CN107268648A CN201710448784.8A CN201710448784A CN107268648A CN 107268648 A CN107268648 A CN 107268648A CN 201710448784 A CN201710448784 A CN 201710448784A CN 107268648 A CN107268648 A CN 107268648A
Authority
CN
China
Prior art keywords
plastic tube
basement rock
infiltration
clitter
pump drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710448784.8A
Other languages
Chinese (zh)
Inventor
张守怀
陈润
虎晓东
张国安
田鸿超
段江鹏
刘建华
王鹏
罗贤武
陈玉
代小玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 6 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 6 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 6 Engineering Co Ltd filed Critical China Gezhouba Group No 6 Engineering Co Ltd
Priority to CN201710448784.8A priority Critical patent/CN107268648A/en
Publication of CN107268648A publication Critical patent/CN107268648A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/20Restraining of underground water by damming or interrupting the passage of underground water by displacing the water, e.g. by compressed air

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

A kind of pump drainage method of basement rock infiltration, bores a hole at basement rock seepage point, is inserted into a plastic tube, and plastic tube one end props up seepage point, and plastic tube other end connection bedrock surface water absorber siphons away the infiltration of seepage point;Clitter is laid on plastic tube periphery, the clitter of lay tightly encases plastic tube;Completely laid cement on the clitter completed, apply spread waterglass immediately, cement quick solidification forms impermeable thin-lift concrete structure together, and infiltration now can only be sucked out outside storehouse from plastic tube;By above-mentioned steps, the pump drainage of basement rock infiltration is completed.Using a kind of pump drainage method of basement rock infiltration of the invention, seepage problem is addressed, it is ensured that position in storehouse is not seeped water for storehouse and concreting by seepage point to be influenceed, and concrete construction quality is ensured.

