard middle layer interconnecting piece (14) Its complementary space fill sticky building materials (4), is provided with multilayer cypress item (161) in sticky building materials (4);Wallboard middle layer is disconnected The wallboard bracket (13) of hollow structure is provided in portion (15), among the wallboard of sticky building materials (4) filled-in panel bracket (13) outside Disconnected portion (15) space of layer;
Floor includes floor frame (21), in floor frame (21) setting there are two floor topping and be located at two floor toppings it Between floor middle layer, connected by sticky building materials (4) between adjacent layer;Floor topping is including sticky building materials (4) and along thickness Degree direction is successively layered the grid cloth (162) being arranged at intervals in sticky building materials (4), cypress item (161), bamboo reinforcement (163) and net Ge Bu (162);Floor middle layer includes middle muscle (12);Middle muscle (12) is arranged in the width direction, and middle muscle (12) is by floor middle layer It is divided into floor middle layer interconnecting piece (23) and the disconnected portion of floor middle layer (24);Filling in floor middle layer interconnecting piece (23) Sticky building materials (4), sticky building materials (4) are interior to be provided with multilayer cypress item (161);It is provided in the disconnected portion of floor middle layer (24) The floor bracket (22) of hollow structure, the disconnected portion of floor middle layer (24) of sticky building materials (4) filled floor bracket (22) outside Space.
2. the integrated building according to claim 1 for resisting high-grade earthquake, it is characterised in that: wallboard (1) and wallboard (1) connection position is corresponding with wallboard middle layer interconnecting piece (14) position;The connection of wallboard (1) and floor (2) with Wallboard middle layer interconnecting piece (14) is corresponding with floor middle layer interconnecting piece (23) position.
3. the integrated building according to claim 2 for resisting high-grade earthquake, it is characterised in that: the middle muscle of wallboard (1) (12) it protrudes into wallboard outer layer (16).
4. the integrated building according to claim 3 for resisting high-grade earthquake, it is characterised in that: in wallboard (1), cypress Item (161) is arranged in the width direction;Bamboo reinforcement (163) is arranged along short transverse.
5. the integrated building according to claim 4 for resisting high-grade earthquake, it is characterised in that: the connection of wallboard middle layer The cypress item (161) of adjacent layer in portion (14) is perpendicular, the cypress item of the adjacent layer in floor middle layer interconnecting piece (23) (161) perpendicular.
CN201710624621.0A 2017-07-27 2017-07-27 The integrated building of high-grade earthquake can be resisted Active CN107269087B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710624621.0A CN107269087B (en) 2017-07-27 2017-07-27 The integrated building of high-grade earthquake can be resisted

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710624621.0A CN107269087B (en) 2017-07-27 2017-07-27 The integrated building of high-grade earthquake can be resisted

Publications (2)

Publication Number Publication Date
CN107269087A CN107269087A (en) 2017-10-20
CN107269087B true CN107269087B (en) 2019-03-19

Family

ID=60078269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710624621.0A Active CN107269087B (en) 2017-07-27 2017-07-27 The integrated building of high-grade earthquake can be resisted

Country Status (1)

Country Link
CN (1) CN107269087B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070175108A1 (en) * 2005-12-29 2007-08-02 Stein Robert J Plastic utility shed wall system
CN101323188B (en) * 2007-06-15 2011-07-06 郎雨 Bamboo magnesite cement composite plate and its manufacture method
CN104863304A (en) * 2015-06-12 2015-08-26 周兴和 Integrated house component module and integrated house component material
CN204753896U (en) * 2015-06-17 2015-11-11 中民筑友有限公司 Multilayer assembled concrete panel structure system
CN205444475U (en) * 2016-03-11 2016-08-10 中民筑友有限公司 Prefab and basic connected node
CN105756369B (en) * 2016-05-03 2018-04-24 三能集成房屋股份有限公司 A kind of structure built-in heat insulation decorates integrated prefabricated buildings and its construction method
CN205577120U (en) * 2016-05-05 2016-09-14 杭州鲁创屋建材科技有限公司 Assembly component of light -duty pottery glass siding wall and floor

Also Published As

Publication number Publication date
CN107269087A (en) 2017-10-20

Similar Documents

Publication Publication Date Title
AU2024201274A1 (en) Prefabricated insulated building panel with at least one cured cementitious layer bonded to insulation
CN104674989B (en) The gently light wall assembled compound shear wall of steel occlusal pattern complex heat-preservation and the practice
CN105714963B (en) A kind of inorganic light weight combined heat-insulating integral exterior wall cladding system and its installation method
CN203412140U (en) Double-layer lightgage steel joist sound proof wall
CN109322392A (en) A kind of light steel house and its build construction method
CN101173567A (en) Assembly building method for energy-saving reconstruction of existing building
CN204551821U (en) Light steel occlusal pattern complex heat-preservation light wall assembling compound shear wall
CN107269087B (en) The integrated building of high-grade earthquake can be resisted
CN107386695B (en) Integrated building with high shock resistance energy
EP1918477A2 (en) Multilayer building block, assembly of such blocks and method of erection of building structures by using such blocks
CN201857689U (en) Combined type foamed concrete prefabricated slab
CN206971403U (en) A kind of assembled architecture of standard building blocks combination
RU150460U1 (en) FAST-PRODUCED ENERGY-EFFICIENT SMALL BUILDING
CN107246065B (en) Antidetonation integrates building
CN204139316U (en) A kind of steel structure shear wall structure system
CN115928909A (en) Short-limb shear wall assembled light steel combined truss bearing steel wire mesh frame mortar-perlite-polyphenyl composite enclosure wall and manufacturing method thereof
CN206888005U (en) A kind of outer wall of basement
CN213233941U (en) Light sound insulation and heat preservation laminated slab
CN213539369U (en) Prefabricated external wall panel window lower wall structure
WO2011154539A1 (en) Building system
CN201050208Y (en) Earthquake-resisting room with wall, floor and roof adopting EPS steel mesh sandwich panel
CN102776988A (en) Thermal insulation fireproof anti-seismic integrated novel energy-saving roof board
CN203393729U (en) Road slope protection structure
CN102561731A (en) Module constructed one-layer villa and construction method thereof
RU169083U1 (en) STRUCTURE OF A WOODEN HOUSE BASED ON CONSTRUCTIVE ELEMENTS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191115

Address after: 610036 No.527, Jinzhou Road, Jinniu high tech Industrial Park, Chengdu, Sichuan Province

Patentee after: Sichuan Xinghe Green Building Materials Group Co., Ltd

Address before: 610036 No. 527, golden week Road, Jinniu District hi tech park, Sichuan, Chengdu

Patentee before: Zhou Xinghe