Description

A kind of basement rock infiltration pump drainage method
Technical field
The present invention relates to basement rock water seepage treatment field, and in particular to a kind of basement rock infiltration pump drainage method.
Background technology
In Construction of Hydropower Engineering, particularly in base concrete in storehouse and concreting process, basement rock seeps water not Handle well, basement rock infiltration can cause to have a strong impact on to base concrete for storehouse and concreting, and then influence concrete construction Quality.
In current work progress, scene does not drill, and directly props up infiltration position using plastic tube, by the carrying-off that seeps water, but Not thoroughly, still have in current warehouse entry;Or drilling, intubation, water is drawn, because the big draining of water outlet scope is very not thoroughly and without it He is handled;Concrete can be caused to have a strong impact on for storehouse and concreting, and then influence concrete construction quality.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of pump drainage method of basement rock infiltration, it is ensured that base concrete is standby Storehouse and concreting are normally carried out, it is ensured that concrete construction quality.
The technical scheme that the present invention takes is:
A kind of pump drainage method of basement rock infiltration, comprises the following steps:
Step one:A hole is bored at basement rock seepage point, a plastic tube is inserted into, plastic tube one end props up seepage point, moulded The expects pipe other end connects bedrock surface water absorber, and the infiltration of seepage point is siphoned away;
Step 2:Clitter is laid on plastic tube periphery, the clitter of lay tightly encases plastic tube;
Step 3:Completely laid cement on the clitter completed, apply spread waterglass immediately, cement quick solidification forms not permeable together The thin-lift concrete structure of water, infiltration now can only be sucked out outside storehouse from plastic tube;
By above-mentioned steps, the pump drainage of basement rock infiltration is completed.
In the step one, a 36mm or so hole is bored at basement rock seepage point with air drill.
In the step 2, the stone diameter of clitter is 2cm~4cm.
In the step 2, the clitter scope piled up is length:30cm×30cm×20cm.
A kind of pump drainage method of basement rock infiltration of the present invention, after above-mentioned steps, seepage problem is addressed, it is ensured that Position in storehouse is not seeped water for storehouse and concreting by seepage point to be influenceed, and concrete construction quality is ensured.
Brief description of the drawings
Fig. 1 is jack construction and installation schematic diagram of the invention;
Fig. 2 lays schematic diagram for the clitter of the present invention;
Fig. 3 is the construction schematic diagram of the waterglass of the present invention;
Fig. 4 is integral construction schematic diagram of the invention.
Embodiment
As shown in Fig. 1 ~ Fig. 4, a kind of pump drainage method of basement rock infiltration comprises the following steps:
Step 1, drilling, intubation step:
A 36mm or so hole is bored at basement rock seepage point with air drill, plastic tube 1 is generally external diameter=26.8mm, internal diameter=20mm Pvc tube, insert substantially without great space in 36mm hole, contact is close;It is inserted into a plastic tube 1, the one end of plastic tube 1 props up seepage point, and another termination bedrock surface water absorber 2 of plastic tube 1 siphons away the infiltration of seepage point.
The utility model patent that bedrock surface water absorber 2 can be authorized using obtaining:" a kind of bedrock surface or concrete surface are inhaled Water installations "(CN201220745754.6).
Step 2, the step of pile up clitter 3:
Piled up on the periphery of plastic tube 1 stone diameter be 2cm~4cm clitter 3, the scope of clitter 3 piled up be about 30cm × 30cm×20cm(Long × wide cm × high cm), the clitter 3 piled up tightly encases plastic tube 1, now without water outside clitter 3.
In the step 2, the stone diameter of clitter 3 is 2cm~4cm.Diameter is used for 2cm~4cm stone Son contacts close between being primarily to facilitate stone, and space is few, is easy to next step to smear waterglass.
In the step 2, the scope of clitter 3 piled up is length:30cm×30cm×20cm.The scope of clitter 3 can Greatly can be small, it can be adjusted according to on-site actual situations, as long as water outlet position around 36mm drilling can be wrapped.
Step 3, the step of lay cement, smear waterglass 4:
Completely laid cement on the clitter 3 completed, apply spread waterglass 4 immediately, cement quick solidification forms impermeable thin together Layer concrete structure, infiltration now can only be sucked out outside storehouse from plastic tube 1.
Waterglass 4 is a kind of water-soluble silicate, and its aqueous solution is commonly called as waterglass, is a kind of ore deposit binder.Can by cement, Sand, stone is preferably mixed, and makes concrete more uniform, integration;It is used as quick dry agent so that the desiccation speed after construction Faster, it can save after construction and wait the time of desiccation, faster into lower one of working procedure;Strengthen construction intensity.Water glass Glass and cement reaction, generate firm solidfied material so that clitter 3 is more firm wear-resisting, and waterproof.
After above-mentioned steps, seepage problem is addressed, it is ensured that position in storehouse is not seeped water for storehouse and concreting The influence of point infiltration, concrete construction quality is ensured.

Claims (4)

1. a kind of pump drainage method of basement rock infiltration, it is characterised in that comprise the following steps:
Step one:A hole is bored at basement rock seepage point, a plastic tube is inserted into(1), plastic tube(1)One end props up infiltration Point, plastic tube(1)The other end connects bedrock surface water absorber(2), the infiltration of seepage point is siphoned away;
Step 2:In plastic tube(1)Periphery lays clitter(3), the clitter of lay(3)By plastic tube(1)Tightly encase;
Step 3:In the clitter completed(3)On completely lay cement, immediately apply spread waterglass(4), cement quick solidification, formation one The impermeable thin-lift concrete structure in road, infiltration now can only be from plastic tube(1)In be sucked out outside storehouse;
By above-mentioned steps, the pump drainage of basement rock infiltration is completed.
2. a kind of pump drainage method that basement rock seeps water according to claim 1, it is characterised in that:In the step one, air drill is used A 36mm or so hole is bored at basement rock seepage point.
3. a kind of pump drainage method that basement rock seeps water according to claim 1, it is characterised in that:In the step 2, clitter(3) Stone diameter be 2cm~4cm.
4. a kind of pump drainage method that basement rock seeps water according to claim 1, it is characterised in that:In the step 2, pile up Clitter(3)Scope is length:30cm×30cm×20cm.
CN201710448784.8A 2017-06-14 2017-06-14 A kind of basement rock infiltration pump drainage method Pending CN107268648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710448784.8A CN107268648A (en) 2017-06-14 2017-06-14 A kind of basement rock infiltration pump drainage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710448784.8A CN107268648A (en) 2017-06-14 2017-06-14 A kind of basement rock infiltration pump drainage method

Publications (1)

Publication Number Publication Date
CN107268648A true CN107268648A (en) 2017-10-20

Family

ID=60066199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710448784.8A Pending CN107268648A (en) 2017-06-14 2017-06-14 A kind of basement rock infiltration pump drainage method

Country Status (1)

Country Link
CN (1) CN107268648A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404516A (en) * 2021-06-24 2021-09-17 北京中铁诚业工程建设监理有限公司 Method and device for processing foundation rock surface of railway tunnel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08239837A (en) * 1995-03-03 1996-09-17 Pub Works Res Inst Ministry Of Constr In-ground slit water sealing wall work method
CN202730792U (en) * 2012-08-28 2013-02-13 中国水电顾问集团中南勘测设计研究院 Uplift pressure regulating and controlling device for dam foundation
CN103774902A (en) * 2012-10-25 2014-05-07 陕西龙海工程建设有限公司 Seepage preventing and leakage stopping method for sewage plant aeration tank
CN105780793A (en) * 2016-04-06 2016-07-20 中建交通建设集团有限公司 Emergency treatment method for sudden gushing of high confined water stratum foundation pit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08239837A (en) * 1995-03-03 1996-09-17 Pub Works Res Inst Ministry Of Constr In-ground slit water sealing wall work method
CN202730792U (en) * 2012-08-28 2013-02-13 中国水电顾问集团中南勘测设计研究院 Uplift pressure regulating and controlling device for dam foundation
CN103774902A (en) * 2012-10-25 2014-05-07 陕西龙海工程建设有限公司 Seepage preventing and leakage stopping method for sewage plant aeration tank
CN105780793A (en) * 2016-04-06 2016-07-20 中建交通建设集团有限公司 Emergency treatment method for sudden gushing of high confined water stratum foundation pit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国电力建设企业协会: "《中国电力建设工法汇编 (2012年度)中册》", 30 November 2012, 中国电力出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404516A (en) * 2021-06-24 2021-09-17 北京中铁诚业工程建设监理有限公司 Method and device for processing foundation rock surface of railway tunnel
CN113404516B (en) * 2021-06-24 2023-09-22 北京中铁诚业工程建设监理有限公司 Railway tunnel bedrock surface processing method and processing device thereof

Similar Documents

Publication Publication Date Title
CN202047416U (en) Well sealing device of pressure-reducing and dewatering well at elevator well pit
CN105178289B (en) Precast dewatering pile tube and its application method in building foundation pit
CN201635308U (en) Multi-channel exhausting-prevention waterproof structure of prefabricated external wallboards
CN204112308U (en) A kind of simple and easy sleeve valve grouting device based on bowlder stone, Thief zone coefficient stratum
CN104805842B (en) Steel flower pipe segmented grouting system and construction method thereof
CN104912574B (en) A kind of tunnel-liner percolating water Treatment Methods
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN104975594A (en) Grouting pipe for miscellaneous fill stratum and construction method
CN107268648A (en) A kind of basement rock infiltration pump drainage method
CN104831704A (en) Electric osmosis and cathode vacuumizing combined soft soil reinforcement device and method
CN107060821A (en) A kind of many lithology method for protecting support of face
CN106545008A (en) A kind of cast-in-situ bored pile pile making method
CN103046534B (en) Method for improving bearing capacity of foundation
CN112281828A (en) Novel composite pile structure and construction method
CN109505633B (en) Lining back guide pipe grouting water plugging device for muddy stratum and construction method
CN210049262U (en) Directional location slip casting curtain between stake
CN209243732U (en) A kind of efficient mini steel-pipe pile constructing structure
CN204282360U (en) A kind of covering layer prestressed anchor fixing structure
CN207295732U (en) It is a kind of can reaming novel slurry filling floral tube
CN205188933U (en) Utilize composite foundation of precipitation well formation
CN204626409U (en) A kind of steel floral tube segmenting slip casting system
CN207714313U (en) A kind of precast concrete drill bit
CN105177282B (en) Liquid injection device for preventing ion-type rare earth mine bodies from slipping
CN114482008A (en) Device and method for electroosmosis and anti-blocking of drainage belt
CN110359472A (en) A kind of base pit dewatering well plugging device and its application method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020